EXECUTIVE SUMMARY

OF
BERAU JAYA PERKASA, PT

Concession Area : 1.398 Ha


DESA TEPIAN BUAH KECAMATAN SEGAH
KABUPATEN BERAU
PROVINSI KALIMANTAN TIMUR
By : PT. BJP

PROJECT SUMMARY

GENERAL PROFILE

General Director : IRHAM, ST


No of Concession : 503/242/IUP/DPMPTSP/2017
IUP Owner : PT.BERAU JAYA PERKASA
Notarial deed : 116 / 20 Januari 2007
Concession Area : 1.398 Ha
Concession Location : Desa: Tepian Buah, Kec: Segah, Kab: Berau –Kaltim
Concession nearby : BBA Area and MBL

EXPLORATION`

Bore holes conducted : 6 Point


Total Depth of drilling : 300m
Bore Analysis : open hole and corring
Soil Analysis : Hidrologi & Geoteknik
Area Topography : Lowlands up to medium hills and some swamps
Drilling Contractor : CV. RAHMADINA
Consultant : CV. RAHMADINA

Doc PT.BERAU JAYA PERKASA, 2021


COAL RESOURCES

Total seams founded : 2 Seam


Total seams mined : 2 Seam
Seams thickness : Minimum-2,5m, Maximum=14,5m
Seams Dipping : Minimum-3m, Maximum=60m
Total measured resources : 4000m
Total mineable reserves : 250 Ha
Stripping Ratio : 1 : 3 minimum to 4 maximum

COAL QUALITY

Based on analysis PT.GEOSERVICE

PARAMETERS QUALITY RANGE


Calorific Value, ADB (kcal/kg) 5100 - 5800
Calorific Value, ARB (kcal/kg) 3200 - 4000
Total Moisture, ADB (%) Top=44,51-Midle=46,51-Bottom=45,87
Inherent Moisture, ADB (%) 13,08-14,24-13,18
Ash Content, ADB (%) 3,40-3,22-3,57
Sulfur, ADB (%) 0,80-0,12-0,81
Volatile Matter, ADB (%) 42,96-43,59-42,81

PRODUCTION PLAN

Mining Method : Open Pit Mine


Production capacity : 50.000 – 200.000 Ton per month
Product specification : 85%
90%
Life of mine : 10 years
Plan of mining : Per 1 year’s

Doc PT.BERAU JAYA PERKASA, 2021


FACILITIES PLAN

Jetty & Stockpile


Jetty and stockpile area :12 Ha
Location : Jetty BJP. PT
Distance from mine site : 8 KM
Draft of Jetty : 7 – 8 meter
Barge size : 270 feet (5.500 MT)
Vessel Anchorage : Muara Berau
Distance to vessel : 72 Mile
Travel time : +/- 18 Hour

HAULLING ROAD FACILITY MAP


E 11 7°. 09 '. 00" E 11 7°. 10 '. 00" E 11 7°. 11 '. 00" E 11 7°. 12 '. 00" E 11 7°. 13 '. 00" E 11 7°. 14 '. 00"

N 02°. 10'. 00,00"


K ecam atan segah - K abupaten Berau
Provinsi Kalimantan T imur

W E

K ONS ESI BJP B LOK-E


B LO K-B
S

S IEK-305 S IEK-304

P ET A RE NC AN A PIT

G eo 0 02 51 /B JP /D ri ll /I x- 17

N 02°. 09'. 00,00"


S IEK-303
K ON SE SI M ARINA S.Seg ah

N o, P ET A, 1 -1
S IEK-3 02/3m h PE T A PR A SA R A NA DAN SARANA
ga
S.Se
L E G E NDA
P IT -C

P IT -C1

S IEK-30 1/2,00m S IEK-21 0/3,20m


W IU P PT , BJ P Site G un un g Sa ri

M es s Baru
1 .8 00

K ONS ESI M BL J a la n H a u lling PT. BJP


1 .7 00

1 .6 00
N 02°. 08'. 00,00"

1 .5 00 J a la n H a u lling PT. BBA


1 2 00 1 1 00 1 0 00 9 00

1 .4 00

g
un J alan P er ke bu na n Sa wit
ag
S.Siagung S.Si
T itik B o r E x isting SIEK
S o d e ta n Sungai

K ONS ESI BBA K ON SE SI BBA


S A W M ILL
ung

T im bun D 1-1
K ON SE SI M B L
S.S iag

T itik B o r E x is ting DETAIL

D 1-1
T itik B or PLAN
N 02°. 07'. 00,00"

S um be r Data
I

S.Se
ga
h

P ET A AD MINIST RA TIP KA B, B ER AU : S KA LA 1 : 4.500.000

G U N U N G TABUR
S EG AH P UL AU D ER AW AN
N 02°. 00'. 00,00"

M ARA TUA

T AN JU NG R ED EB

T EL UK B AYUR

S AM BA LI UNG
N 02°. 06'. 00,00"

K E L AY
T ABA LAR

B IA TAN

T AL IS AYAN
N
B AT UP UTIH
N 01°. 00'. 00,00"

L ok as i Pe me ta an A re a BJP
W E

E 1 1 6 °. 00'. 00" E 1 1 6 °. 00'. 00" E 1 1 7 °. 00'. 00" E 1 1 8 °. 00'. 00"

D ibu at Oleh :

D ip erik sa Oleh :

D iketah ui Oleh :

O ffice :Jln . Du rian tig a, P erum ah an B erau Ind ah B lo k A2 , No . 07 ,K el. Gu nu ng Panjang


K ec. Tanjun g Redeb, Kab Berau-Kaltim

Doc PT.BERAU JAYA PERKASA, 2021


HAULLING ROAD PHOTO

Doc PT.BERAU JAYA PERKASA, 2021


Crushing plan and CPP facilities
Screen, Crushing Plan, and support facilities

- ROM stockpile, capacity 300.000MT


- Clean stockpile, capacity 120.000MT
- Dump Hopper, capacity 40.000m3
- Crushing and screening station :
1. Primary crusher, double : 600Ton/hours
2. Transfer Conveyor : 300Ton/hours
3. Roller Screen, 0 ~ 50 mm output : 300Ton/hours
4. Secondary Crusher, double Roll : 600Ton/hours
5. Stacking Conveyor/Manual : 300 Ton/hours
- Jetty with ramdoor capacity to MT/hrs
- Weight bridge capacity : 30Ton
- Office for administration, Production & Engineering at site
- Workshop and werehouse

JETTY FACILITY MAP


E 117°. 14'. 00"

BJ P
Kecamatan segah - Kabupaten Berau
Provinsi Kalimantan Timur
N 02°. 07'. 00,00"

15
W E

10 S

15

10 Proyeksi > Unipersal Traverse Merckator ( UTM )


Sitym Grid > Geografy (World Global Sistym -84 )
Zona Grid > N 50

4 No, PETA, 1-2

LAY OUT PRA SARANA DAN SARANA

LEGENDA

I
Sungai

S.S
Batas Area JETY PT. BERAU JAYA PERKASA,- SITE GUNUNG SARI

1 13
1 Hauling Road ROM

eg
16 2 Scurity Pos 14 Fuel Tank

3 Fuel Station 15 Barge

ah
II 4 Hopper
16 Parking Area

5 MCC Room 17 Water Tank

11 12 6 Office & Mess Fasility

7 7 Weighbridge

8 Power Generator Room

9 Work Shop

10 Barge Loadding Coal

5 11 Mosque (means of worship )

13 12
12 Setlling Pond

14
17
9
6 8
3 Sumber Data :

PETA ADMINISTRATIP KAB, BERAU : SKALA 1 : 4.500.000

GUNUNG TABUR
SEGAH PULAU DERAWAN
N 02°. 00'. 00,00"

MARATUA

TANJUNG REDEB

TELUK BAYUR

SAMBALIUNG

KELAY
TABALAR

BIATAN

KOORDINAT
TALISAYAN
N
BATUPUTIH
N 01°. 00'. 00,00"

Lokasi Pemetaan Area BJP


W E

Cruiser N 2° 06' 47,6" E 117° 14' 02,1"


BIDUK BIDUK

Loadding barge-1 N 2° 06' 52,3" E 117° 14' 03,6" E 116°. 00'. 00" E 116°. 00'. 00" E 117°. 00'. 00" E 118°. 00'. 00"

Loadding barge-2 N 2° 06' 49,1" E 117° 14' 07,9"


Setlling Pond-I N 2° 06' 51,1" E 117° 14' 04,5" Dibuat Oleh :
Setlling Pond-II N 2° 06' 47,1" E 117° 14' 09,5"
Diperiksa Oleh :
N 02°. 06'. 00,00"

Diketahui Oleh :

BJ P Office :Jln. Durian tiga, Perumahan Berau Indah Blok A2, No. 07,Kel. GunungPanjang
Kec. Tanjung Redeb, Kab Berau-Kaltim

Doc PT.BERAU JAYA PERKASA, 2021


JETTY AREA PT. BJP PHOTO

JETTY AREA PT.BJP

Doc PT.BERAU JAYA PERKASA, 2021


LEGAL :

Doc PT.BERAU JAYA PERKASA, 2021


Doc PT.BERAU JAYA PERKASA, 2021
Doc PT.BERAU JAYA PERKASA, 2021
SERTIFIKAT CLEAR AND CLEAN

Doc PT.BERAU JAYA PERKASA, 2021


Doc PT.BERAU JAYA PERKASA, 2021
Doc PT.BERAU JAYA PERKASA, 2021
Doc PT.BERAU JAYA PERKASA, 2021
R O A (REPORT OF ANALISYS)

C O A (COAL OF ANALISYS)

Doc PT.BERAU JAYA PERKASA, 2021


Doc PT.BERAU JAYA PERKASA, 2021
DATA LOGBOR PADA AREA BLOK BARAT DAN TIMUR

Doc PT.BERAU JAYA PERKASA, 2021


Doc PT.BERAU JAYA PERKASA, 2021
Doc PT.BERAU JAYA PERKASA, 2021
Doc PT.BERAU JAYA PERKASA, 2021
Doc PT.BERAU JAYA PERKASA, 2021
Doc PT.BERAU JAYA PERKASA, 2021
Doc PT.BERAU JAYA PERKASA, 2021
Doc PT.BERAU JAYA PERKASA, 2021
DEPOSITE CALCULATION IN 3,90 Ha, (PIT-1) and 62,35 Ha, (PIT-2)

I- PIT- 1

II- PIT-2

Doc PT.BERAU JAYA PERKASA, 2021


DEPOSITE MAP AREA

PIT MAP-AREA

PT.BERAU JAYA PERKASA


Koordinat PIT-C PETA RENCANA DISPOSAL
X = 519200.82 Y = 236795.88

X = 519259.80 Y = 236813.01 Desa : Gunung Sari

Kecamatan : Segah
X = 519312.92 Y = 236751.35
Kabupaten : Berau
X = 519313.71 Y = 236734.31
Provinsi : Kalimantan Timur

X = 519300.01 Y = 236658.48 KOORDINAT DISPOSAL


X = 519310.18 Y = 236465.06 X = 519198.25 Y = 236784.39 Keterangan :
X = 519224.58 Y = 236608.00
X = 519222.41 Y = 236608.00
Batas BLOK
238000.00N

X = 519242.49 Y = 236465.06
X = 519016.17 Y = 236607.87
X = 519271.00 Y = 236608.00
X = 519270.00 Y = 236507.00 X = 519016.17 Y = 236762.19
Jalan ang Tambang
X = 519348.07 Y = 236507.95 X = 519154.36 Y = 236791.23
X = 519348.09 Y = 236607.95
Rencana PIT

Disposal

25.611,61m2
33.338,33m2
PIT - C

N
237500.00N

DISPOSAL PIT - D
W E

51.446,20m2
S

Skala ,1 : 40.000

PT.BERAU JAYA PERKASA


Judul Peta PETA RENCANA DISPOSAL

No Geo 00252/BJP/Drill/Ix-17

Digambar Oleh

Direncana Oleh

Disetujui Oleh

519000.00E 519500.00E 520000.00E PT. GARAMA OFFSHORE KARYANUSA

Doc PT.BERAU JAYA PERKASA, 2021


E 117°. 09'. 00" E 117°. 10'. 00" E 117°. 11'. 00" E 117°. 12'. 00" E 117°. 13'. 00"

PT.BERAU JAYA PERKASA


J Kantor : Jl. Durian III Perum Berau Indah Blok A2 No.5 Tanjung Redeb Kab. Berau-Kaltim

Pulau Sambit Kel, Tanjung Redeb Kec, tanjung Redeb Telp.0554-202066


Kantor Jakarta: Gedung Graha BIP, Lt.9H,Jl Gatot SubrotoKav 23, Jakarta 12930 telp.021-2522227

Kecamatan segah - Kabupaten Berau

N 02°. 10'. 00,00"


Provinsi Kalimantan Timur
239000.00N

W E

BLOK-F S

0 500 1000 2000 m

0 1 2 4 cm

SKALA, 1 : 50.000
BLOK-E

BLOK-A No, PETA, 6-6

PETA RENCANA TAMBANG

N 02°. 09'. 00,00"


LEGENDA

h
S.S ega
WIUP PT, BJP Site Gunung Sari
BLOK-B
BLOK-D
PIT-B ah
eg
S.S
Jalan Haulling PT. BJP
PIT-C



BLOK-C
Jalan Haulling PT. BBA & Logging

Jalan Perkebunan Sawit

N 02°. 08'. 00,00"


Jembatan Haulling

S.Siagung Jembatan Haulling PT. BJP


ung
S.Siag

LUASAN AREA RENCANA PIT

PIT-A= 377.116,308m²
PIT-B= 35.745,135m²
234000.00N

N 02°. 07'. 00,00"


Proyeksi > Unipersal Traverse Merckator ( UTM )
Sitym Grid > Geografy (World Global Sistym -84 )
Zona Grid > N 50

PETA ADMINISTRATIP KAB, BERAU : SKALA 1 : 4.500.000

S.S
eg
SEGAH
II
G UNUNG TABUR

ah P ULAU DERAWAN

MARA TUA

TANJUNG RE DEB

TELUK BAYUR

S AMBA LIUNG

KELAY
TABALAR

B IATAN

TALISAYAN
N
B ATUP UTIH

Lokasi Pemetaan Area BJP


W E

B IDUK B IDUK

E 116°. 00'. 00" E 116°. 00'. 00" E 117°. 00'. 00" E 118°. 00'. 00"

N 02°. 06'. 00,00"


Dibuat Oleh : PT. B J P

Diperiksa Oleh :

Diketahui Oleh :

516000.00E 521000.00E

CONCLUSION

After studying and analyzing the BJP concession area, it shows that the area is very

suitable for mining because the deposit reserves show more than sufficient after drill

testing and with a low SR it is possible to continue in further exploitation.

Doc PT.BERAU JAYA PERKASA, 2021