You are on page 1of 1

TAMILNADU GENERATION AND DISTRIBUTION CORPORATION LIMITED

Registered Office : No:144, NPKRR Maaligai, Anna Salai, Chennai - 600 002

Tax Invoice for LT Current Consumption Charges for the Month of March 2024
Section Paramankurichi GSTN No: 33AADCT4784E1ZC

Circle TUTICORIN Invoice No: L470240319794824 / Date: 08/03/2024


Sanctioned
Distribution THANDUPATHU Tariff Applied LA1A 1.0 KW
Load
Servie Connection Number 07-363-010-799 Phase 1 phase Invoice Type INVOICE
Name/Address & GST of the Consumer Place of
CT/Non-CT Non-CT Tamil Nadu
MUTHUDIHBAKAR.B Supply
1A,
1/108/A,
Arasarpettai,,Thandapathu,MANADU
Arasarpettai,,Thandapathu,MANADU
THANDAPATHU,Tiruchendur Meter No: 8014952 Supply Type Regular
State: TAMILNADU State Code 33 Reverse
Solar RTS NO NO
Charge
Consumer GST No:
Welding NO Billing Cycle Bi-Monthly
Pay This Bill By Online in 08/01/2024-
https://www.tnebnet.org/qwp/qpay Bill Period 08/03/2024
ä‹df«
Bill Amount Rs.72/-
94987 94987
Due Date 28/03/2024

Energy Final Initial MF Consumption Max Dmd Max Dmd Power Factor
Consumption Reading Reading [After MF & Recorded Recorded Recorded
: DT Loss] : with MF
READING 601.0 469.0 1 132.0 0.43 0.43 0.0
DATE 08/03/2024 08/01/2024
STATUS Normal Normal
PARTICULARS HSN/SAC Base Amount CGST SGST Invoice Amount
SAVE ELECTRICITY Rs. @9% @9% Rs.
SECURITY DEPOSIT Energy Charges 2716 0000 607.20 607.20
Balance as of 01-04-2023 0.00 Fixed Charges 2716 0000
Interest Credited on above 0.00 Sub Total (a) 607.20 607.20
after TDS
Less:
Collection During the Year 300.00
Govt Subsidy 2716 0000 -535.20 -535.20
Refund made in the Year 0.00
Sub Total (b) -535.20 -535.20
Balance as of 08/03/2024 300.00
Welding Sur Chr 996 912
Excess MD Charges 996 912
MCD as of 08/03/2024 0.00
Penalty for LPF 996 912
OLD ARREARS /CREDITS
Net Work Charges 998 631
Particulars Period Amount
Sub Total (c) 0.00 0.00 0.00 0.00
Total - 0.00
Electricity Tax
ADVANCE CC ACCOUNT
TCS /TDS [u/s 206(1C)] 0.00 0.00 0.00 0.00
Balance as of 08/01/2024 0.00
Sub Total (d) 0.00 0.00 0.00 0.00
Collection During the Period 0.00
Other Charges 996 912
Interest Allowed 0.00
ASD Demand
Adjusted (including this Bill) 0.00
Old Arrears
Balance as of 08/03/2024 0.00
Sub Total (e) 0.00 0.00 0.00 0.00
Less:
Adjustments
Advance CC Adj
Refund Of SD
Sub Total (f) 0.00 0.00 0.00 0.00
Round off (g) 0.00 0.00
Net Payable Amt (a+b+c+d+e- 72.00 0.00 0.00 72.00
f+g)
(Rupees:Seventy Two only)
Note:1.Bill amount shall be payable within the due date to avoid disconnection as per Sec 56(1) of Electricity Act 2003.
2.Payment after due date will attract belated payment surcharge and other charges as applicable
3.This is system generated invoice.Does not require signature

Asst Engineer/Paramankurichi

You might also like