Professional Documents
Culture Documents
B'
A C D E
18.00
5.00 1.00 6.00 6.00 B'
1
PREPAINTED RIDGE ROLL
G.I. CORRUGATED ROOFING SHEET, GAUGE 24
PREPAINTED G.I. BOX GUTTER WITH FASCIA COVER ON FASCIA FRAME
4.5MM FIBER CEMENT BOARD
6.00
2.06
2
EXISTING STRUCTURE
7.32
4.63
6.00
EXISTING STRUCTURE
0.63
3
A C D E
2"X4" RECTANGULAR TUBE SPACED B'
@ 0.60M. O.C B.W
4.5MM FIBER CEMENT BOARD (BOTTOM) 18.00
E D C A
5.00 1.00 6.00 6.00 B'
CANOPY EAVE LINE
1
PREPAINTED RIDGE ROLL
G.I. CORRUGATED ROOFING SHEET, GAUGE 24
FIXED CLEAR GLASS 3.00M x 0.40M
6.00
EAVE LINE
2.08
2 EXISTING STRUCTURE
EAVE LINE
7.37
6.00
4.66
EXISTING STRUCTURE
3 0.63
PREPARED BY: REVIEWED BY: SIGNED & SEALED PROJECT TITLE : RECOMMENDING APPROVAL: APPROVED BY: REVIEWED BY: CONFORME: SHEET NUMBER
FROM THE OFFICE OF: