You are on page 1of 1

NOTES: C Ascot Consulting Engineers Pty Ltd

1. FOR LEGEND OF SYMBOLS REFER TO DRAWING E01. DISCLAIMER CONDITIONS


The copyright of this drawing is vested in Ascot Consulting
2. THE ELECTRICAL CONTRACTOR SHALL CO-ORDINATE Engineers Pty Ltd and is not to be reproduced or copied in
whole or in part or amended without prior written approval
THE FINAL LOCATIONS OF ALL POWER OUTLETS, of Ascot Consulting Engineers.
TERMINATION POINTS ETC. FOR ALL MECHANICAL
SERVICES EQUIPMENT NOMINATED ON THE The recipient is responsible for ensuring that they review
the status of this drawing and are in receipt of the current
DRAWINGS WITH THE MECHANICAL CONTRACTOR ON
WA WB WC WD E3 WE A WF B WG C D E2 E1 E F G W1 W2 H J K EA L EB EC M W3 ED N EE EF P SITE. THIS WILL ALSO INCLUDE THE CONFIRMATION
revision prior to use.

OF ALL FINAL POWER RATING OF ALL MECHANICAL Ascot is not responsible for dimensioning and setting out.
SERVICES EQUIPMENT/ITEMS BEING INSTALLED. This drawing has not been produced to a level of
dimensional accuracy suitable for fabrication. The
TYPICAL FOR ALL FANS, AIR CONDITIONING UNITS, contractor is responsible for production of fabrication/shop
MECHANICAL SWITCHBOARDS ETC. drawings where these are required. Contractors are
POWER SUPPLY FOR AUOTMATIC BLINDS. REFER TO NOTE POWER SUPPLY FOR AUOTMATIC BLINDS. REFER TO NOTE responsible for verifying all dimensions prior to
6. 6. commencement of works.
3. THE ELECTRICAL CONTRACTOR SHALL CO-ORDINATE
Location of new / additional Indoor (ceiling mount) WAPs THE FINAL LOCATIONS OF ALL POWER OUTLETS, Do not scale. All dimensions to be checked on site. This
E4 TYPICAL: TERMINATION POINTS ETC. FOR ALL HYDRAULIC drawing describes the clients required system and where
the requirements of this document differs from the
SUPPLY AND INSTALL 2 x 32mmØ HD uPVC CONDUITS SERVICES EQUIPMENT NOMINATED ON THE
specification the greater amount of work shall apply.
(ORANGE AND WHITE) CAST WITHIN SLAB FOR DRAWINGS WITH THE HYDRAULIC CONTRACTOR ON
RETICULATION OF ELECTRICAL AND COMMUNICATIONS SITE. THIS WILL ALSO INCLUDE THE CONFIRMATION Ascot Consulting Engineers has documented this drawing
OF ALL FINAL POWER RATING OF ALL HYDRAULIC in colour. This drawing is required to be printed in colour.
CABLES FROM NEAREST WALL TO FLOORBOX BELOW
Location of new / additional OUTDOOR WAPs
Failure to do so may result in loss of information
TABLE WITHIN MEETING ROOMS. THE ELECTRICAL SERVICES EQUIPMENT/ITEMS BEING INSTALLED.
CONTRACTOR SHALL THEN EXTEND 2-COMPARTMENT TYPICAL FOR ALL HOT WATER UNITS, PUMPS, ETC.
1 UMBILICAL FROM FLOOR BOX TO TABLE FOR
RETICULATION OF CABLES TO TABLE BOX. CONFIRM 4. EXACT LOCATION OF ALL DATA AND POWER OUTLETS
2 EXACT LOCATION AND REQUIREMENTS WITH INT
2
WITHIN EACH ROOM SHALL BE CONFIRMED ON SITE
ARCHITECT PRIOR TO INSTALLATION. PRIOR TO INSTALLATION OF WIRING. THE ELECTRICAL
Location of Indoor (ceiling mount) WAPs TB-1 RJ/1
INT CONTRACTOR MUST FULLY COORDINATE THE
/1 1500 INSTALLATION WITH ALL JOINERY UNITS, DESKS, ETC.
FB-1 1500 RJ RJ/2
E C AB REFER TO ARCHITECTURAL DRAWINGS FOR FURTHER

RJ
AB
AB B
C A CCTV

AB
E

/1
AB R C /1
RJ B AB UMB
AB C C RJ
DETAILS.
AB J /1 E
E C A 32A
RJ
/1 E E FB-1 (1100)
AB AB

AB
Omit

AB
E SS TB-1
CCTV AB AB 5. SUPPLY AND INSTALL PROVISION FOR HEARING

AB
AB
INT AB /1 32A AB

RJ/1
AB RJ B AB WAP CS AUGMENTATION LOOP IN ACCORDANCE WITH BCA
AB A SS /1 R
R AB WAP CS RJ (110 J

AB
AB J /1

AB
B PART D3.7(a). THE HEARING AUGMENTATION SYSTEM

RJ/1
A 0)
CCTV AB UMB 32A RJ/2 MUST BE PROVIDED TO EACH CONFERENCE AND
UMB 1500

AB
AB

AB
RJ SS UMB

AB
BOARD ROOM. THE CONTRACTOR SHALL ALLOW FOR

RJ/1
0) /1
(110

AB
32A FB-1 C

RJ/1
RJ
(1100)

/1
INT

AB
RJ WAP CS AB HLA ROGER MEDIA HUB COMPLETE WITH THE

RJ
INT SS TB-1 E C

AB
AB
1500 300 UMB 32A AB FOLLOWING:-
AB AB E C

C
E
CCTV CL E
RJ/2 AB AB - HEARING AUGMENTATION OUTLET (PA & AV)

AB
RJ SS
FB-1
WAP CS

AB
/1

AB
E

AB
CCTV - 1-OFF 240V DOUBLE GPO ADJACENT TO
AB TB-1 AB

C
E
AB WAP TV/PROJECTOR

AB
AB

AB
R AB
3 AB J /1 300
AB
AB - 1-OFF 240V DOUBLE GPO AT 1400mm AFFL AT EACH

E
AB AB

C
/1

E
RJ ENTRANCE.
AB

RJ/2

AB
RJ/2
E
AB

AB

RJ/1
C
E
C

15A

15A
RJ/1

AB

AB
AB

C
E
THE ELECTRICAL CONTRACTOR SHALL SUBMIT AN

AB
AB 32A

AB
C
AB

E
E
R UB UMB
AB J /1

C
BL SS UMB 32A AB BL APPROVED HEARNG AUGMENTATION SYSTEM IN

RJ/1
RJ/2
W1 AB WAP CS HL

C
HL UMB 32A UMB SS /1

E
RJ ACCORDANCE WITH THE ABOVE FOR APPROVAL
AB

AB
RJ
AB

AB

AB

AB
E
AB

UB

AB

RJ/1
C
/1 SS WAP CS
RJ/1

AB RJ/2
32A RJ/2 AB PRIOR TO INSTALLATION.
WAP CS SS AB AB
AB
W2 AB UB UMB

AB
AB
AB AB AB
AB

RJ/1

RJ/1

RJ/1

RJ/1

RJ/1
UMB 32A UMB 32A 6. 6. SUPPLY AN INSTALL 10OFF 10A SINGLE GPO AS

RJ/1
UMB 32A RJ/1 AB
AB

AB

AB

AB

AB

AB
AB

AB

AB

AB

AB
32A SS SS
AB

AB
RJ SS WAP CS
AB

DENOTED 'BL' WALL MOUNTED AT HIGH LEVEL TO

AB
/1 UMB RJ/1
32A 32A UMB
AB
SS AB AB AB AB AB EACH BLIND FOR POWER SUPPLY FOR FUTURE
SS SS AB AB
AB AB AB AB AB AB AB AB

AB

AB

AB

AB
AB

AB
MOTORISED BLINDS. EXTEND CABLING FROM BLIND

AB

AB

AB

AB

AB
RJ/1 RJ/1

AB
AB

RJ/1

RJ/1

RJ/1

RJ/1

RJ/1
AB AB AB
AB AB POWER SUPPLY TO LOCAL SWITCH FOR CONTROL OF
RJ/1
AB R /1
J AB BLINDS. CONFIRM EXACT WIRING DETAILS WITH BLIND
AB LOUVRES WAP CS AB AB AB
UMB AB AB HL AB AB RJ/1 RJ/1 32A UMB MANUFACTURER AND BLIND CONTROLLER LOCATION
AB AB WAP CS AB
RJ/1

32A AB RJ/1 10A AB SS


WITH ARCHITECT PRIOR TO INSTALLATION.
AB
SS
AB R /1
J RJ/1 AB
RJ/4

15A
AB AB RJ/4

RJ/4
AB AB AB
UMB AB UMB 7. PROVIDE CAT 6A RJ45 OUTLETS THROUGHOUT FOR
AB RJ/1 AB AB AB AB AB 32A
4 32A
AB RJ/1 AB
WAP CS 1500
RJ/1
AB
SS WIRELESS ACCESS POINTS. ALLOW 5-METRES OF
SS AB

E
AB RJ/1 AB

RJ/2
RJ/2
ADDITIONAL CABLE COILED FOR POSSIBLE

C
RTX AB RJ/2 RJ/2 AB AB AB AB
RTX
AB AB AB RELOCATION OF OUTLET TO ACHIEVE REQUIRED
RJ/1 RJ/1 RJ
P

BL AB

P
AB AB

E
AB

RJ
COVERAGE. WHERE CEILINGS ARE GREATER THAN

C
WAP CS BL HL BL RJ/1
R /1 RJ/2

RJ
J FR AB
AB
RJ 0)

3000mm AFFL, OUTLETS SHALL BE WALL MOUNTED AT

/2
HL HL
(1 1 0

AB FR 1500 AB

E
AB RJ AB AB

RJ
AB

C
AB AB COFFEE -1 FB-1 C AB AB WAP CS RJ/1 AB
2800mm AFFL.
AB RJ/1
MW TB (1100)
C AB
AB MW -1 TB-1 E C
W3 RJ/1 AB FB E CCTV RJ/1 8. SUPPLY & INSTALL SALTO ACCESS CONTROL SYSTEM
DW BL BL E AB
AB DW
AB ZIP HL HL AB AB TO PERIMETER DOORS AS NOMINATED ON THE
AB
E

WAP
INDICATIVE CABLE TRAY ROUTE AT HIGH LEVEL. THE AB RJ/1 AB DRAWINGS WHICH ARE MONITORED AND
AB PR RJ/1
ELECTRICAL CONTRACTOR SHALL PROVIDE 1 x 600mm WIDE RETICULATED BACK TO THE COMMUNICATIONS RACK.
E

INT 25A
ELECTRICAL AND AND 1 x 450mm WIDE COMMUNICATIONS BMS PROVIDE 1-OFF CAT. 6A DATA OUTLET ADKJACENT TO

RJ/2
AB
UB
CCTV OV
600

RJ
CABLES TRAYS DOUBLE STACKED THROUGHOUT FOR WAP CS
WAP EACH SECURITY DOOR. CONFIRM EXACT
E

AB
4 4

UB
RJ
RETICULATION OF CABLES . PROVIDE ADEQUATE SEGREGATION REQUIRENENTS WITH CLIENT PRIOR TO

RJ
UB
?
BETWEEN POWER AND COMMUNICATIONS TRAYS. CO- WAP 4 4 INSTALLATION.
AD
ORDINATE WITH ALL HIGH LEVEL SERVICES, MECHANICAL C
-1 C C
DUCTWORK AND STRUCTURAL ELEMENTS. CABLE TRAY SHALL FB E C
BE PAINTED TO SUIT CEILING COLOUR. CONFIRM EXACT -1
E E E
C RTX DATA AND POWER OUTLET LABELING:
RJ TB RJ RJ
REQUIREMENTS WITH ARCHITECT PRIOR TO INSTALLATION. (110 THE ELECTRICAL CONTRACTOR SHALL PROVIDE

P
0)
AD
TRAFFOLYTE LABELING TO THE COVER OF EACH
DATA POINT/OUTLET AND EACH POWER OUTLET.
TYPICAL FOR WORKSTATIONS: WAP 1500 C3 26.02.24 AV UPDATES
THE LABEL SHALL INCLUDE THE FOLLOWING

RJ/2
RJ/2
EXTEND 2 x 300mm WIDE ELECTRICAL AND COMMUNICATIONS CABLE COFFEE C2 27.11.23 REVISED CONSTRUCTION ISSUE
INFORMATION FOR POWER OUTLETS: ROOM
RJ/4
TV

C1 20.02.23 CONSTRUCTION ISSUE CC


TRAYS FROM CENTRAL CABLE TRAY TO EACH WORKSTATION GROUP ZIP RTX NUMBER, DISTRIBUTION BOARD WHERE CIRCUIT
B 11.10.22 REVISED TENDER ISSUE CC
5 AT HIGH LEVEL FOR RETICULATION OF POWER AND COMMUNICATIONS FHR RJ
/2 U U
5
ORIGINATES, CIRCUIT BREAKER NUMBER ie.
A 20.09.22 TENDER ISSUE CC
TO WORK STATIONS. STARTER SOCKETS DENOTED 'SS' SHALL BE 1.01/ELC-1/CB20. THE LABEL SHALL INCLUDE THE

UB
RJ UB INT REV. DATE DESCRIPTION INITIAL

RJ/1
W4 MOUNTED TO UNDERSIDE OF CABLE TRAY AND CABLES SHALL DROP 1500 U FOLLOWING FOR DATA OUTLETS: ROOM NUMBER,

UB
RJ/1
P RJ
RJ/2

WITHIN UMBILICAL DUCT TO WORKSTATION FOR SOFT WIRING RTX FHR DATA OUTLET NUMBER ie. 1.01/D20 CONFIRM
WAP LABELING ARRANGEMENT WITH THE SCHOOL
SOLUTION. ALL POWER TO WORKSTATIONS SHALL BE SOFT WIRED VIA U E4
REPRESENTATIVE/SUPERINTENDENT PRIOR TO ISSUED FOR CONSTRUCTION

300
RJ/2
NOMINATED 20A STARTER SOCKET. ALLOW FOR THE FOLLOWING:
- DEDICATED 20A STARTER SOCKET FOR UP RTX U MAKING LABELS FOR ALLL OUTLETS.
U

300
RJ/2

UB
RJ/1
TO 12 DOUBLE OUTLETS
- PROVIDE JUNCTION BOXES AS REQUIRED WAP CCTV RJ U

UB
RJ/2
WAP Level 1
- PROVIDE CONNECTOR LOADS AS REQUIRED WAP P RTX
416 Mt. Alexander Road,
- PROVIDE POWER MODULES AS REQUIRED TYPICAL FOR WORKSTATIONS: Ascot Vale, Vic, 3032
- 4-OFF SINGLE GPOs OR 2-OFF DOUBLE GPOs PER SUPPLY AND INSTALL CENTRAL CABLE TRAY AT HIGH LEVEL FOR
RETICULATION OF POWER AND COMMUNICATIONS TO MOBILE PH: 03-7013-2388
(1100)

(1100)
DESK MOUNTED IN ACCORDANCE WITH
E: ascoteng@ascoteng.com.au
WORK STATIONS. STARTER SOCKETS DENOTED 'SS' SHALL BE
RJ

RJ
ARCHITECTURAL JOINERY INT
CCTV W: www.ascoteng.com.au
- 3-OFF SINGLE RJ45 CAT 6A OUTLETS PER GROUP OF WORKSTATIONS CM U U MOUNTED TO UNDERSIDE OF CABLE TRAY AND CABLES SHALL
AB AB AB AB
RJ/2 U U DROP WITHIN UMBILICAL DUCT TO WORKSTATION FOR SOFT
6 SOFT WIRING CONFIGURATION TO BE EQUAL TO ECD OR APPROVED RJ/2 RJ/2 U
WAP
U 6
WIRING SOLUTION. ALL POWER TO WORKSTATIONS SHALL BE
CONSULTI NG ENGI NEERS
RJ
(1100)

EQUIVALENT. ENSURE CABLE TRAY IS PAINTED TO MATCH CEILING 15A AB AB AB AB SOFT WIRED VIA NOMINATED 20A STARTER SOCKET. ALLOW FOR
BMS BMS U U AB

RJ/12
LIGHT LIGHT LIGHT AB
COLOUR. CONFIRM EXACT REQUIREMENTS WITH ARCHITECT. AV U U THE FOLLOWING:
BAR BAR BAR 300 HD UMB UMB UMB
20A
LIGHT
20A 20A - DEDICATED 20A STARTER SOCKET FOR UP
BAR ARCHITECT
TO 12 DOUBLE OUTLETS
20A

AB
AB - PROVIDE JUNCTION BOXES AS REQUIRED
U
U - PROVIDE CONNECTOR LOADS AS REQUIRED
IC IC IC
- PROVIDE POWER MODULES AS REQUIRED
TYPICAL: 300 20A 20A
AISLE LIGHT AF AF AF AB CHARGE UB UB - 2-OFF SINGLE GPOs OR 1-OFF DOUBLE GPOs PER
SUPPLY AND INSTALL 1-OFF 10A SINGLE GPO AS DENOTED 1500 RJ/2 U OV FUME 20A U U DESK MOUNTED IN ACCORDANCE WITH
RJ (1100) 300
'BL' AT WALL MOUNTD HIGH-LEVEL TO EACH BLIND FOR RJ (300) ARCHITECTURAL JOINERY
UB UB UB
POWER SUPPLY FOR FUTURE MOTORISED BLINDS AND
AB
CABLE BACK TO DB-CC/P. ALL FUTURE CABLING FROM 300 300 U SOFT WIRING CONFIGURATION TO BE EQUAL TO ECD OR
POWER SUPPLY TO MOTORISED BLINDS SHALL BE BY BLIND HL APPROVED EQUIVALENT. ENSURE CABLE TRAY IS PAINTED TO
RJ/2 EQ-1 RTX HD HD
INSTALLER. CONFIRM EXACT LOCATION AND QUANTITY IC
WAP MATCH CEILING COLOUR. CONFIRM EXACT REQUIREMENTS WITH

P
RJ 15A 1000
WITH ARCHITECT PRIOR TO INSTALLATION ARCHITECT.

AB

AB
RJ CM CM WP AB CLIENT
HL RJ/4 CM RJ/4 CM RJ/4 CM RJ/4 15A U P U P U
7 CL
7
C FB-2

C FB-2

SEATS EQ-2
CM U FHR

UB
1500 300 300 300 P

RTX

RTX
E

RJ

RJ
15A
TYPICAL: WP RTX
C

C
E

DW INT
SUPPLY AND INSTALL CEILING MOUNTED POWER AND
SEATS AB
DATA POINTS AT HIGH LEVEL TO FOR FUTURE
C

20A RD
E

PROVISION OF AV EQUIPMENT WITHIN CONFERENCE 32A 20A


RJ
ROOMS. CONFIRM EXACT LOCATION AND OV P RTX WP
C

C
E

REQUIREMENTS WITH CLIENT PRIOR TO INSTALLATION RJ/2 WP TYPICAL:-


AISLE LIGHT 10A FOR ACCESS CONTROL. REFER TO NOTE 7
C

C
E

SUPPLY AND INSTALL 1-OFF 20A SINGLE PHASE 1500 FR


ISOLATOR FOR POWER SUPPLY TO RETRACTABLE PROJECT
10A
C

C
E

SEATS. CO-ORDINATE EXACT LOCATION AND MOUNTING


HEIGHTS WITH HUSSEY SEATING PRIOR TO
FR RTX
UB UB UB
DJA DJA WURRUNG
HD
C

C
E

INSTALLATION. IN ADDITION TO THE ABOVE, PROVIDE 2- CORPORATE AND


RJ/2

RJ/2

10A 10A
OFF ADDITIONAL DGPOs DENOTED 'AISLE LIGHT' FOR AB AB CCTV
P

MW MW
HD
COMMUNITY CENTRE
C

C
E

POWER SUPPLY TO RETRACTABLE SEAT AISLE


8 LIGHTING. PROVIDE DEDICATED 20A CIRCUIT FOR AISLE 8
CCTV INT
LIGHTS. INV
1000 SERVICE
WP

?
ELECTRICAL SERVICES
EXACT LOCATION OF OUTLETS WITHIN CATERING
TITLE
KITCHEN SHALL BE CO-ORDINATED WITH KITCHEN
P

DB-PV
9
EQUIPMENT AND JOINERY. CONFIRM EXACT MOUNTING
-CC/L 9 BLDG. 1 GROUND FLOOR
HEIGHTS AND RATING FOR POWER SUPPLY TO /P DB
DB-CC
EQUIMENT WITH MANUFACTURER PRIOR TO POWER & COMMUNICATIONS
INSTALLATION.
LAYOUT
NORTH
0 1 2 3 4 5 6

A B WA WB C WC D EA WD E EB WE F EC WF G ED WG H EE J EF K EG L M N P DRAWING DIMENSIONS IN MILLIMETRES UNLESS NOTED OTHERWISE

DESIGNED DRAWN APPROVED SCALE


C.C C.C S.M 1:100 @ B1

PROJECT NUMBER COMMENCED DATE DRAWING NUMBER


17680 MAR 2022

SHEET NUMBER

4 of 5
REVISION

C3
E04
26/02/2024 9:11:28 AM

You might also like