Axpert inverter user manual

Page 1 User Manual 5KW with MPPT Solar Charger Inverter/Charger Version: 1.2... Table Of Contents ABOUT THIS MANUAL ............................1 Purpose ................................1 Scope ................................1 SAFETY INSTRUCTIONS ........................... 1 INTRODUCTION ..............................2 Product Overview ............................. 3 INSTALLATION
..............................4 Unpacking and Inspection..........................4 Preparation ..............................4 Mounting the Unit ............................. 4 Battery Connection ............................ ABOUT THIS MANUAL Purpose This manual describes the assembly, installation, operation and troubleshooting of this unit. Please read this manual carefully before
installations and operations. Keep this manual for future reference.
Scope This manual provides safety and installation guidelines as well as information on tools and wiring. SAFETY INSTRUCTIONS WARNING: This chapter contains important safety and operating instructions. INTRODUCTION This off-grid PV inverter can provide power to connected loads by utilizing PV power, utility power and battery power.
Figure 1 Basic PV System Overview Depending on different power situations, this inverter is designed to generate continuous power from PV solar modules (solar panels), battery, and the utility. Product Overview NOTE: For parallel model installation and operation, please check separate parallel installation guide for the details.
LCD display Status indicator Charging indicator Fault indicator Function buttons Power on/off switch AC input connectors AC output connectors (Load connection) PV connectors 10. INSTALLATION Unpacking and Inspection Before installation, please inspect the unit. Be sure that nothing inside the package is damaged. You should have received the
following items inside of package: Inverter unit Software CD Manual Communication cable Preparation Before connecting all wirings, please take off bottom cover by removing two screws as shown below. Mounting the Unit Consider the following points before selecting where to install: Do not mount the inverter on flammable construction materials.
Install the unit by screwing three screws. It’s recommended to use M4 or M5 screws.
Battery Connection CAUTION: For safety operation and regulation compliance, it’s requested to install a separate DC over-current protector or disconnect device between battery and inverter. vadixufa It may not be required to have a disconnect device in some applications, however, it’s still required to have over-current protection installed.
WARNING: Shock Hazard Installation must be performed with care due to high battery voltage in series. yimulihe CAUTION!! Do not place anything between the flat part of the inverter terminal and the ring terminal. Otherwise, overheating may occur.
CAUTION!! Do not apply anti-oxidant substance on the terminals before terminals are connected tightly. Be sure to connect PE protective conductor ( ) first. hawahoca →Ground (yellow-green) L→LINE (brown or black) N→Neutral (blue) 5. Make sure the wires are securely connected. CAUTION: Important Be sure to connect AC wires with correct
polarity. If L and N wires are connected reversely, it may cause utility short-circuited when these inverters are worked in parallel operation. Please follow below steps to implement PV module connection: 1. Remove insulation sleeve 10 mm for positive and negative conductors. 2. Check correct polarity of connection cable from PV modules and PV
input connectors. Then, connect positive pole (+) of connection cable to positive pole (+) of PV input connector. Communication Connection Serial Connection Please use supplied communication cable to connect to inverter and PC. Insert bundled CD into a computer and follow on-screen instruction to install the monitoring software. For the detailed
software operation, please check user manual of software inside of CD. Bluetooth Connection This unit is equipped with a Bluetooth transmitter. OPERATION Power ON/OFF Once the unit has been properly installed and the batteries are connected well, simply press On/Off switch (located on the display panel) to turn on the unit. Operation and
Display Panel The operation and display panel, shown in below chart, is on the front panel of the inverter. It includes six indicators, six function keys, on/off switch and a LCD display, indicating the operating status and input/output power information. Function Keys Function Key Description Exit setting mode USB function setting Select USB OTG
functions To last selection Down To next selection Enter To confirm the selection in setting mode or enter setting mode LCD Display Icons Icon Function description Input Source Information Indicates the AC input. Page 14 In battery mode, it will present battery capacity. Load Percentage Battery Voltage LCD Display < 1.85V/cell 1.85V/cell ~
1.933V/cell Load >50% 1.933V/cell ~ 2.017V/cell > 2.017V/cell < 1.892V/cell 1.892V/cell ~ 1.975V/cell Load < 50% 1.975V/cell ~ 2.058V/cell > 2.058V/cell Load Information Indicates overload. LCD Setting General Setting ” After pressing and holding “ button for 3 seconds, the unit will enter setting mode. Press “ ” or “ ” button to select setting
programs.

Keep this manual for future reference. Scope This manual provides safety and installation guidelines as well as information on tools and wiring. SAFETY INSTRUCTIONS WARNING: This chapter contains important safety and operating instructions. INTRODUCTION This off-grid PV inverter can provide power to connected loads by utilizing PV power,
utility power and battery power. Figure 1 Basic PV System Overview Depending on different power situations, this inverter is designed to generate continuous power from PV solar modules (solar panels), battery, and the utility. Product Overview NOTE: For parallel model installation and operation, please check separate parallel installation guide for
the details. faxamudaleyo LCD display Status indicator Charging indicator Fault indicator Function buttons Power on/off switch AC input connectors AC output connectors (Load connection) PV connectors 10. INSTALLATION Unpacking and Inspection Before installation, please inspect the unit. Be sure that nothing inside the package is damaged.
You should have received the following items inside of package: Inverter unit Software CD Manual Communication cable Preparation Before connecting all wirings, please take off bottom cover by removing two screws as shown below. Mounting the Unit Consider the following points before selecting where to install: Do not mount the inverter on
flammable construction materials. Install the unit by screwing three screws. It’s recommended to use M4 or M5 screws. Battery Connection CAUTION: For safety operation and regulation compliance, it’s requested to install a separate DC over-current protector or disconnect device between battery and inverter. It may not be required to have a
disconnect device in some applications, however, it’s still required to have over-current protection installed. donikijoludo WARNING: Shock Hazard Installation must be performed with care due to high battery voltage in series. nezi CAUTION!! Do not place anything between the flat part of the inverter terminal and the ring terminal. kinifiboxaxata
Otherwise, overheating may occur. CAUTION!! Do not apply anti-oxidant substance on the terminals before terminals are connected tightly. Be sure to connect PE protective conductor ( ) first. →Ground (yellow-green) L→LINE (brown or black) N→Neutral (blue) 5. todiyuje Make sure the wires are securely connected. CAUTION: Important Be sure to
connect AC wires with correct polarity. If L and N wires are connected reversely, it may cause utility short-circuited when these inverters are worked in parallel operation. Please follow below steps to implement PV module connection: 1. Remove insulation sleeve 10 mm for positive and negative conductors. 2. Check correct polarity of connection
cable from PV modules and PV input connectors. Then, connect positive pole (+) of connection cable to positive pole (+) of PV input connector. Communication Connection Serial Connection Please use supplied communication cable to connect to inverter and PC. Insert bundled CD into a computer and follow on-screen instruction to install the
monitoring software. For the detailed software operation, please check user manual of software inside of CD. Bluetooth Connection This unit is equipped with a Bluetooth transmitter.
OPERATION Power ON/OFF Once the unit has been properly installed and the batteries are connected well, simply press On/Off switch (located on the display panel) to turn on the unit. Operation and Display Panel The operation and display panel, shown in below chart, is on the front panel of the inverter. It includes six indicators, six function keys,
on/off switch and a LCD display, indicating the operating status and input/output power information. Function Keys Function Key Description Exit setting mode USB function setting Select USB OTG functions To last selection Down To next selection Enter To confirm the selection in setting mode or enter setting mode LCD Display Icons Icon Function
description Input Source Information Indicates the AC input. Page 14 In battery mode, it will present battery capacity. Load Percentage Battery Voltage LCD Display < 1.85V/cell 1.85V/cell ~ 1.933V/cell Load >50% 1.933V/cell ~ 2.017V/cell > 2.017V/cell < 1.892V/cell 1.892V/cell ~ 1.975V/cell Load < 50% 1.975V/cell ~ 2.058V/cell > 2.058V/cell
Load Information Indicates overload. LCD Setting General Setting ” After pressing and holding “ button for 3 seconds, the unit will enter setting mode. Press “ ” or “ ” button to select setting programs. And then, press “ ” button to confirm the selection or “ ”... Page 16 Appliances (Default) If selected, acceptable AC input voltage range will be within
90-280VAC. AC input voltage range If selected, acceptable AC input voltage range will be within 170-280VAC. Saving mode disable If disabled, no matter connected (default) load is low or high, the on/off status of inverter output will not be effected.
Page 17 Soltaro battery If selected, programs of 02, 26, 27 and 29 will be automatically set up. No need for further setting. BAK battery If selected, programs of 02, 26, 27 and 29 will be automatically set up. No need for further setting. Restart disable (Default) Restart enable Auto restart when overload... Page 18 current from program 02 30A
(Default) for utility charger. default setting: 46V Setting range is from 44V to 57V and increment of each click is 1V. Setting voltage point back to utility source when selecting “SBU” (SBU priority) or “SUB” (solar 5% (default) If “WECO battery”... Page 19 default setting: 54V 10% (default) If “WECO battery” is selected in program 5, this parameter
value will be displayed in percentage and value setting is based on battery capacity percentage. The setting range is from 10% to 100%. Increment of each click is 5%. If this inverter/charger is working in Line, Standby or Fault mode, charger source can be programmed as below: Solar first... Page 20 Alarm on (Default) Alarm off Alarm control Return
to default display If selected, no matter how users screen (Default) switch display screen, it will automatically return to default display screen (Input voltage /output voltage) after no button is pressed for 1 minute. Auto return to default display screen Stay at latest screen... Page 21 Record enable Record disable (Default) Record Fault code default
setting: 56.4V If self-defined is selected in program 5, this program can be set up. Setting range is from 48.0V Bulk charging voltage to 64.0V. Increment of each click is (C.V voltage) 0.1V. Page 22 If selected, inverter will judge this Automatically (Default): charging time automatically. The setting range is from 5 min to 5 min 900 min. Increment of
each click is 5 min. Bulk charging time (C.V stage) 900 min If “USE” is selected in program 05, this program can be set up. Battery equalization Battery equalization disable (Default) Page 23 30days (Default) Setting range is from 0 to 90 days. Increment of each click is 1 day Equalization interval Enable Disable (Default) Equalization activated
immediately If equalization function is enabled in program 33, this program can be set up. If “Enable” is selected in this program, it’s to activate battery equalization immediately and LCD main page will shows “... Page 24 For minute setting, the range is from Time setting – Minute 00 to 59. For hour setting, the range is from 00 Time setting – Hour
to 23. For day setting, the range is from 00 Time setting– Day to 31. For month setting, the range is from Time setting–... Page 25 This function is to over-write all parameter settings (TEXT file) with settings in the On-The-Go USB disk from a previous setup or to duplicate inverter settings. Please check with your dealer Re-write or installer for detail
instructions. internal parameters Press “ ”... Page 26 Press “ ” button to set up Solar First Timer. Press “ ” button to select staring time. Press “ ” or “ ” button to adjust values and press “ ” to confirm. Press “ ” button to select end time. Press “ ”... Display Setting The LCD display information will be switched in turns by pressing “ ” or “ ” key. The
selectable information is switched as the following table in order. Selectable information LCD display Input Voltage=230V, output voltage=230V Input voltage/Output voltage (Default Display Screen) Input frequency=50Hz Input frequency... Page 28 AC and PV charging current=50A PV charging current=50A Charging current AC charging
current=50A AC and PV charging power=500W PV charging power=500W Charging power AC charging power=500W Battery voltage=50.0V, output voltage=230V Battery voltage and output voltage... Page 29 Output frequency=50Hz Output frequency Load percent=70% Load percentage When connected load is lower than 1kVA, load in VA will
present xxxVA like below chart. Load in VA When load is larger than 1kVA (≧1KVA), load in VA will present x.xkVA like below chart. When load is lower than 1kW, load in W will present xxxW like below chart. Page 30 PV energy generated Today = 3.88kWh, Load output energy Today = 9.88kWh. PV energy generated today and Load output energy
today PV energy generated this month = 388kWh, Load output energy this month = 988kWh. PV energy generated this month and Load output energy this month. Page 31 Main CPU version 00014.04. Main CPU version checking. Secondary CPU version 00001.23. Secondary CPU version checking. Bluetooth version 00001.03. Bluetooth version
checking. Operating Mode Description Operating mode Behaviors LCD display Battery is charged by utility. Standby mode / Power saving mode Battery is charged by PV energy. Note: *Standby mode: The inverter is not turned on yet but at No output is supplied this time, the inverter can by the unit but it still charge battery without AC... Page 33
Charging by utility and PV energy.

ABOUT THIS MANUAL Purpose This manual describes the assembly, installation, operation and troubleshooting of this unit. Please read this manual carefully before installations and operations. Keep this manual for future reference. Scope This manual provides safety and installation guidelines as well as information on tools and wiring. SAFETY
INSTRUCTIONS WARNING: This chapter contains important safety and operating instructions. INTRODUCTION This off-grid PV inverter can provide power to connected loads by utilizing PV power, utility power and battery power. Figure 1 Basic PV System Overview Depending on different power situations, this inverter is designed to generate
continuous power from PV solar modules (solar panels), battery, and the utility. Product Overview NOTE: For parallel model installation and operation, please check separate parallel installation guide for the details. LCD display Status indicator Charging indicator Fault indicator Function buttons Power on/off switch AC input connectors AC output
connectors (Load connection) PV connectors 10. INSTALLATION Unpacking and Inspection Before installation, please inspect the unit. Be sure that nothing inside the package is damaged. You should have received the following items inside of package: Inverter unit Software CD Manual Communication cable Preparation Before connecting all
wirings, please take off bottom cover by removing two screws as shown below. Mounting the Unit Consider the following points before selecting where to install: Do not mount the inverter on flammable construction materials. Install the unit by screwing three screws. It’s recommended to use M4 or M5 screws.
Battery Connection CAUTION: For safety operation and regulation compliance, it’s requested to install a separate DC over-current protector or disconnect device between battery and inverter. It may not be required to have a disconnect device in some applications, however, it’s still required to have over-current protection installed.
WARNING: Shock Hazard Installation must be performed with care due to high battery voltage in series. CAUTION!! Do not place anything between the flat part of the inverter terminal and the ring terminal. Otherwise, overheating may occur. CAUTION!! Do not apply anti-oxidant substance on the terminals before terminals are connected tightly. Be
sure to connect PE protective conductor ( ) first. →Ground (yellow-green) L→LINE (brown or black) N→Neutral (blue) 5. Make sure the wires are securely connected. CAUTION: Important Be sure to connect AC wires with correct polarity. If L and N wires are connected reversely, it may cause utility short-circuited when these inverters are worked in
parallel operation. Please follow below steps to implement PV module connection: 1. Remove insulation sleeve 10 mm for positive and negative conductors. 2. Check correct polarity of connection cable from PV modules and PV input connectors. Then, connect positive pole (+) of connection cable to positive pole (+) of PV input connector.
Communication Connection Serial Connection Please use supplied communication cable to connect to inverter and PC. Insert bundled CD into a computer and follow on-screen instruction to install the monitoring software. For the detailed software operation, please check user manual of software inside of CD. Bluetooth Connection This unit is
equipped with a Bluetooth transmitter. OPERATION Power ON/OFF Once the unit has been properly installed and the batteries are connected well, simply press On/Off switch (located on the display panel) to turn on the unit. Operation and Display Panel The operation and display panel, shown in below chart, is on the front panel of the inverter. It
includes six indicators, six function keys, on/off switch and a LCD display, indicating the operating status and input/output power information. Function Keys Function Key Description Exit setting mode USB function setting Select USB OTG functions To last selection Down To next selection Enter To confirm the selection in setting mode or enter
setting mode LCD Display Icons Icon Function description Input Source Information Indicates the AC input. Page 14 In battery mode, it will present battery capacity.

SAFETY INSTRUCTIONS WARNING: This chapter contains important safety and operating instructions. INTRODUCTION This off-grid PV inverter can provide power to connected loads by utilizing PV power, utility power and battery power. Figure 1 Basic PV System Overview Depending on different power situations, this inverter is designed to
generate continuous power from PV solar modules (solar panels), battery, and the utility. Product Overview NOTE: For parallel model installation and operation, please check separate parallel installation guide for the details. LCD display Status indicator Charging indicator Fault indicator Function buttons Power on/off switch AC input connectors AC
output connectors (Load connection) PV connectors 10. INSTALLATION Unpacking and Inspection Before installation, please inspect the unit. Be sure that nothing inside the package is damaged. You should have received the following items inside of package: Inverter unit Software CD Manual Communication cable Preparation Before connecting all
wirings, please take off bottom cover by removing two screws as shown below.
Mounting the Unit Consider the following points before selecting where to install: Do not mount the inverter on flammable construction materials. Install the unit by screwing three screws. It’s recommended to use M4 or M5 screws. Battery Connection CAUTION: For safety operation and regulation compliance, it’s requested to install a separate DC
over-current protector or disconnect device between battery and inverter. It may not be required to have a disconnect device in some applications, however, it’s still required to have over-current protection installed. WARNING: Shock Hazard Installation must be performed with care due to high battery voltage in series.
CAUTION!! Do not place anything between the flat part of the inverter terminal and the ring terminal. Otherwise, overheating may occur. CAUTION!! Do not apply anti-oxidant substance on the terminals before terminals are connected tightly. Be sure to connect PE protective conductor ( ) first. →Ground (yellow-green) L→LINE (brown or black)
N→Neutral (blue) 5. Make sure the wires are securely connected. CAUTION: Important Be sure to connect AC wires with correct polarity. If L and N wires are connected reversely, it may cause utility short-circuited when these inverters are worked in parallel operation. Please follow below steps to implement PV module connection: 1.
3 INSTALLATION ..............................4 Unpacking and Inspection..........................4 Preparation ..............................4 Mounting the Unit ............................. 4 Battery Connection ............................ ABOUT THIS MANUAL Purpose This manual describes the assembly, installation, operation and troubleshooting of this unit. Please read this manual carefully
before installations and operations.
Keep this manual for future reference. Scope This manual provides safety and installation guidelines as well as information on tools and wiring. SAFETY INSTRUCTIONS WARNING: This chapter contains important safety and operating instructions.
INTRODUCTION This off-grid PV inverter can provide power to connected loads by utilizing PV power, utility power and battery power. Figure 1 Basic PV System Overview Depending on different power situations, this inverter is designed to generate continuous power from PV solar modules (solar panels), battery, and the utility.
Product Overview NOTE: For parallel model installation and operation, please check separate parallel installation guide for the details. LCD display Status indicator Charging indicator Fault indicator Function buttons Power on/off switch AC input connectors AC output connectors (Load connection) PV connectors 10. INSTALLATION Unpacking and
Inspection Before installation, please inspect the unit. Be sure that nothing inside the package is damaged. You should have received the following items inside of package: Inverter unit Software CD Manual Communication cable Preparation Before connecting all wirings, please take off bottom cover by removing two screws as shown below.

4 Battery Connection ............................ ABOUT THIS MANUAL Purpose This manual describes the assembly, installation, operation and troubleshooting of this unit. Please read this manual carefully before installations and operations. Keep this manual for future reference.
Scope This manual provides safety and installation guidelines as well as information on tools and wiring. SAFETY INSTRUCTIONS WARNING: This chapter contains important safety and operating instructions. INTRODUCTION This off-grid PV inverter can provide power to connected loads by utilizing PV power, utility power and battery power.
Figure 1 Basic PV System Overview Depending on different power situations, this inverter is designed to generate continuous power from PV solar modules (solar panels), battery, and the utility. Product Overview NOTE: For parallel model installation and operation, please check separate parallel installation guide for the details. LCD display Status
indicator Charging indicator Fault indicator Function buttons Power on/off switch AC input connectors AC output connectors (Load connection) PV connectors 10. INSTALLATION Unpacking and Inspection Before installation, please inspect the unit. Be sure that nothing inside the package is damaged. You should have received the following items
inside of package: Inverter unit Software CD Manual Communication cable Preparation Before connecting all wirings, please take off bottom cover by removing two screws as shown below. Mounting the Unit Consider the following points before selecting where to install: Do not mount the inverter on flammable construction materials. Install the unit
by screwing three screws. It’s recommended to use M4 or M5 screws. Battery Connection CAUTION: For safety operation and regulation compliance, it’s requested to install a separate DC over-current protector or disconnect device between battery and inverter. It may not be required to have a disconnect device in some applications, however, it’s
still required to have over-current protection installed. WARNING: Shock Hazard Installation must be performed with care due to high battery voltage in series. CAUTION!! Do not place anything between the flat part of the inverter terminal and the ring terminal. Otherwise, overheating may occur. CAUTION!! Do not apply anti-oxidant substance on
the terminals before terminals are connected tightly. Be sure to connect PE protective conductor ( ) first. →Ground (yellow-green) L→LINE (brown or black) N→Neutral (blue) 5. Make sure the wires are securely connected. CAUTION: Important Be sure to connect AC wires with correct polarity.
If L and N wires are connected reversely, it may cause utility short-circuited when these inverters are worked in parallel operation.
Please follow below steps to implement PV module connection: 1. Remove insulation sleeve 10 mm for positive and negative conductors.
2. Check correct polarity of connection cable from PV modules and PV input connectors. Then, connect positive pole (+) of connection cable to positive pole (+) of PV input connector.
Communication Connection Serial Connection Please use supplied communication cable to connect to inverter and PC. Insert bundled CD into a computer and follow on-screen instruction to install the monitoring software. For the detailed software operation, please check user manual of software inside of CD. Bluetooth Connection This unit is
equipped with a Bluetooth transmitter. OPERATION Power ON/OFF Once the unit has been properly installed and the batteries are connected well, simply press On/Off switch (located on the display panel) to turn on the unit. Operation and Display Panel The operation and display panel, shown in below chart, is on the front panel of the inverter. It
includes six indicators, six function keys, on/off switch and a LCD display, indicating the operating status and input/output power information.
Function Keys Function Key Description Exit setting mode USB function setting Select USB OTG functions To last selection Down To next selection Enter To confirm the selection in setting mode or enter setting mode LCD Display Icons Icon Function description Input Source Information Indicates the AC input. Page 14 In battery mode, it will present
battery capacity. Load Percentage Battery Voltage LCD Display < 1.85V/cell 1.85V/cell ~ 1.933V/cell Load >50% 1.933V/cell ~ 2.017V/cell > 2.017V/cell < 1.892V/cell 1.892V/cell ~ 1.975V/cell Load < 50% 1.975V/cell ~ 2.058V/cell > 2.058V/cell Load Information Indicates overload. LCD Setting General Setting ” After pressing and holding “ button
for 3 seconds, the unit will enter setting mode. Press “ ” or “ ” button to select setting programs. And then, press “ ” button to confirm the selection or “ ”... Page 16 Appliances (Default) If selected, acceptable AC input voltage range will be within 90-280VAC. AC input voltage range If selected, acceptable AC input voltage range will be within 170-
280VAC. Saving mode disable If disabled, no matter connected (default) load is low or high, the on/off status of inverter output will not be effected.
Page 17 Soltaro battery If selected, programs of 02, 26, 27 and 29 will be automatically set up. No need for further setting. BAK battery If selected, programs of 02, 26, 27 and 29 will be automatically set up. No need for further setting. Restart disable (Default) Restart enable Auto restart when overload... Page 18 current from program 02 30A
(Default) for utility charger. default setting: 46V Setting range is from 44V to 57V and increment of each click is 1V.
Setting voltage point back to utility source when selecting “SBU” (SBU priority) or “SUB” (solar 5% (default) If “WECO battery”... Page 19 default setting: 54V 10% (default) If “WECO battery” is selected in program 5, this parameter value will be displayed in percentage and value setting is based on battery capacity percentage. The setting range is
from 10% to 100%. Increment of each click is 5%. If this inverter/charger is working in Line, Standby or Fault mode, charger source can be programmed as below: Solar first... Page 20 Alarm on (Default) Alarm off Alarm control Return to default display If selected, no matter how users screen (Default) switch display screen, it will automatically return
to default display screen (Input voltage /output voltage) after no button is pressed for 1 minute.
Auto return to default display screen Stay at latest screen... Page 21 Record enable Record disable (Default) Record Fault code default setting: 56.4V If self-defined is selected in program 5, this program can be set up. Setting range is from 48.0V Bulk charging voltage to 64.0V. Increment of each click is (C.V voltage) 0.1V. Page 22 If selected, inverter
will judge this Automatically (Default): charging time automatically. The setting range is from 5 min to 5 min 900 min. Increment of each click is 5 min. Bulk charging time (C.V stage) 900 min If “USE” is selected in program 05, this program can be set up. Battery equalization Battery equalization disable (Default) Page 23 30days (Default) Setting
range is from 0 to 90 days. Increment of each click is 1 day Equalization interval Enable Disable (Default) Equalization activated immediately If equalization function is enabled in program 33, this program can be set up. If “Enable” is selected in this program, it’s to activate battery equalization immediately and LCD main page will shows “...
Page 24 For minute setting, the range is from Time setting – Minute 00 to 59. For hour setting, the range is from 00 Time setting – Hour to 23. For day setting, the range is from 00 Time setting– Day to 31. For month setting, the range is from Time setting–... Page 25 This function is to over-write all parameter settings (TEXT file) with settings in the
On-The-Go USB disk from a previous setup or to duplicate inverter settings. Please check with your dealer Re-write or installer for detail instructions. internal parameters Press “ ”... Page 26 Press “ ” button to set up Solar First Timer. Press “ ” button to select staring time. Press “ ” or “ ” button to adjust values and press “ ” to confirm. Press “ ”
button to select end time. Press “ ”... Display Setting The LCD display information will be switched in turns by pressing “ ” or “ ” key. The selectable information is switched as the following table in order. Selectable information LCD display Input Voltage=230V, output voltage=230V Input voltage/Output voltage (Default Display Screen) Input
frequency=50Hz Input frequency... Page 28 AC and PV charging current=50A PV charging current=50A Charging current AC charging current=50A AC and PV charging power=500W PV charging power=500W Charging power AC charging power=500W Battery voltage=50.0V, output voltage=230V Battery voltage and output voltage... Page 29
Output frequency=50Hz Output frequency Load percent=70% Load percentage When connected load is lower than 1kVA, load in VA will present xxxVA like below chart. Load in VA When load is larger than 1kVA (≧1KVA), load in VA will present x.xkVA like below chart. When load is lower than 1kW, load in W will present xxxW like below chart. Page
30 PV energy generated Today = 3.88kWh, Load output energy Today = 9.88kWh. PV energy generated today and Load output energy today PV energy generated this month = 388kWh, Load output energy this month = 988kWh. PV energy generated this month and Load output energy this month. Page 31 Main CPU version 00014.04. Main CPU
version checking.
Secondary CPU version 00001.23. Secondary CPU version checking. Bluetooth version 00001.03.
Bluetooth version checking. Operating Mode Description Operating mode Behaviors LCD display Battery is charged by utility. Standby mode / Power saving mode Battery is charged by PV energy.
Note: *Standby mode: The inverter is not turned on yet but at No output is supplied this time, the inverter can by the unit but it still charge battery without AC... Page 33 Charging by utility and PV energy. Charging by utility.
Output power from Line mode utility. Charger is available. Battery is not connected, solar energy and the utility will provide the loads. Power from utility. Output power from Line mode utility. Charger is available. Faults Reference Code Fault Code Fault Event Icon on Fan is locked when inverter is off.
Over temperature Battery voltage is too high Battery voltage is too low Output short circuited or over temperature is detected by internal converter components. Output voltage is too high. BATTERY EQUALIZATION Equalization function is added into charge controller. It reverses the buildup of negative chemical effects like stratification, a condition
where acid concentration is greater at the bottom of the battery than at the top.
Equalization also helps to remove sulfate crystals that might have built up on the plates.
If left unchecked, this condition, called sulfation, will reduce the overall capacity of the battery. Page 36 However, in Equalize stage, when battery equalized time is expired and battery voltage doesn’t rise to battery equalization voltage point, the charge controller will extend the battery equalized time until battery voltage achieves battery
equalization voltage. If battery voltage is still lower than battery equalization voltage when battery equalized timeout setting is over, the charge controller will stop equalization and return to float stage. SPECIFICATIONS Table 1 Line Mode Specifications INVERTER MODEL Input Voltage Waveform Sinusoidal (utility or generator) Nominal Input
Voltage 230Vac 170Vac± 7V (UPS) Low Loss Voltage 90Vac± 7V (Appliances) 180Vac± 7V (UPS); Low Loss Return Voltage 100Vac± 7V (Appliances) High Loss Voltage 280Vac±... Page 38 Table 2 Inverter Mode Specifications INVERTER MODEL Rated Output Power 5KVA/5KW Pure Sine Wave Output Voltage Waveform 230Vac± 5% Output Voltage
Regulation 60Hz or 50Hz Output Frequency Peak Efficiency Overload Protection 5s@≥150% load; 10s@110%~150% load 2* rated power for 5 seconds Surge Capacity Nominal DC Input Voltage 48Vdc... Page 39 Table 3 Charge Mode Specifications Utility Charging Mode INVERTER MODEL Charging Current (UPS) @ Nominal Input Voltage Flooded
58.4 Bulk Charging Battery Voltage AGM / Gel 56.4 Battery Floating Charging Voltage 54Vdc Overcharge Protection 64Vdc Charging Algorithm 3-Step 2.43Vdc (2.35Vdc) Voltage 2.25Vdc Charging Curve... TROUBLE SHOOTING Problem LCD/LED/Buzzer Explanation / Possible cause What to do Unit shuts down LCD/LEDs and buzzer automatically
will be active for 3 The battery voltage is too low 1.
Re-charge battery. during startup seconds and then (<1.91V/Cell) 2. Replace battery. process. Appendix I: Parallel function 1. Introduction This inverter can be used in parallel with two different operation modes.
1. Parallel operation in single phase with up to 9 units. The supported maximum output power is 45KW/45KVA. 2. Maximum nine units work together to support three-phase equipment. Seven units support one phase maximum. Page 42 Step 3: Remove two screws as below chart to take out cover of parallel communication. Step 4: Install new parallel
board with 2 screws tightly. Step 6: Connect 2-pin to original position. Step 7: Put communication board back to the unit. Step 8: Put wire cover back to the unit. Page 43 4. Mounting the Unit When installing multiple units, please follow below chart. NOTE: For proper air circulation to dissipate heat, allow a clearance of approx. 20 cm to the side and
approx. 50 cm above and below the unit. Be sure to install each unit in the same level. 5. Page 44 Recommended breaker specification of battery for each inverter: Model 1 unit* 80A/70VDC *If you want to use only one breaker at the battery side for the whole system, the rating of the breaker should be X times current of 1 unit. “X” indicates the
number of inverters connected in parallel.
Recommended breaker specification of AC input with single phase: 2 units 3 units...
Page 45 5-1. Parallel Operation in Single phase Two inverters in parallel: Power Connection Load Communication Connection Three inverters in parallel: Power Connection Load Communication Connection... Page 46 Four inverters in parallel: Power Connection Load Communication Connection Five inverters in parallel: Power Connection Load
Communication Connection... Page 47 Six inverters in parallel: Power Connection Load Communication Connection Seven inverters in parallel: Power Connection Load Communication Connection ❶ ❷ ❸ ❹ ❺ ❻ ❼... Page 48 Eight inverters in parallel: Power Connection Load Communication Connection ❸ ❹ ❺ ❻ ❼ ❽ ❶ ❷ Nine inverters in parallel:
Power Connection Load Communication Connection ❸ ❹ ❺ ❻ ❼ ❽ ❾ ❶ ❷ 5-2. Support 3-phase equipment Three inverters in each phase: Power Connection Load Communication Connection... Page 49 Three inverters in one phase, three inverters in second phase and two inverter for the third phase: Power Connection Load Communication Connection
❶ ❷ ❸ ❹ ❺ ❻ ❼ ❽ Three inverters in one phase, two inverters in second phase and two inverters for the third phase: Power Connection Load Communication Connection... Page 50 Two inverters in each phase: Power Connection Load Communication Connection Seven inverters in one phase and one inverter for the other two phases: Power
Connection Load Note: It’s up to customer’s demand to pick 7 inverters on any phase. P1: L1-phase, P2: L2-phase, P3: L3-phase. Communication Connection ①... Page 51 Four inverters in one phase and one inverter for the other two phases: Power Connection Load Communication Connection Three inverters in one phase, two inverters in second
phase and one inverter for the third phase: Power Connection Load... Page 52 Communication Connection Three inverters in one phase and only one inverter for the remaining two phases: Power Connection Load Communication Connection Two inverters in two phases and only one inverter for the remaining phase: Power Connection Load... Page 53
Communication Connection Two inverters in one phase and only one inverter for the remaining phases: Power Connection Load Communication Connection One inverter in each phase: Power Connection Load... Page 54 Communication Connection WARNING: Do not connect the current sharing cable between the inverters which are in different
phases. Otherwise, it may damage the inverters. 6. PV Connection Please refer to user manual of single unit for PV Connection. CAUTION: Each inverter should connect to PV modules separately. Page 55 7. LCD Setting and Display Setting Program: Program Description Selectable option Single: When the units are used in parallel with single phase,
please select “PAL” in program Parallel: It is required to have at least 3 inverters or maximum 6 inverters to support three-phase equipment. Page 56 8. Commissioning Parallel in single phase Step 1: Check the following requirements before commissioning: Correct wire connection Ensure all breakers in Line wires of load side are open and each
Neutral wires of each unit are connected together. Step 2: Turn on each unit and set “PAL”... Page 57 Step 5: If there is no more fault alarm, the system to support 3-phase equipment is completely installed. Step 6: Please switch on all breakers of Line wires in load side. This system will start to provide power to the load. Appendix II: BMS
Communication Installation 1. Introduction If connecting to lithium battery, it is recommended to purchase a custom-made RJ45 communication cable. Please check with your dealer or integrator for details.
This custom-made RJ45 communication cable delivers information and signal between lithium battery and the inverter.
Page 59 3. Installation and Operation PYLONTECH After configuration, please install LCD panel with inverter and Lithium battery with the following steps. Step 1. Use a custom-made RJ45 cable to connect inverter and Lithium battery. Please take notice for parallel system: 1. Only support common battery installation. 2. Page 60 WECO Step 1. Use a
custom-made RJ45 cable to connect inverter and Lithium battery. Please take notice for parallel system: 1. Only support common battery installation. 2. Use one custom-made RJ45 cable to connect any inverter (no need to connect to a specific inverter) and Lithium battery. Page 61 SOLTARO Step 1. Use a custom-made RJ45 cable to connect inverter
and Lithium battery. Please take notice for parallel system: 1. Only support common battery installation.
2. Use one custom-made RJ45 cable to connect any inverter (no need to connect to a specific inverter) and Lithium battery. Page 62 Step 1. Use custom-made RJ45 cable to connect inverter and Lithium battery. Please take notice for parallel system: 1. Only support common battery installation. 2. Use one custom-made RJ45 cable to connect any
inverter (no need to connect to a specific inverter) and Lithium battery. Page 63 4. LCD Display Information Press “UP” or “DOWN” key to switch LCD display information. It will show battery pack and battery group number before “Main CPU version checking” as below screen. Selectable information LCD display Battery pack numbers & Battery
Battery pack numbers = 3, battery group numbers = 1 group numbers 5. Appendix III: Approximate Back-up Time Table Model Load (VA) Backup Time @ 48Vdc 200Ah (min) Backup Time @ 48Vdc 400Ah (min) 1226 2576 1000 1226 1500 2000 2500 3000 3500 4000 4500 5000 Note: Backup time depends on the quality of the battery, age of battery
and type of battery. Specifications of batteries may vary depending on different manufacturers. Page 1 User Manual AXPERT MLV 5KVA-48V INVERTER / CHARGER Version: 1.1... Table of Contents ABOUT THIS MANUAL ............................. 1 Purpose ................................1 Scope ................................1 SAFETY INSTRUCTIONS ..........................1
INTRODUCTION ............................... 2 Features ................................2 Basic System Architecture ..........................2 Product Overview ............................. 3 INSTALLATION ..............................4 Unpacking and Inspection..........................4 Preparation ..............................
ABOUT THIS MANUAL Purpose This manual describes the assembly, installation, operation and troubleshooting of this unit. Please read this manual carefully before installations and operations. Keep this manual for future reference.
Scope This manual provides safety and installation guidelines as well as information on tools and wiring. SAFETY INSTRUCTIONS WARNING: This chapter contains important safety and operating instructions. INTRODUCTION This is a multi-functional inverter/charger, combining the functions of inverter, MPPT solar charger and battery charger to
offer uninterruptible power support with portability. Its comprehensive LCD display offers user-configurable and easy-accessible button operation such as battery charging current, priority setting for AC/solar charger, and acceptable input voltage setting to suit different applications. Product Overview 1. Battery connector 2. Power on/off switch 3.
Dry contact 4. USB communication port 5. RS232 communication port 6. PV input 7. Parallel communication port (only for parallel model) 8. Current sharing port (only for parallel model) 9. Parallel ID (Please check chapter 6 in Parallel Function for setting details.) 10. INSTALLATION Unpacking and Inspection Before installation, please inspect the
unit. Be sure that nothing inside the package is damaged. You should have received the following items inside the package: The unit Mounting plate Fixing screws RS-232 cable USB cable Software CD User manual Current sharing cable Parallel communication cable... Install the unit by screwing four screws as shown in the diagram. It’s
recommended to use M5 screws. 1. Drill four holes in the marked locations with 4 2. Raise the inverter and place it over the mounting screws. The reference tightening torque is 35 plate. Page 8 4. Connect all battery packs as below chart. Inverter WARNING: Shock Hazard Installation must be performed with care due to high battery voltage in
series. CAUTION!! Do not place anything between the flat part of the inverter terminal and the ring terminal. AC Input/Output Connection CAUTION!! Before connecting to AC input power source, please install a separate AC breaker between inverter and AC input power source. This will ensure the inverter can be securely disconnected during
maintenance and fully protected from over current of AC input. The recommended spec of AC breaker is 40A for 5KVA. Page 10 Please follow below steps to implement AC input/output connection: 1. Before making AC input/output connection, be sure to open DC protector or disconnector first. 2. Remove insulation sleeve 10mm from the six
conductors. And short-circuit phase L and neutral conductor N 3 mm. CAUTION: Important Be sure to connect AC wires with correct polarity. If L and N wires are connected reversely, it may cause utility short-circuited when these inverters are worked in parallel operation. CAUTION: Appliances such as air conditioner are required at least 2~3
minutes to restart because it’s required to have enough time to balance refrigerant gas inside of circuits. Final Assembly After connecting all wirings, please put the bottom cover back by fixing two screws as shown below. Communication Connection Please use supplied communication cable to connect to inverter and PC.
Insert bundled CD into a computer and follow the on-screen instructions to install the monitoring software. For the detailed software operations, please check user manual of software inside the CD. OPERATION Power ON/OFF Once the unit has been properly installed and the batteries are connected well, simply press On/Off switch (located on the
bottom of the inverter) to turn on the unit.
Operation and Display Panel The operation and display panel, as shown in the chart below, are on the front panel of the inverter. It includes three indicators, four function keys and an LCD display, indicating the operating status and input/output power information. LCD Display Icons Icon Function description Input Source Information Indicates the
AC input. Indicates the PV input Indicates the input 1 and output 1 data. Indicates the input 2 and output 2 data. Indicates input voltage, input frequency, PV voltage, battery voltage and charger current. Page 15 bar will flash. In floating mode, batteries are fully charged. 4 bars will be on. In battery mode, it will present battery capacity. Load
Percentage Battery Voltage LCD Display < 1.717V/cell 1.717V/cell ~ 1.8V/cell Load >50% 1.8 ~ 1.883V/cell > 1.883 V/cell <... LCD Setting After pressing and holding the ENTER button for 3 seconds, the unit will enter setting mode. Press “UP” or “DOWN” button to select setting programs. And then, press “ENTER” button to confirm the selection or
ESC button to exit. Setting Programs: Program Description... Page 17 60A (default) 100A 110A 120A 130A Maximum charging 140A 150A current: To configure the total charging current for solar and utility chargers. (Max. charging current = utility charging current + 160A 170A solar charging current) 180A 190A 200A 210A 220A Appliances
(default) If selected, acceptable AC input voltage range will be within... Page 18 User-Defined If “User-Defined” is selected, battery charge voltage and low DC cut-off voltage can be set up in program 26, 27 and 29. Restart disable Restart enable (default) Automatically restart when overload occurs Restart disable Restart enable (default)
Automatically restart when over temperature occurs 110V 120V (default) Page 19 Battery fully charged 48.0V 49.0V 50.0V 51.0V 52.0V Setting voltage point back to battery mode when selecting “SBU priority” or 53.0V 54.0V “Solar first” in program 01. 55.0V 56.0V 57.0V 58.0V If this inverter/charger is working in Line, Standby or Fault mode,
charger source can be programmed as below: Solar first Solar energy will charge battery as... Page 20 Return to default If selected, no matter how users display screen switch display screen, it will (default) automatically return to default display screen (Input voltage /output voltage) Automatically return to after no button is pressed for 1 default
display screen minute.
Page 21 Support L2 phase output Support L3 phase output on on 3-Phase application. 3-Phase application. Output voltage Output voltage is 120V. is 120V. AC output mode *This setting is able to set up only when the inverter Support L1/L2 phase output on split Support L1/L2 phase is in standby mode. Page 22 If selected, solar input power will be
Solar power balance automatically adjusted according to enable (Default): the following formula: Max. input solar power = Max. battery charging power + Solar power balance: Connected load power.
When enabled, solar input If selected, the solar input power Solar power balance power will be will be the same as max. If equalization function is enabled in program 33, this program can be set up. If “Enable” is selected in this program, it’s to activate battery equalization immediately and LCD main page will shows “ ”. If “Disable” is selected, it will
cancel equalization function until next activated equalization time arrives based on program 37 setting. Page 24 PV1 voltage=60V , PV1 Power = 200W MPPT Input 1 Charging current / MPPT Input 1 Charging power PV2 voltage=60V ,PV2 Power = 200W MPPT Input 2 Charging current / MPPT Input 2 Charging power Load 1 Watt=200W, Load 1
percent=60% Load 1 Watt/ Load 1 percentage Load 2 Watt=200W, Load 2 percent=60% Load 2 Watt/ Load 2 percentage... Page 25 Load 2 Watt 200W, Load 2 in VA=600VA Load 2 Watt/ Load 2 in VA Charging current=25A, Battery voltage=56.0V DC charging current / Battery voltage Battery voltage=53.0V, discharging current=1A Battery voltage/
DC discharging current Main CPU version 00014.04 Main CPU version checking Secondary CPU version: 00003.03 Secondary CPU version checking... Operating Mode Description Operation mode Description LCD display Charging by utility. Charging by PV energy. Standby mode Note: No output is supplied by the *Standby mode: The inverter unit
but it still can charge is not turned on yet but at this Charging by PV energy and utility the batteries. Charging by PV energy Charging by utility.
The unit will provide output power from the mains. It Line Mode will also charge the battery in line mode. Charging by PV energy and utility Power from battery and PV energy. The unit will provide output Battery Mode power from battery and PV Power from battery only. Over current or surge Bus voltage is too low Inverter soft start failed Over DC
voltage in AC output Battery connection is open Current sensor failed Output voltage is too low Internal circuit mismatch Parallel ID missing Parallel ID in conflict Working mode synchronization loss Warning Indicator Warning... SPECIFICATIONS Table 1: Line Mode Specifications INVERTER MODEL 5KVA Input Voltage Waveform Sinusoidal (utility
or generator) Nominal Input Voltage 110/120Vac(L-N or L1-N-L2) 95Vac± 7V (UPS) Low Loss Voltage 65Vac± 7V (Appliances) 100Vac± 7V (UPS); Low Loss Return Voltage 70Vac± 7V (Appliances) High Loss Voltage 140Vac±...
Page 30 Table 2: Inverter Mode Specifications INVERTER MODEL 5KVA 5KVA/5KW Rated Output Power Pure Sine Wave Output Voltage Waveform 110/120Vac(L-N or L1-N-L2) Output Voltage Regulation 60Hz or 50Hz Output Frequency Peak Efficiency Overload Protection 5s@≥150% load; 10s@110%~150% load 2* rated power for 5 seconds Surge
Capacity Nominal DC Input Voltage 48Vdc... Page 31 Battery Voltage, per cell Charging Current, % 2.43Vdc (2.35Vdc) Voltage 2.25Vdc 100% Charging Curve T1 = 10* T0, minimum 10mins, maximum 8hrs Current Time Bulk Absorption Maintenance (Constant Current) (Constant Voltage) (Floating) Solar Charging Mode(Per number of MPPT)
INVERTER MODEL 5KVA Rated Power 4000 W x 2... TROUBLESHOOTING Problem LCD/LED/Buzzer Explanation / Possible cause What to do Unit shuts down LCD/LEDs and buzzer automatically will be active for 3 The battery voltage is too low 1. Re-charge the battery. during startup seconds and then (<1.91V/Cell) 2. Replace the battery. process.
Appendix I: Approximate Back-up Time Table Model Load (VA) Backup Time @48Vdc 200Ah (min) Backup Time @48Vdc 400Ah (min) 1226 2576 1000 1226 1500 2000 2500 5KVA 3000 3500 4000 4500 5000 Note: Backup time depends on the quality of the battery, age of battery and type of battery. Specifications of batteries may vary depending on
different manufacturers. Appendix II: Parallel function 1. Introduction This inverter can be used in parallel with three different operation modes. 1. Parallel operation in single phase with up to three units. The supported maximum output power is 15KW/15KVA. 2. Maximum three units work together to support three-phase equipment. The supported
maximum output power is 15KW/15KVA. Page 35 4. Wiring Connection The size of the cable for each inverter is shown as below: WARNING: Be sure the length of all battery cables is the same. Otherwise, there will be voltage difference between inverter and battery which might cause mal-function of the parallel inverters. Recommended battery cable
and terminal size for each inverter: Model Wire Size... Page 36 4-1. Parallel Operation in Single phase Two inverters in parallel: Power Connection L1 L2 L1 L2 Load Communication Connection ❶ ❷ Three inverters in parallel: Power Connection L1 L2 L1 L2 L1 L2 Load... Page 37 Communication Connection ❶ ❷ ❸ 4-2. Support 2-phase equipment Two
inverters in parallel (Line to Line output voltage is 208V): Power Connection Load Communication Connection ❶ ❷... Page 38 Two inverters in parallel (Line to Line output voltage is 240V): Power Connection Load Communication Connection ❶ ❷ Three inverters in parallel (Line to Line output voltage is 208V): Power Connection Load... Page 39
Communication Connection ❶ ❷ ❸ Three inverters in parallel (Line to Line output voltage is 240V): Power Connection Load Communication Connection ❶ ❷ ❸...
Page 40 4-3. Support 3-phase equipment One inverter in each phase Power Connection L1 L2 L1 L2 L1 L2 Load Communication Connection ❶ ❷ ❸ WARNING: Do NOT connect the current sharing cables between the inverters in different phases. Otherwise, it may damage the inverters. NOTE: For parallel model operation, please refer to LCD
program 28 5. Page 41 Parallel ID Setting It’s necessary to set up parallel ID for each inverter. Parallel ID * Not used...
Page 42 7. LCD Setting and Display Setting Program: Program Description Selectable option Parallel output in single When the units are used in parallel for phase. Output voltage is single phase application, please select “2A0” in program 28. L1 to L2 output 120V. Page 43 When “ONE” is selected, as long as one of the inverters has been connected
to PV modules and PV input is normal, parallel or 3-phase system will continue working according to rule of “solar first” setting.
For example, two units are connected in One Inverter (Default): parallel and set “SOL”...
Page 44 8. Commissioning Parallel in single phase Step 1: Check the following requirements before installation: Correct wire connection Ensure all breakers in Line wires at load side are open and each Neutral wires of each unit is connected together. Step 2: Turn on all of the units and configure LCD program 28 as 2A0. Page 45 Step 5: If there is
no more fault alarm, the parallel system is completely installed. Step 6: Please switch on all breakers of Line wires in load side. This system will start to provide power to the load. Support three-phase equipment Step 1: Check the following requirements before installation: Correct wire connection ...
Page 46 9. Troubleshooting If the device fails to function as expected, check the list of common faults below before consulting the service center. Situation Fault Solution Fault Event Description Code Restart the inverter. Check if L/N cables are not connected reversely in all inverters. For parallel system in single phase, make sure the current sharing
cables Current feedback into are connected to all inverters.