Professional Documents
Culture Documents
ACUAN-HARGA SATUAN-KONSULTAN
ACUAN-HARGA SATUAN-KONSULTAN
Lama Gaji Dasar Beban Biaya Beban Biaya Tunjangan Beban Biaya
Sub Jumlah 1 Keuntungan
Pengalaman (Rp) Sosial Umum Penugasan Personil / Bulan
No Uraian Kegiatan Personil/Pendidikan/Jurusan
Keahlian (Rp) (Rp) (Rp) (Rp) (Rp)
(Rp)
(Thn) (GD) ( 0,3-04) x GD ( 0,5-1,3) x GD 0,1x(GD+BBS+BBU) (0,1-0,3) x GD (2,2-3,1) x GD
(1) (2) (3) (4) (5) (6) (7)=(4)+(5)+(6) (8)=0.1x(7) (9)=0.1x(4) (10)=(7)+(8)+(9)
I TENAGA AHLI
1 Ketua Tim/Ahli Madya Teknik Arsiktetur Landscape (S1) 8 7,000,000.00 2,100,000.00 6,300,000.00 15,400,000.00 1,540,000.00 1,400,000.00 18,340,000.00
2 Ahli Teknik Bangunan Gedung / Teknik Sipil (S1) 5 5,500,000.00 1,650,000.00 4,950,000.00 12,100,000.00 1,210,000.00 1,100,000.00 14,410,000.00
2 Ahli Arsitek/Ahli Muda Teknik Bangunan Gedung (S1) 5 5,500,000.00 1,650,000.00 4,950,000.00 12,100,000.00 1,210,000.00 1,100,000.00 14,410,000.00
4 Ahli Teknik Mekanikal/Teknik Mesin (S1) 8 5,500,000.00 1,650,000.00 4,950,000.00 12,100,000.00 1,210,000.00 1,100,000.00 14,410,000.00
3 Ahli Teknik Tenaga Listrikl/Teknik Elektro (S1) 5 5,500,000.00 1,650,000.00 4,950,000.00 12,100,000.00 1,210,000.00 1,100,000.00 14,410,000.00
6 Ahli Arsitektur Landscape/Teknik Arsitektur (S1) 8 5,500,000.00 1,650,000.00 4,950,000.00 12,100,000.00 1,210,000.00 1,100,000.00 14,410,000.00
6 Ahli Manajemen Konstruksi/Teknik Sipil (S1) 8 5,500,000.00 1,650,000.00 4,950,000.00 12,100,000.00 1,210,000.00 1,100,000.00 14,410,000.00
1 Asisten Ahli Teknik Arsitek/Teknik Arsitektur (S1) 3 3,750,000.00 1,125,000.00 3,375,000.00 8,250,000.00 825,000.00 750,000.00 9,825,000.00
2 Asisten Arsitek/Teknik Arsitektur (S1) 3 3,750,000.00 1,125,000.00 3,375,000.00 8,250,000.00 825,000.00 750,000.00 9,825,000.00
3 Asisten Ahli Teknik Mekanikal/Teknik Mesin (S1) 3 3,750,000.00 1,125,000.00 3,375,000.00 8,250,000.00 825,000.00 750,000.00 9,825,000.00
4 Asisten Ahli Teknik Tenaga Listrik/Teknik Elektro (S1) 3 3,750,000.00 1,125,000.00 3,375,000.00 8,250,000.00 825,000.00 750,000.00 9,825,000.00
5 Asisten Ahli Manajemen Konstruksi/Teknik Sipil (S1) 3 3,750,000.00 1,125,000.00 3,375,000.00 8,250,000.00 825,000.00 750,000.00 9,825,000.00
II TENAGA PENDUKUNG
11,112,000
TEAM LEADER
1 Ketua Tim Ahli Muda Teknik Sipil (S1) Teknik Sipil 2 Tahun Org/Bln 1.00 3.00 18,447,000.00 55,341,000.00
2 Ahli Muda (S1) Teknik Lingkungan 1 Tahun Org/Bln 1.00 3.00 17,028,000.00 51,084,000.00
106,425,000.00
B TENAGA PENDUKUNG LAINNYA
1 Assiten Tenaga Ahli 2 Tahun Org/Bln 1.00 3.00 8,020,000.00 24,060,000.00
2 Cost Estimator 2 Tahun Org/Bln 1.00 1.00 5,350,000.00 5,350,000.00
3 Surveyor (S1) 2 Tahun Org/Bln 1.00 2.00 4,280,000.00 8,560,000.00
4 Operator Komputer 1 Tahun Org/Bln 1.00 3.00 3,470,000.00 10,410,000.00
5 Juru Gambar (Drafter) 1 Tahun Org/Bln 1.00 1.00 4,280,000.00 4,280,000.00
52,660,000.00
159,085,000.00
22,350,000.00
HARGA PERKIRAAN SENDIRI
REKAPITULASI
PENYUSUNAN DETAIL ENGINEERING (DED) DI KABUPATEN TANAH LAUT
JUMLAH
NO URAIAN KEGIATAN
(RP)
1 2 3
TERBILANG : ( SERATUS SEMBILAN PULUH SEMBILAN JUTA LIMA RATUS TUJUH PULUH DELAPAN RIBU RUPIAH )
Ditetapkan Oleh :
SE-38/A/2000