You are on page 1of 2
a Alumill Tech Gulf LLC ppb ity ait og! Date: 10-4-24| onumin mma OG, “ Mis Alumioch GuMfLLC—:Umesh . Bhosale (Projects) ve vena atin) WH He Yah echt Moan) ‘Subject: Commissioning of tration syst 2000 LPH with iter surtace ora of 65 SOM, supplied asa replacoment of oldsystom, 1M. Ntin came on 3-424 he checked athe hardware and conmections made, 2. On 44-24 openthe fiterand as pe is nstuetion he packing washers were added nthe ‘ubahoiaing pistes 3. 0154.24, packing plate ot 20mm added on Bumping cytincer to aust the stroke, And planet stot But found that the fowneter aed and needs to start the system rmanvaly 4. Ws. Span confirmed to spy the lawmetr tough courier on urgunt basis system to set manvally tthe flow meter is receive. 5, Startacthe system, aust the speed ofthe pump to 1900 rpm by checking low manually @r4so.em, 5. Flowmeter ftom Mis. Span reveled on 13-4-24 recelved late due to ED holidays). Fito the flow meter on 14-424 and system was pt into auto tow control mode Fitermadmum pressures sett 1.2bar,anintertackis putin place to stop thefiter ifthe ‘iter pressure reaches 1.2ba. Than, based onthe run hs, and tow rat, the operation person can deci to restart or take the bow down tanster ect). 8. Fiter pump RPH is esscted o 2200 pm by Hs. lumi o contol the iter pressure. 10. Ponder Celt 545 -60 kgsto be charged during pracoat cycle 11. The datas of un timo of ftor and ait collection av attached, 12, The cly data noods to ba collected in tha format mentioned below to monitor the performance ofthe fiter sna stucge separator, 18. The 1stcycla lowdown cyclo was taken eat or sting the studge separstoxporameters. 14, The sludge trom the separator is completely dy without any ol content init 15; iter operation and sludge separator operation raining is ven othe shitt unervisors and ‘mill operation persons. Taining recoras attached. ',elacrica’ arawings ana PLC backup of sludge separator and iter are handed over to Electrical department 17 Final operation and maintnance manual wl be sent by mailon or before 304-24 18. Ms. Span ad sont the stage separstr fine mesh trough cour. 19. withthe currentpertormance recorded M/s Alum confirms that te performance is satisfactory end accepte, koa Page tot2 Alumill Tech Gulf LLe ape et og Following are tne detits of otng done for Fite an slodge separator Frito sting 41. Bump time se. 2, Procoattime-9 mins 3, Filter prassurefor stoppage 1.2 bar 4 Flow = 1440 LPM, Studie seperator stings ‘ir blowrtown e180. ‘Air vont open tine —20 53. Pot opentime20 see Pump ontime-18 sae, ‘Sludge separator pressure sting 42 bar Dirty outlet open time£0 suc. Format for data collection of moxtoring the Filter andl Suge separctor performance ‘charge Wo. Oe ee Precoat Powder charge Tine Date Number of cas rolled ‘Woight of ach cot Number of Passes Mill power (tart reading) a power (nd reading Mil power bate Weight of dry stuige collected Page 2012 eye We

You might also like