You are on page 1of 20

PROYECTO: "MEJORAMIENTO COLECTORES QUEBRADAS SAPHY, AV. SOL, TULLUMAYO Y AV.

EJERCITO"

REPORTE DE TUBERIAS MODELAMIENTO HIDRAULICO AÑO 20 (2039) + LLUVIAS - COLECTOR QUEBRADA SAPHY

Diam. Longitud
Long. Planta Pendiente Velocidad Tensión
ID Nombre Buzon Inicio Buzon Final Material Interior Dn (mm) Inclinada
(m) (m/km) Caudal (L/s) (m/s) Tirante (%) Tractiva (Pa) Notas
(mm) (m)
153392 TUB AL-23 BZ:88 BZ:87 PVC-U SN4 237.6 Dn= 250 23.00 21.70 336.24 37.21 5.99 43.40 93.45 PROYECTADA
153462 TUB AL-25 BZ:86 BZ:85 PVC-U SN4 240.2 Dn= 250 34.20 32.40 336.07 37.21 5.98 42.80 93.24 PROYECTADA
153450 TUB AL-24 BZ:87 BZ:86 PVC-U SN4 240.2 Dn= 250 29.60 28.10 331.33 37.21 5.95 42.80 92.21 PROYECTADA
153257 TUB AL-36 BZ:115 BZ:114 PVC-U SN4 192.2 Dn= 200 9.90 8.50 546.47 18.42 5.93 38.90 103.82 PROYECTADA
153350 TUB AL-115 BZ:57 BZ:56 PVC-U SN4 302.6 Dn= 315 18.10 17.80 194.20 74.11 5.86 46.60 79.11 PROYECTADA
153294 TUB AL-35 BZ:76 BZ:75 PVC-U SN4 240.2 Dn= 250 14.80 14.30 258.31 39.02 5.53 44.50 77.52 PROYECTADA
153402 TUB AL-42 BZ:111' BZ:111 PVC-U SN4 192.2 Dn= 200 25.10 23.00 434.76 18.42 5.47 39.30 86.87 PROYECTADA
153574 MU-14 BZ:124 BZ:125 PVC-U SN4 192.2 Dn= 200 10.40 8.30 746.89 8.80 5.30 26.20 95.02 PROYECTADA
153525 TUB AL-27 BZ:84 BZ:83 PVC-U SN4 240.2 Dn= 250 57.30 55.70 237.32 37.21 5.29 43.70 71.06 PROYECTADA
153419 TUB AL-133 BZ:39 BZ:38 PVC-U SN4 302.6 Dn= 315 24.80 24.60 137.86 75.55 5.23 48.10 60.95 PROYECTADA
153251 TUB AL-147 BZ:27 BZ:26 PVC-U SN4 302.6 Dn= 315 6.40 6.20 122.90 84.66 5.19 54.40 58.46 PROYECTADA
153499 TUB AL-30 BZ:81 BZ:80 PVC-U SN4 240.2 Dn= 250 42.70 41.80 216.68 37.21 5.12 43.90 66.19 PROYECTADA
153577 MU-16 BZ:126 BZ:127 PVC-U SN4 192.2 Dn= 200 10.80 9.00 677.98 8.80 5.12 26.30 88.16 PROYECTADA
153311 TUB AL-131 BZ:41 BZ:40 PVC-U SN4 302.6 Dn= 315 16.30 16.20 126.85 75.55 5.08 48.70 57.09 PROYECTADA
153537 TUB AL-33 BZ:78 BZ:77 PVC-U SN4 240.2 Dn= 250 76.50 74.80 208.57 37.21 5.06 66.90 64.25 PROYECTADA
153364 TUB AL-43 BZ:111 BZ:110' PVC-U SN2 192.2 Dn= 200 21.10 20.00 333.07 18.42 4.99 39.90 70.51 PROYECTADA
153300 TUB AL-111 BZ:61 BZ:60 PVC-U SN2 240.2 Dn= 250 14.70 14.60 127.32 65.31 4.98 60.30 55.52 PROYECTADA
153464 TUB AL-34 BZ:77 BZ:76 PVC-U SN2 240.2 Dn= 250 33.30 32.70 192.79 39.02 4.98 45.30 61.73 PROYECTADA
153377 TUB AL-100 BZ:72 BZ:71 PVC-U SN2 240.2 Dn= 250 21.50 21.30 123.48 65.31 4.93 59.80 54.18 PROYECTADA
153334 TUB AL-98 BZ:74 BZ:73 PVC-U SN2 240.2 Dn= 250 17.70 17.30 177.38 39.02 4.84 45.60 57.79 PROYECTADA
153400 TUB AL-101 BZ:71 BZ:70 PVC-U SN2 240.2 Dn= 250 23.10 23.00 111.08 65.31 4.74 60.30 49.87 PROYECTADA
153456 TUB AL-121 BZ:51 BZ:50 PVC-U SN2 302.6 Dn= 315 30.20 30.00 103.32 74.11 4.69 48.60 48.21 PROYECTADA
153380 TUB AL-41 BZ:112 BZ:111' PVC-U SN2 192.2 Dn= 200 22.20 21.50 262.66 18.42 4.58 40.50 58.70 PROYECTADA
153289 TUB AL-31 BZ:80 BZ:79 PVC-U SN2 240.2 Dn= 250 13.90 13.70 155.96 37.21 4.56 44.80 51.18 PROYECTADA
153275 TUB AL-46 BZ:109' BZ:109 PVC-U SN2 192.2 Dn= 200 11.00 10.80 191.05 26.29 4.54 49.50 53.46 PROYECTADA
153286 TUB AL-6 BZ:103' BZ:102' PVC-U SN2 192.2 Dn= 200 13.60 13.30 236.01 20.05 4.52 42.50 56.04 PROYECTADA
153444 TUB AL-51 BZ:107 BZ:73 PVC-U SN2 192.2 Dn= 200 28.80 28.30 186.49 26.29 4.50 49.50 52.45 PROYECTADA
153245 TUB AL-92 BZ:123 BZ:109' PVC-U SN2 192.2 Dn= 200 6.20 5.50 481.66 7.87 4.40 56.40 64.33 PROYECTADA
153512 TUB AL-29 BZ:82 BZ:81 PVC-U SN2 240.2 Dn= 250 47.80 47.30 139.20 37.21 4.38 45.20 46.85 PROYECTADA
153375 TUB AL-128 BZ:44 BZ:43 PVC-U SN2 302.6 Dn= 315 21.20 21.10 83.74 75.55 4.37 49.90 41.22 PROYECTADA
153588 MU-1 BZ:136 BZ:135' PVC-U SN2 240.2 Dn= 250 21.50 19.80 428.33 9.11 4.29 20.50 59.81 PROYECTADA
153413 TUB AL-44 BZ:110' BZ:110 PVC-U SN2 192.2 Dn= 200 24.90 24.30 209.98 18.42 4.23 41.00 49.29 PROYECTADA
153568 TUB AL-136(1) BZ:36 BZ:35' PVC-U SN2 302.6 Dn= 315 37.30 37.20 74.69 75.55 4.20 72.70 37.66 PROYECTADA
153248 TUB AL-32 BZ:79 BZ:78 PVC-U SN2 240.2 Dn= 250 5.80 5.80 121.00 37.21 4.17 47.30 41.97 PROYECTADA
153359 TUB AL-97 BZ:75 BZ:74 PVC-U SN2 240.2 Dn= 250 19.00 18.90 112.60 39.02 4.12 47.00 40.49 PROYECTADA
153433 TUB AL-132 BZ:40 BZ:39 PVC-U SN2 302.6 Dn= 315 27.60 27.50 70.48 75.55 4.11 50.50 35.98 PROYECTADA
153348 TUB AL-45 BZ:110 BZ:109' PVC-U SN2 192.2 Dn= 200 18.10 17.80 186.67 18.42 4.06 67.40 44.95 PROYECTADA
153424 TUB AL-106 BZ:66 BZ:65 PVC-U SN2 240.2 Dn= 250 24.90 24.80 71.80 65.31 4.05 62.40 35.24 PROYECTADA
153515 TUB AL-142 BZ:31 BZ:31' PVC-U SN2 302.6 Dn= 315 49.20 49.10 59.04 84.66 3.98 54.20 32.84 PROYECTADA
153325 TUB AL-39 BZ:113 BZ:112' PVC-U SN2 192.2 Dn= 200 17.40 17.10 171.17 18.42 3.94 41.60 42.01 PROYECTADA
153580 MU-20 BZ:130 BZ:131 PVC-U SN2 192.2 Dn= 200 17.00 16.20 316.66 8.80 3.93 27.40 48.83 PROYECTADA
153489 TUB AL-126 BZ:47 BZ:45 PVC-U SN2 302.6 Dn= 315 38.10 38.00 61.54 75.55 3.92 51.00 32.33 PROYECTADA
153569 TUB AL-136(2) BZ:35' BZ:35 PVC-U SN2 302.6 Dn= 315 12.60 12.60 56.22 84.66 3.91 56.00 31.58 PROYECTADA
153496 TUB AL-28 BZ:83 BZ:82 PVC-U SN2 240.2 Dn= 250 41.50 41.30 99.09 37.21 3.88 46.30 35.88 PROYECTADA
153446 TUB AL-135 BZ:37 BZ:36 PVC-U SN2 302.6 Dn= 315 28.80 28.80 59.79 75.55 3.88 51.10 31.60 PROYECTADA
153314 TUB AL-67 BZ:10 BZ:11 PVC-U SN4 190.2 Dn= 200 17.20 16.20 364.22 7.12 3.87 24.70 49.63 PROYECTADA
153263 TUB AL-49 BZ:108 BZ:107' PVC-U SN2 192.2 Dn= 200 8.90 8.90 121.97 26.29 3.87 51.50 37.57 PROYECTADA
153461 TUB AL-48 BZ:108' BZ:108 PVC-U SN2 192.2 Dn= 200 32.10 31.90 120.11 26.29 3.85 51.00 37.11 PROYECTADA
153442 TUB AL-50 BZ:107' BZ:107 PVC-U SN2 192.2 Dn= 200 28.30 28.10 118.89 26.29 3.84 51.10 36.81 PROYECTADA
153528 TUB AL-143 BZ:31' BZ:30 PVC-U SN2 302.6 Dn= 315 59.50 59.40 52.69 84.66 3.83 54.70 30.00 PROYECTADA
153277 TUB AL-1 BZ:106 BZ:106' PVC-U SN2 192.2 Dn= 200 11.00 10.90 142.44 20.05 3.79 43.90 37.73 PROYECTADA
153513 TUB AL-138 BZ:34 BZ:33 PVC-U SN2 302.6 Dn= 315 47.50 47.50 50.96 84.66 3.78 54.90 29.22 PROYECTADA
153352 TUB AL-47 BZ:109 BZ:108' PVC-U SN2 192.2 Dn= 200 18.00 17.80 112.68 26.29 3.75 51.30 35.35 PROYECTADA
153522 TUB AL-144 BZ:30 BZ:29 PVC-U SN2 302.6 Dn= 315 54.00 53.90 45.63 84.66 3.63 55.40 26.77 PROYECTADA
153504 TUB AL-140 BZ:33' BZ:32 PVC-U SN2 302.6 Dn= 315 44.60 44.60 45.09 84.66 3.62 55.50 26.52 PROYECTADA
153477 TUB AL-139 BZ:33 BZ:33' PVC-U SN2 302.6 Dn= 315 36.00 35.90 44.81 84.66 3.61 55.50 26.39 PROYECTADA
153406 TUB AL-93 BZ:131 BZ:132 PVC-U SN2 192.2 Dn= 200 24.30 23.70 226.07 8.80 3.50 27.90 37.56 PROYECTADA
153539 TUB AL-146 BZ:28 BZ:27 PVC-U SN2 302.6 Dn= 315 93.50 93.30 40.72 84.66 3.49 56.00 24.44 PROYECTADA
153448 TUB AL-120 BZ:52 BZ:51 PVC-U SN2 302.6 Dn= 315 28.90 28.80 44.05 74.11 3.45 51.90 24.64 PROYECTADA
153401 TUB AL-117 BZ:55 BZ:54 PVC-U SN2 302.6 Dn= 315 23.00 23.00 43.52 74.11 3.44 52.20 24.40 PROYECTADA
153511 TUB AL-105 BZ:67 BZ:66 PVC-U SN2 240.2 Dn= 250 47.00 46.90 45.39 65.31 3.42 65.00 24.43 PROYECTADA
153519 TUB AL-141 BZ:32 BZ:31 PVC-U SN2 302.6 Dn= 315 52.10 52.00 38.44 84.66 3.41 56.20 23.35 PROYECTADA
153493 TUB AL-125 BZ:46 BZ:47 PVC-U SN2 302.6 Dn= 315 38.90 38.90 40.41 75.55 3.37 52.80 23.19 PROYECTADA
153605 MU-17 BZ:127 BZ:128 PVC-U SN2 192.2 Dn= 200 33.00 32.40 201.74 8.80 3.35 28.10 34.45 PROYECTADA
153417 TUB AL-76 BZ:19 BZ:20 PVC-U SN2 192.2 Dn= 200 25.10 24.50 234.74 7.12 3.32 25.00 35.19 PROYECTADA
153572 MU-3 BZ:135 BZ:35' PVC-U SN2 240.2 Dn= 250 8.10 7.90 207.15 9.11 3.32 21.40 34.17 PROYECTADA
153399 TUB AL-40 BZ:112' BZ:112 PVC-U SN2 192.2 Dn= 200 23.00 22.90 101.43 18.42 3.27 43.10 27.90 PROYECTADA
153354 TUB AL-112 BZ:60 BZ:59 PVC-U SN2 240.2 Dn= 250 17.90 17.90 39.18 65.31 3.24 66.80 21.71 PROYECTADA
153530 TUB AL-99 BZ:73 BZ:72 PVC-U SN2 240.2 Dn= 250 61.80 61.80 38.22 65.31 3.21 66.10 21.28 PROYECTADA
153455 TUB AL-94 BZ:132 BZ:133 PVC-U SN2 192.2 Dn= 200 30.30 29.80 177.01 8.80 3.20 28.40 31.10 PROYECTADA
153591 MU-2 BZ:135' BZ:135 PVC-U SN2 240.2 Dn= 250 20.40 20.00 185.05 9.11 3.19 21.60 31.31 PROYECTADA
153495 TUB AL-3 BZ:105 BZ:104 PVC-U SN2 192.2 Dn= 200 41.00 40.90 82.20 20.05 3.10 45.70 24.57 PROYECTADA
153291 TUB AL-122 BZ:50 BZ:49 PVC-U SN2 302.6 Dn= 315 13.90 13.90 31.59 74.11 3.07 54.80 18.92 PROYECTADA
153582 MU-18 BZ:128 BZ:129 PVC-U SN2 192.2 Dn= 200 17.60 17.40 154.44 8.80 3.05 28.60 27.98 PROYECTADA
153594 MU-19 BZ:129 BZ:130 PVC-U SN2 192.2 Dn= 200 26.00 25.70 151.22 8.80 3.03 28.70 27.52 PROYECTADA
153534 TUB AL-145 BZ:29 BZ:28 PVC-U SN2 302.6 Dn= 315 64.80 64.80 26.54 84.66 2.98 58.20 17.38 PROYECTADA
153486 TUB AL-22 BZ:89 BZ:88 PVC-U SN4 237.6 Dn= 250 37.70 37.70 46.94 37.21 2.97 49.80 19.95 PROYECTADA
153316 TUB AL-102 BZ:70 BZ:69 PVC-U SN2 240.2 Dn= 250 16.80 16.70 30.45 65.31 2.95 68.70 17.71 PROYECTADA
153280 TUB AL-96 BZ:134 BZ:59 PVC-U SN2 192.2 Dn= 200 11.80 11.60 134.83 8.80 2.91 28.90 25.18 PROYECTADA
153508 TUB AL-137 BZ:35 BZ:34 PVC-U SN2 302.6 Dn= 315 46.70 46.60 24.44 84.66 2.89 58.70 16.27 PROYECTADA
153409 TUB AL-95 BZ:133 BZ:134 PVC-U SN2 192.2 Dn= 200 23.90 23.70 129.96 8.80 2.87 29.00 24.47 PROYECTADA
153361 TUB AL-129 BZ:43 BZ:42 PVC-U SN2 302.6 Dn= 315 20.00 20.00 26.02 75.55 2.87 55.70 16.35 PROYECTADA
153503 TUB AL-127 BZ:45 BZ:44 PVC-U SN2 302.6 Dn= 315 44.20 44.20 25.58 75.55 2.85 55.10 16.12 PROYECTADA
153601 MU-6 BZ:144 BZ:143 PVC-U SN2 192.2 Dn= 200 34.00 28.90 619.02 1.44 2.85 10.60 36.24 PROYECTADA
153422 TUB AL-119 BZ:53 BZ:52 PVC-U SN2 302.6 Dn= 315 24.70 24.70 24.31 74.11 2.78 55.10 15.37 PROYECTADA
153585 MU-11 BZ:139 BZ:138 PVC-U SN2 192.2 Dn= 200 20.80 18.00 574.07 1.44 2.77 10.60 34.24 PROYECTADA
153452 TUB AL-59 BZ:2 BZ:3 PVC-U SN2 192.2 Dn= 200 30.10 29.80 136.26 7.12 2.74 25.90 23.13 PROYECTADA
153254 TUB AL-104 BZ:68 BZ:67 PVC-U SN2 240.2 Dn= 250 8.30 8.30 23.99 65.31 2.70 72.50 14.58 PROYECTADA
153428 TUB AL-91 BZ:122 BZ:123 PVC-U SN2 192.2 Dn= 200 25.50 25.30 118.59 7.87 2.69 27.50 21.68 PROYECTADA
153309 TUB AL-2 BZ:106' BZ:105 PVC-U SN2 192.2 Dn= 200 15.20 15.20 54.62 20.05 2.68 47.30 17.80 PROYECTADA
PROYECTO: "MEJORAMIENTO COLECTORES QUEBRADAS SAPHY, AV. SOL, TULLUMAYO Y AV. EJERCITO"

REPORTE DE TUBERIAS MODELAMIENTO HIDRAULICO AÑO 20 (2039) + LLUVIAS - COLECTOR QUEBRADA SAPHY

Diam. Longitud
Long. Planta Pendiente Velocidad Tensión
ID Nombre Buzon Inicio Buzon Final Material Interior Dn (mm) Inclinada
(m) (m/km) Caudal (L/s) (m/s) Tirante (%) Tractiva (Pa) Notas
(mm) (m)
153570 MU-13 BZ:137 BZ:46 PVC-U SN2 192.2 Dn= 200 6.50 5.90 487.12 1.44 2.64 58.20 30.00 PROYECTADA
153492 TUB AL-103 BZ:69 BZ:68 PVC-U SN2 240.2 Dn= 250 38.20 38.20 22.53 65.31 2.63 70.00 13.86 PROYECTADA
153297 TUB AL-75 BZ:18 BZ:19 PVC-U SN2 192.2 Dn= 200 14.70 14.60 116.64 7.12 2.60 26.20 20.47 PROYECTADA
153386 TUB AL-5 BZ:103 BZ:103' PVC-U SN2 192.2 Dn= 200 21.90 21.90 49.80 20.05 2.60 47.60 16.55 PROYECTADA
153434 TUB AL-77 BZ:20 BZ:21 PVC-U SN2 192.2 Dn= 200 28.00 27.80 115.10 7.12 2.58 47.40 20.26 PROYECTADA
153593 MU-12 BZ:138 BZ:137 PVC-U SN2 192.2 Dn= 200 25.40 23.40 414.23 1.44 2.49 10.80 26.48 PROYECTADA
153283 TUB AL-116 BZ:56 BZ:55 PVC-U SN2 302.6 Dn= 315 12.50 12.50 17.57 74.11 2.47 58.30 11.84 PROYECTADA
153387 TUB AL-107 BZ:65 BZ:64 PVC-U SN2 240.2 Dn= 250 22.20 22.20 17.14 65.31 2.37 72.80 11.06 PROYECTADA
153337 TUB AL-109 BZ:63 BZ:62 PVC-U SN2 240.2 Dn= 250 17.30 17.30 16.75 65.31 2.35 73.50 10.85 PROYECTADA
153319 TUB AL-108 BZ:64 BZ:63 PVC-U SN2 240.2 Dn= 250 16.80 16.80 16.64 65.31 2.34 73.60 10.79 PROYECTADA
153445 TUB AL-9 BZ:101 BZ:100 PVC-U SN2 192.2 Dn= 200 28.70 28.60 35.95 20.95 2.34 50.10 13.04 PROYECTADA
153472 TUB AL-11 BZ:100' BZ:99 PVC-U SN2 192.2 Dn= 200 35.00 34.90 35.49 20.95 2.33 50.20 12.90 PROYECTADA
153475 TUB AL-66 BZ:9 BZ:10 PVC-U SN4 190.2 Dn= 200 36.20 35.90 81.73 7.12 2.30 27.20 15.54 PROYECTADA
153355 TUB AL-113 BZ:59 BZ:58 PVC-U SN2 302.6 Dn= 315 18.30 18.30 14.23 74.11 2.29 58.80 10.00 PROYECTADA
153360 TUB AL-110 BZ:62 BZ:61 PVC-U SN2 240.2 Dn= 250 19.90 19.90 15.59 65.31 2.29 73.90 10.22 PROYECTADA
153389 TUB AL-134 BZ:38 BZ:37 PVC-U SN2 302.6 Dn= 315 22.30 22.20 13.93 75.55 2.28 59.20 9.91 PROYECTADA
153501 TUB AL-58 BZ:1 BZ:2 PVC-U SN2 192.2 Dn= 200 43.00 42.90 79.11 7.12 2.27 26.90 15.14 PROYECTADA
153468 TUB AL-61 BZ:4 BZ:5 PVC-U SN2 192.2 Dn= 200 33.60 33.50 77.55 7.12 2.25 26.90 14.89 PROYECTADA
153260 TUB AL-118 BZ:54 BZ:53 PVC-U SN2 302.6 Dn= 315 8.60 8.60 12.76 74.11 2.20 60.90 9.16 PROYECTADA
153396 TUB AL-73 BZ:16 BZ:17 PVC-U SN2 192.2 Dn= 200 22.60 22.60 71.27 7.12 2.19 27.10 13.95 PROYECTADA
153269 TUB AL-124 BZ:48 BZ:46 PVC-U SN2 302.6 Dn= 315 9.10 9.10 12.04 74.11 2.15 70.30 8.73 PROYECTADA
153322 TUB AL-70 BZ:13 BZ:14 PVC-U SN2 192.2 Dn= 200 17.10 17.10 66.84 7.12 2.14 27.30 13.27 PROYECTADA
153609 MU-7 BZ:143 BZ:142 PVC-U SN2 192.2 Dn= 200 57.30 55.40 262.37 1.44 2.12 11.10 18.65 PROYECTADA
153404 TUB AL-38 BZ:113' BZ:113 PVC-U SN2 192.2 Dn= 200 23.60 23.60 28.85 18.42 2.08 47.90 10.38 PROYECTADA
153484 TUB AL-60 BZ:3 BZ:4 PVC-U SN2 192.2 Dn= 200 37.00 37.00 61.15 7.12 2.07 27.40 12.38 PROYECTADA
153426 TUB AL-72 BZ:15 BZ:16 PVC-U SN2 192.2 Dn= 200 25.00 24.90 59.81 7.12 2.05 27.50 12.17 PROYECTADA
153344 TUB AL-123 BZ:49 BZ:48 PVC-U SN2 302.6 Dn= 315 17.50 17.50 10.27 74.11 2.03 61.00 7.68 PROYECTADA
153430 TUB AL-114 BZ:58 BZ:57 PVC-U SN2 302.6 Dn= 315 26.10 26.00 9.98 74.11 2.00 60.70 7.50 PROYECTADA
153595 MU-9 BZ:141 BZ:140 PVC-U SN2 192.2 Dn= 200 26.50 25.90 221.54 1.44 2.00 11.20 16.38 PROYECTADA
153592 MU-15 BZ:125 BZ:126 PVC-U SN2 192.2 Dn= 200 23.30 23.30 45.90 8.80 1.99 31.30 10.88 PROYECTADA
153527 TUB AL-21 Bz:90 BZ:89 PVC-U SN4 237.6 Dn= 250 57.30 57.30 14.84 37.21 1.96 55.70 7.98 PROYECTADA
153607 MU-8 BZ:142 BZ:141 PVC-U SN2 192.2 Dn= 200 42.20 41.40 198.24 1.44 1.92 11.30 15.04 PROYECTADA
153606 MU-10 BZ:140 BZ:139 PVC-U SN2 192.2 Dn= 200 40.00 39.40 165.31 1.44 1.80 11.50 13.08 PROYECTADA
153538 TUB AL-26 BZ:85 BZ:84 PVC-U SN2 240.2 Dn= 250 81.30 81.30 11.31 37.21 1.77 56.70 6.41 PROYECTADA
153431 TUB AL-82 BZ:25 BZ:95 PVC-U SN2 192.2 Dn= 200 26.60 26.50 20.08 16.26 1.76 46.50 7.40 PASE AEREO
153482 TUB AL-71 BZ:14 BZ:15 PVC-U SN2 192.2 Dn= 200 36.30 36.30 38.00 7.12 1.75 28.50 8.55 PROYECTADA
153421 TUB AL-130 BZ:42 BZ:41 PVC-U SN2 302.6 Dn= 315 24.70 24.70 6.49 75.55 1.71 64.90 5.30 PROYECTADA
153529 TUB AL-17 BZ:94 BZ:93 PVC-U SN4 237.6 Dn= 250 60.60 60.60 10.24 37.21 1.70 58.20 5.92 PROYECTADA
153473 TUB AL-19 BZ:92 BZ:91 PVC-U SN8 235.4 Dn= 250 35.30 35.30 10.20 37.21 1.70 59.00 5.90 PROYECTADA
153432 TUB AL-69 BZ:12 BZ:13 PVC-U SN2 192.2 Dn= 200 27.00 27.00 34.49 7.12 1.69 28.80 7.93 PROYECTADA
153520 TUB AL-16 BZ:95 BZ:94 PVC-U SN4 237.6 Dn= 250 52.80 52.80 9.86 37.21 1.68 58.50 5.74 PROYECTADA
153598 MU-5 BZ:145 BZ:144 PVC-U SN2 192.2 Dn= 200 28.70 28.50 133.18 1.44 1.67 11.60 11.07 PROYECTADA
153437 TUB AL-20 BZ:91 Bz:90 PVC-U SN8 235.4 Dn= 250 27.90 27.90 9.67 37.21 1.67 59.40 5.65 PROYECTADA
153480 TUB AL-18 BZ:93 BZ:92 PVC-U SN4 237.6 Dn= 250 36.30 36.30 9.64 37.21 1.67 67.10 5.64 PROYECTADA
153345 TUB AL-13 BZ:98 BZ:97 PVC-U SN2 192.2 Dn= 200 17.50 17.50 13.69 20.95 1.64 55.40 6.03 PROYECTADA
153457 TUB AL-37 BZ:114 BZ:113' PVC-U SN2 192.2 Dn= 200 30.40 30.40 14.81 18.42 1.64 51.20 6.10 PROYECTADA
153306 TUB AL-10 BZ:100 BZ:100' PVC-U SN2 192.2 Dn= 200 14.90 14.90 13.46 20.95 1.63 55.50 5.95 PROYECTADA
153373 TUB AL-7 BZ:102' BZ:102 PVC-U SN2 192.2 Dn= 200 21.10 21.10 13.28 20.05 1.61 64.80 5.78 PROYECTADA
153339 TUB AL-79 BZ:22 BZ:23 PVC-U SN2 192.2 Dn= 200 17.50 17.50 15.44 16.26 1.61 47.70 6.00 PROYECTADA
153341 TUB AL-4 BZ:104 BZ:103 PVC-U SN2 192.2 Dn= 200 17.50 17.50 11.99 20.05 1.55 54.90 5.33 PROYECTADA
153440 TUB AL-8 BZ:102 BZ:101 PVC-U SN2 192.2 Dn= 200 28.00 28.00 11.43 20.95 1.54 56.60 5.21 PROYECTADA
153357 TUB AL-81 BZ:24 BZ:25 PVC-U SN2 192.2 Dn= 200 18.40 18.40 13.56 16.26 1.53 48.40 5.41 PROYECTADA
153395 TUB AL-14 BZ:97 BZ:96 PVC-U SN2 192.2 Dn= 200 22.50 22.50 11.11 20.95 1.52 56.80 5.09 PROYECTADA
153367 TUB AL-15 BZ:96 BZ:95 PVC-U SN2 192.2 Dn= 200 20.60 20.60 10.21 20.95 1.47 74.20 4.76 PROYECTADA
153435 TUB AL-12 BZ:99 BZ:98 PVC-U SN2 192.2 Dn= 200 27.90 27.90 10.03 20.95 1.46 57.50 4.69 PROYECTADA
153272 TUB AL-80 BZ:23 BZ:24 PVC-U SN2 192.2 Dn= 200 9.70 9.70 9.25 16.26 1.33 50.80 3.98 PROYECTADA
153403 TUB AL-74 BZ:17 BZ:18 PVC-U SN2 192.2 Dn= 200 23.60 23.60 17.40 7.12 1.32 30.70 4.65 PROYECTADA
153411 TUB AL-78 BZ:21 BZ:22 PVC-U SN2 192.2 Dn= 200 24.20 24.20 8.66 16.26 1.30 51.00 3.78 PROYECTADA
153303 TUB AL-64 BZ:7 BZ:8 PVC-U SN4 190.2 Dn= 200 14.80 14.80 13.53 7.12 1.22 31.90 3.82 PROYECTADA
153414 TUB AL-86 BZ:117' BZ:118 PVC-U SN4 190.2 Dn= 200 24.40 24.40 10.67 7.87 1.15 34.40 3.31 PROYECTADA
153470 TUB AL-90 BZ:121 BZ:122 PVC-U SN4 190.2 Dn= 200 33.90 33.90 10.62 7.87 1.14 34.50 3.30 PROYECTADA
153331 TUB AL-88 BZ:119 BZ:120 PVC-U SN4 190.2 Dn= 200 17.30 17.30 10.41 7.87 1.14 34.50 3.25 PROYECTADA
153494 TUB AL-89 BZ:120 BZ:121 PVC-U SN4 190.2 Dn= 200 39.80 39.80 10.29 7.87 1.13 34.60 3.22 PROYECTADA
153458 TUB AL-62 BZ:5 BZ:6 PVC-U SN2 192.2 Dn= 200 31.60 31.60 11.08 7.12 1.13 37.40 3.26 PROYECTADA
153514 TUB AL-87 BZ:118 BZ:119 PVC-U SN4 190.2 Dn= 200 48.00 48.00 10.21 7.87 1.13 34.60 3.20 PROYECTADA
153485 TUB AL-85 BZ:117 BZ:117' PVC-U SN4 190.2 Dn= 200 37.70 37.70 10.08 7.87 1.12 34.60 3.17 PROYECTADA
153466 TUB AL-84 BZ:116' BZ:117 PVC-U SN4 190.2 Dn= 200 32.70 32.70 10.08 7.87 1.12 34.60 3.17 PROYECTADA
153328 TUB AL-83 BZ:116 BZ:116' PVC-U SN2 192.2 Dn= 200 17.20 17.20 9.89 7.87 1.12 39.30 3.12 PROYECTADA
153488 TUB AL-63 BZ:6 BZ:7 PVC-U SN4 190.2 Dn= 200 37.90 37.90 10.28 7.12 1.10 32.80 3.08 PROYECTADA
153266 TUB AL-68 BZ:11 BZ:12 PVC-U SN2 192.2 Dn= 200 9.00 9.00 10.04 7.12 1.09 32.40 3.02 PROYECTADA
153533 TUB AL-65 BZ:8 BZ:9 PVC-U SN4 190.2 Dn= 200 62.20 62.20 9.49 7.12 1.07 33.10 2.89 PROYECTADA
153603 MU-4 BZ:146 BZ:145 PVC-U SN2 192.2 Dn= 200 30.70 30.70 15.63 1.44 0.80 13.90 2.10 PROYECTADA
PROYECTO: "MEJORAMIENTO COLECTORES QUEBRADAS SAPHY, AV. SOL, TULLUMAYO Y AV. EJERCITO"

REPORTE DE BUZONES MODELAMIENTO HIDRAULICO AÑO 20 (2039) + LLUVIAS - COLECTOR QUEBRADA SAPHY

Diam. Línea de
Cota Tapa Cota Fondo Altura de
ID Nombre X (m) Y (m) Interior BZ Gradiente Notas
(m) (m) Buzon (m)
(m) hidráulica (m)

153502 BZ:1 175,130.81 8,505,586.74 3,678.00 3,676.80 1,200.00 1.20 3,676.87 Buzon proyectado
153453 BZ:2 175,170.83 8,505,571.41 3,674.61 3,673.41 1,200.00 1.20 3,673.48 Buzon proyectado
153454 BZ:3 175,200.57 8,505,569.58 3,670.55 3,669.35 1,200.00 1.20 3,669.42 Buzon proyectado
153469 BZ:4 175,218.50 8,505,537.26 3,668.29 3,667.09 1,200.00 1.20 3,667.16 Buzon proyectado
153459 BZ:5 175,245.53 8,505,517.43 3,665.69 3,664.49 1,200.00 1.20 3,664.56 Buzon proyectado
153460 BZ:6 175,268.96 8,505,538.60 3,666.44 3,664.14 1,200.00 2.30 3,664.21 Buzon proyectado
153304 BZ:7 175,305.82 8,505,547.55 3,668.15 3,663.75 1,200.00 4.40 3,663.82 Buzon proyectado
153305 BZ:8 175,314.53 8,505,535.61 3,667.65 3,663.55 1,200.00 4.10 3,663.62 Buzon proyectado
153476 BZ:9 175,266.90 8,505,495.68 3,666.56 3,662.96 1,200.00 3.60 3,663.03 Buzon proyectado
153315 BZ:10 175,288.97 8,505,467.42 3,661.23 3,658.23 1,200.00 3.00 3,658.30 Buzon proyectado
153267 BZ:11 175,293.88 8,505,452.01 3,653.54 3,652.34 1,200.00 1.20 3,652.41 Buzon proyectado
153268 BZ:12 175,300.47 8,505,445.94 3,653.55 3,652.25 1,200.00 1.30 3,652.32 Buzon proyectado
153323 BZ:13 175,327.44 8,505,445.70 3,652.52 3,651.32 1,200.00 1.20 3,651.39 Buzon proyectado
153324 BZ:14 175,343.05 8,505,438.82 3,651.38 3,650.18 1,200.00 1.20 3,650.25 Buzon proyectado
153427 BZ:15 175,374.63 8,505,420.88 3,649.80 3,648.80 1,200.00 1.00 3,648.87 Buzon proyectado
153397 BZ:16 175,383.31 8,505,397.53 3,648.31 3,647.31 1,200.00 1.00 3,647.38 Buzon proyectado
153398 BZ:17 175,378.74 8,505,375.41 3,646.70 3,645.70 1,200.00 1.00 3,645.77 Buzon proyectado
153298 BZ:18 175,374.25 8,505,352.28 3,646.29 3,645.29 1,200.00 1.00 3,645.36 Buzon proyectado
153299 BZ:19 175,365.09 8,505,340.95 3,644.59 3,643.59 1,200.00 1.00 3,643.66 Buzon proyectado
153418 BZ:20 175,364.94 8,505,316.50 3,638.85 3,637.85 1,200.00 1.00 3,637.92 Buzon proyectado
153412 BZ:21 175,352.23 8,505,291.77 3,635.65 3,634.65 1,200.00 1.00 3,634.76 Buzon proyectado
153340 BZ:22 175,348.70 8,505,267.79 3,635.84 3,634.44 1,200.00 1.40 3,634.55 Buzon proyectado
153273 BZ:23 175,338.62 8,505,253.49 3,635.57 3,634.17 1,200.00 1.40 3,634.28 Buzon proyectado
153274 BZ:24 175,339.04 8,505,243.77 3,636.78 3,634.08 1,200.00 2.70 3,634.19 Buzon proyectado
153358 BZ:25 175,334.56 8,505,225.88 3,635.03 3,633.83 1,200.00 1.20 3,633.94 Buzon proyectado
153253 BZ:26 176,863.02 8,504,372.99 3,459.53 3,455.93 1,200.00 3.60 3,456.17 Buzon proyectado
153252 BZ:27 176,857.74 8,504,369.77 3,461.69 3,457.69 1,200.00 4.00 3,457.92 Buzon proyectado
153535 BZ:28 176,797.22 8,504,440.82 3,464.69 3,463.49 1,200.00 1.20 3,463.72 Buzon proyectado
153524 BZ:29 176,754.62 8,504,489.66 3,466.41 3,465.21 1,200.00 1.20 3,465.44 Buzon proyectado
153523 BZ:30 176,713.46 8,504,524.48 3,469.37 3,467.67 1,200.00 1.70 3,467.90 Buzon proyectado
153516 BZ:31 176,622.71 8,504,582.63 3,474.90 3,473.70 1,200.00 1.20 3,473.93 Buzon proyectado
153517 BZ:31' 176,667.13 8,504,561.66 3,472.00 3,470.80 1,200.00 1.20 3,471.03 Buzon proyectado
153505 BZ:32 176,587.71 8,504,621.13 3,476.90 3,475.70 1,200.00 1.20 3,475.93 Buzon proyectado
153478 BZ:33 176,553.66 8,504,693.60 3,480.52 3,479.32 1,200.00 1.20 3,479.55 Buzon proyectado
153479 BZ:33' 176,565.10 8,504,659.54 3,478.91 3,477.71 1,200.00 1.20 3,477.94 Buzon proyectado
153510 BZ:34 176,523.25 8,504,730.08 3,482.94 3,481.74 1,200.00 1.20 3,481.97 Buzon proyectado
153509 BZ:35 176,507.81 8,504,774.08 3,484.08 3,482.88 1,200.00 1.20 3,483.11 Buzon proyectado
153567 BZ:35' 176,497.23 8,504,780.98 3,484.79 3,483.59 1,200.00 1.20 3,483.82 Buzon proyectado
153447 BZ:36 176,463.47 8,504,796.65 3,488.37 3,486.37 1,200.00 2.00 3,486.58 Buzon proyectado
153391 BZ:37 176,452.29 8,504,823.16 3,489.59 3,488.09 1,200.00 1.50 3,488.30 Buzon proyectado
153390 BZ:38 176,441.44 8,504,842.58 3,489.60 3,488.40 1,200.00 1.20 3,488.61 Buzon proyectado
153420 BZ:39 176,418.47 8,504,833.80 3,492.99 3,491.79 1,200.00 1.20 3,492.00 Buzon proyectado
153313 BZ:40 176,391.05 8,504,836.25 3,494.93 3,493.73 1,200.00 1.20 3,493.94 Buzon proyectado
153312 BZ:41 176,376.77 8,504,843.82 3,496.98 3,495.78 1,200.00 1.20 3,495.99 Buzon proyectado
153363 BZ:42 176,367.17 8,504,866.53 3,496.94 3,495.94 1,200.00 1.00 3,496.15 Buzon proyectado
153362 BZ:43 176,359.27 8,504,884.89 3,497.46 3,496.46 1,200.00 1.00 3,496.67 Buzon proyectado
153376 BZ:44 176,344.35 8,504,899.86 3,499.23 3,498.23 1,200.00 1.00 3,498.44 Buzon proyectado
153491 BZ:45 176,312.77 8,504,930.76 3,500.36 3,499.36 1,200.00 1.00 3,499.57 Buzon proyectado
153271 BZ:46 176,258.00 8,504,984.68 3,504.47 3,503.27 1,200.00 1.20 3,503.48 Buzon proyectado
153490 BZ:47 176,286.40 8,504,958.16 3,502.70 3,501.70 1,200.00 1.00 3,501.91 Buzon proyectado
153270 BZ:48 176,250.91 8,504,990.44 3,504.73 3,503.38 1,200.00 1.35 3,503.59 Buzon proyectado
153293 BZ:49 176,237.31 8,505,001.50 3,504.96 3,503.56 1,200.00 1.40 3,503.77 Buzon proyectado
153292 BZ:50 176,237.15 8,505,015.42 3,505.40 3,504.00 1,200.00 1.40 3,504.21 Buzon proyectado
153449 BZ:51 176,208.57 8,505,024.55 3,508.30 3,507.10 1,200.00 1.20 3,507.31 Buzon proyectado
153423 BZ:52 176,186.16 8,505,042.70 3,509.57 3,508.37 1,200.00 1.20 3,508.58 Buzon proyectado
153262 BZ:53 176,170.85 8,505,062.05 3,511.07 3,508.97 1,200.00 2.10 3,509.18 Buzon proyectado
153261 BZ:54 176,162.27 8,505,061.19 3,510.28 3,509.08 1,200.00 1.20 3,509.29 Buzon proyectado
153285 BZ:55 176,142.78 8,505,073.37 3,512.58 3,510.08 1,200.00 2.50 3,510.29 Buzon proyectado
153284 BZ:56 176,134.76 8,505,082.99 3,511.50 3,510.30 1,200.00 1.20 3,510.51 Buzon proyectado
153351 BZ:57 176,129.73 8,505,100.08 3,515.26 3,513.76 1,200.00 1.50 3,513.97 Buzon proyectado
153356 BZ:58 176,129.97 8,505,126.13 3,515.72 3,514.02 1,200.00 1.70 3,514.23 Buzon proyectado
153282 BZ:59 176,122.00 8,505,142.57 3,515.78 3,514.28 1,200.00 1.50 3,514.49 Buzon proyectado
PROYECTO: "MEJORAMIENTO COLECTORES QUEBRADAS SAPHY, AV. SOL, TULLUMAYO Y AV. EJERCITO"

REPORTE DE BUZONES MODELAMIENTO HIDRAULICO AÑO 20 (2039) + LLUVIAS - COLECTOR QUEBRADA SAPHY

Diam. Línea de
Cota Tapa Cota Fondo Altura de
ID Nombre X (m) Y (m) Interior BZ Gradiente Notas
(m) (m) Buzon (m)
(m) hidráulica (m)

153302 BZ:60 176,118.41 8,505,160.07 3,517.48 3,515.48 1,200.00 2.00 3,515.69 Buzon proyectado
153301 BZ:61 176,115.21 8,505,174.33 3,519.84 3,517.34 1,200.00 2.50 3,517.55 Buzon proyectado
153338 BZ:62 176,109.42 8,505,193.34 3,519.85 3,517.65 1,200.00 2.20 3,517.86 Buzon proyectado
153321 BZ:63 176,102.94 8,505,209.40 3,519.79 3,517.94 1,200.00 1.85 3,518.15 Buzon proyectado
153320 BZ:64 176,096.73 8,505,225.04 3,519.77 3,518.22 1,200.00 1.55 3,518.43 Buzon proyectado
153388 BZ:65 176,074.72 8,505,227.70 3,519.80 3,518.60 1,200.00 1.20 3,518.81 Buzon proyectado
153425 BZ:66 176,054.84 8,505,242.51 3,521.88 3,520.38 1,200.00 1.50 3,520.59 Buzon proyectado
153256 BZ:67 176,062.63 8,505,288.79 3,525.01 3,522.51 1,200.00 2.50 3,522.72 Buzon proyectado
153255 BZ:68 176,059.67 8,505,296.59 3,524.76 3,522.71 1,200.00 2.05 3,522.92 Buzon proyectado
153318 BZ:69 176,022.27 8,505,304.22 3,525.07 3,523.57 1,200.00 1.50 3,523.78 Buzon proyectado
153317 BZ:70 176,009.25 8,505,314.76 3,525.28 3,524.08 1,200.00 1.20 3,524.29 Buzon proyectado
153379 BZ:71 175,997.03 8,505,334.19 3,527.83 3,526.63 1,200.00 1.20 3,526.84 Buzon proyectado
153378 BZ:72 175,982.71 8,505,349.96 3,530.46 3,529.26 1,200.00 1.20 3,529.47 Buzon proyectado
153336 BZ:73 175,947.36 8,505,400.60 3,533.62 3,531.62 1,200.00 2.00 3,531.83 Buzon proyectado
153335 BZ:74 175,934.94 8,505,412.65 3,536.99 3,535.19 1,200.00 1.80 3,535.35 Buzon proyectado
153296 BZ:75 175,933.56 8,505,431.52 3,538.52 3,537.32 1,200.00 1.20 3,537.48 Buzon proyectado
153295 BZ:76 175,919.58 8,505,434.65 3,542.22 3,541.02 1,200.00 1.20 3,541.18 Buzon proyectado
153465 BZ:77 175,902.02 8,505,407.09 3,548.52 3,547.32 1,200.00 1.20 3,547.48 Buzon proyectado
153250 BZ:78 175,829.60 8,505,425.98 3,564.13 3,562.93 1,200.00 1.20 3,563.09 Buzon proyectado
153249 BZ:79 175,825.04 8,505,422.42 3,564.83 3,563.63 1,200.00 1.20 3,563.79 Buzon proyectado
153290 BZ:80 175,830.89 8,505,410.01 3,566.97 3,565.77 1,200.00 1.20 3,565.93 Buzon proyectado
153500 BZ:81 175,795.13 8,505,388.42 3,576.02 3,574.82 1,200.00 1.20 3,574.98 Buzon proyectado
153498 BZ:82 175,754.16 8,505,364.69 3,582.61 3,581.41 1,200.00 1.20 3,581.57 Buzon proyectado
153497 BZ:83 175,718.73 8,505,343.53 3,586.70 3,585.50 1,200.00 1.20 3,585.66 Buzon proyectado
153526 BZ:84 175,670.29 8,505,316.02 3,600.62 3,598.72 1,200.00 1.90 3,598.88 Buzon proyectado
153463 BZ:85 175,629.40 8,505,386.34 3,600.84 3,599.64 1,200.00 1.20 3,599.80 Buzon proyectado
153451 BZ:86 175,601.34 8,505,370.07 3,611.74 3,610.54 1,200.00 1.20 3,610.70 Buzon proyectado
153394 BZ:87 175,573.28 8,505,370.34 3,621.04 3,619.84 1,200.00 1.20 3,620.00 Buzon proyectado
153393 BZ:88 175,555.09 8,505,358.42 3,631.75 3,627.35 1,200.00 4.40 3,627.51 Buzon proyectado
153487 BZ:89 175,520.39 8,505,373.18 3,632.92 3,629.12 1,200.00 3.80 3,629.28 Buzon proyectado
153438 BZ:91 175,444.95 8,505,374.47 3,635.28 3,630.24 1,200.00 5.04 3,630.40 Buzon proyectado
153474 BZ:92 175,421.02 8,505,348.54 3,635.17 3,630.60 1,200.00 4.57 3,630.76 Buzon proyectado
153481 BZ:93 175,401.58 8,505,317.89 3,635.15 3,630.95 1,200.00 4.20 3,631.11 Buzon proyectado
153521 BZ:94 175,382.48 8,505,260.41 3,635.02 3,631.57 1,200.00 3.45 3,631.73 Buzon proyectado
153369 BZ:95 175,358.07 8,505,213.65 3,634.54 3,632.09 1,200.00 2.45 3,632.25 Buzon proyectado
153368 BZ:96 175,340.81 8,505,202.45 3,633.90 3,632.30 1,200.00 1.60 3,632.43 Buzon proyectado
153347 BZ:97 175,331.49 8,505,181.96 3,634.00 3,632.55 1,200.00 1.45 3,632.68 Buzon proyectado
153346 BZ:98 175,316.45 8,505,172.94 3,634.09 3,632.79 1,200.00 1.30 3,632.92 Buzon proyectado
153436 BZ:99 175,292.42 8,505,158.74 3,634.47 3,633.07 1,200.00 1.40 3,633.20 Buzon proyectado
153307 BZ:100 175,252.64 8,505,145.40 3,636.51 3,634.51 1,200.00 2.00 3,634.64 Buzon proyectado
153308 BZ:100' 175,264.98 8,505,137.12 3,636.51 3,634.31 1,200.00 2.20 3,634.44 Buzon proyectado
153441 BZ:101 175,236.66 8,505,121.63 3,637.64 3,635.54 1,200.00 2.10 3,635.67 Buzon proyectado
153374 BZ:102 175,215.37 8,505,103.44 3,638.56 3,635.86 1,200.00 2.70 3,635.99 Buzon proyectado
153288 BZ:102' 175,205.10 8,505,085.02 3,637.34 3,636.14 1,200.00 1.20 3,636.26 Buzon proyectado
153343 BZ:103 175,192.37 8,505,052.33 3,641.76 3,640.36 1,200.00 1.40 3,640.48 Buzon proyectado
153287 BZ:103' 175,201.34 8,505,072.30 3,640.47 3,639.27 1,200.00 1.20 3,639.39 Buzon proyectado
153342 BZ:104 175,175.88 8,505,046.43 3,641.77 3,640.57 1,200.00 1.20 3,640.69 Buzon proyectado
153310 BZ:105 175,148.58 8,505,016.00 3,645.13 3,643.93 1,200.00 1.20 3,644.05 Buzon proyectado
153278 BZ:106 175,126.61 8,505,023.56 3,647.51 3,646.31 1,200.00 1.20 3,646.43 Buzon proyectado
153279 BZ:106' 175,133.41 8,505,015.06 3,645.96 3,644.76 1,200.00 1.20 3,644.88 Buzon proyectado
153443 BZ:107 175,920.26 8,505,392.62 3,538.69 3,537.39 1,200.00 1.30 3,537.53 Buzon proyectado
153265 BZ:107' 175,895.70 8,505,378.97 3,542.23 3,540.73 1,200.00 1.50 3,540.87 Buzon proyectado
153264 BZ:108 175,898.76 8,505,370.66 3,543.01 3,541.81 1,200.00 1.20 3,541.95 Buzon proyectado
153353 BZ:108' 175,872.87 8,505,352.05 3,546.84 3,545.64 1,200.00 1.20 3,545.78 Buzon proyectado
153276 BZ:109 175,855.48 8,505,348.06 3,548.85 3,547.65 1,200.00 1.20 3,547.79 Buzon proyectado
153247 BZ:109' 175,845.92 8,505,343.08 3,551.21 3,549.71 1,200.00 1.50 3,549.85 Buzon proyectado
153349 BZ:110 175,831.27 8,505,332.99 3,554.53 3,553.03 1,200.00 1.50 3,553.15 Buzon proyectado
153366 BZ:110' 175,811.34 8,505,319.03 3,559.64 3,558.14 1,200.00 1.50 3,558.26 Buzon proyectado
153365 BZ:111 175,795.10 8,505,307.31 3,566.01 3,564.81 1,200.00 1.20 3,564.93 Buzon proyectado
153382 BZ:111' 175,777.06 8,505,293.03 3,576.01 3,574.81 1,200.00 1.20 3,574.93 Buzon proyectado
153381 BZ:112 175,758.63 8,505,281.96 3,581.96 3,580.46 1,200.00 1.50 3,580.58 Buzon proyectado
153327 BZ:112' 175,739.28 8,505,269.75 3,584.28 3,582.78 1,200.00 1.50 3,582.90 Buzon proyectado
PROYECTO: "MEJORAMIENTO COLECTORES QUEBRADAS SAPHY, AV. SOL, TULLUMAYO Y AV. EJERCITO"

REPORTE DE BUZONES MODELAMIENTO HIDRAULICO AÑO 20 (2039) + LLUVIAS - COLECTOR QUEBRADA SAPHY

Diam. Línea de
Cota Tapa Cota Fondo Altura de
ID Nombre X (m) Y (m) Interior BZ Gradiente Notas
(m) (m) Buzon (m)
(m) hidráulica (m)

153326 BZ:113 175,722.20 8,505,268.65 3,587.21 3,585.71 1,200.00 1.50 3,585.83 Buzon proyectado
153405 BZ:113' 175,699.90 8,505,261.01 3,587.89 3,586.39 1,200.00 1.50 3,586.51 Buzon proyectado
153259 BZ:114 175,673.26 8,505,246.40 3,588.04 3,586.84 1,200.00 1.20 3,586.96 Buzon proyectado
153258 BZ:115 175,671.57 8,505,238.12 3,595.96 3,591.96 1,200.00 4.00 3,592.08 Buzon proyectado
153329 BZ:116 176,031.56 8,505,197.60 3,558.56 3,557.96 1,200.00 0.60 3,558.04 Buzon proyectado
153330 BZ:116' 176,027.03 8,505,214.17 3,558.74 3,557.79 1,200.00 0.95 3,557.87 Buzon proyectado
153467 BZ:117 176,006.62 8,505,239.76 3,560.81 3,557.46 1,200.00 3.35 3,557.54 Buzon proyectado
153415 BZ:117' 175,976.12 8,505,261.88 3,561.93 3,557.08 1,200.00 4.85 3,557.16 Buzon proyectado
153416 BZ:118 175,964.55 8,505,283.32 3,561.87 3,556.82 1,200.00 5.05 3,556.90 Buzon proyectado
153332 BZ:119 175,953.37 8,505,330.01 3,561.13 3,556.33 1,200.00 4.80 3,556.41 Buzon proyectado
153333 BZ:120 175,944.62 8,505,344.93 3,560.85 3,556.15 1,200.00 4.70 3,556.23 Buzon proyectado
153471 BZ:121 175,905.92 8,505,335.47 3,559.29 3,555.74 1,200.00 3.55 3,555.82 Buzon proyectado
153429 BZ:122 175,872.09 8,505,333.24 3,556.98 3,555.38 1,200.00 1.60 3,555.46 Buzon proyectado
153246 BZ:123 175,847.18 8,505,337.68 3,554.38 3,552.38 1,200.00 2.00 3,552.46 Buzon proyectado
153575 BZ:124 175,944.78 8,505,096.65 3,563.65 3,561.65 1,200.00 2.00 3,561.73 Buzon proyectado
153576 BZ:125 175,951.62 8,505,101.35 3,556.65 3,555.45 1,200.00 1.20 3,555.53 Buzon proyectado
153578 BZ:126 175,974.92 8,505,102.28 3,555.58 3,554.38 1,200.00 1.20 3,554.46 Buzon proyectado
153579 BZ:127 175,981.42 8,505,108.45 3,549.50 3,548.30 1,200.00 1.20 3,548.38 Buzon proyectado
153583 BZ:128 176,002.92 8,505,132.66 3,542.97 3,541.77 1,200.00 1.20 3,541.85 Buzon proyectado
153584 BZ:129 176,005.20 8,505,149.86 3,540.29 3,539.09 1,200.00 1.20 3,539.17 Buzon proyectado
153581 BZ:130 176,030.50 8,505,154.48 3,536.70 3,535.20 1,200.00 1.50 3,535.28 Buzon proyectado
153407 BZ:131 176,037.67 8,505,169.04 3,531.26 3,530.06 1,200.00 1.20 3,530.14 Buzon proyectado
153408 BZ:132 176,060.94 8,505,164.74 3,525.91 3,524.71 1,200.00 1.20 3,524.79 Buzon proyectado
153410 BZ:133 176,089.52 8,505,156.21 3,520.63 3,519.43 1,200.00 1.20 3,519.51 Buzon proyectado
153281 BZ:134 176,111.86 8,505,148.29 3,517.55 3,516.35 1,200.00 1.20 3,516.43 Buzon proyectado
153573 BZ:135 176,489.33 8,504,780.48 3,486.93 3,485.43 1,200.00 1.50 3,485.51 Buzon proyectado
153590 BZ:135' 176,489.27 8,504,760.43 3,491.64 3,489.14 1,200.00 2.50 3,489.22 Buzon proyectado
153589 BZ:136 176,471.55 8,504,751.66 3,499.61 3,497.61 1,200.00 2.00 3,497.69 Buzon proyectado
153571 BZ:137 176,252.35 8,504,983.18 3,507.32 3,506.12 1,200.00 1.20 3,506.15 Buzon proyectado
153587 BZ:138 176,235.01 8,504,967.40 3,517.33 3,515.83 1,200.00 1.50 3,515.86 Buzon proyectado
153586 BZ:139 176,222.26 8,504,954.63 3,527.69 3,526.19 1,200.00 1.50 3,526.22 Buzon proyectado
153597 BZ:140 176,194.40 8,504,926.71 3,534.21 3,532.71 1,200.00 1.50 3,532.74 Buzon proyectado
153596 BZ:141 176,171.67 8,504,914.28 3,539.65 3,538.45 1,200.00 1.20 3,538.48 Buzon proyectado
153608 BZ:142 176,147.03 8,504,881.05 3,547.85 3,546.65 1,200.00 1.20 3,546.68 Buzon proyectado
153602 BZ:143 176,102.16 8,504,848.53 3,562.69 3,561.19 1,200.00 1.50 3,561.22 Buzon proyectado
153600 BZ:144 176,081.13 8,504,828.66 3,581.10 3,579.10 1,200.00 2.00 3,579.13 Buzon proyectado
153599 BZ:145 176,058.93 8,504,810.85 3,584.09 3,582.89 1,200.00 1.20 3,582.92 Buzon proyectado
153604 BZ:146 176,036.82 8,504,832.18 3,584.92 3,583.37 1,200.00 1.55 3,583.40 Buzon proyectado
153439 Bz:90 175,466.42 8,505,392.32 3,634.72 3,629.97 1,200.00 4.75 3,630.13 Buzon proyectado
PROYECTO: "MEJORAMIENTO COLECTORES QUEBRADAS SAPHY, AV. SOL, TULLUMAYO Y AV. EJERCITO"

REPORTE DE TUBERIAS MODELAMIENTO HIDRAULICO AÑO 0 (2019) + LLUVIAS - COLECTOR QUEBRADA SAPHY

Diam. Longitud
Long. Planta Pendiente Velocidad Tensión
ID Nombre Buzon Inicio Buzon Final Material Interior Dn (mm) Inclinada
(m) (m/km) Caudal (L/s) (m/s) Tirante (%) Tractiva (Pa) Notas
(mm) (m)
153245 TUB AL-92 BZ:123 BZ:109' PVC-U SN2 192.2 Dn= 200 6.20 5.50 481.66 7.21 4.28 54.00 61.85 PROYECTADA
153248 TUB AL-32 BZ:79 BZ:78 PVC-U SN2 240.2 Dn= 250 5.80 5.80 121.00 33.58 4.05 44.80 40.10 PROYECTADA
153251 TUB AL-147 BZ:27 BZ:26 PVC-U SN4 302.6 Dn= 315 6.40 6.20 122.90 77.19 5.05 51.70 56.22 PROYECTADA
153254 TUB AL-104 BZ:68 BZ:67 PVC-U SN2 240.2 Dn= 250 8.30 8.30 23.99 59.38 2.64 69.10 14.08 PROYECTADA
153257 TUB AL-36 BZ:115 BZ:114 PVC-U SN4 192.2 Dn= 200 9.90 8.50 546.47 16.93 5.78 37.20 99.99 PROYECTADA
153260 TUB AL-118 BZ:54 BZ:53 PVC-U SN2 302.6 Dn= 315 8.60 8.60 12.76 67.49 2.14 57.90 8.83 PROYECTADA
153263 TUB AL-49 BZ:108 BZ:107' PVC-U SN2 192.2 Dn= 200 8.90 8.90 121.97 24.14 3.77 49.30 36.26 PROYECTADA
153266 TUB AL-68 BZ:11 BZ:12 PVC-U SN2 192.2 Dn= 200 9.00 9.00 10.04 6.32 1.05 30.50 2.87 PROYECTADA
153269 TUB AL-124 BZ:48 BZ:46 PVC-U SN2 302.6 Dn= 315 9.10 9.10 12.04 67.49 2.10 67.10 8.42 PROYECTADA
153272 TUB AL-80 BZ:23 BZ:24 PVC-U SN2 192.2 Dn= 200 9.70 9.70 9.25 14.75 1.30 48.20 3.83 PROYECTADA
153275 TUB AL-46 BZ:109' BZ:109 PVC-U SN2 192.2 Dn= 200 11.00 10.80 191.05 24.14 4.42 47.40 51.56 PROYECTADA
153277 TUB AL-1 BZ:106 BZ:106' PVC-U SN2 192.2 Dn= 200 11.00 10.90 142.44 18.01 3.66 41.60 36.05 PROYECTADA
153280 TUB AL-96 BZ:134 BZ:59 PVC-U SN2 192.2 Dn= 200 11.80 11.60 134.83 8.10 2.84 27.70 24.27 PROYECTADA
153283 TUB AL-116 BZ:56 BZ:55 PVC-U SN2 302.6 Dn= 315 12.50 12.50 17.57 67.49 2.41 55.40 11.42 PROYECTADA
153286 TUB AL-6 BZ:103' BZ:102' PVC-U SN2 192.2 Dn= 200 13.60 13.30 236.01 18.01 4.38 40.30 53.45 PROYECTADA
153289 TUB AL-31 BZ:80 BZ:79 PVC-U SN2 240.2 Dn= 250 13.90 13.70 155.96 33.58 4.43 42.50 48.95 PROYECTADA
153291 TUB AL-122 BZ:50 BZ:49 PVC-U SN2 302.6 Dn= 315 13.90 13.90 31.59 67.49 2.99 52.10 18.21 PROYECTADA
153294 TUB AL-35 BZ:76 BZ:75 PVC-U SN4 240.2 Dn= 250 14.80 14.30 258.31 35.24 5.37 42.30 74.15 PROYECTADA
153297 TUB AL-75 BZ:18 BZ:19 PVC-U SN2 192.2 Dn= 200 14.70 14.60 116.64 6.32 2.51 24.60 19.38 PROYECTADA
153300 TUB AL-111 BZ:61 BZ:60 PVC-U SN2 240.2 Dn= 250 14.70 14.60 127.32 59.38 4.85 57.70 53.37 PROYECTADA
153303 TUB AL-64 BZ:7 BZ:8 PVC-U SN4 190.2 Dn= 200 14.80 14.80 13.53 6.32 1.17 30.00 3.63 PROYECTADA
153306 TUB AL-10 BZ:100 BZ:100' PVC-U SN2 192.2 Dn= 200 14.90 14.90 13.46 18.83 1.59 52.40 5.70 PROYECTADA
153309 TUB AL-2 BZ:106' BZ:105 PVC-U SN2 192.2 Dn= 200 15.20 15.20 54.62 18.01 2.61 44.70 16.98 PROYECTADA
153311 TUB AL-131 BZ:41 BZ:40 PVC-U SN4 302.6 Dn= 315 16.30 16.20 126.85 68.82 4.94 46.30 54.84 PROYECTADA
153314 TUB AL-67 BZ:10 BZ:11 PVC-U SN4 190.2 Dn= 200 17.20 16.20 364.22 6.32 3.74 23.30 47.03 PROYECTADA
153316 TUB AL-102 BZ:70 BZ:69 PVC-U SN2 240.2 Dn= 250 16.80 16.70 30.45 59.38 2.88 65.60 17.08 PROYECTADA
153319 TUB AL-108 BZ:64 BZ:63 PVC-U SN2 240.2 Dn= 250 16.80 16.80 16.64 59.38 2.29 70.10 10.44 PROYECTADA
153322 TUB AL-70 BZ:13 BZ:14 PVC-U SN2 192.2 Dn= 200 17.10 17.10 66.84 6.32 2.06 25.70 12.59 PROYECTADA
153325 TUB AL-39 BZ:113 BZ:112' PVC-U SN2 192.2 Dn= 200 17.40 17.10 171.17 16.93 3.84 39.80 40.49 PROYECTADA
153328 TUB AL-83 BZ:116 BZ:116' PVC-U SN2 192.2 Dn= 200 17.20 17.20 9.89 7.21 1.09 37.60 3.00 PROYECTADA
153331 TUB AL-88 BZ:119 BZ:120 PVC-U SN4 190.2 Dn= 200 17.30 17.30 10.41 7.21 1.11 33.00 3.13 PROYECTADA
153334 TUB AL-98 BZ:74 BZ:73 PVC-U SN2 240.2 Dn= 250 17.70 17.30 177.38 35.24 4.70 43.30 55.28 PROYECTADA
153337 TUB AL-109 BZ:63 BZ:62 PVC-U SN2 240.2 Dn= 250 17.30 17.30 16.75 59.38 2.30 70.00 10.50 PROYECTADA
153339 TUB AL-79 BZ:22 BZ:23 PVC-U SN2 192.2 Dn= 200 17.50 17.50 15.44 14.75 1.56 45.40 5.77 PROYECTADA
153341 TUB AL-4 BZ:104 BZ:103 PVC-U SN2 192.2 Dn= 200 17.50 17.50 11.99 18.01 1.51 51.80 5.11 PROYECTADA
153344 TUB AL-123 BZ:49 BZ:48 PVC-U SN2 302.6 Dn= 315 17.50 17.50 10.27 67.49 1.98 57.90 7.41 PROYECTADA
153345 TUB AL-13 BZ:98 BZ:97 PVC-U SN2 192.2 Dn= 200 17.50 17.50 13.69 18.83 1.60 52.30 5.78 PROYECTADA
153348 TUB AL-45 BZ:110 BZ:109' PVC-U SN2 192.2 Dn= 200 18.10 17.80 186.67 16.93 3.96 64.60 43.32 PROYECTADA
153350 TUB AL-115 BZ:57 BZ:56 PVC-U SN4 302.6 Dn= 315 18.10 17.80 194.20 67.49 5.72 44.40 75.87 PROYECTADA
153352 TUB AL-47 BZ:109 BZ:108' PVC-U SN2 192.2 Dn= 200 18.00 17.80 112.68 24.14 3.67 49.10 34.03 PROYECTADA
153354 TUB AL-112 BZ:60 BZ:59 PVC-U SN2 240.2 Dn= 250 17.90 17.90 39.18 59.38 3.16 63.70 20.91 PROYECTADA
153355 TUB AL-113 BZ:59 BZ:58 PVC-U SN2 302.6 Dn= 315 18.30 18.30 14.23 67.49 2.23 55.90 9.64 PROYECTADA
153357 TUB AL-81 BZ:24 BZ:25 PVC-U SN2 192.2 Dn= 200 18.40 18.40 13.56 14.75 1.49 46.00 5.20 PROYECTADA
153359 TUB AL-97 BZ:75 BZ:74 PVC-U SN2 240.2 Dn= 250 19.00 18.90 112.60 35.24 4.00 44.60 38.75 PROYECTADA
153360 TUB AL-110 BZ:62 BZ:61 PVC-U SN2 240.2 Dn= 250 19.90 19.90 15.59 59.38 2.24 70.30 9.90 PROYECTADA
153361 TUB AL-129 BZ:43 BZ:42 PVC-U SN2 302.6 Dn= 315 20.00 20.00 26.02 68.82 2.80 52.90 15.73 PROYECTADA
153364 TUB AL-43 BZ:111 BZ:110' PVC-U SN2 192.2 Dn= 200 21.10 20.00 333.07 16.93 4.86 38.20 68.01 PROYECTADA
153367 TUB AL-15 BZ:96 BZ:95 PVC-U SN2 192.2 Dn= 200 20.60 20.60 10.21 18.83 1.43 70.30 4.57 PROYECTADA
153373 TUB AL-7 BZ:102' BZ:102 PVC-U SN2 192.2 Dn= 200 21.10 21.10 13.28 18.01 1.56 61.30 5.54 PROYECTADA
153375 TUB AL-128 BZ:44 BZ:43 PVC-U SN2 302.6 Dn= 315 21.20 21.10 83.74 68.82 4.26 47.50 39.61 PROYECTADA
153377 TUB AL-100 BZ:72 BZ:71 PVC-U SN2 240.2 Dn= 250 21.50 21.30 123.48 59.38 4.79 57.40 52.10 PROYECTADA
153380 TUB AL-41 BZ:112 BZ:111' PVC-U SN2 192.2 Dn= 200 22.20 21.50 262.66 16.93 4.46 38.70 56.55 PROYECTADA
153386 TUB AL-5 BZ:103 BZ:103' PVC-U SN2 192.2 Dn= 200 21.90 21.90 49.80 18.01 2.52 45.00 15.82 PROYECTADA
153387 TUB AL-107 BZ:65 BZ:64 PVC-U SN2 240.2 Dn= 250 22.20 22.20 17.14 59.38 2.32 69.30 10.70 PROYECTADA
153389 TUB AL-134 BZ:38 BZ:37 PVC-U SN2 302.6 Dn= 315 22.30 22.20 13.93 68.82 2.23 56.30 9.56 PROYECTADA
153392 TUB AL-23 BZ:88 BZ:87 PVC-U SN4 237.6 Dn= 250 23.00 21.70 336.24 33.58 5.80 41.20 89.43 PROYECTADA
153395 TUB AL-14 BZ:97 BZ:96 PVC-U SN2 192.2 Dn= 200 22.50 22.50 11.11 18.83 1.48 53.60 4.89 PROYECTADA
153396 TUB AL-73 BZ:16 BZ:17 PVC-U SN2 192.2 Dn= 200 22.60 22.60 71.27 6.32 2.11 25.60 13.24 PROYECTADA
153399 TUB AL-40 BZ:112' BZ:112 PVC-U SN2 192.2 Dn= 200 23.00 22.90 101.43 16.93 3.20 41.20 26.87 PROYECTADA
153400 TUB AL-101 BZ:71 BZ:70 PVC-U SN2 240.2 Dn= 250 23.10 23.00 111.08 59.38 4.62 57.80 47.90 PROYECTADA
153401 TUB AL-117 BZ:55 BZ:54 PVC-U SN2 302.6 Dn= 315 23.00 23.00 43.52 67.49 3.35 49.60 23.47 PROYECTADA
153402 TUB AL-42 BZ:111' BZ:111 PVC-U SN4 192.2 Dn= 200 25.10 23.00 434.76 16.93 5.34 37.60 83.65 PROYECTADA
153403 TUB AL-74 BZ:17 BZ:18 PVC-U SN2 192.2 Dn= 200 23.60 23.60 17.40 6.32 1.28 28.90 4.41 PROYECTADA
153404 TUB AL-38 BZ:113' BZ:113 PVC-U SN2 192.2 Dn= 200 23.60 23.60 28.85 16.93 2.04 45.80 10.01 PROYECTADA
153406 TUB AL-93 BZ:131 BZ:132 PVC-U SN2 192.2 Dn= 200 24.30 23.70 226.07 8.10 3.40 26.80 36.25 PROYECTADA
153409 TUB AL-95 BZ:133 BZ:134 PVC-U SN2 192.2 Dn= 200 23.90 23.70 129.96 8.10 2.80 27.80 23.58 PROYECTADA
153411 TUB AL-78 BZ:21 BZ:22 PVC-U SN2 192.2 Dn= 200 24.20 24.20 8.66 14.75 1.27 48.40 3.64 PROYECTADA
153413 TUB AL-44 BZ:110' BZ:110 PVC-U SN2 192.2 Dn= 200 24.90 24.30 209.98 16.93 4.13 39.30 47.49 PROYECTADA
153414 TUB AL-86 BZ:117' BZ:118 PVC-U SN4 190.2 Dn= 200 24.40 24.40 10.67 7.21 1.12 32.90 3.19 PROYECTADA
153417 TUB AL-76 BZ:19 BZ:20 PVC-U SN2 192.2 Dn= 200 25.10 24.50 234.74 6.32 3.21 23.50 33.33 PROYECTADA
153419 TUB AL-133 BZ:39 BZ:38 PVC-U SN4 302.6 Dn= 315 24.80 24.60 137.86 68.82 5.09 45.90 58.54 PROYECTADA
153421 TUB AL-130 BZ:42 BZ:41 PVC-U SN2 302.6 Dn= 315 24.70 24.70 6.49 68.82 1.67 61.50 5.14 PROYECTADA
153422 TUB AL-119 BZ:53 BZ:52 PVC-U SN2 302.6 Dn= 315 24.70 24.70 24.31 67.49 2.72 52.40 14.79 PROYECTADA
153424 TUB AL-106 BZ:66 BZ:65 PVC-U SN2 240.2 Dn= 250 24.90 24.80 71.80 59.38 3.95 59.80 33.89 PROYECTADA
153426 TUB AL-72 BZ:15 BZ:16 PVC-U SN2 192.2 Dn= 200 25.00 24.90 59.81 6.32 1.98 25.90 11.54 PROYECTADA
153428 TUB AL-91 BZ:122 BZ:123 PVC-U SN2 192.2 Dn= 200 25.50 25.30 118.59 7.21 2.62 26.30 20.85 PROYECTADA
153430 TUB AL-114 BZ:58 BZ:57 PVC-U SN2 302.6 Dn= 315 26.10 26.00 9.98 67.49 1.96 57.60 7.24 PROYECTADA
153431 TUB AL-82 BZ:25 BZ:95 PVC-U SN2 192.2 Dn= 200 26.60 26.50 20.08 14.75 1.72 44.10 7.09 PASE AEREO
153432 TUB AL-69 BZ:12 BZ:13 PVC-U SN2 192.2 Dn= 200 27.00 27.00 34.49 6.32 1.64 27.10 7.51 PROYECTADA
153433 TUB AL-132 BZ:40 BZ:39 PVC-U SN2 302.6 Dn= 315 27.60 27.50 70.48 68.82 4.00 48.10 34.59 PROYECTADA
153434 TUB AL-77 BZ:20 BZ:21 PVC-U SN2 192.2 Dn= 200 28.00 27.80 115.10 6.32 2.50 44.80 19.18 PROYECTADA
153435 TUB AL-12 BZ:99 BZ:98 PVC-U SN2 192.2 Dn= 200 27.90 27.90 10.03 18.83 1.43 54.20 4.50 PROYECTADA
153437 TUB AL-20 BZ:91 Bz:90 PVC-U SN8 235.4 Dn= 250 27.90 27.90 9.67 33.58 1.63 56.20 5.43 PROYECTADA
153440 TUB AL-8 BZ:102 BZ:101 PVC-U SN2 192.2 Dn= 200 28.00 28.00 11.43 18.83 1.50 53.40 5.00 PROYECTADA
153442 TUB AL-50 BZ:107' BZ:107 PVC-U SN2 192.2 Dn= 200 28.30 28.10 118.89 24.14 3.73 49.00 35.55 PROYECTADA
153444 TUB AL-51 BZ:107 BZ:73 PVC-U SN2 192.2 Dn= 200 28.80 28.30 186.49 24.14 4.38 47.50 50.58 PROYECTADA
153445 TUB AL-9 BZ:101 BZ:100 PVC-U SN2 192.2 Dn= 200 28.70 28.60 35.95 18.83 2.27 47.40 12.46 PROYECTADA
153446 TUB AL-135 BZ:37 BZ:36 PVC-U SN2 302.6 Dn= 315 28.80 28.80 59.79 68.82 3.78 48.70 30.38 PROYECTADA
153448 TUB AL-120 BZ:52 BZ:51 PVC-U SN2 302.6 Dn= 315 28.90 28.80 44.05 67.49 3.36 49.50 23.69 PROYECTADA
153450 TUB AL-24 BZ:87 BZ:86 PVC-U SN4 240.2 Dn= 250 29.60 28.10 331.33 33.58 5.79 40.60 88.03 PROYECTADA
153452 TUB AL-59 BZ:2 BZ:3 PVC-U SN2 192.2 Dn= 200 30.10 29.80 136.26 6.32 2.65 24.40 21.90 PROYECTADA
PROYECTO: "MEJORAMIENTO COLECTORES QUEBRADAS SAPHY, AV. SOL, TULLUMAYO Y AV. EJERCITO"

REPORTE DE TUBERIAS MODELAMIENTO HIDRAULICO AÑO 0 (2019) + LLUVIAS - COLECTOR QUEBRADA SAPHY

Diam. Longitud
Long. Planta Pendiente Velocidad Tensión
ID Nombre Buzon Inicio Buzon Final Material Interior Dn (mm) Inclinada
(m) (m/km) Caudal (L/s) (m/s) Tirante (%) Tractiva (Pa) Notas
(mm) (m)
153455 TUB AL-94 BZ:132 BZ:133 PVC-U SN2 192.2 Dn= 200 30.30 29.80 177.01 8.10 3.12 27.20 30.03 PROYECTADA
153456 TUB AL-121 BZ:51 BZ:50 PVC-U SN2 302.6 Dn= 315 30.20 30.00 103.32 67.49 4.57 46.30 46.30 PROYECTADA
153457 TUB AL-37 BZ:114 BZ:113' PVC-U SN2 192.2 Dn= 200 30.40 30.40 14.81 16.93 1.60 49.00 5.90 PROYECTADA
153458 TUB AL-62 BZ:5 BZ:6 PVC-U SN2 192.2 Dn= 200 31.60 31.60 11.08 6.32 1.09 35.10 3.10 PROYECTADA
153461 TUB AL-48 BZ:108' BZ:108 PVC-U SN2 192.2 Dn= 200 32.10 31.90 120.11 24.14 3.75 48.90 35.83 PROYECTADA
153462 TUB AL-25 BZ:86 BZ:85 PVC-U SN4 240.2 Dn= 250 34.20 32.40 336.07 33.58 5.82 40.60 88.97 PROYECTADA
153464 TUB AL-34 BZ:77 BZ:76 PVC-U SN2 240.2 Dn= 250 33.30 32.70 192.79 35.24 4.84 43.00 59.00 PROYECTADA
153466 TUB AL-84 BZ:116' BZ:117 PVC-U SN4 190.2 Dn= 200 32.70 32.70 10.08 7.21 1.10 33.10 3.05 PROYECTADA
153468 TUB AL-61 BZ:4 BZ:5 PVC-U SN2 192.2 Dn= 200 33.60 33.50 77.55 6.32 2.17 25.40 14.13 PROYECTADA
153470 TUB AL-90 BZ:121 BZ:122 PVC-U SN4 190.2 Dn= 200 33.90 33.90 10.62 7.21 1.12 32.90 3.17 PROYECTADA
153472 TUB AL-11 BZ:100' BZ:99 PVC-U SN2 192.2 Dn= 200 35.00 34.90 35.49 18.83 2.26 47.50 12.33 PROYECTADA
153473 TUB AL-19 BZ:92 BZ:91 PVC-U SN8 235.4 Dn= 250 35.30 35.30 10.20 33.58 1.66 55.80 5.67 PROYECTADA
153475 TUB AL-66 BZ:9 BZ:10 PVC-U SN4 190.2 Dn= 200 36.20 35.90 81.73 6.32 2.21 25.60 14.75 PROYECTADA
153477 TUB AL-139 BZ:33 BZ:33' PVC-U SN2 302.6 Dn= 315 36.00 35.90 44.81 77.19 3.52 52.90 25.39 PROYECTADA
153480 TUB AL-18 BZ:93 BZ:92 PVC-U SN4 237.6 Dn= 250 36.30 36.30 9.64 33.58 1.62 63.70 5.42 PROYECTADA
153482 TUB AL-71 BZ:14 BZ:15 PVC-U SN2 192.2 Dn= 200 36.30 36.30 38.00 6.32 1.69 26.90 8.11 PROYECTADA
153484 TUB AL-60 BZ:3 BZ:4 PVC-U SN2 192.2 Dn= 200 37.00 37.00 61.15 6.32 2.00 25.90 11.74 PROYECTADA
153485 TUB AL-85 BZ:117 BZ:117' PVC-U SN4 190.2 Dn= 200 37.70 37.70 10.08 7.21 1.10 33.10 3.05 PROYECTADA
153486 TUB AL-22 BZ:89 BZ:88 PVC-U SN4 237.6 Dn= 250 37.70 37.70 46.94 33.58 2.89 47.20 19.11 PROYECTADA
153488 TUB AL-63 BZ:6 BZ:7 PVC-U SN4 190.2 Dn= 200 37.90 37.90 10.28 6.32 1.06 30.90 2.93 PROYECTADA
153489 TUB AL-126 BZ:47 BZ:45 PVC-U SN2 302.6 Dn= 315 38.10 38.00 61.54 68.82 3.82 48.60 31.08 PROYECTADA
153492 TUB AL-103 BZ:69 BZ:68 PVC-U SN2 240.2 Dn= 250 38.20 38.20 22.53 59.38 2.57 66.80 13.38 PROYECTADA
153493 TUB AL-125 BZ:46 BZ:47 PVC-U SN2 302.6 Dn= 315 38.90 38.90 40.41 68.82 3.28 50.30 22.29 PROYECTADA
153494 TUB AL-89 BZ:120 BZ:121 PVC-U SN4 190.2 Dn= 200 39.80 39.80 10.29 7.21 1.11 33.00 3.10 PROYECTADA
153495 TUB AL-3 BZ:105 BZ:104 PVC-U SN2 192.2 Dn= 200 41.00 40.90 82.20 18.01 3.01 43.30 23.43 PROYECTADA
153496 TUB AL-28 BZ:83 BZ:82 PVC-U SN2 240.2 Dn= 250 41.50 41.30 99.09 33.58 3.77 43.90 34.33 PROYECTADA
153499 TUB AL-30 BZ:81 BZ:80 PVC-U SN4 240.2 Dn= 250 42.70 41.80 216.68 33.58 4.97 41.70 63.28 PROYECTADA
153501 TUB AL-58 BZ:1 BZ:2 PVC-U SN2 192.2 Dn= 200 43.00 42.90 79.11 6.32 2.19 25.40 14.36 PROYECTADA
153503 TUB AL-127 BZ:45 BZ:44 PVC-U SN2 302.6 Dn= 315 44.20 44.20 25.58 68.82 2.78 52.50 15.52 PROYECTADA
153504 TUB AL-140 BZ:33' BZ:32 PVC-U SN2 302.6 Dn= 315 44.60 44.60 45.09 77.19 3.52 52.90 25.52 PROYECTADA
153508 TUB AL-137 BZ:35 BZ:34 PVC-U SN2 302.6 Dn= 315 46.70 46.60 24.44 77.19 2.82 56.00 15.69 PROYECTADA
153511 TUB AL-105 BZ:67 BZ:66 PVC-U SN2 240.2 Dn= 250 47.00 46.90 45.39 59.38 3.34 62.20 23.52 PROYECTADA
153512 TUB AL-29 BZ:82 BZ:81 PVC-U SN2 240.2 Dn= 250 47.80 47.30 139.20 33.58 4.24 42.90 44.83 PROYECTADA
153513 TUB AL-138 BZ:34 BZ:33 PVC-U SN2 302.6 Dn= 315 47.50 47.50 50.96 77.19 3.69 52.40 28.10 PROYECTADA
153514 TUB AL-87 BZ:118 BZ:119 PVC-U SN4 190.2 Dn= 200 48.00 48.00 10.21 7.21 1.10 33.10 3.08 PROYECTADA
153515 TUB AL-142 BZ:31 BZ:31' PVC-U SN2 302.6 Dn= 315 49.20 49.10 59.04 77.19 3.88 51.70 31.58 PROYECTADA
153519 TUB AL-141 BZ:32 BZ:31 PVC-U SN2 302.6 Dn= 315 52.10 52.00 38.44 77.19 3.33 53.70 22.49 PROYECTADA
153520 TUB AL-16 BZ:95 BZ:94 PVC-U SN4 237.6 Dn= 250 52.80 52.80 9.86 33.58 1.64 55.30 5.52 PROYECTADA
153522 TUB AL-144 BZ:30 BZ:29 PVC-U SN2 302.6 Dn= 315 54.00 53.90 45.63 77.19 3.54 52.90 25.76 PROYECTADA
153525 TUB AL-27 BZ:84 BZ:83 PVC-U SN4 240.2 Dn= 250 57.30 55.70 237.32 33.58 5.13 41.40 67.94 PROYECTADA
153527 TUB AL-21 Bz:90 BZ:89 PVC-U SN4 237.6 Dn= 250 57.30 57.30 14.84 33.58 1.90 52.70 7.67 PROYECTADA
153528 TUB AL-143 BZ:31' BZ:30 PVC-U SN2 302.6 Dn= 315 59.50 59.40 52.69 77.19 3.73 52.20 28.86 PROYECTADA
153529 TUB AL-17 BZ:94 BZ:93 PVC-U SN4 237.6 Dn= 250 60.60 60.60 10.24 33.58 1.66 55.10 5.69 PROYECTADA
153530 TUB AL-99 BZ:73 BZ:72 PVC-U SN2 240.2 Dn= 250 61.80 61.80 38.22 59.38 3.13 63.30 20.50 PROYECTADA
153533 TUB AL-65 BZ:8 BZ:9 PVC-U SN4 190.2 Dn= 200 62.20 62.20 9.49 6.32 1.03 31.20 2.75 PROYECTADA
153534 TUB AL-145 BZ:29 BZ:28 PVC-U SN2 302.6 Dn= 315 64.80 64.80 26.54 77.19 2.91 55.50 16.75 PROYECTADA
153537 TUB AL-33 BZ:78 BZ:77 PVC-U SN4 240.2 Dn= 250 76.50 74.80 208.57 33.58 4.90 63.50 61.43 PROYECTADA
153538 TUB AL-26 BZ:85 BZ:84 PVC-U SN2 240.2 Dn= 250 81.30 81.30 11.31 33.58 1.72 53.60 6.16 PROYECTADA
153539 TUB AL-146 BZ:28 BZ:27 PVC-U SN2 302.6 Dn= 315 93.50 93.30 40.72 77.19 3.40 53.40 23.53 PROYECTADA
153568 TUB AL-136(1) BZ:36 BZ:35' PVC-U SN2 302.6 Dn= 315 37.30 37.20 74.69 68.82 4.09 69.40 36.18 PROYECTADA
153569 TUB AL-136(2) BZ:35' BZ:35 PVC-U SN2 302.6 Dn= 315 12.60 12.60 56.22 77.19 3.82 53.30 30.36 PROYECTADA
153570 MU-13 BZ:137 BZ:46 PVC-U SN2 192.2 Dn= 200 6.50 5.90 487.12 1.33 2.56 57.90 29.10 PROYECTADA
153572 MU-3 BZ:135 BZ:35' PVC-U SN2 240.2 Dn= 250 8.10 7.90 207.15 8.36 3.23 20.50 32.87 PROYECTADA
153574 MU-14 BZ:124 BZ:125 PVC-U SN4 192.2 Dn= 200 10.40 8.30 746.89 8.10 5.17 25.10 91.53 PROYECTADA
153577 MU-16 BZ:126 BZ:127 PVC-U SN4 192.2 Dn= 200 10.80 9.00 677.98 8.10 5.00 25.20 84.93 PROYECTADA
153580 MU-20 BZ:130 BZ:131 PVC-U SN2 192.2 Dn= 200 17.00 16.20 316.66 8.10 3.84 26.20 47.03 PROYECTADA
153582 MU-18 BZ:128 BZ:129 PVC-U SN2 192.2 Dn= 200 17.60 17.40 154.44 8.10 2.98 27.40 26.97 PROYECTADA
153585 MU-11 BZ:139 BZ:138 PVC-U SN2 192.2 Dn= 200 20.80 18.00 574.07 1.33 2.71 10.20 33.07 PROYECTADA
153588 MU-1 BZ:136 BZ:135' PVC-U SN2 240.2 Dn= 250 21.50 19.80 428.33 8.36 4.17 19.70 57.64 PROYECTADA
153591 MU-2 BZ:135' BZ:135 PVC-U SN2 240.2 Dn= 250 20.40 20.00 185.05 8.36 3.11 20.70 30.13 PROYECTADA
153592 MU-15 BZ:125 BZ:126 PVC-U SN2 192.2 Dn= 200 23.30 23.30 45.90 8.10 1.94 30.00 10.49 PROYECTADA
153593 MU-12 BZ:138 BZ:137 PVC-U SN2 192.2 Dn= 200 25.40 23.40 414.23 1.33 2.44 10.40 25.56 PROYECTADA
153594 MU-19 BZ:129 BZ:130 PVC-U SN2 192.2 Dn= 200 26.00 25.70 151.22 8.10 2.96 27.50 26.53 PROYECTADA
153595 MU-9 BZ:141 BZ:140 PVC-U SN2 192.2 Dn= 200 26.50 25.90 221.54 1.33 1.95 10.80 15.81 PROYECTADA
153598 MU-5 BZ:145 BZ:144 PVC-U SN2 192.2 Dn= 200 28.70 28.50 133.18 1.33 1.63 11.20 10.69 PROYECTADA
153601 MU-6 BZ:144 BZ:143 PVC-U SN2 192.2 Dn= 200 34.00 28.90 619.02 1.33 2.80 10.20 34.82 PROYECTADA
153603 MU-4 BZ:146 BZ:145 PVC-U SN2 192.2 Dn= 200 30.70 30.70 15.63 1.33 0.78 13.30 2.03 PROYECTADA
153605 MU-17 BZ:127 BZ:128 PVC-U SN2 192.2 Dn= 200 33.00 32.40 201.74 8.10 3.26 27.00 33.26 PROYECTADA
153606 MU-10 BZ:140 BZ:139 PVC-U SN2 192.2 Dn= 200 40.00 39.40 165.31 1.33 1.76 11.00 12.62 PROYECTADA
153607 MU-8 BZ:142 BZ:141 PVC-U SN2 192.2 Dn= 200 42.20 41.40 198.24 1.33 1.88 10.90 14.52 PROYECTADA
153609 MU-7 BZ:143 BZ:142 PVC-U SN2 192.2 Dn= 200 57.30 55.40 262.37 1.33 2.07 10.70 18.00 PROYECTADA
PROYECTO: "MEJORAMIENTO COLECTORES QUEBRADAS SAPHY, AV. SOL, TULLUMAYO Y AV. EJERCITO"

REPORTE DE BUZONES MODELAMIENTO HIDRAULICO AÑO 0 (2019) + LLUVIAS - COLECTOR QUEBRADA SAPHY

Línea de
Diam.
Cota Tapa Cota Fondo Altura de Gradiente
ID Nombre X (m) Y (m) Interior BZ Notas
(m) (m) Buzon (m) hidráulica
(m)
(m)

153246 BZ:123 175,847.18 8,505,337.68 3,554.38 3,552.38 1,200.00 2.00 3,552.45 Buzon proyectado
153247 BZ:109' 175,845.92 8,505,343.08 3,551.21 3,549.71 1,200.00 1.50 3,549.85 Buzon proyectado
153249 BZ:79 175,825.04 8,505,422.42 3,564.83 3,563.63 1,200.00 1.20 3,563.78 Buzon proyectado
153250 BZ:78 175,829.60 8,505,425.98 3,564.13 3,562.93 1,200.00 1.20 3,563.08 Buzon proyectado
153252 BZ:27 176,857.74 8,504,369.77 3,461.69 3,457.69 1,200.00 4.00 3,457.91 Buzon proyectado
153253 BZ:26 176,863.02 8,504,372.99 3,459.53 3,455.93 1,200.00 3.60 3,456.15 Buzon proyectado
153255 BZ:68 176,059.67 8,505,296.59 3,524.76 3,522.71 1,200.00 2.05 3,522.91 Buzon proyectado
153256 BZ:67 176,062.63 8,505,288.79 3,525.01 3,522.51 1,200.00 2.50 3,522.71 Buzon proyectado
153258 BZ:115 175,671.57 8,505,238.12 3,595.96 3,591.96 1,200.00 4.00 3,592.07 Buzon proyectado
153259 BZ:114 175,673.26 8,505,246.40 3,588.04 3,586.84 1,200.00 1.20 3,586.95 Buzon proyectado
153261 BZ:54 176,162.27 8,505,061.19 3,510.28 3,509.08 1,200.00 1.20 3,509.28 Buzon proyectado
153262 BZ:53 176,170.85 8,505,062.05 3,511.07 3,508.97 1,200.00 2.10 3,509.17 Buzon proyectado
153264 BZ:108 175,898.76 8,505,370.66 3,543.01 3,541.81 1,200.00 1.20 3,541.95 Buzon proyectado
153265 BZ:107' 175,895.70 8,505,378.97 3,542.23 3,540.73 1,200.00 1.50 3,540.87 Buzon proyectado
153267 BZ:11 175,293.88 8,505,452.01 3,653.54 3,652.34 1,200.00 1.20 3,652.41 Buzon proyectado
153268 BZ:12 175,300.47 8,505,445.94 3,653.55 3,652.25 1,200.00 1.30 3,652.32 Buzon proyectado
153270 BZ:48 176,250.91 8,504,990.44 3,504.73 3,503.38 1,200.00 1.35 3,503.58 Buzon proyectado
153271 BZ:46 176,258.00 8,504,984.68 3,504.47 3,503.27 1,200.00 1.20 3,503.47 Buzon proyectado
153273 BZ:23 175,338.62 8,505,253.49 3,635.57 3,634.17 1,200.00 1.40 3,634.27 Buzon proyectado
153274 BZ:24 175,339.04 8,505,243.77 3,636.78 3,634.08 1,200.00 2.70 3,634.18 Buzon proyectado
153276 BZ:109 175,855.48 8,505,348.06 3,548.85 3,547.65 1,200.00 1.20 3,547.79 Buzon proyectado
153278 BZ:106 175,126.61 8,505,023.56 3,647.51 3,646.31 1,200.00 1.20 3,646.43 Buzon proyectado
153279 BZ:106' 175,133.41 8,505,015.06 3,645.96 3,644.76 1,200.00 1.20 3,644.88 Buzon proyectado
153281 BZ:134 176,111.86 8,505,148.29 3,517.55 3,516.35 1,200.00 1.20 3,516.43 Buzon proyectado
153282 BZ:59 176,122.00 8,505,142.57 3,515.78 3,514.28 1,200.00 1.50 3,514.48 Buzon proyectado
153284 BZ:56 176,134.76 8,505,082.99 3,511.50 3,510.30 1,200.00 1.20 3,510.50 Buzon proyectado
153285 BZ:55 176,142.78 8,505,073.37 3,512.58 3,510.08 1,200.00 2.50 3,510.28 Buzon proyectado
153287 BZ:103' 175,201.34 8,505,072.30 3,640.47 3,639.27 1,200.00 1.20 3,639.39 Buzon proyectado
153288 BZ:102' 175,205.10 8,505,085.02 3,637.34 3,636.14 1,200.00 1.20 3,636.26 Buzon proyectado
153290 BZ:80 175,830.89 8,505,410.01 3,566.97 3,565.77 1,200.00 1.20 3,565.92 Buzon proyectado
153292 BZ:50 176,237.15 8,505,015.42 3,505.40 3,504.00 1,200.00 1.40 3,504.20 Buzon proyectado
153293 BZ:49 176,237.31 8,505,001.50 3,504.96 3,503.56 1,200.00 1.40 3,503.76 Buzon proyectado
153295 BZ:76 175,919.58 8,505,434.65 3,542.22 3,541.02 1,200.00 1.20 3,541.17 Buzon proyectado
153296 BZ:75 175,933.56 8,505,431.52 3,538.52 3,537.32 1,200.00 1.20 3,537.47 Buzon proyectado
153298 BZ:18 175,374.25 8,505,352.28 3,646.29 3,645.29 1,200.00 1.00 3,645.36 Buzon proyectado
153299 BZ:19 175,365.09 8,505,340.95 3,644.59 3,643.59 1,200.00 1.00 3,643.66 Buzon proyectado
153301 BZ:61 176,115.21 8,505,174.33 3,519.84 3,517.34 1,200.00 2.50 3,517.54 Buzon proyectado
153302 BZ:60 176,118.41 8,505,160.07 3,517.48 3,515.48 1,200.00 2.00 3,515.68 Buzon proyectado
153304 BZ:7 175,305.82 8,505,547.55 3,668.15 3,663.75 1,200.00 4.40 3,663.82 Buzon proyectado
153305 BZ:8 175,314.53 8,505,535.61 3,667.65 3,663.55 1,200.00 4.10 3,663.62 Buzon proyectado
153307 BZ:100 175,252.64 8,505,145.40 3,636.51 3,634.51 1,200.00 2.00 3,634.63 Buzon proyectado
153308 BZ:100' 175,264.98 8,505,137.12 3,636.51 3,634.31 1,200.00 2.20 3,634.43 Buzon proyectado
153310 BZ:105 175,148.58 8,505,016.00 3,645.13 3,643.93 1,200.00 1.20 3,644.05 Buzon proyectado
153312 BZ:41 176,376.77 8,504,843.82 3,496.98 3,495.78 1,200.00 1.20 3,495.98 Buzon proyectado
153313 BZ:40 176,391.05 8,504,836.25 3,494.93 3,493.73 1,200.00 1.20 3,493.93 Buzon proyectado
153315 BZ:10 175,288.97 8,505,467.42 3,661.23 3,658.23 1,200.00 3.00 3,658.30 Buzon proyectado
153317 BZ:70 176,009.25 8,505,314.76 3,525.28 3,524.08 1,200.00 1.20 3,524.28 Buzon proyectado
153318 BZ:69 176,022.27 8,505,304.22 3,525.07 3,523.57 1,200.00 1.50 3,523.77 Buzon proyectado
153320 BZ:64 176,096.73 8,505,225.04 3,519.77 3,518.22 1,200.00 1.55 3,518.42 Buzon proyectado
153321 BZ:63 176,102.94 8,505,209.40 3,519.79 3,517.94 1,200.00 1.85 3,518.14 Buzon proyectado
153323 BZ:13 175,327.44 8,505,445.70 3,652.52 3,651.32 1,200.00 1.20 3,651.39 Buzon proyectado
153324 BZ:14 175,343.05 8,505,438.82 3,651.38 3,650.18 1,200.00 1.20 3,650.25 Buzon proyectado
153326 BZ:113 175,722.20 8,505,268.65 3,587.21 3,585.71 1,200.00 1.50 3,585.82 Buzon proyectado
153327 BZ:112' 175,739.28 8,505,269.75 3,584.28 3,582.78 1,200.00 1.50 3,582.89 Buzon proyectado
153329 BZ:116 176,031.56 8,505,197.60 3,558.56 3,557.96 1,200.00 0.60 3,558.03 Buzon proyectado
153330 BZ:116' 176,027.03 8,505,214.17 3,558.74 3,557.79 1,200.00 0.95 3,557.86 Buzon proyectado
153332 BZ:119 175,953.37 8,505,330.01 3,561.13 3,556.33 1,200.00 4.80 3,556.40 Buzon proyectado
153333 BZ:120 175,944.62 8,505,344.93 3,560.85 3,556.15 1,200.00 4.70 3,556.22 Buzon proyectado
153335 BZ:74 175,934.94 8,505,412.65 3,536.99 3,535.19 1,200.00 1.80 3,535.34 Buzon proyectado
153336 BZ:73 175,947.36 8,505,400.60 3,533.62 3,531.62 1,200.00 2.00 3,531.82 Buzon proyectado
153338 BZ:62 176,109.42 8,505,193.34 3,519.85 3,517.65 1,200.00 2.20 3,517.85 Buzon proyectado
PROYECTO: "MEJORAMIENTO COLECTORES QUEBRADAS SAPHY, AV. SOL, TULLUMAYO Y AV. EJERCITO"

REPORTE DE BUZONES MODELAMIENTO HIDRAULICO AÑO 0 (2019) + LLUVIAS - COLECTOR QUEBRADA SAPHY

Línea de
Diam.
Cota Tapa Cota Fondo Altura de Gradiente
ID Nombre X (m) Y (m) Interior BZ Notas
(m) (m) Buzon (m) hidráulica
(m)
(m)

153340 BZ:22 175,348.70 8,505,267.79 3,635.84 3,634.44 1,200.00 1.40 3,634.55 Buzon proyectado
153342 BZ:104 175,175.88 8,505,046.43 3,641.77 3,640.57 1,200.00 1.20 3,640.69 Buzon proyectado
153343 BZ:103 175,192.37 8,505,052.33 3,641.76 3,640.36 1,200.00 1.40 3,640.48 Buzon proyectado
153346 BZ:98 175,316.45 8,505,172.94 3,634.09 3,632.79 1,200.00 1.30 3,632.91 Buzon proyectado
153347 BZ:97 175,331.49 8,505,181.96 3,634.00 3,632.55 1,200.00 1.45 3,632.67 Buzon proyectado
153349 BZ:110 175,831.27 8,505,332.99 3,554.53 3,553.03 1,200.00 1.50 3,553.14 Buzon proyectado
153351 BZ:57 176,129.73 8,505,100.08 3,515.26 3,513.76 1,200.00 1.50 3,513.96 Buzon proyectado
153353 BZ:108' 175,872.87 8,505,352.05 3,546.84 3,545.64 1,200.00 1.20 3,545.78 Buzon proyectado
153356 BZ:58 176,129.97 8,505,126.13 3,515.72 3,514.02 1,200.00 1.70 3,514.22 Buzon proyectado
153358 BZ:25 175,334.56 8,505,225.88 3,635.03 3,633.83 1,200.00 1.20 3,633.93 Buzon proyectado
153362 BZ:43 176,359.27 8,504,884.89 3,497.46 3,496.46 1,200.00 1.00 3,496.66 Buzon proyectado
153363 BZ:42 176,367.17 8,504,866.53 3,496.94 3,495.94 1,200.00 1.00 3,496.14 Buzon proyectado
153365 BZ:111 175,795.10 8,505,307.31 3,566.01 3,564.81 1,200.00 1.20 3,564.92 Buzon proyectado
153366 BZ:110' 175,811.34 8,505,319.03 3,559.64 3,558.14 1,200.00 1.50 3,558.25 Buzon proyectado
153368 BZ:96 175,340.81 8,505,202.45 3,633.90 3,632.30 1,200.00 1.60 3,632.42 Buzon proyectado
153369 BZ:95 175,358.07 8,505,213.65 3,634.54 3,632.09 1,200.00 2.45 3,632.24 Buzon proyectado
153374 BZ:102 175,215.37 8,505,103.44 3,638.56 3,635.86 1,200.00 2.70 3,635.98 Buzon proyectado
153376 BZ:44 176,344.35 8,504,899.86 3,499.23 3,498.23 1,200.00 1.00 3,498.43 Buzon proyectado
153378 BZ:72 175,982.71 8,505,349.96 3,530.46 3,529.26 1,200.00 1.20 3,529.46 Buzon proyectado
153379 BZ:71 175,997.03 8,505,334.19 3,527.83 3,526.63 1,200.00 1.20 3,526.83 Buzon proyectado
153381 BZ:112 175,758.63 8,505,281.96 3,581.96 3,580.46 1,200.00 1.50 3,580.57 Buzon proyectado
153382 BZ:111' 175,777.06 8,505,293.03 3,576.01 3,574.81 1,200.00 1.20 3,574.92 Buzon proyectado
153388 BZ:65 176,074.72 8,505,227.70 3,519.80 3,518.60 1,200.00 1.20 3,518.80 Buzon proyectado
153390 BZ:38 176,441.44 8,504,842.58 3,489.60 3,488.40 1,200.00 1.20 3,488.60 Buzon proyectado
153391 BZ:37 176,452.29 8,504,823.16 3,489.59 3,488.09 1,200.00 1.50 3,488.29 Buzon proyectado
153393 BZ:88 175,555.09 8,505,358.42 3,631.75 3,627.35 1,200.00 4.40 3,627.50 Buzon proyectado
153394 BZ:87 175,573.28 8,505,370.34 3,621.04 3,619.84 1,200.00 1.20 3,619.99 Buzon proyectado
153397 BZ:16 175,383.31 8,505,397.53 3,648.31 3,647.31 1,200.00 1.00 3,647.38 Buzon proyectado
153398 BZ:17 175,378.74 8,505,375.41 3,646.70 3,645.70 1,200.00 1.00 3,645.77 Buzon proyectado
153405 BZ:113' 175,699.90 8,505,261.01 3,587.89 3,586.39 1,200.00 1.50 3,586.50 Buzon proyectado
153407 BZ:131 176,037.67 8,505,169.04 3,531.26 3,530.06 1,200.00 1.20 3,530.14 Buzon proyectado
153408 BZ:132 176,060.94 8,505,164.74 3,525.91 3,524.71 1,200.00 1.20 3,524.79 Buzon proyectado
153410 BZ:133 176,089.52 8,505,156.21 3,520.63 3,519.43 1,200.00 1.20 3,519.51 Buzon proyectado
153412 BZ:21 175,352.23 8,505,291.77 3,635.65 3,634.65 1,200.00 1.00 3,634.75 Buzon proyectado
153415 BZ:117' 175,976.12 8,505,261.88 3,561.93 3,557.08 1,200.00 4.85 3,557.15 Buzon proyectado
153416 BZ:118 175,964.55 8,505,283.32 3,561.87 3,556.82 1,200.00 5.05 3,556.89 Buzon proyectado
153418 BZ:20 175,364.94 8,505,316.50 3,638.85 3,637.85 1,200.00 1.00 3,637.92 Buzon proyectado
153420 BZ:39 176,418.47 8,504,833.80 3,492.99 3,491.79 1,200.00 1.20 3,491.99 Buzon proyectado
153423 BZ:52 176,186.16 8,505,042.70 3,509.57 3,508.37 1,200.00 1.20 3,508.57 Buzon proyectado
153425 BZ:66 176,054.84 8,505,242.51 3,521.88 3,520.38 1,200.00 1.50 3,520.58 Buzon proyectado
153427 BZ:15 175,374.63 8,505,420.88 3,649.80 3,648.80 1,200.00 1.00 3,648.87 Buzon proyectado
153429 BZ:122 175,872.09 8,505,333.24 3,556.98 3,555.38 1,200.00 1.60 3,555.45 Buzon proyectado
153436 BZ:99 175,292.42 8,505,158.74 3,634.47 3,633.07 1,200.00 1.40 3,633.19 Buzon proyectado
153438 BZ:91 175,444.95 8,505,374.47 3,635.28 3,630.24 1,200.00 5.04 3,630.39 Buzon proyectado
153439 Bz:90 175,466.42 8,505,392.32 3,634.72 3,629.97 1,200.00 4.75 3,630.12 Buzon proyectado
153441 BZ:101 175,236.66 8,505,121.63 3,637.64 3,635.54 1,200.00 2.10 3,635.66 Buzon proyectado
153443 BZ:107 175,920.26 8,505,392.62 3,538.69 3,537.39 1,200.00 1.30 3,537.53 Buzon proyectado
153447 BZ:36 176,463.47 8,504,796.65 3,488.37 3,486.37 1,200.00 2.00 3,486.57 Buzon proyectado
153449 BZ:51 176,208.57 8,505,024.55 3,508.30 3,507.10 1,200.00 1.20 3,507.30 Buzon proyectado
153451 BZ:86 175,601.34 8,505,370.07 3,611.74 3,610.54 1,200.00 1.20 3,610.69 Buzon proyectado
153453 BZ:2 175,170.83 8,505,571.41 3,674.61 3,673.41 1,200.00 1.20 3,673.48 Buzon proyectado
153454 BZ:3 175,200.57 8,505,569.58 3,670.55 3,669.35 1,200.00 1.20 3,669.42 Buzon proyectado
153459 BZ:5 175,245.53 8,505,517.43 3,665.69 3,664.49 1,200.00 1.20 3,664.56 Buzon proyectado
153460 BZ:6 175,268.96 8,505,538.60 3,666.44 3,664.14 1,200.00 2.30 3,664.21 Buzon proyectado
153463 BZ:85 175,629.40 8,505,386.34 3,600.84 3,599.64 1,200.00 1.20 3,599.79 Buzon proyectado
153465 BZ:77 175,902.02 8,505,407.09 3,548.52 3,547.32 1,200.00 1.20 3,547.47 Buzon proyectado
153467 BZ:117 176,006.62 8,505,239.76 3,560.81 3,557.46 1,200.00 3.35 3,557.53 Buzon proyectado
153469 BZ:4 175,218.50 8,505,537.26 3,668.29 3,667.09 1,200.00 1.20 3,667.16 Buzon proyectado
153471 BZ:121 175,905.92 8,505,335.47 3,559.29 3,555.74 1,200.00 3.55 3,555.81 Buzon proyectado
153474 BZ:92 175,421.02 8,505,348.54 3,635.17 3,630.60 1,200.00 4.57 3,630.75 Buzon proyectado
153476 BZ:9 175,266.90 8,505,495.68 3,666.56 3,662.96 1,200.00 3.60 3,663.03 Buzon proyectado
PROYECTO: "MEJORAMIENTO COLECTORES QUEBRADAS SAPHY, AV. SOL, TULLUMAYO Y AV. EJERCITO"

REPORTE DE BUZONES MODELAMIENTO HIDRAULICO AÑO 0 (2019) + LLUVIAS - COLECTOR QUEBRADA SAPHY

Línea de
Diam.
Cota Tapa Cota Fondo Altura de Gradiente
ID Nombre X (m) Y (m) Interior BZ Notas
(m) (m) Buzon (m) hidráulica
(m)
(m)

153478 BZ:33 176,553.66 8,504,693.60 3,480.52 3,479.32 1,200.00 1.20 3,479.54 Buzon proyectado
153479 BZ:33' 176,565.10 8,504,659.54 3,478.91 3,477.71 1,200.00 1.20 3,477.93 Buzon proyectado
153481 BZ:93 175,401.58 8,505,317.89 3,635.15 3,630.95 1,200.00 4.20 3,631.10 Buzon proyectado
153487 BZ:89 175,520.39 8,505,373.18 3,632.92 3,629.12 1,200.00 3.80 3,629.27 Buzon proyectado
153490 BZ:47 176,286.40 8,504,958.16 3,502.70 3,501.70 1,200.00 1.00 3,501.90 Buzon proyectado
153491 BZ:45 176,312.77 8,504,930.76 3,500.36 3,499.36 1,200.00 1.00 3,499.56 Buzon proyectado
153497 BZ:83 175,718.73 8,505,343.53 3,586.70 3,585.50 1,200.00 1.20 3,585.65 Buzon proyectado
153498 BZ:82 175,754.16 8,505,364.69 3,582.61 3,581.41 1,200.00 1.20 3,581.56 Buzon proyectado
153500 BZ:81 175,795.13 8,505,388.42 3,576.02 3,574.82 1,200.00 1.20 3,574.97 Buzon proyectado
153502 BZ:1 175,130.81 8,505,586.74 3,678.00 3,676.80 1,200.00 1.20 3,676.87 Buzon proyectado
153505 BZ:32 176,587.71 8,504,621.13 3,476.90 3,475.70 1,200.00 1.20 3,475.92 Buzon proyectado
153509 BZ:35 176,507.81 8,504,774.08 3,484.08 3,482.88 1,200.00 1.20 3,483.10 Buzon proyectado
153510 BZ:34 176,523.25 8,504,730.08 3,482.94 3,481.74 1,200.00 1.20 3,481.96 Buzon proyectado
153516 BZ:31 176,622.71 8,504,582.63 3,474.90 3,473.70 1,200.00 1.20 3,473.92 Buzon proyectado
153517 BZ:31' 176,667.13 8,504,561.66 3,472.00 3,470.80 1,200.00 1.20 3,471.02 Buzon proyectado
153521 BZ:94 175,382.48 8,505,260.41 3,635.02 3,631.57 1,200.00 3.45 3,631.72 Buzon proyectado
153523 BZ:30 176,713.46 8,504,524.48 3,469.37 3,467.67 1,200.00 1.70 3,467.89 Buzon proyectado
153524 BZ:29 176,754.62 8,504,489.66 3,466.41 3,465.21 1,200.00 1.20 3,465.43 Buzon proyectado
153526 BZ:84 175,670.29 8,505,316.02 3,600.62 3,598.72 1,200.00 1.90 3,598.87 Buzon proyectado
153535 BZ:28 176,797.22 8,504,440.82 3,464.69 3,463.49 1,200.00 1.20 3,463.71 Buzon proyectado
153567 BZ:35' 176,497.23 8,504,780.98 3,484.79 3,483.59 1,200.00 1.20 3,483.81 Buzon proyectado
153571 BZ:137 176,252.35 8,504,983.18 3,507.32 3,506.12 1,200.00 1.20 3,506.15 Buzon proyectado
153573 BZ:135 176,489.33 8,504,780.48 3,486.93 3,485.43 1,200.00 1.50 3,485.50 Buzon proyectado
153575 BZ:124 175,944.78 8,505,096.65 3,563.65 3,561.65 1,200.00 2.00 3,561.73 Buzon proyectado
153576 BZ:125 175,951.62 8,505,101.35 3,556.65 3,555.45 1,200.00 1.20 3,555.53 Buzon proyectado
153578 BZ:126 175,974.92 8,505,102.28 3,555.58 3,554.38 1,200.00 1.20 3,554.46 Buzon proyectado
153579 BZ:127 175,981.42 8,505,108.45 3,549.50 3,548.30 1,200.00 1.20 3,548.38 Buzon proyectado
153581 BZ:130 176,030.50 8,505,154.48 3,536.70 3,535.20 1,200.00 1.50 3,535.28 Buzon proyectado
153583 BZ:128 176,002.92 8,505,132.66 3,542.97 3,541.77 1,200.00 1.20 3,541.85 Buzon proyectado
153584 BZ:129 176,005.20 8,505,149.86 3,540.29 3,539.09 1,200.00 1.20 3,539.17 Buzon proyectado
153586 BZ:139 176,222.26 8,504,954.63 3,527.69 3,526.19 1,200.00 1.50 3,526.22 Buzon proyectado
153587 BZ:138 176,235.01 8,504,967.40 3,517.33 3,515.83 1,200.00 1.50 3,515.86 Buzon proyectado
153589 BZ:136 176,471.55 8,504,751.66 3,499.61 3,497.61 1,200.00 2.00 3,497.68 Buzon proyectado
153590 BZ:135' 176,489.27 8,504,760.43 3,491.64 3,489.14 1,200.00 2.50 3,489.21 Buzon proyectado
153596 BZ:141 176,171.67 8,504,914.28 3,539.65 3,538.45 1,200.00 1.20 3,538.48 Buzon proyectado
153597 BZ:140 176,194.40 8,504,926.71 3,534.21 3,532.71 1,200.00 1.50 3,532.74 Buzon proyectado
153599 BZ:145 176,058.93 8,504,810.85 3,584.09 3,582.89 1,200.00 1.20 3,582.92 Buzon proyectado
153600 BZ:144 176,081.13 8,504,828.66 3,581.10 3,579.10 1,200.00 2.00 3,579.13 Buzon proyectado
153602 BZ:143 176,102.16 8,504,848.53 3,562.69 3,561.19 1,200.00 1.50 3,561.22 Buzon proyectado
153604 BZ:146 176,036.82 8,504,832.18 3,584.92 3,583.37 1,200.00 1.55 3,583.40 Buzon proyectado
153608 BZ:142 176,147.03 8,504,881.05 3,547.85 3,546.65 1,200.00 1.20 3,546.68 Buzon proyectado
PROYECTO: "MEJORAMIENTO COLECTORES QUEBRADAS SAPHY, AV. SOL, TULLUMAYO Y AV. EJERCITO"

REPORTE DE TUBERIAS MODELAMIENTO HIDRAULICO AÑO 20 (2039) SIN LLUVIAS - COLECTOR QUEBRADA SAPHY

Diam. Longitud
Long. Planta Pendiente Velocidad Tensión
ID Nombre Buzon Inicio Buzon Final Material Interior Dn (mm) Inclinada
(m) (m/km) Caudal (L/s) (m/s) Tirante (%) Tractiva (Pa) Notas
(mm) (m)
153245 TUB AL-92 BZ:123 BZ:109' PVC-U SN4 190,20 Dn= 200 6.20 5.50 481663.00 190,20 3.19 33.30 40.35 PROYECTADA
153275 TUB AL-46 BZ:109' BZ:109 PVC-U SN4 190,20 Dn= 200 11.00 10.80 191051.00 190,20 3.34 29.30 33.78 PROYECTADA
153248 TUB AL-32 BZ:79 BZ:78 PVC-U SN4 228,40 Dn= 250 5.80 5.80 121003.00 228,40 3.47 35.60 31.93 PROYECTADA
153537 TUB AL-33 BZ:78 BZ:77 PVC-U SN4 228,40 Dn= 250 76.50 74.80 208568.00 228,40 4.21 50.90 48.76 PROYECTADA
153251 TUB AL-147 BZ:27 BZ:26 PVC-U SN4 284,40 Dn= 315 6.40 6.20 122900.00 284,40 4.11 37.60 41.29 PROYECTADA
153254 TUB AL-104 BZ:68 BZ:67 PVC-U SN4 237,60 Dn= 250 8.30 8.30 23987.00 237,60 2.18 48.00 10.65 PROYECTADA
153511 TUB AL-105 BZ:67 BZ:66 PVC-U SN4 237,60 Dn= 250 47.00 46.90 45386.00 237,60 2.75 44.20 17.62 PROYECTADA
153257 TUB AL-36 BZ:115 BZ:114 PVC-U SN4 183,30 Dn= 200 9.90 8.50 546474.00 183,30 4.26 23.20 63.28 PROYECTADA
153457 TUB AL-37 BZ:114 BZ:113' PVC-U SN4 183,30 Dn= 200 30.40 30.40 14812.00 183,30 1.20 30.40 3.83 PROYECTADA
153260 TUB AL-118 BZ:54 BZ:53 PVC-U SN4 299,60 Dn= 315 8.60 8.60 12757.00 299,60 1.76 39.60 6.59 PROYECTADA
153422 TUB AL-119 BZ:53 BZ:52 PVC-U SN4 299,60 Dn= 315 24.70 24.70 24312.00 299,60 2.22 36.40 10.94 PROYECTADA
153263 TUB AL-49 BZ:108 BZ:107' PVC-U SN4 190,20 Dn= 200 8.90 8.90 121974.00 190,20 2.85 30.20 23.82 PROYECTADA
153442 TUB AL-50 BZ:107' BZ:107 PVC-U SN4 190,20 Dn= 200 28.30 28.10 118893.00 190,20 2.83 30.30 23.35 PROYECTADA
153266 TUB AL-68 BZ:11 BZ:12 PVC-U SN4 190,20 Dn= 200 9.00 9.00 10039.00 190,20 0.92 24.40 2.35 PROYECTADA
153432 TUB AL-69 BZ:12 BZ:13 PVC-U SN4 190,20 Dn= 200 27.00 27.00 34487.00 190,20 1.43 21.70 6.14 PROYECTADA
153269 TUB AL-124 BZ:48 BZ:46 PVC-U SN4 299,60 Dn= 315 9.10 9.10 12036.00 299,60 1.73 46.70 6.29 PROYECTADA
153493 TUB AL-125 BZ:46 BZ:47 PVC-U SN4 299,60 Dn= 315 38.90 38.90 40406.00 299,60 2.67 35.10 16.39 PROYECTADA
153272 TUB AL-80 BZ:23 BZ:24 PVC-U SN4 190,20 Dn= 200 9.70 9.70 9245.00 190,20 1.07 33.40 2.85 PROYECTADA
153357 TUB AL-81 BZ:24 BZ:25 PVC-U SN4 190,20 Dn= 200 18.40 18.40 13563.00 190,20 1.22 32.10 3.85 PROYECTADA
153352 TUB AL-47 BZ:109 BZ:108' PVC-U SN4 190,20 Dn= 200 18.00 17.80 112676.00 190,20 2.78 30.40 22.40 PROYECTADA
153277 TUB AL-1 BZ:106 BZ:106' PVC-U SN4 190,20 Dn= 200 11.00 10.90 142437.00 190,20 3.10 31.40 28.02 PROYECTADA
153309 TUB AL-2 BZ:106' BZ:105 PVC-U SN4 190,20 Dn= 200 15.20 15.20 54622.00 190,20 2.21 33.70 13.28 PROYECTADA
153280 TUB AL-96 BZ:134 BZ:59 PVC-U SN4 190,20 Dn= 200 11.80 11.60 134834.00 190,20 2.20 18.20 16.59 PROYECTADA
153355 TUB AL-113 BZ:59 BZ:58 PVC-U SN4 299,60 Dn= 315 18.30 18.30 14231.00 299,60 1.83 38.40 7.18 PROYECTADA
153283 TUB AL-116 BZ:56 BZ:55 PVC-U SN4 299,60 Dn= 315 12.50 12.50 17565.00 299,60 1.98 38.00 8.47 PROYECTADA
153401 TUB AL-117 BZ:55 BZ:54 PVC-U SN4 299,60 Dn= 315 23.00 23.00 43515.00 299,60 2.73 34.60 17.25 PROYECTADA
153286 TUB AL-6 BZ:103' BZ:102' PVC-U SN4 190,20 Dn= 200 13.60 13.30 236005.00 190,20 3.70 30.40 41.51 PROYECTADA
153373 TUB AL-7 BZ:102' BZ:102 PVC-U SN4 190,20 Dn= 200 21.10 21.10 13278.00 190,20 1.33 45.90 4.38 PROYECTADA
153289 TUB AL-31 BZ:80 BZ:79 PVC-U SN4 228,40 Dn= 250 13.90 13.70 155961.00 228,40 3.79 34.40 38.92 PROYECTADA
153291 TUB AL-122 BZ:50 BZ:49 PVC-U SN4 299,60 Dn= 315 13.90 13.90 31592.00 299,60 2.44 35.80 13.43 PROYECTADA
153344 TUB AL-123 BZ:49 BZ:48 PVC-U SN4 299,60 Dn= 315 17.50 17.50 10271.00 299,60 1.63 39.70 5.55 PROYECTADA
153294 TUB AL-35 BZ:76 BZ:75 PVC-U SN4 228,40 Dn= 250 14.80 14.30 258310.00 228,40 4.58 33.90 58.52 PROYECTADA
153359 TUB AL-97 BZ:75 BZ:74 PVC-U SN4 228,40 Dn= 250 19.00 18.90 112600.00 228,40 3.42 35.80 30.65 PROYECTADA
153297 TUB AL-75 BZ:18 BZ:19 PVC-U SN4 190,20 Dn= 200 14.70 14.60 116637.00 190,20 2.50 24.70 19.26 PROYECTADA
153417 TUB AL-76 BZ:19 BZ:20 PVC-U SN4 190,20 Dn= 200 25.10 24.50 234743.00 190,20 3.20 23.60 33.14 PROYECTADA
153300 TUB AL-111 BZ:61 BZ:60 PVC-U SN4 237,60 Dn= 250 14.70 14.60 127324.00 237,60 3.97 40.90 39.52 PROYECTADA
153354 TUB AL-112 BZ:60 BZ:59 PVC-U SN4 237,60 Dn= 250 17.90 17.90 39180.00 237,60 2.61 44.80 15.68 PROYECTADA
153303 TUB AL-64 BZ:7 BZ:8 PVC-U SN4 190,20 Dn= 200 14.80 14.80 13534.00 190,20 0.74 13.60 1.81 PROYECTADA
153533 TUB AL-65 BZ:8 BZ:9 PVC-U SN4 190,20 Dn= 200 62.20 62.20 9493.00 190,20 0.65 14.10 1.37 PROYECTADA
153306 TUB AL-10 BZ:100 BZ:100' PVC-U SN4 190,20 Dn= 200 14.90 14.90 13461.00 190,20 1.35 39.10 4.50 PROYECTADA
153472 TUB AL-11 BZ:100' BZ:99 PVC-U SN4 190,20 Dn= 200 35.00 34.90 35494.00 190,20 1.92 35.60 9.63 PROYECTADA
153495 TUB AL-3 BZ:105 BZ:104 PVC-U SN4 190,20 Dn= 200 41.00 40.90 82196.00 190,20 2.55 32.60 18.27 PROYECTADA
153311 TUB AL-131 BZ:41 BZ:40 PVC-U SN4 284,40 Dn= 315 16.30 16.20 126845.00 284,40 4.03 34.50 40.39 PROYECTADA
153433 TUB AL-132 BZ:40 BZ:39 PVC-U SN4 284,40 Dn= 315 27.60 27.50 70476.00 284,40 3.28 36.00 25.54 PROYECTADA
153314 TUB AL-67 BZ:10 BZ:11 PVC-U SN4 190,20 Dn= 200 17.20 16.20 364216.00 190,20 3.26 18.40 38.10 PROYECTADA
153316 TUB AL-102 BZ:70 BZ:69 PVC-U SN4 237,60 Dn= 250 16.80 16.70 30448.00 237,60 2.39 45.80 12.84 PROYECTADA
153492 TUB AL-103 BZ:69 BZ:68 PVC-U SN4 237,60 Dn= 250 38.20 38.20 22532.00 237,60 2.14 47.10 10.13 PROYECTADA
153319 TUB AL-108 BZ:64 BZ:63 PVC-U SN4 237,60 Dn= 250 16.80 16.80 16641.00 237,60 1.92 48.70 7.96 PROYECTADA
153337 TUB AL-109 BZ:63 BZ:62 PVC-U SN4 237,60 Dn= 250 17.30 17.30 16754.00 237,60 1.92 48.60 8.01 PROYECTADA
153322 TUB AL-70 BZ:13 BZ:14 PVC-U SN4 190,20 Dn= 200 17.10 17.10 66837.00 190,20 1.80 31.60 10.25 PROYECTADA
153482 TUB AL-71 BZ:14 BZ:15 PVC-U SN4 190,20 Dn= 200 36.30 36.30 37996.00 190,20 1.68 27.00 8.07 PROYECTADA
153325 TUB AL-39 BZ:113 BZ:112' PVC-U SN4 183,30 Dn= 200 17.40 17.10 171169.00 183,30 2.84 24.80 25.73 PROYECTADA
153399 TUB AL-40 BZ:112' BZ:112 PVC-U SN4 183,30 Dn= 200 23.00 22.90 101431.00 183,30 2.36 25.70 17.15 PROYECTADA
153328 TUB AL-83 BZ:116 BZ:116' PVC-U SN4 190,20 Dn= 200 17.20 17.20 9894.00 190,20 0.83 20.40 1.98 PROYECTADA
153466 TUB AL-84 BZ:116' BZ:117 PVC-U SN4 190,20 Dn= 200 32.70 32.70 10084.00 190,20 0.83 20.40 2.01 PROYECTADA
153331 TUB AL-88 BZ:119 BZ:120 PVC-U SN4 190,20 Dn= 200 17.30 17.30 10409.00 190,20 0.84 20.30 2.06 PROYECTADA
153494 TUB AL-89 BZ:120 BZ:121 PVC-U SN4 190,20 Dn= 200 39.80 39.80 10292.00 190,20 0.84 20.30 2.04 PROYECTADA
153334 TUB AL-98 BZ:74 BZ:73 PVC-U SN4 228,40 Dn= 250 17.70 17.30 177379.00 228,40 4.01 34.70 43.68 PROYECTADA
153530 TUB AL-99 BZ:73 BZ:72 PVC-U SN4 237,60 Dn= 250 61.80 61.80 38215.00 237,60 2.59 44.90 15.38 PROYECTADA
153360 TUB AL-110 BZ:62 BZ:61 PVC-U SN4 237,60 Dn= 250 19.90 19.90 15592.00 237,60 1.87 48.90 7.56 PROYECTADA
153339 TUB AL-79 BZ:22 BZ:23 PVC-U SN4 190,20 Dn= 200 17.50 17.50 15436.00 190,20 1.28 31.70 4.26 PROYECTADA
153341 TUB AL-4 BZ:104 BZ:103 PVC-U SN4 190,20 Dn= 200 17.50 17.50 11989.00 190,20 1.29 38.80 4.04 PROYECTADA
153386 TUB AL-5 BZ:103 BZ:103' PVC-U SN4 190,20 Dn= 200 21.90 21.90 49797.00 190,20 2.14 33.90 12.35 PROYECTADA
153345 TUB AL-13 BZ:98 BZ:97 PVC-U SN4 190,20 Dn= 200 17.50 17.50 13686.00 190,20 1.36 39.00 4.56 PROYECTADA
153395 TUB AL-14 BZ:97 BZ:96 PVC-U SN4 190,20 Dn= 200 22.50 22.50 11105.00 190,20 1.27 39.90 3.86 PROYECTADA
153348 TUB AL-45 BZ:110 BZ:109' PVC-U SN4 190,20 Dn= 200 18.10 17.80 186668.00 190,20 2.98 39.60 28.26 PROYECTADA
153350 TUB AL-115 BZ:57 BZ:56 PVC-U SN4 284,40 Dn= 315 18.10 17.80 194201.00 284,40 4.66 33.30 55.86 PROYECTADA
153461 TUB AL-48 BZ:108' BZ:108 PVC-U SN4 190,20 Dn= 200 32.10 31.90 120111.00 190,20 2.84 30.20 23.54 PROYECTADA
153430 TUB AL-114 BZ:58 BZ:57 PVC-U SN4 299,60 Dn= 315 26.10 26.00 9981.00 299,60 1.62 46.80 5.43 PROYECTADA
153431 TUB AL-82 BZ:25 BZ:95 PASE AEREO 190,20 PASE AEREO 26.60 26.50 20079.00 190,20 1.40 30.80 5.23 PROYECTADA
153361 TUB AL-129 BZ:43 BZ:42 PVC-U SN4 299,60 Dn= 315 20.00 20.00 26015.00 299,60 2.29 36.50 11.61 PROYECTADA
153421 TUB AL-130 BZ:42 BZ:41 PVC-U SN4 299,60 Dn= 315 24.70 24.70 6490.00 299,60 1.39 47.20 3.88 PROYECTADA
153364 TUB AL-43 BZ:111 BZ:110' PVC-U SN4 190,20 Dn= 200 21.10 20.00 333065.00 190,20 3.65 23.60 44.31 PROYECTADA
153413 TUB AL-44 BZ:110' BZ:110 PVC-U SN4 190,20 Dn= 200 24.90 24.30 209982.00 190,20 3.11 24.30 30.95 PROYECTADA
153367 TUB AL-15 BZ:96 BZ:95 PVC-U SN4 190,20 Dn= 200 20.60 20.60 10207.00 190,20 1.22 51.60 3.62 PROYECTADA
153520 TUB AL-16 BZ:95 BZ:94 PVC-U SN4 237,60 Dn= 250 52.80 52.80 9857.00 237,60 1.38 39.40 4.26 PROYECTADA
153440 TUB AL-8 BZ:102 BZ:101 PVC-U SN4 190,20 Dn= 200 28.00 28.00 11426.00 190,20 1.28 39.80 3.95 PROYECTADA
153375 TUB AL-128 BZ:44 BZ:43 PVC-U SN4 299,60 Dn= 315 21.20 21.10 83739.00 299,60 3.46 33.20 28.96 PROYECTADA
153377 TUB AL-100 BZ:72 BZ:71 PVC-U SN4 237,60 Dn= 250 21.50 21.30 123476.00 237,60 3.93 41.00 38.58 PROYECTADA
153400 TUB AL-101 BZ:71 BZ:70 PVC-U SN4 237,60 Dn= 250 23.10 23.00 111080.00 237,60 3.79 41.30 35.49 PROYECTADA
153380 TUB AL-41 BZ:112 BZ:111' PVC-U SN4 183,30 Dn= 200 22.20 21.50 262662.00 183,30 3.31 24.20 35.82 PROYECTADA
153402 TUB AL-42 BZ:111' BZ:111 PVC-U SN4 183,30 Dn= 200 25.10 23.00 434760.00 183,30 3.93 36.80 53.02 PROYECTADA
153387 TUB AL-107 BZ:65 BZ:64 PVC-U SN4 237,60 Dn= 250 22.20 22.20 17138.00 237,60 1.93 48.50 8.16 PROYECTADA
153389 TUB AL-134 BZ:38 BZ:37 PVC-U SN4 299,60 Dn= 315 22.30 22.20 13933.00 299,60 1.83 38.70 7.11 PROYECTADA
153446 TUB AL-135 BZ:37 BZ:36 PVC-U SN4 299,60 Dn= 315 28.80 28.80 59787.00 299,60 3.07 34.00 22.27 PROYECTADA
153392 TUB AL-23 BZ:88 BZ:87 PVC-U SN4 228,40 Dn= 250 23.00 21.70 336238.00 228,40 4.86 31.50 68.32 PROYECTADA
153450 TUB AL-24 BZ:87 BZ:86 PVC-U SN4 228,40 Dn= 250 29.60 28.10 331329.00 228,40 4.84 31.60 67.54 PROYECTADA
153396 TUB AL-73 BZ:16 BZ:17 PVC-U SN4 190,20 Dn= 200 22.60 22.60 71267.00 190,20 2.10 25.70 13.16 PROYECTADA
153403 TUB AL-74 BZ:17 BZ:18 PVC-U SN4 190,20 Dn= 200 23.60 23.60 17402.00 190,20 1.28 29.00 4.39 PROYECTADA
153404 TUB AL-38 BZ:113' BZ:113 PVC-U SN4 183,30 Dn= 200 23.60 23.60 28847.00 183,30 1.52 28.50 6.44 PROYECTADA
153406 TUB AL-93 BZ:131 BZ:132 PVC-U SN4 190,20 Dn= 200 24.30 23.70 226070.00 190,20 2.63 17.60 24.78 PROYECTADA
PROYECTO: "MEJORAMIENTO COLECTORES QUEBRADAS SAPHY, AV. SOL, TULLUMAYO Y AV. EJERCITO"

REPORTE DE TUBERIAS MODELAMIENTO HIDRAULICO AÑO 20 (2039) SIN LLUVIAS - COLECTOR QUEBRADA SAPHY

Diam. Longitud
Long. Planta Pendiente Velocidad Tensión
ID Nombre Buzon Inicio Buzon Final Material Interior Dn (mm) Inclinada
(m) (m/km) Caudal (L/s) (m/s) Tirante (%) Tractiva (Pa) Notas
(mm) (m)
153455 TUB AL-94 BZ:132 BZ:133 PVC-U SN4 190,20 Dn= 200 30.30 29.80 177009.00 190,20 2.42 17.90 20.48 PROYECTADA
153409 TUB AL-95 BZ:133 BZ:134 PVC-U SN4 190,20 Dn= 200 23.90 23.70 129957.00 190,20 2.17 18.30 16.12 PROYECTADA
153411 TUB AL-78 BZ:21 BZ:22 PVC-U SN4 190,20 Dn= 200 24.20 24.20 8662.00 190,20 1.04 33.70 2.71 PROYECTADA
153414 TUB AL-86 BZ:117' BZ:118 PVC-U SN4 190,20 Dn= 200 24.40 24.40 10672.00 190,20 0.85 20.30 2.10 PROYECTADA
153514 TUB AL-87 BZ:118 BZ:119 PVC-U SN4 190,20 Dn= 200 48.00 48.00 10207.00 190,20 0.84 20.40 2.03 PROYECTADA
153434 TUB AL-77 BZ:20 BZ:21 PVC-U SN4 190,20 Dn= 200 28.00 27.80 115103.00 190,20 2.49 36.60 19.05 PROYECTADA
153419 TUB AL-133 BZ:39 BZ:38 PVC-U SN4 284,40 Dn= 315 24.80 24.60 137863.00 284,40 4.15 34.30 43.14 PROYECTADA
153448 TUB AL-120 BZ:52 BZ:51 PVC-U SN4 299,60 Dn= 315 28.90 28.80 44050.00 299,60 2.74 34.60 17.42 PROYECTADA
153424 TUB AL-106 BZ:66 BZ:65 PVC-U SN4 237,60 Dn= 250 24.90 24.80 71796.00 237,60 3.24 42.60 25.24 PROYECTADA
153426 TUB AL-72 BZ:15 BZ:16 PVC-U SN4 190,20 Dn= 200 25.00 24.90 59812.00 190,20 1.98 26.00 11.48 PROYECTADA
153428 TUB AL-91 BZ:122 BZ:123 PVC-U SN4 190,20 Dn= 200 25.50 25.30 118593.00 190,20 1.96 16.50 13.63 PROYECTADA
153435 TUB AL-12 BZ:99 BZ:98 PVC-U SN4 190,20 Dn= 200 27.90 27.90 10033.00 190,20 1.22 40.40 3.57 PROYECTADA
153437 TUB AL-20 BZ:91 Bz:90 PVC-U SN8 235,40 Dn= 250 27.90 27.90 9671.00 235,40 1.37 40.40 4.24 PROYECTADA
153527 TUB AL-21 Bz:90 BZ:89 PVC-U SN4 237,60 Dn= 250 57.30 57.30 14842.00 237,60 1.60 38.10 5.93 PROYECTADA
153445 TUB AL-9 BZ:101 BZ:100 PVC-U SN4 190,20 Dn= 200 28.70 28.60 35954.00 190,20 1.92 35.50 9.73 PROYECTADA
153444 TUB AL-51 BZ:107 BZ:73 PVC-U SN4 190,20 Dn= 200 28.80 28.30 186492.00 190,20 3.31 29.40 33.16 PROYECTADA
153568 TUB AL-136(1) BZ:36 BZ:35' PVC-U SN4 299,60 Dn= 315 37.30 37.20 74688.00 299,60 3.32 48.20 26.49 PROYECTADA
153456 TUB AL-121 BZ:51 BZ:50 PVC-U SN4 299,60 Dn= 315 30.20 30.00 103317.00 299,60 3.71 32.40 33.87 PROYECTADA
153462 TUB AL-25 BZ:86 BZ:85 PVC-U SN4 228,40 Dn= 250 34.20 32.40 336069.00 228,40 4.86 31.50 68.29 PROYECTADA
153452 TUB AL-59 BZ:2 BZ:3 PVC-U SN4 190,20 Dn= 200 30.10 29.80 136256.00 190,20 1.36 8.20 8.10 PROYECTADA
153484 TUB AL-60 BZ:3 BZ:4 PVC-U SN4 190,20 Dn= 200 37.00 37.00 61151.00 190,20 1.03 8.70 4.37 PROYECTADA
153458 TUB AL-62 BZ:5 BZ:6 PVC-U SN4 190,20 Dn= 200 31.60 31.60 11084.00 190,20 0.69 13.90 1.55 PROYECTADA
153488 TUB AL-63 BZ:6 BZ:7 PVC-U SN4 190,20 Dn= 200 37.90 37.90 10282.00 190,20 0.67 14.00 1.46 PROYECTADA
153538 TUB AL-26 BZ:85 BZ:84 PVC-U SN4 228,40 Dn= 250 81.30 81.30 11310.00 228,40 1.46 49.40 4.81 PROYECTADA
153464 TUB AL-34 BZ:77 BZ:76 PVC-U SN4 228,40 Dn= 250 33.30 32.70 192791.00 228,40 4.14 34.50 46.60 PROYECTADA
153485 TUB AL-85 BZ:117 BZ:117' PVC-U SN4 190,20 Dn= 200 37.70 37.70 10084.00 190,20 0.83 20.40 2.01 PROYECTADA
153468 TUB AL-61 BZ:4 BZ:5 PVC-U SN4 190,20 Dn= 200 33.60 33.50 77547.00 190,20 1.12 13.70 5.24 PROYECTADA
153470 TUB AL-90 BZ:121 BZ:122 PVC-U SN4 190,20 Dn= 200 33.90 33.90 10617.00 190,20 0.85 20.30 2.09 PROYECTADA
153473 TUB AL-19 BZ:92 BZ:91 PVC-U SN8 235,40 Dn= 250 35.30 35.30 10201.00 235,40 1.40 40.10 4.42 PROYECTADA
153475 TUB AL-66 BZ:9 BZ:10 PVC-U SN4 190,20 Dn= 200 36.20 35.90 81725.00 190,20 1.37 11.60 7.28 PROYECTADA
153477 TUB AL-139 BZ:33 BZ:33' PVC-U SN4 299,60 Dn= 315 36.00 35.90 44813.00 299,60 2.86 36.70 18.62 PROYECTADA
153504 TUB AL-140 BZ:33' BZ:32 PVC-U SN4 299,60 Dn= 315 44.60 44.60 45091.00 299,60 2.86 36.70 18.71 PROYECTADA
153480 TUB AL-18 BZ:93 BZ:92 PVC-U SN4 237,60 Dn= 250 36.30 36.30 9643.00 237,60 1.37 46.10 4.23 PROYECTADA
153486 TUB AL-22 BZ:89 BZ:88 PVC-U SN4 237,60 Dn= 250 37.70 37.70 46943.00 237,60 2.42 46.30 14.64 PROYECTADA
153489 TUB AL-126 BZ:47 BZ:45 PVC-U SN4 299,60 Dn= 315 38.10 38.00 61535.00 299,60 3.10 33.90 22.78 PROYECTADA
153503 TUB AL-127 BZ:45 BZ:44 PVC-U SN4 299,60 Dn= 315 44.20 44.20 25575.00 299,60 2.27 36.50 11.46 PROYECTADA
153496 TUB AL-28 BZ:83 BZ:82 PVC-U SN4 228,40 Dn= 250 41.50 41.30 99094.00 228,40 3.24 35.50 27.32 PROYECTADA
153512 TUB AL-29 BZ:82 BZ:81 PVC-U SN4 228,40 Dn= 250 47.80 47.30 139199.00 228,40 3.65 34.60 35.59 PROYECTADA
153499 TUB AL-30 BZ:81 BZ:80 PVC-U SN4 228,40 Dn= 250 42.70 41.80 216675.00 228,40 4.27 33.70 50.23 PROYECTADA
153501 TUB AL-58 BZ:1 BZ:2 PVC-U SN4 190,20 Dn= 200 43.00 42.90 79108.00 190,20 1.12 8.50 5.32 PROYECTADA
153519 TUB AL-141 BZ:32 BZ:31 PVC-U SN4 299,60 Dn= 315 52.10 52.00 38436.00 299,60 2.71 37.20 16.50 PROYECTADA
153508 TUB AL-137 BZ:35 BZ:34 PVC-U SN4 299,60 Dn= 315 46.70 46.60 24444.00 299,60 2.31 38.70 11.57 PROYECTADA
153513 TUB AL-138 BZ:34 BZ:33 PVC-U SN4 299,60 Dn= 315 47.50 47.50 50961.00 299,60 3.00 36.30 20.56 PROYECTADA
153515 TUB AL-142 BZ:31 BZ:31' PVC-U SN4 299,60 Dn= 315 49.20 49.10 59039.00 299,60 3.15 35.90 23.09 PROYECTADA
153528 TUB AL-143 BZ:31' BZ:30 PVC-U SN4 299,60 Dn= 315 59.50 59.40 52691.00 299,60 3.03 36.30 21.13 PROYECTADA
153529 TUB AL-17 BZ:94 BZ:93 PVC-U SN4 237,60 Dn= 250 60.60 60.60 10237.00 237,60 1.40 45.80 4.39 PROYECTADA
153522 TUB AL-144 BZ:30 BZ:29 PVC-U SN4 299,60 Dn= 315 54.00 53.90 45634.00 299,60 2.87 36.70 18.89 PROYECTADA
153534 TUB AL-145 BZ:29 BZ:28 PVC-U SN4 299,60 Dn= 315 64.80 64.80 26537.00 299,60 2.37 38.40 12.34 PROYECTADA
153525 TUB AL-27 BZ:84 BZ:83 PVC-U SN4 228,40 Dn= 250 57.30 55.70 237320.00 228,40 4.40 33.50 53.94 PROYECTADA
153539 TUB AL-146 BZ:28 BZ:27 PVC-U SN4 299,60 Dn= 315 93.50 93.30 40716.00 299,60 2.76 37.00 17.26 PROYECTADA
153569 TUB AL-136(2) BZ:35' BZ:35 PVC-U SN4 299,60 Dn= 315 12.60 12.60 56219.00 299,60 3.10 36.40 22.22 PROYECTADA
153570 muros (Polyline)BZ:137 BZ:46 PVC-U SN4 190,20 Dn= 200 6.50 5.90 487123.00 190,20 1.93 42.00 19.42 PROYECTADA
153572 muros (Polyline)BZ:135 BZ:35' PVC-U SN4 237,60 Dn= 250 8.10 7.90 207145.00 237,60 2.52 13.80 22.84 PROYECTADA
153574 muros (Polyline)BZ:124 BZ:125 PVC-U SN4 183,30 Dn= 200 10.40 8.30 746891.00 183,30 4.00 17.30 63.04 PROYECTADA
153592 muros (Polyline)BZ:125 BZ:126 PVC-U SN4 183,30 Dn= 200 23.30 23.30 45896.00 183,30 1.51 20.70 7.26 PROYECTADA
153577 muros (Polyline)BZ:126 BZ:127 PVC-U SN4 183,30 Dn= 200 10.80 9.00 677980.00 183,30 3.87 17.40 58.48 PROYECTADA
153605 muros (Polyline)BZ:127 BZ:128 PVC-U SN4 190,20 Dn= 200 33.00 32.40 201736.00 190,20 2.53 17.80 22.66 PROYECTADA
153580 muros (Polyline)BZ:130 BZ:131 PVC-U SN4 190,20 Dn= 200 17.00 16.20 316659.00 190,20 2.98 17.30 32.05 PROYECTADA
153582 muros (Polyline)BZ:128 BZ:129 PVC-U SN4 190,20 Dn= 200 17.60 17.40 154439.00 190,20 2.31 18.10 18.42 PROYECTADA
153594 muros (Polyline)BZ:129 BZ:130 PVC-U SN4 190,20 Dn= 200 26.00 25.70 151223.00 190,20 2.29 18.10 18.12 PROYECTADA
153585 muros (Polyline)BZ:139 BZ:138 PVC-U SN4 190,20 Dn= 200 20.80 18.00 574069.00 190,20 2.05 6.60 21.96 PROYECTADA
153593 muros (Polyline)BZ:138 BZ:137 PVC-U SN4 190,20 Dn= 200 25.40 23.40 414229.00 190,20 1.88 6.70 16.79 PROYECTADA
153588 muros (Polyline)BZ:136 BZ:135' PVC-U SN4 237,60 Dn= 250 21.50 19.80 428333.00 237,60 3.24 13.20 40.03 PROYECTADA
153591 muros (Polyline)BZ:135' BZ:135 PVC-U SN4 237,60 Dn= 250 20.40 20.00 185046.00 237,60 2.43 13.90 20.89 PROYECTADA
153595 muros (Polyline)BZ:141 BZ:140 PVC-U SN4 190,20 Dn= 200 26.50 25.90 221543.00 190,20 1.49 7.00 10.46 PROYECTADA
153606 muros (Polyline)BZ:140 BZ:139 PVC-U SN4 190,20 Dn= 200 40.00 39.40 165305.00 190,20 1.33 7.20 8.42 PROYECTADA
153598 muros (Polyline)BZ:145 BZ:144 PVC-U SN4 190,20 Dn= 200 28.70 28.50 133181.00 190,20 1.26 7.20 7.04 PROYECTADA
153601 muros (Polyline)BZ:144 BZ:143 PVC-U SN4 190,20 Dn= 200 34.00 28.90 619021.00 190,20 2.11 6.60 23.23 PROYECTADA
153609 muros (Polyline)BZ:143 BZ:142 PVC-U SN4 190,20 Dn= 200 57.30 55.40 262374.00 190,20 1.58 6.90 11.93 PROYECTADA
153603 muros (Polyline)BZ:146 BZ:145 PVC-U SN4 190,20 Dn= 200 30.70 30.70 15627.00 190,20 0.59 8.70 1.36 PROYECTADA
153607 muros (Polyline)BZ:142 BZ:141 PVC-U SN4 190,20 Dn= 200 42.20 41.40 198239.00 190,20 1.43 7.10 9.62 PROYECTADA
153630 CO-2 BZ:14' BZ:14 PVC-U SN4 190,20 Dn= 200 8.1 7.6 232990 190,20 2.32 14.1 20.846 PROYECTADA
153634 CO-3 BZ:102A BZ:102 PVC-U SN4 190,20 Dn= 200 13.7 12.9 323795 190,20 1.52 5.8 12.031 PROYECTADA
PROYECTO: "MEJORAMIENTO COLECTORES QUEBRADAS SAPHY, AV. SOL, TULLUMAYO Y AV. EJERCITO"

REPORTE DE BUZONES MODELAMIENTO HIDRAULICO AÑO 20 (2039) SIN LLUVIAS - COLECTOR QUEBRADA SAPHY

Diam. Línea de
Cota Tapa Cota Fondo Altura de
ID Nombre X (m) Y (m) Interior BZ Gradiente Notas
(m) (m) Buzon (m)
(m) hidráulica (m)

153246 BZ:123 175,847.18 8,505,337.68 3,554.38 3,552.38 1,200.00 2.00 3,552.43 Buzon proyectado
153247 BZ:109' 175,845.92 8,505,343.08 3,551.21 3,549.71 1,200.00 1.50 3,549.80 Buzon proyectado
153249 BZ:79 175,825.04 8,505,422.42 3,564.83 3,563.63 1,200.00 1.20 3,563.74 Buzon proyectado
153250 BZ:78 175,829.60 8,505,425.98 3,564.13 3,562.93 1,200.00 1.20 3,563.04 Buzon proyectado
153252 BZ:27 176,857.74 8,504,369.77 3,461.69 3,457.69 1,200.00 4.00 3,457.84 Buzon proyectado
153253 BZ:26 176,863.02 8,504,372.99 3,459.53 3,455.93 1,200.00 3.60 3,456.08 Buzon proyectado
153255 BZ:68 176,059.67 8,505,296.59 3,524.76 3,522.71 1,200.00 2.05 3,522.85 Buzon proyectado
153256 BZ:67 176,062.63 8,505,288.79 3,525.01 3,522.51 1,200.00 2.50 3,522.65 Buzon proyectado
153258 BZ:115 175,671.57 8,505,238.12 3,595.96 3,591.96 1,200.00 4.00 3,592.03 Buzon proyectado
153259 BZ:114 175,673.26 8,505,246.40 3,588.04 3,586.84 1,200.00 1.20 3,586.91 Buzon proyectado
153261 BZ:54 176,162.27 8,505,061.19 3,510.28 3,509.08 1,200.00 1.20 3,509.22 Buzon proyectado
153262 BZ:53 176,170.85 8,505,062.05 3,511.07 3,508.97 1,200.00 2.10 3,509.11 Buzon proyectado
153264 BZ:108 175,898.76 8,505,370.66 3,543.01 3,541.81 1,200.00 1.20 3,541.90 Buzon proyectado
153265 BZ:107' 175,895.70 8,505,378.97 3,542.23 3,540.73 1,200.00 1.50 3,540.82 Buzon proyectado
153267 BZ:11 175,293.88 8,505,452.01 3,653.54 3,652.34 1,200.00 1.20 3,652.39 Buzon proyectado
153268 BZ:12 175,300.47 8,505,445.94 3,653.55 3,652.25 1,200.00 1.30 3,652.30 Buzon proyectado
153270 BZ:48 176,250.91 8,504,990.44 3,504.73 3,503.38 1,200.00 1.35 3,503.52 Buzon proyectado
153271 BZ:46 176,258.00 8,504,984.68 3,504.47 3,503.27 1,200.00 1.20 3,503.41 Buzon proyectado
153273 BZ:23 175,338.62 8,505,253.49 3,635.57 3,634.17 1,200.00 1.40 3,634.24 Buzon proyectado
153274 BZ:24 175,339.04 8,505,243.77 3,636.78 3,634.08 1,200.00 2.70 3,634.15 Buzon proyectado
153276 BZ:109 175,855.48 8,505,348.06 3,548.85 3,547.65 1,200.00 1.20 3,547.74 Buzon proyectado
153278 BZ:106 175,126.61 8,505,023.56 3,647.51 3,646.31 1,200.00 1.20 3,646.40 Buzon proyectado
153279 BZ:106' 175,133.41 8,505,015.06 3,645.96 3,644.76 1,200.00 1.20 3,644.85 Buzon proyectado
153281 BZ:134 176,111.86 8,505,148.29 3,517.55 3,516.35 1,200.00 1.20 3,516.40 Buzon proyectado
153282 BZ:59 176,122.00 8,505,142.57 3,515.78 3,514.28 1,200.00 1.50 3,514.42 Buzon proyectado
153284 BZ:56 176,134.76 8,505,082.99 3,511.50 3,510.30 1,200.00 1.20 3,510.44 Buzon proyectado
153285 BZ:55 176,142.78 8,505,073.37 3,512.58 3,510.08 1,200.00 2.50 3,510.22 Buzon proyectado
153287 BZ:103' 175,201.34 8,505,072.30 3,640.47 3,639.27 1,200.00 1.20 3,639.36 Buzon proyectado
153288 BZ:102' 175,205.10 8,505,085.02 3,637.34 3,636.14 1,200.00 1.20 3,636.23 Buzon proyectado
153290 BZ:80 175,830.89 8,505,410.01 3,566.97 3,565.77 1,200.00 1.20 3,565.88 Buzon proyectado
153292 BZ:50 176,237.15 8,505,015.42 3,505.40 3,504.00 1,200.00 1.40 3,504.14 Buzon proyectado
153293 BZ:49 176,237.31 8,505,001.50 3,504.96 3,503.56 1,200.00 1.40 3,503.70 Buzon proyectado
153295 BZ:76 175,919.58 8,505,434.65 3,542.22 3,541.02 1,200.00 1.20 3,541.13 Buzon proyectado
153296 BZ:75 175,933.56 8,505,431.52 3,538.52 3,537.32 1,200.00 1.20 3,537.43 Buzon proyectado
153298 BZ:18 175,374.25 8,505,352.28 3,646.29 3,645.29 1,200.00 1.00 3,645.34 Buzon proyectado
153299 BZ:19 175,365.09 8,505,340.95 3,644.59 3,643.59 1,200.00 1.00 3,643.64 Buzon proyectado
153301 BZ:61 176,115.21 8,505,174.33 3,519.84 3,517.34 1,200.00 2.50 3,517.48 Buzon proyectado
153302 BZ:60 176,118.41 8,505,160.07 3,517.48 3,515.48 1,200.00 2.00 3,515.62 Buzon proyectado
153304 BZ:7 175,305.82 8,505,547.55 3,668.15 3,663.75 1,200.00 4.40 3,663.80 Buzon proyectado
153305 BZ:8 175,314.53 8,505,535.61 3,667.65 3,663.55 1,200.00 4.10 3,663.60 Buzon proyectado
153307 BZ:100 175,252.64 8,505,145.40 3,636.51 3,634.51 1,200.00 2.00 3,634.60 Buzon proyectado
153308 BZ:100' 175,264.98 8,505,137.12 3,636.51 3,634.31 1,200.00 2.20 3,634.40 Buzon proyectado
153310 BZ:105 175,148.58 8,505,016.00 3,645.13 3,643.93 1,200.00 1.20 3,644.02 Buzon proyectado
153312 BZ:41 176,376.77 8,504,843.82 3,496.98 3,495.78 1,200.00 1.20 3,495.92 Buzon proyectado
153313 BZ:40 176,391.05 8,504,836.25 3,494.93 3,493.73 1,200.00 1.20 3,493.87 Buzon proyectado
153315 BZ:10 175,288.97 8,505,467.42 3,661.23 3,658.23 1,200.00 3.00 3,658.28 Buzon proyectado
153317 BZ:70 176,009.25 8,505,314.76 3,525.28 3,524.08 1,200.00 1.20 3,524.22 Buzon proyectado
153318 BZ:69 176,022.27 8,505,304.22 3,525.07 3,523.57 1,200.00 1.50 3,523.71 Buzon proyectado
153320 BZ:64 176,096.73 8,505,225.04 3,519.77 3,518.22 1,200.00 1.55 3,518.36 Buzon proyectado
153321 BZ:63 176,102.94 8,505,209.40 3,519.79 3,517.94 1,200.00 1.85 3,518.08 Buzon proyectado
153323 BZ:13 175,327.44 8,505,445.70 3,652.52 3,651.32 1,200.00 1.20 3,651.37 Buzon proyectado
153324 BZ:14 175,343.05 8,505,438.82 3,651.38 3,650.18 1,200.00 1.20 3,650.23 Buzon proyectado
153326 BZ:113 175,722.20 8,505,268.65 3,587.21 3,585.71 1,200.00 1.50 3,585.78 Buzon proyectado
153327 BZ:112' 175,739.28 8,505,269.75 3,584.28 3,582.78 1,200.00 1.50 3,582.85 Buzon proyectado
153329 BZ:116 176,031.56 8,505,197.60 3,558.56 3,557.96 1,200.00 0.60 3,558.01 Buzon proyectado
153330 BZ:116' 176,027.03 8,505,214.17 3,558.74 3,557.79 1,200.00 0.95 3,557.84 Buzon proyectado
153332 BZ:119 175,953.37 8,505,330.01 3,561.13 3,556.33 1,200.00 4.80 3,556.38 Buzon proyectado
153333 BZ:120 175,944.62 8,505,344.93 3,560.85 3,556.15 1,200.00 4.70 3,556.20 Buzon proyectado
153335 BZ:74 175,934.94 8,505,412.65 3,536.99 3,535.19 1,200.00 1.80 3,535.30 Buzon proyectado
153336 BZ:73 175,947.36 8,505,400.60 3,533.62 3,531.62 1,200.00 2.00 3,531.76 Buzon proyectado
153338 BZ:62 176,109.42 8,505,193.34 3,519.85 3,517.65 1,200.00 2.20 3,517.79 Buzon proyectado
153340 BZ:22 175,348.70 8,505,267.79 3,635.84 3,634.44 1,200.00 1.40 3,634.51 Buzon proyectado
PROYECTO: "MEJORAMIENTO COLECTORES QUEBRADAS SAPHY, AV. SOL, TULLUMAYO Y AV. EJERCITO"

REPORTE DE BUZONES MODELAMIENTO HIDRAULICO AÑO 20 (2039) SIN LLUVIAS - COLECTOR QUEBRADA SAPHY

Diam. Línea de
Cota Tapa Cota Fondo Altura de
ID Nombre X (m) Y (m) Interior BZ Gradiente Notas
(m) (m) Buzon (m)
(m) hidráulica (m)

153342 BZ:104 175,175.88 8,505,046.43 3,641.77 3,640.57 1,200.00 1.20 3,640.66 Buzon proyectado
153343 BZ:103 175,192.37 8,505,052.33 3,641.76 3,640.36 1,200.00 1.40 3,640.45 Buzon proyectado
153346 BZ:98 175,316.45 8,505,172.94 3,634.09 3,632.79 1,200.00 1.30 3,632.88 Buzon proyectado
153347 BZ:97 175,331.49 8,505,181.96 3,634.00 3,632.55 1,200.00 1.45 3,632.64 Buzon proyectado
153349 BZ:110 175,831.27 8,505,332.99 3,554.53 3,553.03 1,200.00 1.50 3,553.10 Buzon proyectado
153351 BZ:57 176,129.73 8,505,100.08 3,515.26 3,513.76 1,200.00 1.50 3,513.90 Buzon proyectado
153353 BZ:108' 175,872.87 8,505,352.05 3,546.84 3,545.64 1,200.00 1.20 3,545.73 Buzon proyectado
153356 BZ:58 176,129.97 8,505,126.13 3,515.72 3,514.02 1,200.00 1.70 3,514.16 Buzon proyectado
153358 BZ:25 175,334.56 8,505,225.88 3,635.03 3,633.83 1,200.00 1.20 3,633.90 Buzon proyectado
153362 BZ:43 176,359.27 8,504,884.89 3,497.46 3,496.46 1,200.00 1.00 3,496.60 Buzon proyectado
153363 BZ:42 176,367.17 8,504,866.53 3,496.94 3,495.94 1,200.00 1.00 3,496.08 Buzon proyectado
153365 BZ:111 175,795.10 8,505,307.31 3,566.01 3,564.81 1,200.00 1.20 3,564.88 Buzon proyectado
153366 BZ:110' 175,811.34 8,505,319.03 3,559.64 3,558.14 1,200.00 1.50 3,558.21 Buzon proyectado
153368 BZ:96 175,340.81 8,505,202.45 3,633.90 3,632.30 1,200.00 1.60 3,632.39 Buzon proyectado
153369 BZ:95 175,358.07 8,505,213.65 3,634.54 3,632.09 1,200.00 2.45 3,632.20 Buzon proyectado
153374 BZ:102 175,215.37 8,505,103.44 3,638.56 3,635.86 1,200.00 2.70 3,635.95 Buzon proyectado
153376 BZ:44 176,344.35 8,504,899.86 3,499.23 3,498.23 1,200.00 1.00 3,498.37 Buzon proyectado
153378 BZ:72 175,982.71 8,505,349.96 3,530.46 3,529.26 1,200.00 1.20 3,529.40 Buzon proyectado
153379 BZ:71 175,997.03 8,505,334.19 3,527.83 3,526.63 1,200.00 1.20 3,526.77 Buzon proyectado
153381 BZ:112 175,758.63 8,505,281.96 3,581.96 3,580.46 1,200.00 1.50 3,580.53 Buzon proyectado
153382 BZ:111' 175,777.06 8,505,293.03 3,576.01 3,574.81 1,200.00 1.20 3,574.88 Buzon proyectado
153388 BZ:65 176,074.72 8,505,227.70 3,519.80 3,518.60 1,200.00 1.20 3,518.74 Buzon proyectado
153390 BZ:38 176,441.44 8,504,842.58 3,489.60 3,488.40 1,200.00 1.20 3,488.54 Buzon proyectado
153391 BZ:37 176,452.29 8,504,823.16 3,489.59 3,488.09 1,200.00 1.50 3,488.23 Buzon proyectado
153393 BZ:88 175,555.09 8,505,358.42 3,631.75 3,627.35 1,200.00 4.40 3,627.46 Buzon proyectado
153394 BZ:87 175,573.28 8,505,370.34 3,621.04 3,619.84 1,200.00 1.20 3,619.95 Buzon proyectado
153397 BZ:16 175,383.31 8,505,397.53 3,648.31 3,647.31 1,200.00 1.00 3,647.36 Buzon proyectado
153398 BZ:17 175,378.74 8,505,375.41 3,646.70 3,645.70 1,200.00 1.00 3,645.75 Buzon proyectado
153405 BZ:113' 175,699.90 8,505,261.01 3,587.89 3,586.39 1,200.00 1.50 3,586.46 Buzon proyectado
153407 BZ:131 176,037.67 8,505,169.04 3,531.26 3,530.06 1,200.00 1.20 3,530.11 Buzon proyectado
153408 BZ:132 176,060.94 8,505,164.74 3,525.91 3,524.71 1,200.00 1.20 3,524.76 Buzon proyectado
153410 BZ:133 176,089.52 8,505,156.21 3,520.63 3,519.43 1,200.00 1.20 3,519.48 Buzon proyectado
153412 BZ:21 175,352.23 8,505,291.77 3,635.65 3,634.65 1,200.00 1.00 3,634.72 Buzon proyectado
153415 BZ:117' 175,976.12 8,505,261.88 3,561.93 3,557.08 1,200.00 4.85 3,557.13 Buzon proyectado
153416 BZ:118 175,964.55 8,505,283.32 3,561.87 3,556.82 1,200.00 5.05 3,556.87 Buzon proyectado
153418 BZ:20 175,364.94 8,505,316.50 3,638.85 3,637.85 1,200.00 1.00 3,637.90 Buzon proyectado
153420 BZ:39 176,418.47 8,504,833.80 3,492.99 3,491.79 1,200.00 1.20 3,491.93 Buzon proyectado
153423 BZ:52 176,186.16 8,505,042.70 3,509.57 3,508.37 1,200.00 1.20 3,508.51 Buzon proyectado
153425 BZ:66 176,054.84 8,505,242.51 3,521.88 3,520.38 1,200.00 1.50 3,520.52 Buzon proyectado
153427 BZ:15 175,374.63 8,505,420.88 3,649.80 3,648.80 1,200.00 1.00 3,648.85 Buzon proyectado
153429 BZ:122 175,872.09 8,505,333.24 3,556.98 3,555.38 1,200.00 1.60 3,555.43 Buzon proyectado
153436 BZ:99 175,292.42 8,505,158.74 3,634.47 3,633.07 1,200.00 1.40 3,633.16 Buzon proyectado
153438 BZ:91 175,444.95 8,505,374.47 3,635.28 3,630.24 1,200.00 5.04 3,630.35 Buzon proyectado
153439 Bz:90 175,466.42 8,505,392.32 3,634.72 3,629.97 1,200.00 4.75 3,630.08 Buzon proyectado
153441 BZ:101 175,236.66 8,505,121.63 3,637.64 3,635.54 1,200.00 2.10 3,635.63 Buzon proyectado
153443 BZ:107 175,920.26 8,505,392.62 3,538.69 3,537.39 1,200.00 1.30 3,537.48 Buzon proyectado
153447 BZ:36 176,463.47 8,504,796.65 3,488.37 3,486.37 1,200.00 2.00 3,486.51 Buzon proyectado
153449 BZ:51 176,208.57 8,505,024.55 3,508.30 3,507.10 1,200.00 1.20 3,507.24 Buzon proyectado
153451 BZ:86 175,601.34 8,505,370.07 3,611.74 3,610.54 1,200.00 1.20 3,610.65 Buzon proyectado
153453 BZ:2 175,170.83 8,505,571.41 3,674.61 3,673.41 1,200.00 1.20 3,673.46 Buzon proyectado
153454 BZ:3 175,200.57 8,505,569.58 3,670.55 3,669.35 1,200.00 1.20 3,669.40 Buzon proyectado
153459 BZ:5 175,245.53 8,505,517.43 3,665.69 3,664.49 1,200.00 1.20 3,664.54 Buzon proyectado
153460 BZ:6 175,268.96 8,505,538.60 3,666.44 3,664.14 1,200.00 2.30 3,664.19 Buzon proyectado
153463 BZ:85 175,629.40 8,505,386.34 3,600.84 3,599.64 1,200.00 1.20 3,599.75 Buzon proyectado
153465 BZ:77 175,902.02 8,505,407.09 3,548.52 3,547.32 1,200.00 1.20 3,547.43 Buzon proyectado
153467 BZ:117 176,006.62 8,505,239.76 3,560.81 3,557.46 1,200.00 3.35 3,557.51 Buzon proyectado
153469 BZ:4 175,218.50 8,505,537.26 3,668.29 3,667.09 1,200.00 1.20 3,667.14 Buzon proyectado
153471 BZ:121 175,905.92 8,505,335.47 3,559.29 3,555.74 1,200.00 3.55 3,555.79 Buzon proyectado
153474 BZ:92 175,421.02 8,505,348.54 3,635.17 3,630.60 1,200.00 4.57 3,630.71 Buzon proyectado
153476 BZ:9 175,266.90 8,505,495.68 3,666.56 3,662.96 1,200.00 3.60 3,663.01 Buzon proyectado
153478 BZ:33 176,553.66 8,504,693.60 3,480.52 3,479.32 1,200.00 1.20 3,479.47 Buzon proyectado
153479 BZ:33' 176,565.10 8,504,659.54 3,478.91 3,477.71 1,200.00 1.20 3,477.86 Buzon proyectado
PROYECTO: "MEJORAMIENTO COLECTORES QUEBRADAS SAPHY, AV. SOL, TULLUMAYO Y AV. EJERCITO"

REPORTE DE BUZONES MODELAMIENTO HIDRAULICO AÑO 20 (2039) SIN LLUVIAS - COLECTOR QUEBRADA SAPHY

Diam. Línea de
Cota Tapa Cota Fondo Altura de
ID Nombre X (m) Y (m) Interior BZ Gradiente Notas
(m) (m) Buzon (m)
(m) hidráulica (m)

153481 BZ:93 175,401.58 8,505,317.89 3,635.15 3,630.95 1,200.00 4.20 3,631.06 Buzon proyectado
153487 BZ:89 175,520.39 8,505,373.18 3,632.92 3,629.12 1,200.00 3.80 3,629.23 Buzon proyectado
153490 BZ:47 176,286.40 8,504,958.16 3,502.70 3,501.70 1,200.00 1.00 3,501.84 Buzon proyectado
153491 BZ:45 176,312.77 8,504,930.76 3,500.36 3,499.36 1,200.00 1.00 3,499.50 Buzon proyectado
153497 BZ:83 175,718.73 8,505,343.53 3,586.70 3,585.50 1,200.00 1.20 3,585.61 Buzon proyectado
153498 BZ:82 175,754.16 8,505,364.69 3,582.61 3,581.41 1,200.00 1.20 3,581.52 Buzon proyectado
153500 BZ:81 175,795.13 8,505,388.42 3,576.02 3,574.82 1,200.00 1.20 3,574.93 Buzon proyectado
153502 BZ:1 175,130.81 8,505,586.74 3,678.00 3,676.80 1,200.00 1.20 3,676.85 Buzon proyectado
153505 BZ:32 176,587.71 8,504,621.13 3,476.90 3,475.70 1,200.00 1.20 3,475.85 Buzon proyectado
153509 BZ:35 176,507.81 8,504,774.08 3,484.08 3,482.88 1,200.00 1.20 3,483.03 Buzon proyectado
153510 BZ:34 176,523.25 8,504,730.08 3,482.94 3,481.74 1,200.00 1.20 3,481.89 Buzon proyectado
153516 BZ:31 176,622.71 8,504,582.63 3,474.90 3,473.70 1,200.00 1.20 3,473.85 Buzon proyectado
153517 BZ:31' 176,667.13 8,504,561.66 3,472.00 3,470.80 1,200.00 1.20 3,470.95 Buzon proyectado
153521 BZ:94 175,382.48 8,505,260.41 3,635.02 3,631.57 1,200.00 3.45 3,631.68 Buzon proyectado
153523 BZ:30 176,713.46 8,504,524.48 3,469.37 3,467.67 1,200.00 1.70 3,467.82 Buzon proyectado
153524 BZ:29 176,754.62 8,504,489.66 3,466.41 3,465.21 1,200.00 1.20 3,465.36 Buzon proyectado
153526 BZ:84 175,670.29 8,505,316.02 3,600.62 3,598.72 1,200.00 1.90 3,598.83 Buzon proyectado
153535 BZ:28 176,797.22 8,504,440.82 3,464.69 3,463.49 1,200.00 1.20 3,463.64 Buzon proyectado
153567 BZ:35' 176,497.23 8,504,780.98 3,484.79 3,483.59 1,200.00 1.20 3,483.74 Buzon proyectado
153571 BZ:137 176,252.35 8,504,983.18 3,507.32 3,506.12 1,200.00 1.20 3,506.14 Buzon proyectado
153573 BZ:135 176,489.33 8,504,780.48 3,486.93 3,485.43 1,200.00 1.50 3,485.48 Buzon proyectado
153575 BZ:124 175,944.78 8,505,096.65 3,563.65 3,561.65 1,200.00 2.00 3,561.70 Buzon proyectado
153576 BZ:125 175,951.62 8,505,101.35 3,556.65 3,555.45 1,200.00 1.20 3,555.50 Buzon proyectado
153578 BZ:126 175,974.92 8,505,102.28 3,555.58 3,554.38 1,200.00 1.20 3,554.43 Buzon proyectado
153579 BZ:127 175,981.42 8,505,108.45 3,549.50 3,548.30 1,200.00 1.20 3,548.35 Buzon proyectado
153581 BZ:130 176,030.50 8,505,154.48 3,536.70 3,535.20 1,200.00 1.50 3,535.25 Buzon proyectado
153583 BZ:128 176,002.92 8,505,132.66 3,542.97 3,541.77 1,200.00 1.20 3,541.82 Buzon proyectado
153584 BZ:129 176,005.20 8,505,149.86 3,540.29 3,539.09 1,200.00 1.20 3,539.14 Buzon proyectado
153586 BZ:139 176,222.26 8,504,954.63 3,527.69 3,526.19 1,200.00 1.50 3,526.21 Buzon proyectado
153587 BZ:138 176,235.01 8,504,967.40 3,517.33 3,515.83 1,200.00 1.50 3,515.85 Buzon proyectado
153589 BZ:136 176,471.55 8,504,751.66 3,499.61 3,497.61 1,200.00 2.00 3,497.66 Buzon proyectado
153590 BZ:135' 176,489.27 8,504,760.43 3,491.64 3,489.14 1,200.00 2.50 3,489.19 Buzon proyectado
153596 BZ:141 176,171.67 8,504,914.28 3,539.65 3,538.45 1,200.00 1.20 3,538.47 Buzon proyectado
153597 BZ:140 176,194.40 8,504,926.71 3,534.21 3,532.71 1,200.00 1.50 3,532.73 Buzon proyectado
153599 BZ:145 176,058.93 8,504,810.85 3,584.09 3,582.89 1,200.00 1.20 3,582.91 Buzon proyectado
153600 BZ:144 176,081.13 8,504,828.66 3,581.10 3,579.10 1,200.00 2.00 3,579.12 Buzon proyectado
153602 BZ:143 176,102.16 8,504,848.53 3,562.69 3,561.19 1,200.00 1.50 3,561.21 Buzon proyectado
153604 BZ:146 176,036.82 8,504,832.18 3,584.92 3,583.37 1,200.00 1.55 3,583.39 Buzon proyectado
153608 BZ:142 176,147.03 8,504,881.05 3,547.85 3,546.65 1,200.00 1.20 3,546.67 Buzon proyectado
PROYECTO: "MEJORAMIENTO COLECTORES QUEBRADAS SAPHY, AV. SOL, TULLUMAYO Y AV. EJERCITO"

REPORTE DE TUBERIAS MODELAMIENTO HIDRAULICO AÑO 0 (2019) SIN LLUVIAS - COLECTOR QUEBRADA SAPHY

Diam. Longitud
Long. Planta Pendiente Velocidad Tensión
ID Nombre Buzon Inicio Buzon Final Material Interior Dn (mm) Inclinada Caudal (L/s) Tirante (%) Notas
(m) (m/km) (m/s) Tractiva (Pa)
(mm) (m)
153245 TUB AL-92 BZ:123 BZ:109' PVC-U SN2 192.2 Dn= 200 6.20 5.50 481.66 2.59 3.12 31.60 39.04 PROYECTADA
153248 TUB AL-32 BZ:79 BZ:78 PVC-U SN2 240.2 Dn= 250 5.80 5.80 121.00 14.44 3.16 28.40 27.67 PROYECTADA
153251 TUB AL-147 BZ:27 BZ:26 PVC-U SN4 302.6 Dn= 315 6.40 6.20 122.90 29.67 3.82 30.70 36.97 PROYECTADA
153254 TUB AL-104 BZ:68 BZ:67 PVC-U SN2 240.2 Dn= 250 8.30 8.30 23.99 23.53 2.05 41.90 9.67 PROYECTADA
153257 TUB AL-36 BZ:115 BZ:114 PVC-U SN4 192.2 Dn= 200 9.90 8.50 546.47 5.94 4.24 21.70 62.25 PROYECTADA
153260 TUB AL-118 BZ:54 BZ:53 PVC-U SN2 302.6 Dn= 315 8.60 8.60 12.76 26.29 1.65 34.60 5.98 PROYECTADA
153263 TUB AL-49 BZ:108 BZ:107' PVC-U SN2 192.2 Dn= 200 8.90 8.90 121.97 8.53 2.78 28.60 22.97 PROYECTADA
153266 TUB AL-68 BZ:11 BZ:12 PVC-U SN2 192.2 Dn= 200 9.00 9.00 10.04 3.18 0.87 21.50 2.12 PROYECTADA
153269 TUB AL-124 BZ:48 BZ:46 PVC-U SN2 302.6 Dn= 315 9.10 9.10 12.04 26.29 1.62 41.00 5.71 PROYECTADA
153272 TUB AL-80 BZ:23 BZ:24 PVC-U SN2 192.2 Dn= 200 9.70 9.70 9.25 6.04 1.01 30.10 2.64 PROYECTADA
153275 TUB AL-46 BZ:109' BZ:109 PVC-U SN2 192.2 Dn= 200 11.00 10.80 191.05 8.53 3.25 27.80 32.58 PROYECTADA
153277 TUB AL-1 BZ:106 BZ:106' PVC-U SN2 192.2 Dn= 200 11.00 10.90 142.44 8.10 2.89 27.60 25.32 PROYECTADA
153280 TUB AL-96 BZ:134 BZ:59 PVC-U SN2 192.2 Dn= 200 11.80 11.60 134.83 2.76 2.05 16.10 14.99 PROYECTADA
153283 TUB AL-116 BZ:56 BZ:55 PVC-U SN2 302.6 Dn= 315 12.50 12.50 17.57 26.29 1.85 33.20 7.68 PROYECTADA
153286 TUB AL-6 BZ:103' BZ:102' PVC-U SN2 192.2 Dn= 200 13.60 13.30 236.01 8.10 3.46 26.70 37.46 PROYECTADA
153289 TUB AL-31 BZ:80 BZ:79 PVC-U SN2 240.2 Dn= 250 13.90 13.70 155.96 14.44 3.45 27.60 33.70 PROYECTADA
153291 TUB AL-122 BZ:50 BZ:49 PVC-U SN2 302.6 Dn= 315 13.90 13.90 31.59 26.29 2.28 31.30 12.16 PROYECTADA
153294 TUB AL-35 BZ:76 BZ:75 PVC-U SN4 240.2 Dn= 250 14.80 14.30 258.31 15.00 4.17 27.30 50.70 PROYECTADA
153297 TUB AL-75 BZ:18 BZ:19 PVC-U SN2 192.2 Dn= 200 14.70 14.60 116.64 3.18 2.04 17.40 14.25 PROYECTADA
153300 TUB AL-111 BZ:61 BZ:60 PVC-U SN2 240.2 Dn= 250 14.70 14.60 127.32 23.53 3.71 35.90 35.75 PROYECTADA
153303 TUB AL-64 BZ:7 BZ:8 PVC-U SN4 190.2 Dn= 200 14.80 14.80 13.53 3.18 0.96 21.20 2.68 PROYECTADA
153306 TUB AL-10 BZ:100 BZ:100' PVC-U SN2 192.2 Dn= 200 14.90 14.90 13.46 8.40 1.27 34.30 4.08 PROYECTADA
153309 TUB AL-2 BZ:106' BZ:105 PVC-U SN2 192.2 Dn= 200 15.20 15.20 54.62 8.10 2.06 29.60 12.03 PROYECTADA
153311 TUB AL-131 BZ:41 BZ:40 PVC-U SN4 302.6 Dn= 315 16.30 16.20 126.85 26.72 3.74 28.40 36.16 PROYECTADA
153314 TUB AL-67 BZ:10 BZ:11 PVC-U SN4 190.2 Dn= 200 17.20 16.20 364.22 3.18 3.06 16.40 34.29 PROYECTADA
153316 TUB AL-102 BZ:70 BZ:69 PVC-U SN2 240.2 Dn= 250 16.80 16.70 30.45 23.53 2.23 40.20 11.67 PROYECTADA
153319 TUB AL-108 BZ:64 BZ:63 PVC-U SN2 240.2 Dn= 250 16.80 16.80 16.64 23.53 1.80 42.60 7.25 PROYECTADA
153322 TUB AL-70 BZ:13 BZ:14 PVC-U SN2 192.2 Dn= 200 17.10 17.10 66.84 3.18 1.68 18.10 9.26 PROYECTADA
153325 TUB AL-39 BZ:113 BZ:112' PVC-U SN2 192.2 Dn= 200 17.40 17.10 171.17 5.94 2.82 23.30 25.38 PROYECTADA
153328 TUB AL-83 BZ:116 BZ:116' PVC-U SN2 192.2 Dn= 200 17.20 17.20 9.89 2.59 0.81 22.20 1.92 PROYECTADA
153331 TUB AL-88 BZ:119 BZ:120 PVC-U SN4 190.2 Dn= 200 17.30 17.30 10.41 2.59 0.82 19.60 2.00 PROYECTADA
153334 TUB AL-98 BZ:74 BZ:73 PVC-U SN2 240.2 Dn= 250 17.70 17.30 177.38 15.00 3.65 27.90 37.88 PROYECTADA
153337 TUB AL-109 BZ:63 BZ:62 PVC-U SN2 240.2 Dn= 250 17.30 17.30 16.75 23.53 1.80 42.50 7.29 PROYECTADA
153339 TUB AL-79 BZ:22 BZ:23 PVC-U SN2 192.2 Dn= 200 17.50 17.50 15.44 6.04 1.21 28.50 3.94 PROYECTADA
153341 TUB AL-4 BZ:104 BZ:103 PVC-U SN2 192.2 Dn= 200 17.50 17.50 11.99 8.10 1.20 34.10 3.67 PROYECTADA
153344 TUB AL-123 BZ:49 BZ:48 PVC-U SN2 302.6 Dn= 315 17.50 17.50 10.27 26.29 1.53 34.80 5.04 PROYECTADA
153345 TUB AL-13 BZ:98 BZ:97 PVC-U SN2 192.2 Dn= 200 17.50 17.50 13.69 8.40 1.28 34.20 4.13 PROYECTADA
153348 TUB AL-45 BZ:110 BZ:109' PVC-U SN2 192.2 Dn= 200 18.10 17.80 186.67 5.94 2.91 37.50 27.14 PROYECTADA
153350 TUB AL-115 BZ:57 BZ:56 PVC-U SN4 302.6 Dn= 315 18.10 17.80 194.20 26.29 4.31 27.40 50.04 PROYECTADA
153352 TUB AL-47 BZ:109 BZ:108' PVC-U SN2 192.2 Dn= 200 18.00 17.80 112.68 8.53 2.71 28.80 21.60 PROYECTADA
153354 TUB AL-112 BZ:60 BZ:59 PVC-U SN2 240.2 Dn= 250 17.90 17.90 39.18 23.53 2.44 39.30 14.22 PROYECTADA
153355 TUB AL-113 BZ:59 BZ:58 PVC-U SN2 302.6 Dn= 315 18.30 18.30 14.23 26.29 1.72 33.70 6.51 PROYECTADA
153357 TUB AL-81 BZ:24 BZ:25 PVC-U SN2 192.2 Dn= 200 18.40 18.40 13.56 6.04 1.16 28.90 3.56 PROYECTADA
153359 TUB AL-97 BZ:75 BZ:74 PVC-U SN2 240.2 Dn= 250 19.00 18.90 112.60 15.00 3.11 28.70 26.61 PROYECTADA
153360 TUB AL-110 BZ:62 BZ:61 PVC-U SN2 240.2 Dn= 250 19.90 19.90 15.59 23.53 1.76 42.80 6.88 PROYECTADA
153361 TUB AL-129 BZ:43 BZ:42 PVC-U SN2 302.6 Dn= 315 20.00 20.00 26.02 26.72 2.14 32.10 10.52 PROYECTADA
153364 TUB AL-43 BZ:111 BZ:110' PVC-U SN2 192.2 Dn= 200 21.10 20.00 333.07 5.94 3.55 22.30 42.57 PROYECTADA
153367 TUB AL-15 BZ:96 BZ:95 PVC-U SN2 192.2 Dn= 200 20.60 20.60 10.21 8.40 1.15 45.60 3.28 PROYECTADA
153373 TUB AL-7 BZ:102' BZ:102 PVC-U SN2 192.2 Dn= 200 21.10 21.10 13.28 8.10 1.25 40.30 3.98 PROYECTADA
153375 TUB AL-128 BZ:44 BZ:43 PVC-U SN2 302.6 Dn= 315 21.20 21.10 83.74 26.72 3.24 29.20 26.17 PROYECTADA
153377 TUB AL-100 BZ:72 BZ:71 PVC-U SN2 240.2 Dn= 250 21.50 21.30 123.48 23.53 3.67 36.00 34.90 PROYECTADA
153380 TUB AL-41 BZ:112 BZ:111' PVC-U SN2 192.2 Dn= 200 22.20 21.50 262.66 5.94 3.27 22.60 35.42 PROYECTADA
153386 TUB AL-5 BZ:103 BZ:103' PVC-U SN2 192.2 Dn= 200 21.90 21.90 49.80 8.10 2.00 29.80 11.17 PROYECTADA
153387 TUB AL-107 BZ:65 BZ:64 PVC-U SN2 240.2 Dn= 250 22.20 22.20 17.14 23.53 1.82 42.40 7.42 PROYECTADA
153389 TUB AL-134 BZ:38 BZ:37 PVC-U SN2 302.6 Dn= 315 22.30 22.20 13.93 26.72 1.71 34.00 6.45 PROYECTADA
153392 TUB AL-23 BZ:88 BZ:87 PVC-U SN4 237.6 Dn= 250 23.00 21.70 336.24 14.44 4.53 26.70 61.24 PROYECTADA
153395 TUB AL-14 BZ:97 BZ:96 PVC-U SN2 192.2 Dn= 200 22.50 22.50 11.11 8.40 1.18 35.00 3.51 PROYECTADA
153396 TUB AL-73 BZ:16 BZ:17 PVC-U SN2 192.2 Dn= 200 22.60 22.60 71.27 3.18 1.72 18.00 9.73 PROYECTADA
153399 TUB AL-40 BZ:112' BZ:112 PVC-U SN2 192.2 Dn= 200 23.00 22.90 101.43 5.94 2.35 24.10 16.90 PROYECTADA
153400 TUB AL-101 BZ:71 BZ:70 PVC-U SN2 240.2 Dn= 250 23.10 23.00 111.08 23.53 3.54 36.20 32.14 PROYECTADA
153401 TUB AL-117 BZ:55 BZ:54 PVC-U SN2 302.6 Dn= 315 23.00 23.00 43.52 26.29 2.55 30.40 15.61 PROYECTADA
153402 TUB AL-42 BZ:111' BZ:111 PVC-U SN4 192.2 Dn= 200 25.10 23.00 434.76 5.94 3.90 22.00 52.31 PROYECTADA
153403 TUB AL-74 BZ:17 BZ:18 PVC-U SN2 192.2 Dn= 200 23.60 23.60 17.40 3.18 1.05 20.40 3.26 PROYECTADA
153404 TUB AL-38 BZ:113' BZ:113 PVC-U SN2 192.2 Dn= 200 23.60 23.60 28.85 5.94 1.50 26.70 6.37 PROYECTADA
153406 TUB AL-93 BZ:131 BZ:132 PVC-U SN2 192.2 Dn= 200 24.30 23.70 226.07 2.76 2.47 15.50 22.23 PROYECTADA
153409 TUB AL-95 BZ:133 BZ:134 PVC-U SN2 192.2 Dn= 200 23.90 23.70 129.96 2.76 2.04 16.10 14.49 PROYECTADA
153411 TUB AL-78 BZ:21 BZ:22 PVC-U SN2 192.2 Dn= 200 24.20 24.20 8.66 6.04 0.99 30.30 2.50 PROYECTADA
153413 TUB AL-44 BZ:110' BZ:110 PVC-U SN2 192.2 Dn= 200 24.90 24.30 209.98 5.94 3.02 23.00 29.78 PROYECTADA
153414 TUB AL-86 BZ:117' BZ:118 PVC-U SN4 190.2 Dn= 200 24.40 24.40 10.67 2.59 0.83 19.60 2.04 PROYECTADA
153417 TUB AL-76 BZ:19 BZ:20 PVC-U SN2 192.2 Dn= 200 25.10 24.50 234.74 3.18 2.61 16.60 24.44 PROYECTADA
153419 TUB AL-133 BZ:39 BZ:38 PVC-U SN4 302.6 Dn= 315 24.80 24.60 137.86 26.72 3.85 28.20 38.57 PROYECTADA
153421 TUB AL-130 BZ:42 BZ:41 PVC-U SN2 302.6 Dn= 315 24.70 24.70 6.49 26.72 1.30 37.00 3.53 PROYECTADA
153422 TUB AL-119 BZ:53 BZ:52 PVC-U SN2 302.6 Dn= 315 24.70 24.70 24.31 26.29 2.08 32.00 9.90 PROYECTADA
153424 TUB AL-106 BZ:66 BZ:65 PVC-U SN2 240.2 Dn= 250 24.90 24.80 71.80 23.53 3.03 37.40 22.86 PROYECTADA
153426 TUB AL-72 BZ:15 BZ:16 PVC-U SN2 192.2 Dn= 200 25.00 24.90 59.81 3.18 1.62 18.30 8.48 PROYECTADA
153428 TUB AL-91 BZ:122 BZ:123 PVC-U SN2 192.2 Dn= 200 25.50 25.30 118.59 2.59 1.92 15.70 13.20 PROYECTADA
153430 TUB AL-114 BZ:58 BZ:57 PVC-U SN2 302.6 Dn= 315 26.10 26.00 9.98 26.29 1.51 34.90 4.93 PROYECTADA
153431 TUB AL-82 BZ:25 BZ:95 PVC-U SN2 192.2 Dn= 200 26.60 26.50 20.08 6.04 1.33 27.80 4.83 PASE AEREO
153432 TUB AL-69 BZ:12 BZ:13 PVC-U SN2 192.2 Dn= 200 27.00 27.00 34.49 3.18 1.33 19.10 5.54 PROYECTADA
153433 TUB AL-132 BZ:40 BZ:39 PVC-U SN2 302.6 Dn= 315 27.60 27.50 70.48 26.72 3.04 29.60 22.89 PROYECTADA
153434 TUB AL-77 BZ:20 BZ:21 PVC-U SN2 192.2 Dn= 200 28.00 27.80 115.10 3.18 2.03 29.40 14.10 PROYECTADA
153435 TUB AL-12 BZ:99 BZ:98 PVC-U SN2 192.2 Dn= 200 27.90 27.90 10.03 8.40 1.14 35.40 3.24 PROYECTADA
153437 TUB AL-20 BZ:91 Bz:90 PVC-U SN8 235.4 Dn= 250 27.90 27.90 9.67 14.44 1.29 35.90 3.85 PROYECTADA
153440 TUB AL-8 BZ:102 BZ:101 PVC-U SN2 192.2 Dn= 200 28.00 28.00 11.43 8.40 1.20 34.90 3.59 PROYECTADA
153442 TUB AL-50 BZ:107' BZ:107 PVC-U SN2 192.2 Dn= 200 28.30 28.10 118.89 8.53 2.76 28.70 22.52 PROYECTADA
153444 TUB AL-51 BZ:107 BZ:73 PVC-U SN2 192.2 Dn= 200 28.80 28.30 186.49 8.53 3.23 27.80 31.95 PROYECTADA
153445 TUB AL-9 BZ:101 BZ:100 PVC-U SN2 192.2 Dn= 200 28.70 28.60 35.95 8.40 1.80 31.20 8.81 PROYECTADA
153446 TUB AL-135 BZ:37 BZ:36 PVC-U SN2 302.6 Dn= 315 28.80 28.80 59.79 26.72 2.87 29.90 20.13 PROYECTADA
153448 TUB AL-120 BZ:52 BZ:51 PVC-U SN2 302.6 Dn= 315 28.90 28.80 44.05 26.29 2.57 30.40 15.76 PROYECTADA
153450 TUB AL-24 BZ:87 BZ:86 PVC-U SN4 240.2 Dn= 250 29.60 28.10 331.33 14.44 4.50 26.30 60.40 PROYECTADA
153452 TUB AL-59 BZ:2 BZ:3 PVC-U SN2 192.2 Dn= 200 30.10 29.80 136.26 3.18 2.15 17.20 16.06 PROYECTADA
153455 TUB AL-94 BZ:132 BZ:133 PVC-U SN2 192.2 Dn= 200 30.30 29.80 177.01 2.76 2.26 15.80 18.43 PROYECTADA
153456 TUB AL-121 BZ:51 BZ:50 PVC-U SN2 302.6 Dn= 315 30.20 30.00 103.32 26.29 3.46 28.50 30.61 PROYECTADA
153457 TUB AL-37 BZ:114 BZ:113' PVC-U SN2 192.2 Dn= 200 30.40 30.40 14.81 5.94 1.19 28.40 3.79 PROYECTADA
153458 TUB AL-62 BZ:5 BZ:6 PVC-U SN2 192.2 Dn= 200 31.60 31.60 11.08 3.18 0.89 24.60 2.29 PROYECTADA
153461 TUB AL-48 BZ:108' BZ:108 PVC-U SN2 192.2 Dn= 200 32.10 31.90 120.11 8.53 2.77 28.70 22.70 PROYECTADA
153462 TUB AL-25 BZ:86 BZ:85 PVC-U SN4 240.2 Dn= 250 34.20 32.40 336.07 14.44 4.52 26.30 61.07 PROYECTADA
153464 TUB AL-34 BZ:77 BZ:76 PVC-U SN2 240.2 Dn= 250 33.30 32.70 192.79 15.00 3.75 27.80 40.49 PROYECTADA
PROYECTO: "MEJORAMIENTO COLECTORES QUEBRADAS SAPHY, AV. SOL, TULLUMAYO Y AV. EJERCITO"

REPORTE DE TUBERIAS MODELAMIENTO HIDRAULICO AÑO 0 (2019) SIN LLUVIAS - COLECTOR QUEBRADA SAPHY

Diam. Longitud
Long. Planta Pendiente Velocidad Tensión
ID Nombre Buzon Inicio Buzon Final Material Interior Dn (mm) Inclinada Caudal (L/s) Tirante (%) Notas
(m) (m/km) (m/s) Tractiva (Pa)
(mm) (m)
153466 TUB AL-84 BZ:116' BZ:117 PVC-U SN4 190.2 Dn= 200 32.70 32.70 10.08 2.59 0.82 19.70 1.95 PROYECTADA
153468 TUB AL-61 BZ:4 BZ:5 PVC-U SN2 192.2 Dn= 200 33.60 33.50 77.55 3.18 1.77 17.90 10.39 PROYECTADA
153470 TUB AL-90 BZ:121 BZ:122 PVC-U SN4 190.2 Dn= 200 33.90 33.90 10.62 2.59 0.83 19.60 2.03 PROYECTADA
153472 TUB AL-11 BZ:100' BZ:99 PVC-U SN2 192.2 Dn= 200 35.00 34.90 35.49 8.40 1.79 31.30 8.72 PROYECTADA
153473 TUB AL-19 BZ:92 BZ:91 PVC-U SN8 235.4 Dn= 250 35.30 35.30 10.20 14.44 1.32 35.70 4.02 PROYECTADA
153475 TUB AL-66 BZ:9 BZ:10 PVC-U SN4 190.2 Dn= 200 36.20 35.90 81.73 3.18 1.80 18.10 10.84 PROYECTADA
153477 TUB AL-139 BZ:33 BZ:33' PVC-U SN2 302.6 Dn= 315 36.00 35.90 44.81 29.67 2.67 32.30 16.84 PROYECTADA
153480 TUB AL-18 BZ:93 BZ:92 PVC-U SN4 237.6 Dn= 250 36.30 36.30 9.64 14.44 1.29 41.00 3.84 PROYECTADA
153482 TUB AL-71 BZ:14 BZ:15 PVC-U SN2 192.2 Dn= 200 36.30 36.30 38.00 3.18 1.38 19.00 5.97 PROYECTADA
153484 TUB AL-60 BZ:3 BZ:4 PVC-U SN2 192.2 Dn= 200 37.00 37.00 61.15 3.18 1.63 18.30 8.64 PROYECTADA
153485 TUB AL-85 BZ:117 BZ:117' PVC-U SN4 190.2 Dn= 200 37.70 37.70 10.08 2.59 0.82 19.70 1.95 PROYECTADA
153486 TUB AL-22 BZ:89 BZ:88 PVC-U SN4 237.6 Dn= 250 37.70 37.70 46.94 14.44 2.26 30.50 13.27 PROYECTADA
153488 TUB AL-63 BZ:6 BZ:7 PVC-U SN4 190.2 Dn= 200 37.90 37.90 10.28 3.18 0.87 21.80 2.16 PROYECTADA
153489 TUB AL-126 BZ:47 BZ:45 PVC-U SN2 302.6 Dn= 315 38.10 38.00 61.54 26.72 2.91 29.90 20.57 PROYECTADA
153492 TUB AL-103 BZ:69 BZ:68 PVC-U SN2 240.2 Dn= 250 38.20 38.20 22.53 23.53 2.01 41.30 9.21 PROYECTADA
153493 TUB AL-125 BZ:46 BZ:47 PVC-U SN2 302.6 Dn= 315 38.90 38.90 40.41 26.72 2.50 30.90 14.84 PROYECTADA
153494 TUB AL-89 BZ:120 BZ:121 PVC-U SN4 190.2 Dn= 200 39.80 39.80 10.29 2.59 0.82 19.70 1.98 PROYECTADA
153495 TUB AL-3 BZ:105 BZ:104 PVC-U SN2 192.2 Dn= 200 41.00 40.90 82.20 8.10 2.39 28.70 16.51 PROYECTADA
153496 TUB AL-28 BZ:83 BZ:82 PVC-U SN2 240.2 Dn= 250 41.50 41.30 99.09 14.44 2.94 28.40 23.69 PROYECTADA
153499 TUB AL-30 BZ:81 BZ:80 PVC-U SN4 240.2 Dn= 250 42.70 41.80 216.68 14.44 3.87 27.00 43.50 PROYECTADA
153501 TUB AL-58 BZ:1 BZ:2 PVC-U SN2 192.2 Dn= 200 43.00 42.90 79.11 3.18 1.78 17.90 10.55 PROYECTADA
153503 TUB AL-127 BZ:45 BZ:44 PVC-U SN2 302.6 Dn= 315 44.20 44.20 25.58 26.72 2.12 32.10 10.39 PROYECTADA
153504 TUB AL-140 BZ:33' BZ:32 PVC-U SN2 302.6 Dn= 315 44.60 44.60 45.09 29.67 2.68 32.30 16.93 PROYECTADA
153508 TUB AL-137 BZ:35 BZ:34 PVC-U SN2 302.6 Dn= 315 46.70 46.60 24.44 29.67 2.16 34.00 10.49 PROYECTADA
153511 TUB AL-105 BZ:67 BZ:66 PVC-U SN2 240.2 Dn= 250 47.00 46.90 45.39 23.53 2.58 38.80 15.96 PROYECTADA
153512 TUB AL-29 BZ:82 BZ:81 PVC-U SN2 240.2 Dn= 250 47.80 47.30 139.20 14.44 3.32 27.80 30.86 PROYECTADA
153513 TUB AL-138 BZ:34 BZ:33 PVC-U SN2 302.6 Dn= 315 47.50 47.50 50.96 29.67 2.80 32.00 18.62 PROYECTADA
153514 TUB AL-87 BZ:118 BZ:119 PVC-U SN4 190.2 Dn= 200 48.00 48.00 10.21 2.59 0.82 19.70 1.97 PROYECTADA
153515 TUB AL-142 BZ:31 BZ:31' PVC-U SN2 302.6 Dn= 315 49.20 49.10 59.04 29.67 2.95 31.60 20.89 PROYECTADA
153519 TUB AL-141 BZ:32 BZ:31 PVC-U SN2 302.6 Dn= 315 52.10 52.00 38.44 29.67 2.53 32.70 14.94 PROYECTADA
153520 TUB AL-16 BZ:95 BZ:94 PVC-U SN4 237.6 Dn= 250 52.80 52.80 9.86 14.44 1.30 35.40 3.91 PROYECTADA
153522 TUB AL-144 BZ:30 BZ:29 PVC-U SN2 302.6 Dn= 315 54.00 53.90 45.63 29.67 2.69 32.30 17.08 PROYECTADA
153525 TUB AL-27 BZ:84 BZ:83 PVC-U SN4 240.2 Dn= 250 57.30 55.70 237.32 14.44 4.00 26.90 46.68 PROYECTADA
153527 TUB AL-21 Bz:90 BZ:89 PVC-U SN4 237.6 Dn= 250 57.30 57.30 14.84 14.44 1.50 33.90 5.39 PROYECTADA
153528 TUB AL-143 BZ:31' BZ:30 PVC-U SN2 302.6 Dn= 315 59.50 59.40 52.69 29.67 2.83 31.90 19.11 PROYECTADA
153529 TUB AL-17 BZ:94 BZ:93 PVC-U SN4 237.6 Dn= 250 60.60 60.60 10.24 14.44 1.32 35.20 4.03 PROYECTADA
153530 TUB AL-99 BZ:73 BZ:72 PVC-U SN2 240.2 Dn= 250 61.80 61.80 38.22 23.53 2.42 39.40 13.95 PROYECTADA
153533 TUB AL-65 BZ:8 BZ:9 PVC-U SN4 190.2 Dn= 200 62.20 62.20 9.49 3.18 0.85 21.90 2.03 PROYECTADA
153534 TUB AL-145 BZ:29 BZ:28 PVC-U SN2 302.6 Dn= 315 64.80 64.80 26.54 29.67 2.22 33.80 11.19 PROYECTADA
153537 TUB AL-33 BZ:78 BZ:77 PVC-U SN4 240.2 Dn= 250 76.50 74.80 208.57 14.44 3.82 40.70 42.27 PROYECTADA
153538 TUB AL-26 BZ:85 BZ:84 PVC-U SN2 240.2 Dn= 250 81.30 81.30 11.31 14.44 1.36 34.40 4.35 PROYECTADA
153539 TUB AL-146 BZ:28 BZ:27 PVC-U SN2 302.6 Dn= 315 93.50 93.30 40.72 29.67 2.59 32.60 15.63 PROYECTADA
153568 TUB AL-136(1) BZ:36 BZ:35' PVC-U SN2 302.6 Dn= 315 37.30 37.20 74.69 26.72 3.11 42.30 23.94 PROYECTADA
153569 TUB AL-136(2) BZ:35' BZ:35 PVC-U SN2 302.6 Dn= 315 12.60 12.60 56.22 29.67 2.90 31.80 20.10 PROYECTADA
153570 MU-13 BZ:137 BZ:46 PVC-U SN2 192.2 Dn= 200 6.50 5.90 487.12 0.43 1.83 36.90 17.24 PROYECTADA
153572 MU-3 BZ:135 BZ:35' PVC-U SN2 240.2 Dn= 250 8.10 7.90 207.15 2.95 2.35 12.20 20.58 PROYECTADA
153574 MU-14 BZ:124 BZ:125 PVC-U SN4 192.2 Dn= 200 10.40 8.30 746.89 2.76 3.71 14.50 56.33 PROYECTADA
153577 MU-16 BZ:126 BZ:127 PVC-U SN4 192.2 Dn= 200 10.80 9.00 677.98 2.76 3.59 14.60 52.28 PROYECTADA
153580 MU-20 BZ:130 BZ:131 PVC-U SN2 192.2 Dn= 200 17.00 16.20 316.66 2.76 2.75 15.20 29.03 PROYECTADA
153582 MU-18 BZ:128 BZ:129 PVC-U SN2 192.2 Dn= 200 17.60 17.40 154.44 2.76 2.16 15.90 16.60 PROYECTADA
153585 MU-11 BZ:139 BZ:138 PVC-U SN2 192.2 Dn= 200 20.80 18.00 574.07 0.43 1.94 5.80 19.55 PROYECTADA
153588 MU-1 BZ:136 BZ:135' PVC-U SN2 240.2 Dn= 250 21.50 19.80 428.33 2.95 3.03 11.70 35.98 PROYECTADA
153591 MU-2 BZ:135' BZ:135 PVC-U SN2 240.2 Dn= 250 20.40 20.00 185.05 2.95 2.26 12.30 18.87 PROYECTADA
153592 MU-15 BZ:125 BZ:126 PVC-U SN2 192.2 Dn= 200 23.30 23.30 45.90 2.76 1.41 17.40 6.49 PROYECTADA
153593 MU-12 BZ:138 BZ:137 PVC-U SN2 192.2 Dn= 200 25.40 23.40 414.23 0.43 1.72 5.90 15.29 PROYECTADA
153594 MU-19 BZ:129 BZ:130 PVC-U SN2 192.2 Dn= 200 26.00 25.70 151.22 2.76 2.14 15.90 16.33 PROYECTADA
153595 MU-9 BZ:141 BZ:140 PVC-U SN2 192.2 Dn= 200 26.50 25.90 221.54 0.43 1.38 6.20 9.45 PROYECTADA
153598 MU-5 BZ:145 BZ:144 PVC-U SN2 192.2 Dn= 200 28.70 28.50 133.18 0.43 1.16 6.40 6.36 PROYECTADA
153601 MU-6 BZ:144 BZ:143 PVC-U SN2 192.2 Dn= 200 34.00 28.90 619.02 0.43 2.00 5.80 20.71 PROYECTADA
153603 MU-4 BZ:146 BZ:145 PVC-U SN2 192.2 Dn= 200 30.70 30.70 15.63 0.43 0.55 7.70 1.22 PROYECTADA
153605 MU-17 BZ:127 BZ:128 PVC-U SN2 192.2 Dn= 200 33.00 32.40 201.74 2.76 2.37 15.60 20.37 PROYECTADA
153606 MU-10 BZ:140 BZ:139 PVC-U SN2 192.2 Dn= 200 40.00 39.40 165.31 0.43 1.25 6.30 7.52 PROYECTADA
153607 MU-8 BZ:142 BZ:141 PVC-U SN2 192.2 Dn= 200 42.20 41.40 198.24 0.43 1.33 6.20 8.66 PROYECTADA
153609 MU-7 BZ:143 BZ:142 PVC-U SN2 192.2 Dn= 200 57.30 55.40 262.37 0.43 1.50 6.10 10.62 PROYECTADA
PROYECTO: "MEJORAMIENTO COLECTORES QUEBRADAS SAPHY, AV. SOL, TULLUMAYO Y AV. EJERCITO"

REPORTE DE BUZONES MODELAMIENTO HIDRAULICO AÑO 0 (2019) SIN LLUVIAS - COLECTOR QUEBRADA SAPHY

Línea de
Diam.
Cota Tapa Cota Fondo Altura de Gradiente
ID Nombre X (m) Y (m) Interior BZ Notas
(m) (m) Buzon (m) hidráulica
(m)
(m)

153246 BZ:123 175,847.18 8,505,337.68 3,554.38 3,552.38 1,200.00 2.00 3,552.42 Buzon proyectado
153247 BZ:109' 175,845.92 8,505,343.08 3,551.21 3,549.71 1,200.00 1.50 3,549.79 Buzon proyectado
153249 BZ:79 175,825.04 8,505,422.42 3,564.83 3,563.63 1,200.00 1.20 3,563.73 Buzon proyectado
153250 BZ:78 175,829.60 8,505,425.98 3,564.13 3,562.93 1,200.00 1.20 3,563.03 Buzon proyectado
153252 BZ:27 176,857.74 8,504,369.77 3,461.69 3,457.69 1,200.00 4.00 3,457.82 Buzon proyectado
153253 BZ:26 176,863.02 8,504,372.99 3,459.53 3,455.93 1,200.00 3.60 3,456.06 Buzon proyectado
153255 BZ:68 176,059.67 8,505,296.59 3,524.76 3,522.71 1,200.00 2.05 3,522.83 Buzon proyectado
153256 BZ:67 176,062.63 8,505,288.79 3,525.01 3,522.51 1,200.00 2.50 3,522.63 Buzon proyectado
153258 BZ:115 175,671.57 8,505,238.12 3,595.96 3,591.96 1,200.00 4.00 3,592.03 Buzon proyectado
153259 BZ:114 175,673.26 8,505,246.40 3,588.04 3,586.84 1,200.00 1.20 3,586.91 Buzon proyectado
153261 BZ:54 176,162.27 8,505,061.19 3,510.28 3,509.08 1,200.00 1.20 3,509.20 Buzon proyectado
153262 BZ:53 176,170.85 8,505,062.05 3,511.07 3,508.97 1,200.00 2.10 3,509.09 Buzon proyectado
153264 BZ:108 175,898.76 8,505,370.66 3,543.01 3,541.81 1,200.00 1.20 3,541.89 Buzon proyectado
153265 BZ:107' 175,895.70 8,505,378.97 3,542.23 3,540.73 1,200.00 1.50 3,540.81 Buzon proyectado
153267 BZ:11 175,293.88 8,505,452.01 3,653.54 3,652.34 1,200.00 1.20 3,652.39 Buzon proyectado
153268 BZ:12 175,300.47 8,505,445.94 3,653.55 3,652.25 1,200.00 1.30 3,652.30 Buzon proyectado
153270 BZ:48 176,250.91 8,504,990.44 3,504.73 3,503.38 1,200.00 1.35 3,503.50 Buzon proyectado
153271 BZ:46 176,258.00 8,504,984.68 3,504.47 3,503.27 1,200.00 1.20 3,503.39 Buzon proyectado
153273 BZ:23 175,338.62 8,505,253.49 3,635.57 3,634.17 1,200.00 1.40 3,634.24 Buzon proyectado
153274 BZ:24 175,339.04 8,505,243.77 3,636.78 3,634.08 1,200.00 2.70 3,634.15 Buzon proyectado
153276 BZ:109 175,855.48 8,505,348.06 3,548.85 3,547.65 1,200.00 1.20 3,547.73 Buzon proyectado
153278 BZ:106 175,126.61 8,505,023.56 3,647.51 3,646.31 1,200.00 1.20 3,646.39 Buzon proyectado
153279 BZ:106' 175,133.41 8,505,015.06 3,645.96 3,644.76 1,200.00 1.20 3,644.84 Buzon proyectado
153281 BZ:134 176,111.86 8,505,148.29 3,517.55 3,516.35 1,200.00 1.20 3,516.39 Buzon proyectado
153282 BZ:59 176,122.00 8,505,142.57 3,515.78 3,514.28 1,200.00 1.50 3,514.40 Buzon proyectado
153284 BZ:56 176,134.76 8,505,082.99 3,511.50 3,510.30 1,200.00 1.20 3,510.42 Buzon proyectado
153285 BZ:55 176,142.78 8,505,073.37 3,512.58 3,510.08 1,200.00 2.50 3,510.20 Buzon proyectado
153287 BZ:103' 175,201.34 8,505,072.30 3,640.47 3,639.27 1,200.00 1.20 3,639.35 Buzon proyectado
153288 BZ:102' 175,205.10 8,505,085.02 3,637.34 3,636.14 1,200.00 1.20 3,636.22 Buzon proyectado
153290 BZ:80 175,830.89 8,505,410.01 3,566.97 3,565.77 1,200.00 1.20 3,565.87 Buzon proyectado
153292 BZ:50 176,237.15 8,505,015.42 3,505.40 3,504.00 1,200.00 1.40 3,504.12 Buzon proyectado
153293 BZ:49 176,237.31 8,505,001.50 3,504.96 3,503.56 1,200.00 1.40 3,503.68 Buzon proyectado
153295 BZ:76 175,919.58 8,505,434.65 3,542.22 3,541.02 1,200.00 1.20 3,541.12 Buzon proyectado
153296 BZ:75 175,933.56 8,505,431.52 3,538.52 3,537.32 1,200.00 1.20 3,537.42 Buzon proyectado
153298 BZ:18 175,374.25 8,505,352.28 3,646.29 3,645.29 1,200.00 1.00 3,645.34 Buzon proyectado
153299 BZ:19 175,365.09 8,505,340.95 3,644.59 3,643.59 1,200.00 1.00 3,643.64 Buzon proyectado
153301 BZ:61 176,115.21 8,505,174.33 3,519.84 3,517.34 1,200.00 2.50 3,517.46 Buzon proyectado
153302 BZ:60 176,118.41 8,505,160.07 3,517.48 3,515.48 1,200.00 2.00 3,515.61 Buzon proyectado
153304 BZ:7 175,305.82 8,505,547.55 3,668.15 3,663.75 1,200.00 4.40 3,663.80 Buzon proyectado
153305 BZ:8 175,314.53 8,505,535.61 3,667.65 3,663.55 1,200.00 4.10 3,663.60 Buzon proyectado
153307 BZ:100 175,252.64 8,505,145.40 3,636.51 3,634.51 1,200.00 2.00 3,634.59 Buzon proyectado
153308 BZ:100' 175,264.98 8,505,137.12 3,636.51 3,634.31 1,200.00 2.20 3,634.39 Buzon proyectado
153310 BZ:105 175,148.58 8,505,016.00 3,645.13 3,643.93 1,200.00 1.20 3,644.01 Buzon proyectado
153312 BZ:41 176,376.77 8,504,843.82 3,496.98 3,495.78 1,200.00 1.20 3,495.90 Buzon proyectado
153313 BZ:40 176,391.05 8,504,836.25 3,494.93 3,493.73 1,200.00 1.20 3,493.85 Buzon proyectado
153315 BZ:10 175,288.97 8,505,467.42 3,661.23 3,658.23 1,200.00 3.00 3,658.28 Buzon proyectado
153317 BZ:70 176,009.25 8,505,314.76 3,525.28 3,524.08 1,200.00 1.20 3,524.21 Buzon proyectado
153318 BZ:69 176,022.27 8,505,304.22 3,525.07 3,523.57 1,200.00 1.50 3,523.70 Buzon proyectado
153320 BZ:64 176,096.73 8,505,225.04 3,519.77 3,518.22 1,200.00 1.55 3,518.35 Buzon proyectado
153321 BZ:63 176,102.94 8,505,209.40 3,519.79 3,517.94 1,200.00 1.85 3,518.07 Buzon proyectado
153323 BZ:13 175,327.44 8,505,445.70 3,652.52 3,651.32 1,200.00 1.20 3,651.37 Buzon proyectado
153324 BZ:14 175,343.05 8,505,438.82 3,651.38 3,650.18 1,200.00 1.20 3,650.23 Buzon proyectado
153326 BZ:113 175,722.20 8,505,268.65 3,587.21 3,585.71 1,200.00 1.50 3,585.78 Buzon proyectado
153327 BZ:112' 175,739.28 8,505,269.75 3,584.28 3,582.78 1,200.00 1.50 3,582.85 Buzon proyectado
153329 BZ:116 176,031.56 8,505,197.60 3,558.56 3,557.96 1,200.00 0.60 3,558.00 Buzon proyectado
153330 BZ:116' 176,027.03 8,505,214.17 3,558.74 3,557.79 1,200.00 0.95 3,557.83 Buzon proyectado
153332 BZ:119 175,953.37 8,505,330.01 3,561.13 3,556.33 1,200.00 4.80 3,556.37 Buzon proyectado
153333 BZ:120 175,944.62 8,505,344.93 3,560.85 3,556.15 1,200.00 4.70 3,556.19 Buzon proyectado
153335 BZ:74 175,934.94 8,505,412.65 3,536.99 3,535.19 1,200.00 1.80 3,535.29 Buzon proyectado
153336 BZ:73 175,947.36 8,505,400.60 3,533.62 3,531.62 1,200.00 2.00 3,531.74 Buzon proyectado
153338 BZ:62 176,109.42 8,505,193.34 3,519.85 3,517.65 1,200.00 2.20 3,517.78 Buzon proyectado
153340 BZ:22 175,348.70 8,505,267.79 3,635.84 3,634.44 1,200.00 1.40 3,634.51 Buzon proyectado
153342 BZ:104 175,175.88 8,505,046.43 3,641.77 3,640.57 1,200.00 1.20 3,640.65 Buzon proyectado
153343 BZ:103 175,192.37 8,505,052.33 3,641.76 3,640.36 1,200.00 1.40 3,640.44 Buzon proyectado
153346 BZ:98 175,316.45 8,505,172.94 3,634.09 3,632.79 1,200.00 1.30 3,632.87 Buzon proyectado
153347 BZ:97 175,331.49 8,505,181.96 3,634.00 3,632.55 1,200.00 1.45 3,632.63 Buzon proyectado
PROYECTO: "MEJORAMIENTO COLECTORES QUEBRADAS SAPHY, AV. SOL, TULLUMAYO Y AV. EJERCITO"

REPORTE DE BUZONES MODELAMIENTO HIDRAULICO AÑO 0 (2019) SIN LLUVIAS - COLECTOR QUEBRADA SAPHY

Línea de
Diam.
Cota Tapa Cota Fondo Altura de Gradiente
ID Nombre X (m) Y (m) Interior BZ Notas
(m) (m) Buzon (m) hidráulica
(m)
(m)

153349 BZ:110 175,831.27 8,505,332.99 3,554.53 3,553.03 1,200.00 1.50 3,553.10 Buzon proyectado
153351 BZ:57 176,129.73 8,505,100.08 3,515.26 3,513.76 1,200.00 1.50 3,513.88 Buzon proyectado
153353 BZ:108' 175,872.87 8,505,352.05 3,546.84 3,545.64 1,200.00 1.20 3,545.72 Buzon proyectado
153356 BZ:58 176,129.97 8,505,126.13 3,515.72 3,514.02 1,200.00 1.70 3,514.14 Buzon proyectado
153358 BZ:25 175,334.56 8,505,225.88 3,635.03 3,633.83 1,200.00 1.20 3,633.90 Buzon proyectado
153362 BZ:43 176,359.27 8,504,884.89 3,497.46 3,496.46 1,200.00 1.00 3,496.58 Buzon proyectado
153363 BZ:42 176,367.17 8,504,866.53 3,496.94 3,495.94 1,200.00 1.00 3,496.06 Buzon proyectado
153365 BZ:111 175,795.10 8,505,307.31 3,566.01 3,564.81 1,200.00 1.20 3,564.88 Buzon proyectado
153366 BZ:110' 175,811.34 8,505,319.03 3,559.64 3,558.14 1,200.00 1.50 3,558.21 Buzon proyectado
153368 BZ:96 175,340.81 8,505,202.45 3,633.90 3,632.30 1,200.00 1.60 3,632.38 Buzon proyectado
153369 BZ:95 175,358.07 8,505,213.65 3,634.54 3,632.09 1,200.00 2.45 3,632.19 Buzon proyectado
153374 BZ:102 175,215.37 8,505,103.44 3,638.56 3,635.86 1,200.00 2.70 3,635.94 Buzon proyectado
153376 BZ:44 176,344.35 8,504,899.86 3,499.23 3,498.23 1,200.00 1.00 3,498.35 Buzon proyectado
153378 BZ:72 175,982.71 8,505,349.96 3,530.46 3,529.26 1,200.00 1.20 3,529.39 Buzon proyectado
153379 BZ:71 175,997.03 8,505,334.19 3,527.83 3,526.63 1,200.00 1.20 3,526.76 Buzon proyectado
153381 BZ:112 175,758.63 8,505,281.96 3,581.96 3,580.46 1,200.00 1.50 3,580.53 Buzon proyectado
153382 BZ:111' 175,777.06 8,505,293.03 3,576.01 3,574.81 1,200.00 1.20 3,574.88 Buzon proyectado
153388 BZ:65 176,074.72 8,505,227.70 3,519.80 3,518.60 1,200.00 1.20 3,518.73 Buzon proyectado
153390 BZ:38 176,441.44 8,504,842.58 3,489.60 3,488.40 1,200.00 1.20 3,488.52 Buzon proyectado
153391 BZ:37 176,452.29 8,504,823.16 3,489.59 3,488.09 1,200.00 1.50 3,488.21 Buzon proyectado
153393 BZ:88 175,555.09 8,505,358.42 3,631.75 3,627.35 1,200.00 4.40 3,627.45 Buzon proyectado
153394 BZ:87 175,573.28 8,505,370.34 3,621.04 3,619.84 1,200.00 1.20 3,619.94 Buzon proyectado
153397 BZ:16 175,383.31 8,505,397.53 3,648.31 3,647.31 1,200.00 1.00 3,647.36 Buzon proyectado
153398 BZ:17 175,378.74 8,505,375.41 3,646.70 3,645.70 1,200.00 1.00 3,645.75 Buzon proyectado
153405 BZ:113' 175,699.90 8,505,261.01 3,587.89 3,586.39 1,200.00 1.50 3,586.46 Buzon proyectado
153407 BZ:131 176,037.67 8,505,169.04 3,531.26 3,530.06 1,200.00 1.20 3,530.10 Buzon proyectado
153408 BZ:132 176,060.94 8,505,164.74 3,525.91 3,524.71 1,200.00 1.20 3,524.75 Buzon proyectado
153410 BZ:133 176,089.52 8,505,156.21 3,520.63 3,519.43 1,200.00 1.20 3,519.47 Buzon proyectado
153412 BZ:21 175,352.23 8,505,291.77 3,635.65 3,634.65 1,200.00 1.00 3,634.72 Buzon proyectado
153415 BZ:117' 175,976.12 8,505,261.88 3,561.93 3,557.08 1,200.00 4.85 3,557.12 Buzon proyectado
153416 BZ:118 175,964.55 8,505,283.32 3,561.87 3,556.82 1,200.00 5.05 3,556.86 Buzon proyectado
153418 BZ:20 175,364.94 8,505,316.50 3,638.85 3,637.85 1,200.00 1.00 3,637.90 Buzon proyectado
153420 BZ:39 176,418.47 8,504,833.80 3,492.99 3,491.79 1,200.00 1.20 3,491.91 Buzon proyectado
153423 BZ:52 176,186.16 8,505,042.70 3,509.57 3,508.37 1,200.00 1.20 3,508.49 Buzon proyectado
153425 BZ:66 176,054.84 8,505,242.51 3,521.88 3,520.38 1,200.00 1.50 3,520.51 Buzon proyectado
153427 BZ:15 175,374.63 8,505,420.88 3,649.80 3,648.80 1,200.00 1.00 3,648.85 Buzon proyectado
153429 BZ:122 175,872.09 8,505,333.24 3,556.98 3,555.38 1,200.00 1.60 3,555.42 Buzon proyectado
153436 BZ:99 175,292.42 8,505,158.74 3,634.47 3,633.07 1,200.00 1.40 3,633.15 Buzon proyectado
153438 BZ:91 175,444.95 8,505,374.47 3,635.28 3,630.24 1,200.00 5.04 3,630.34 Buzon proyectado
153439 Bz:90 175,466.42 8,505,392.32 3,634.72 3,629.97 1,200.00 4.75 3,630.07 Buzon proyectado
153441 BZ:101 175,236.66 8,505,121.63 3,637.64 3,635.54 1,200.00 2.10 3,635.62 Buzon proyectado
153443 BZ:107 175,920.26 8,505,392.62 3,538.69 3,537.39 1,200.00 1.30 3,537.47 Buzon proyectado
153447 BZ:36 176,463.47 8,504,796.65 3,488.37 3,486.37 1,200.00 2.00 3,486.49 Buzon proyectado
153449 BZ:51 176,208.57 8,505,024.55 3,508.30 3,507.10 1,200.00 1.20 3,507.22 Buzon proyectado
153451 BZ:86 175,601.34 8,505,370.07 3,611.74 3,610.54 1,200.00 1.20 3,610.64 Buzon proyectado
153453 BZ:2 175,170.83 8,505,571.41 3,674.61 3,673.41 1,200.00 1.20 3,673.46 Buzon proyectado
153454 BZ:3 175,200.57 8,505,569.58 3,670.55 3,669.35 1,200.00 1.20 3,669.40 Buzon proyectado
153459 BZ:5 175,245.53 8,505,517.43 3,665.69 3,664.49 1,200.00 1.20 3,664.54 Buzon proyectado
153460 BZ:6 175,268.96 8,505,538.60 3,666.44 3,664.14 1,200.00 2.30 3,664.19 Buzon proyectado
153463 BZ:85 175,629.40 8,505,386.34 3,600.84 3,599.64 1,200.00 1.20 3,599.74 Buzon proyectado
153465 BZ:77 175,902.02 8,505,407.09 3,548.52 3,547.32 1,200.00 1.20 3,547.42 Buzon proyectado
153467 BZ:117 176,006.62 8,505,239.76 3,560.81 3,557.46 1,200.00 3.35 3,557.50 Buzon proyectado
153469 BZ:4 175,218.50 8,505,537.26 3,668.29 3,667.09 1,200.00 1.20 3,667.14 Buzon proyectado
153471 BZ:121 175,905.92 8,505,335.47 3,559.29 3,555.74 1,200.00 3.55 3,555.78 Buzon proyectado
153474 BZ:92 175,421.02 8,505,348.54 3,635.17 3,630.60 1,200.00 4.57 3,630.70 Buzon proyectado
153476 BZ:9 175,266.90 8,505,495.68 3,666.56 3,662.96 1,200.00 3.60 3,663.01 Buzon proyectado
153478 BZ:33 176,553.66 8,504,693.60 3,480.52 3,479.32 1,200.00 1.20 3,479.45 Buzon proyectado
153479 BZ:33' 176,565.10 8,504,659.54 3,478.91 3,477.71 1,200.00 1.20 3,477.84 Buzon proyectado
153481 BZ:93 175,401.58 8,505,317.89 3,635.15 3,630.95 1,200.00 4.20 3,631.05 Buzon proyectado
153487 BZ:89 175,520.39 8,505,373.18 3,632.92 3,629.12 1,200.00 3.80 3,629.22 Buzon proyectado
153490 BZ:47 176,286.40 8,504,958.16 3,502.70 3,501.70 1,200.00 1.00 3,501.82 Buzon proyectado
153491 BZ:45 176,312.77 8,504,930.76 3,500.36 3,499.36 1,200.00 1.00 3,499.48 Buzon proyectado
153497 BZ:83 175,718.73 8,505,343.53 3,586.70 3,585.50 1,200.00 1.20 3,585.60 Buzon proyectado
153498 BZ:82 175,754.16 8,505,364.69 3,582.61 3,581.41 1,200.00 1.20 3,581.51 Buzon proyectado
153500 BZ:81 175,795.13 8,505,388.42 3,576.02 3,574.82 1,200.00 1.20 3,574.92 Buzon proyectado
153502 BZ:1 175,130.81 8,505,586.74 3,678.00 3,676.80 1,200.00 1.20 3,676.85 Buzon proyectado
PROYECTO: "MEJORAMIENTO COLECTORES QUEBRADAS SAPHY, AV. SOL, TULLUMAYO Y AV. EJERCITO"

REPORTE DE BUZONES MODELAMIENTO HIDRAULICO AÑO 0 (2019) SIN LLUVIAS - COLECTOR QUEBRADA SAPHY

Línea de
Diam.
Cota Tapa Cota Fondo Altura de Gradiente
ID Nombre X (m) Y (m) Interior BZ Notas
(m) (m) Buzon (m) hidráulica
(m)
(m)

153505 BZ:32 176,587.71 8,504,621.13 3,476.90 3,475.70 1,200.00 1.20 3,475.83 Buzon proyectado
153509 BZ:35 176,507.81 8,504,774.08 3,484.08 3,482.88 1,200.00 1.20 3,483.01 Buzon proyectado
153510 BZ:34 176,523.25 8,504,730.08 3,482.94 3,481.74 1,200.00 1.20 3,481.87 Buzon proyectado
153516 BZ:31 176,622.71 8,504,582.63 3,474.90 3,473.70 1,200.00 1.20 3,473.83 Buzon proyectado
153517 BZ:31' 176,667.13 8,504,561.66 3,472.00 3,470.80 1,200.00 1.20 3,470.93 Buzon proyectado
153521 BZ:94 175,382.48 8,505,260.41 3,635.02 3,631.57 1,200.00 3.45 3,631.67 Buzon proyectado
153523 BZ:30 176,713.46 8,504,524.48 3,469.37 3,467.67 1,200.00 1.70 3,467.80 Buzon proyectado
153524 BZ:29 176,754.62 8,504,489.66 3,466.41 3,465.21 1,200.00 1.20 3,465.34 Buzon proyectado
153526 BZ:84 175,670.29 8,505,316.02 3,600.62 3,598.72 1,200.00 1.90 3,598.82 Buzon proyectado
153535 BZ:28 176,797.22 8,504,440.82 3,464.69 3,463.49 1,200.00 1.20 3,463.62 Buzon proyectado
153567 BZ:35' 176,497.23 8,504,780.98 3,484.79 3,483.59 1,200.00 1.20 3,483.72 Buzon proyectado
153571 BZ:137 176,252.35 8,504,983.18 3,507.32 3,506.12 1,200.00 1.20 3,506.14 Buzon proyectado
153573 BZ:135 176,489.33 8,504,780.48 3,486.93 3,485.43 1,200.00 1.50 3,485.47 Buzon proyectado
153575 BZ:124 175,944.78 8,505,096.65 3,563.65 3,561.65 1,200.00 2.00 3,561.69 Buzon proyectado
153576 BZ:125 175,951.62 8,505,101.35 3,556.65 3,555.45 1,200.00 1.20 3,555.49 Buzon proyectado
153578 BZ:126 175,974.92 8,505,102.28 3,555.58 3,554.38 1,200.00 1.20 3,554.42 Buzon proyectado
153579 BZ:127 175,981.42 8,505,108.45 3,549.50 3,548.30 1,200.00 1.20 3,548.34 Buzon proyectado
153581 BZ:130 176,030.50 8,505,154.48 3,536.70 3,535.20 1,200.00 1.50 3,535.24 Buzon proyectado
153583 BZ:128 176,002.92 8,505,132.66 3,542.97 3,541.77 1,200.00 1.20 3,541.81 Buzon proyectado
153584 BZ:129 176,005.20 8,505,149.86 3,540.29 3,539.09 1,200.00 1.20 3,539.13 Buzon proyectado
153586 BZ:139 176,222.26 8,504,954.63 3,527.69 3,526.19 1,200.00 1.50 3,526.21 Buzon proyectado
153587 BZ:138 176,235.01 8,504,967.40 3,517.33 3,515.83 1,200.00 1.50 3,515.85 Buzon proyectado
153589 BZ:136 176,471.55 8,504,751.66 3,499.61 3,497.61 1,200.00 2.00 3,497.65 Buzon proyectado
153590 BZ:135' 176,489.27 8,504,760.43 3,491.64 3,489.14 1,200.00 2.50 3,489.18 Buzon proyectado
153596 BZ:141 176,171.67 8,504,914.28 3,539.65 3,538.45 1,200.00 1.20 3,538.47 Buzon proyectado
153597 BZ:140 176,194.40 8,504,926.71 3,534.21 3,532.71 1,200.00 1.50 3,532.73 Buzon proyectado
153599 BZ:145 176,058.93 8,504,810.85 3,584.09 3,582.89 1,200.00 1.20 3,582.91 Buzon proyectado
153600 BZ:144 176,081.13 8,504,828.66 3,581.10 3,579.10 1,200.00 2.00 3,579.12 Buzon proyectado
153602 BZ:143 176,102.16 8,504,848.53 3,562.69 3,561.19 1,200.00 1.50 3,561.21 Buzon proyectado
153604 BZ:146 176,036.82 8,504,832.18 3,584.92 3,583.37 1,200.00 1.55 3,583.39 Buzon proyectado
153608 BZ:142 176,147.03 8,504,881.05 3,547.85 3,546.65 1,200.00 1.20 3,546.67 Buzon proyectado