MVL USA INC, QATAR

Repair Comm Infrastructure Manhole

Activity Hazard Analysis (AHA)


Activity/Work Task: Overall Risk Assessment Code (RAC) (Use highest code)
Earthworks
Project Location: AL-UDIED US BASE Risk Assessment Code (RAC) Matrix
Contract Number: FA570223F0080 Probability
Severity
Date Prepared: 04-05-2024 Frequent Likely Occasional Seldom Unlikely
LAWRENCE OMISAKIN Catastrophic E E H H M
Prepared by (Name/Title):
(HSEM) Critical E H H M L
Marginal H M M L L
Reviewed by (Title): Christhoper J.C (PM)
Negligible M L L L L
- Notes: Operatives must have completed the Project HSE Step 1: Review each “Hazard” with identified safety “Controls” and determine RAC
Induction, and other applicable trainings prior to deployment. (See above)
- Pre-task instructions will be conducted every start of shift and at “Probability” is the likelihood to cause an incident, near miss,
each new task. or accident and identified as: Frequent, Likely, Occasional, RAC Chart
- Effective measures shall be implemented when working under Seldom or Unlikely.
extreme weather conditions; prevent heat stress/hypothermia. “Severity” is the outcome/degree if an incident, near miss, or E = Extremely High
accident did occur and identified as: Catastrophic, Critical, Risk
Minimum PPE Requirements: Marginal, or Negligible H = High Risk
- Hard hat, Safety Glasses, Safety boots, High-visibility vests Step 2: Identify the RAC (Probability/Severity) as E, H, M, or M = Moderate Risk
Specific PPE are indicated in this AHA where required L for each “Hazard” on AHA. Annotate the overall highest
L = Low Risk
RAC at the top of AHA.

Page 1 of 4
Act Responsible
Activity Potential Hazards Consequence Control Measures
No. Party
Injury from falling into ➢ The open edge of excavation shall be barricaded, and no one
Working in and around excavation or shall work close to the edge of excavations.
Survey,
excavation Being hit by a moving ➢ Marking out areas near plant vehicle movement area shall be Site Engineer/
1 Marking isolated via physical barriers or controlled by banksman.
Working near plant and vehicle/plant site Supervisor
layer/level
vehicle ➢ PPE such as safety shoe, reflective jacket and helmet must be
worn by all those involved in the activities
Workers are not Wearing ➢ Mandatory PPE Shall be worn on site (Coverall helmet, Safety Shoes
adequate PPR. & High visibility Vest.)
No supervision, person not ➢ Strict supervision shall be required for the whole duration of the
Unsafe Behavior (Injury) competent
operation (charge hand never leave the workplace during operation)
Circulation (Slip, Trip, & Obstruction around the
Fall) workplace ➢ Conduit is storage safely and not left lying around as a trip hazard only
During all the the amount of conduit to be used straight away is taken to the
Manual Handling Lack of lighting in the
operation/
(injury/Squeeze) workplace. workplace. Others are left in storage until they are required.
Preparation of Safety Officer/ site
2 Work
Gesture and Postures Lifting load in an award ➢ No work is Permitted if lighting is not enough. Extra lifting is not Supervisor
(injury/Plan) position. enough.
Co-Activity Working in an awkward ➢ Intervention of specialized workers + Mechanical equipment shall be
(Injury/Collision) position. For a long time (In
Prioritize + load of 20kg or more shall not be lifted by a single person.
Extension…)
Traffic Disturbance ➢ Ergonomic adaption of work strains + small break /changing task

➢ Special description shall be taken while on the road by the provision of


banks man & barricaders + limit vehicle access + speed limitation.
➢ Obtain excavation work permit from HSE department before
commencing the work and site supervisor shall make sure the permit,
Method statement and TBT on method statement/risk assessments are
available at site.
Personal injury /property ➢ Competent supervision must be available during work.
Safety Officer/ site
damage from ➢ Identify and mark the underground utilities before starting the
Supervisor
• Underground utilities excavation and protect the utilities (If any) during work.
• Working with moving • Collusion with moving ➢ Provide adequate protection for open pits such as hard barriers, adequate
Excavation plants and vehicle
3 plants hazard warning signs (Danger Deep Excavation), mini flashlights if the
• Noise • Striking underground trench is near to live road.
Dust services ➢ Only manual excavation to be done in areas where there is presence of
• Slip, trip and fall underground utilities.
➢ Equipment operation shall only be under the guidance of a competent
banks man.
➢ PPE such as safety shoe, reflective jacket, dust mask. goggles and
helmet must be worn by all those involved in the activities

Trenches (1.2m- Underground utilities not Impact with underground ➢ Use scanning machines to locate underground services and mark.
2m) depth identified. Dig permit not utilities, ➢ And a permit to excavate must be issued before work commences.
secured before excavation. Physical or serious injuries ➢ A copy of permit must be always available in the working area.
Lack of proper traffic because of being hit by Supervisor/safety
➢ Hand-digging measures to be used to expose existing services. Banks
management system, moving plant or any other Officer, site
4 man to observe area being excavated for any undiscovered services. engineer
improper signal device i.e. workers in the vicinity
reverse alarm and
revolving light on plant. ➢ While excavation Banks man to ensure safe equipment movement.
➢ Do not allow workers to work near to the near to the equipment.
➢ Barricade area with safety signage and warning light. Equipment.
Page 2 of 4
➢ Traffic management must be in place before the start of work.
➢ Danger signage shall be provided at the working area.
➢ Warning lights shall be positioned around the excavated area.
Working around ➢ Open trenches shall be well protected or barricaded. Site Engineer
1. Falling Hazard. ➢ Proper housekeeping shall be done at the beginning and at the close of
5 the trenches or
2. Sharp objects
Workers Supervisor
Excavated areas the Job. Safety Officer
➢ Sharp Object shall not be kept within the trenched unsafely.
➢ Safe access and egress shall be provided into the trenches.
dust Personal injury /property ➢ Rotate compaction tasks to minimize worker exposure to continuous
damage from manual handling.
Slip, trip, and fall.
Collusion with moving plants ➢ Good housekeeping shall be utilized to avoid tripping hazards created
Overexertion and muscle or vehicle by the debris.
Bedding,
Cave in ➢ Workers to be self-conscious/alert of the working environment. Safety Officer/ site
6 compaction, and pain
Fall into excavation. Supervisor
backfilling ➢ Keeping the back upright for some minutes before bending again
Exposure to snakes, Material/equipment fall from ➢ Clear work areas of equipment, tools, construction debris and other
rodents height.
materials
Slip, trip and fall.

Leveling and Strains, sprains, injuries. Personal injury, Slip, trip and ➢ All operators must use dust masks, gloves, ear protection, and safety
compaction with exposure to dust and noise, fall. shoes at all times.
reversible plate Physical injuries ➢ The use of loose clothes and jewelry must not be allowed, and proper
compactor/ Physical or serious injuries monitoring must be done by the charge hand.
Compaction Roller when workers are hit by ➢ Proper inspection of the equipment must be carried out every day
Site Engineer,
Machine/Equipmen plant or equipment. before the start of work and if any damage is found it must be removed
Activity
t from site.
7 Supervisor & HSE
➢ Breaks must be given at intervals for the operators as soon as the
operator discovers that is fingers started to tingle from the vibration.
➢ The operator must stop using the equipment to flex its muscles, hands,
finger to keep them warm to allow blood circulation.
➢ When backfilling is going bank man shall keep watch when using
compactors.
Unauthorized operation
Un guarded Rotating ➢ Compactors will be operated by competent operators.
Injury from unguarded
Use of Plate
parts.
moving parts ➢ The supervisor and operator shall make sure the plant is equipped with Safety Officer/ site
8 compactor
Vibration
Health hazard from Vibration, guards on all rotating parts. Supervisor
Noise
Noise, dust ➢ Operator shall use heavy duty hand gloves, ear protection and dust mask
Dust
Use of fuel in addition to his mandatory PPEs.
➢ All Road diversions, Detour and working close to live road shall be
carried out as per approved detour plan and permit.
➢ All activity shall be carried out under competent supervision only.
➢ A competent banks man must be present in the vehicle/plant
Moving traffic
movement area.
Operatives and
plants/vehicle close to the ➢ Pedestrian and vehicle routes shall be segregated so far as reasonably
Personal injury, practical and shall be clearly marked with signs and barriers.
live traffic
Working close to Fatality, Property damage ➢ All work shall be carried out within the work zone (hard barrier) no Safety Officer/ site
9 Live Road
Dust
from traffic accident Supervisor
Foreign object particles one will be allowed to go to live road.
Material falling from ➢ All employees shall follow instructions and attend training on site
moving vehicles. traffic management and logistics.
➢ Avoid reverse movement.
➢ All employees should always wear high visibility jackets.
➢ No workers shall be allowed to cross live roads, always be away from
live road and adjacent barriers.
Page 3 of 4
➢ Do not move any barrier or signs from its location.
➢ Ensure adequate lighting provided during night activities.
➢ Do not store or keep any loose materials close to live road, do not
throw any materials on live road.
➢ Heavy equipment such as cranes, boom loaders, excavators, back hoes
should not swing/extend their booms/arms towards live road direction
at any time. Banks man must control/guide the operators
Dust Accumulation Serious health / ➢ Water should be applied at least three times a day or more, Supervisor/safety
. Noise Body injuries or death depending on the atmospheric conditions. Also, to be aware of Officer sec.
Final Grading falls from some level the quantity of water applied and prevent excess water that can
to lower-level trench.
cause erosion problems.
. Edges, tranches, and
depressions ➢ Use ear plugs to prevent noise pollution and other ear problems.
10 . improper access to work
area ➢ Instruct workers to stay clear of edges.
. Respiratory hazard ➢ No one is permeated underneath loads handled by digging
equipment’s and stand away from vehicle that are backing.
➢ Access must be free and clear from material.
➢ Appropriate PPE such as dust mask or face cover shall be used.
Emergency No available notice boards All personnel and work force ➢ Established Contact for key personnel for Emergency Situation Safety Officer/
procedure/First posted at the sites. ➢ Ensure ALL are aware & understood the Emergency Procedure Supervisor
Aid Lack of responsible person & Plan during formwork installation works.
in case of emergency. ➢ Ensuring the First Aid kits box is always available.
Missing emergency vehicle ➢ Stand-by Certified First Aider (if works commencing at the night
11 Unavailability of First shift operation)
Aider ➢ Trained First Aider Team to be arranged & deployed before
commencing works.
➢ Emergency vehicle must be standby should in case of emergency need.
➢ Ensure adequate training among emergency rescue team

➢ Ensure workers to replace fluids being used from the body by taking Safety Officer/
Working in Physical Injury due All workers exposed under appropriate drinking water. Supervisor
climate Weather Exposure to Hot Weather direct sunlight. ➢ Ensure appropriate dress code in cold/hot weather.
(sandstorm-dust and
skin/eye irritation ➢ The Management Team must ensure that all working and testing
crew/personnel should follow client safety instructions and respond to
12
their safety policy.
➢ Ensure close monitoring by the activity supervisor and assigned safety.
➢ Ensure proper site timing while working as approved by the Site
Management Team.

General Slips, Trips and Falls Fire ➢ Site of works to be always kept neat and tidy.
Housekeeping of Discarded materials / Falling, ➢ Keep the area organized and tidy at all times.
site waste. ➢ Waste to be immediately placed into waste containers.
Materials poorly stored / Tripping Hazard
➢ / Receptacles.
untidy. Supervisor/safety
13 Work areas not ➢ Store all materials securely and tidy.
Officer
maintained. ➢ Ensure all work areas are properly lit.
Poorly lighted work areas. ➢ Wear appropriate footwear and clothing to prevent.
Inappropriate footwear / ➢ Segregation of materials
clothing.

Page 4 of 4