You are on page 1of 160
PREVENTIVE MAINTENANCE (ELE) - CHECKLIST; GENERATOR = CE WABAG ¢ - a Paciunes ay = locaton: og. MSPS 5 ate: 0 03 /auy loorapne, 409- De- oor No. Equipment Description of Work amar [elt erat stat km Bator fo avid staring dung materarce Gemove bate teranatsv0Vo) 2 (Check batter vtage and record rating 40 V 3 Check tateryolecro}ee level, top-up ft requed 4 For open cal batory check speci gravy, highight any abnormality (valu loss than 1.25) Bod (check battery terminals and intor cals connections for corrosion and weak tighiness, ect it irequved 4 [escent umland emer erm! chine! (Check ATS panel fer loose connectons, fuses blown, VSR setings, timers setngs, Recty ary !abnrenaly, Use air tiower snd vaccum cleaner to clean generator contol panel generator body and laeneratorroom 3 Detect the goneratr by connecting batey terminal 10 [Run generator witrtoadwthout load and check. 11 |Atctaing te check bate votae and ead a4V 12 [meget ug nap and mend ir 18m seer ered cunt anda o” 14 | shutdown generator and record hour mete reading oso = 15 Emre he genre sts pontlon here: ‘Electrical Technician Electrical Foreman. “Pumping station & network Facilities in-Charge \GatarEnergy Representative. - = je el v Form ho FAT JONEDOZ2-RO PREVENTIVE MAINTENANCE (ELE) - CHECKLIST; GENERATOR ¢: come RreREhcs-wenaconassuiza same oe Setareherey Contract Title : OPERATION AND MAINTENANCE OF SEWERAGE SYSTEM AND TREATMENT Pastimes are lesion: oye Maps & potane: = Yog- Der- oof No. | Equipment Description of Work ‘Frequency Executed Remark + ae erst ety aren dangers pene try | Femi? |. = twrmino*Ve.Ve) Monty |e 2 Chace sage ad cps eaceg Feanstiy | pve] 30 3 (Check batayolacvodte love. opp frequred 4 |Foropen cot batery chock space gravy, highlight any abrmalty (value less than 1.25) 15 [Check baterytrminals and inter cls connections for corosion and weak tighness, ei i required | 6 creck enunciator pane! and. thermostat connection. ‘Check ATS panel for loose connectons, uses blown, VSR satings, timers songs. Recty any |sorermaty| Chmed \Use alr blower and vaccum cleaner to clean generator contre! panel, generator body and [generator oom ‘9 _De-colate the generator by connecting batory terminal 10 Run gonorator wih lodiwithout oad and check, 11 [Attartng te cock bate voltage and record it pes’ 12 [Chock generator ulgoing votaye and record. 419 V 12 foc gna ered caret andrea oO” 14 anion grata cord ou met eng Tro 18 [Emuto te gear sch ie au poten lors ct Tecnian | eecveaForman [ppg FamprasaionE mine’) Faces chee [atrénery Representative pelt | wor es vo ly Form No FO#T-JONEDO2-RO PREVENTIVE MAINTENANCE (ELE, NDWTP - CHECKLIST = Rises ¢ DOCUMENT REFERENCE: Wenwcranac oo7a2 Batra so Contract No: GC21105800 Bee can oem ET omaconcene | SRI TREATMENT FACILITIES AT MIC 3 Location: § 40» Daralio Janu pate: 213/24 POT MW TRY TSR, TAR OT P-12B-1RS]O%, 195) 129 7130,13LB 2 Motor Tag Nc Ra No. Equipment / Description of Work Frequency | Executed Remarks 1 INDUCTION MOTORS Ist he motr tm th power supply and contol supply ans respect oa aproper ocho tagout proceaure . Monty [Done ‘6, _ [Open motor terminal box and Check cable termination for any sign of overheating) Monthy Done [lean andre ate commecton otpower cable hemos heir cabes | wonmy | Dorie | C lecumh 4 lone weg rents, nation stance vase Monty hee hued € Check hemostat resistence valu oropen cose contion wonty | Dene { [ltean motor Open tn motor fam cover clean fn and Check he cooing co! Monty | Jor 8 [Check motor for proper earthing connection Monthly | sper Checked [Note: |SAFETY: Ensure the motor isolated before any maintenance is carried out. Electrical Technician | Electrical Foreman ‘QNQC Engineer Facilities in-charge feenane Ohio?” ner ima ie See Form No; FO4S loheck gtness of calor and Fuse unk MCB MPC, MCE, Morty AN pose @[eheck Power Fuse and controle contnuly required replaced tise. Monthy Check et coaster an & ely concer cable Ugtness and Goan The © feanacts ving CRC Monty checked 1 [eck ume 22 ry and Therma ove lad relays stings Menthiy [Check a contol relays and Tiers function Monthy 1 feneck a power cet and contol rut able tightness Monty 1 Jeneck cr & Pr tgtiness Monthy | [one pane nesta, themosiattghness and uncon orth vFD + [Visual checking of VED panel for dit or moisture signs woniny | Dow 2 [heck air creuation eystem working, exhaust fans, clean fers monty |pova | Chaeksal 3. [clean VEO pane! using vaccum cleaner monty | DoweR | cl 5 4+ oneck VFO input a votage Monty | Dowie 5 [Check VFO output ac voltage: ‘Monthly, Bon 4. uy 8 [Check de vottage forthe VED OC bus Monthly — | Dor ® 7 |eneck Power cable and contol cable tightness moniny | foo! {8 [check for unusual oration and noise monty | DoE 9 |check proper earthing of the VED Monily — | Dont 10 |Ensure cooling system is properly working in the VFD control Pane! ‘Monthly wt SUBMERSIBLE MOTOR a [Check winding resistance, nsuaton resistance Monthy | gibt ¢ __ [Check thermostat resistence vaiue or open &ctose condition: Monthly Pair |NOTE: [SAFETY Ensure the motors aolted before any maintenance is eared out Electrica! Technician Electrical Foreman QAIQC Engineer Facilities In-Charge_ oe, Db | Wor i fil “ Form No: FO4T-JUNE2022-RO PREVENTIVE MAINTENANCE ELE) NOWTP CHECKLIST WApac & Demme wma < ares SAREE | etm ormaronne mun OIE orraawe name cen | SERRATE ‘re becaton: 40% Acrelem Jomle pate: 282 4 Motor tagna: Jo] PY). 18. 19), 199 VOR pa PO \L68, 126% — Motorkw: (| 5 ‘Motor Winding insulation Results Wer wate Wezotr WoaWoer | Neatior | wadwoor | Woswour mene ‘teas tegen megs | “aiegna” | “ogea”| eget RAE! Soom s Foomn | Yoon Fons} pocom-~| /poomn| 18 | 500 md foomS— | Qeoms-| Boom s4 toooms—| /apomn . PET Soom] Too ms Rooms | Poomsl (000m /ogam~ Motor vining Resistance Resuts veer sean: woamor | noanoor | osmaor | nest mane wry sx 6 4] Poe} bees} yaad pe ken bac | pen] pea] Wain] aed se os han Los} yer] WS olor hemostal Resistance Results Yes oe neato wean [meaner | moan | neat me {p90 (2 leg. yn | ren} arost 0.6.5} 6.894 Motor Rataing Gant sap ie “amo | ime | “Sime | femarts ©] 219 tala |\o-7@ | ta-sal aoa | aaa "1 i226 6310 vga liotce | ee | Ke * | 12-20 late laga |wsal sea | z-po | MezsusingEqepment Dts ltrs Dette rorrrsu /AGIDC CLAMP METER 2086 | Date - 03-July-2023 Due Date - 03-—July.2024 voniTsu NOULATION TESTER KEWSSSIT [Gal Date -03-uty2029_ Due Date 03 Julyz024 [APETV Eau the tere eed elvan nonance cated oo TE: Eetical Technician | Electcal Foreman awac engineer Facites in-charge camareneray bee < Our Now Ge Form No: FO3®-JUNE2022-RO ‘PREVENTIVE MANTENANCE (ELE) NOWTP - CHECKLIST f ‘DOGUNENT REFERENGE: WPAECIOAGE-000722 Saehst ‘Contract No: 0621105800 Conrat Tile: OPERATION AND MAINTENANE OF SEWERAGE SYSTEM ANO TREATMENT FACITIES ‘are tocaton: .09- Denalion Jone pate: >|, )2_4 (Motor Tago: JOT Pm JAD LAS. [Qu, 198 AG 130 Motor KW: 2 Motor Winding Insulation Results Net Motor ‘Wo Motor NoaMotor | WodMotor | Nos Motor | No. Motor Remarks Moga o. Magne ‘Megs 0 Mega a Mega O Mega O nes Jocem} Sf pom | Jocomn] (Sommst focoms | (ooom. vee fogom s— Joo ms— pms | Jovomr| jp00m | |ooom—~ — ane ogom S— Jooma— =~ loopms| oooms~| locom7 Motor Winding Resistance Results oor 2 woo a wocra | wera | wera | amor | Remar oF OSS D8] 0-94 Neel pT. D6 oes ors, Ber) jy OG me 0:8. ods ‘oor ThemestatResitonce Res vos mar Neato Noster roar emorks Inve | QOU-I-af 71D. 3 | 218-6 od Motor cents eadngs 02 Motor . 7 NoaNtor her “me me | ame | Am ‘ane | Tamar "[saip| 33-49 23-yp|s2-y pl 2320] Sura y 2 . 33198 234A 2ane [goin | 3 2a] sda ® laa aya saa | dria | 83-26 | Bye ‘emuring Eeipment De alton Ona KYORITSU AC/DC CLAMP METER 2056R (cal Date - 3-July.2023. Due Date - 9-Juy-2024 [KYORITSU INSULATION TESTER KEW35528T ‘cal Date 02-Juy-2023 Ove Date -03-July.2024 [SAFETY: Ensure the motor is soated before any maintenance is caried out Inore Electca Technician | Eleccal Foreman ‘QNAC Enginer Facies n-Charge cee ater | wae t¢ bn. Y Form Ne: FO86-JUNE2022-RO PREVENTIVE MAINTENANCE (ELE) NDWTP - CHECKLIST DOCUMENT REFERENCE: WPIMICIOAGC-0047/22 _ Contract No: GC21108800 ‘Contract Tile : OPERATION AND MAINTENANCE OF SEWERAGE SYSTEM AND TREATMENT FACILITIES AT NC / toeati: AOL Alowalion bev he Motor agnor NO]. pa). (8) |32~ EG PM }33 Be - Motor Winding Insulation Results Wo Motor a2 Motor Nestor | NoaMetor | Nos Motor | Nea Woter Renae egn nea eon 2 | “hago ‘Mega ‘tage me Llecem} fooom evomn| f “ Z “F] jocomn| (ocomn— woomn| _/ B88 | ee mse wom Jooom.~ E Motor Winding Resistance Results Noa io? Noa Noa Nos Nos aa tor 0 motor 0 motor a | Mowra | moter | Motor | ray Of Ogre om val 0-6 2-6 SX (Ge par On Pe 0-6» AG oor Themestat Resatnce Rests Not Mtr No Motor Noawoter | NoaMotor | NosMotor | _No@éetor nomate a ° a 2 2 2 Jun] 202-7=| 904 9% | Bes | yt Motor Running Curent No. Motor No.2 Motor Nosworr | wosmoter | Mos Motor | Na@dtor romans ‘ane ‘np ‘ane ane ‘ame ame ® Ta 218 Bu. bo " Ja Buse al / , — 7 7 23-16 34 Ta Toba / ‘Measuring Equipments Detaits Calibration Details IkvorITsu acioc CLAMP METER 2066R {Cal Date -02-July-2023 Due Date -02-suy.2024 {KYORITSU INSULATION TESTER KEWS5528T (cal Date -03-Juy-2023 Due Date -03-uly 2024 [SAFETY: Ensure the motor is Isolated before any maintenance is catied out. INOTE: Electrical Technician Electrical Foreman QA/QC Engineer Facilities In-Charge QatarEnergy Representative 5 “ Ole? New q ms Vw Form No; F038.JUNEZ022-RO a ‘Gontact Nox CRT T05800 mc PREVENTIVE MAINTENANCE (ELE) UPS - CHECKLIST DOCUMENT REFERENCE: weiaciaaac-904222 ‘Contract Tle :OPERATION AND MANTENANCE OF SEWERAGE SYSTEM AND TREATMENT FACKTIES AT Location: 4/4 Mes- TaAGNO: 4I4~ Yps- of © Date: Frequency | Executed Ne Equipment / Description of Work Remarks A UPSAC Bi 1, Visual inspection of the panel display for any warning or fault Monthy | “Dew® Bi . 2. Visual inspection for any abnormal sound or heat Merny | Donk | Nevin intemal fan working if requir Si Dnt 3. [Check internal fan working f required Monthy | 2 #eé , 7 isatapecion UPS parr ose cect vty (Oe | lab ond YA [Visual check all compounents or any detoriorsalion, excessive dust or Bi UE |S fis sor wontiy | deat 6 [Clean vent plugs for ventilation Monty | Dawe Bi ; S 7 [ehock main ac nputvotoge vcsny | Deve | __ aheV/ serv e Bi 0 | 8 [Check reserve ac votag Monthly 24 7 Bi ara 9. [Check input battery de vottage Won ’ Bi 10 [onec out ac votage Monthy ko B BATTERY BANK 1 Visual check of cals for any abnormal heat Bi ” Monthly 2 [Check inferels and terminals for corrosion and loose connection, apply Bi petroluem gel and inti required Monthy Bae eles il if requir Neat 3 fpreck electro ove, ii equired Monthy | Bi Dak 4 eneck battery bank votage and record reading cay | Det i = 5 |Check dc voltage to earth and record reading wontny | Deet : |sAFErY: STRICALLY RESPECT SAFETY PRECAUTIONS. Note: Pumping station & network Electrical , atarEneray Technician | letealForemen | operionsmantenance | Facies InCharge repacenete JE | woe te a Form No: F042-JUNE2022-RO Page Sot GC ‘Contract No: GC21105800 gual a GeterEresay | Contract Tile : OPERATION AND MAINTENANCE OF SEWERAGE SYSTEM AND TREATMENT FACILITIES AT MIC PREVENTIVE MAINTENANCE (ELE,) PS, - CHECKLIST DOCUMENT REFERENCE: WPIMICIQAQC-0088/22 | Saran KR wasac \Location: Arye Mspsy 2 Date: 0 3 Joa)a4 Motor Tag Ni W 2 AtH- PM-oO9l, gop Bl002, iy-Pm-o) No, Equipment Description of Work Frequency | Executed Remarks A MOTOR CONTROL PANEL | +See te feeder fom power supply and contol supply respect a proper san oy | yee ut and tagout procedure ae 2. Check tightness Isolators and Fuse uni, MCB,MPCB, MCCB, Bimontiy | ree | fl Fuses dle 23 Ensure general cleaning for the control panel Bimoniny | oad | ¢leomed «Jom Ronr Fun and conte cna aged repacestins. | sineny | (oa 5 ‘heck poner contacter and & aur contacter cable ghines nd cen Binontiy |e ce che « JL iyhs «Shes dean anes, push buon seer oie, cortl sand siNonty Dent 7 [Check all power circuit and control circuit cable tightness. Bi Monthly | \ )o 8 [Check CT & PT tightness BiMoniny | {eae 2 [chock paetnester nomosiat ions and uncon sinonty | Dove 8 INDUCTION MOTORS 1 [stot feeder rom power sup ard conte supp especta POET | Binntiy |e 2 [Schanig See owacges NIT Te Oae | olak ally 3. (Clean and hte cable connecons of ower cable, emmosiat 8 eater | Bony | De 4 |Check winding resistance, insulation resistance BiMonthiy | owe | 5 | check hermosa resistence valu o pen close conon Bimoniiy | [owe 6 [Clean motor & ‘Open the motor fan cover clean fan and Check the cooling! 5 wont Doak Cleane J ee amen] Dt | oT Form No: F88-JUNE2022-RO Page tots PREVENTIVE MAINTENANCE (ELE, P.S. - CHECKLIST DOCUMENT REFERENCE: WPmMIC/QAQC-0088/22 ‘Contract No: 6621105800 ‘Setar4S=y | Contract Title : OPERATION AND MAINTENANCE OF SEWERAGE SYSTEM AND TREATMENT ACILIES ATIC Locations 4. [lp —— MIQs~ Date: 0 3/o5/ 24 IMotortagno; 46/4 YER Mol dei ly Pa-o2 kw: | Hig PM Od | © DEODORIZER MOTOR &CONTOL PANEL [soi Todor om pow suppl ard Son sappy respecting 8 ope TeeRo Deke Faimonay 2. [Check tihness felts and Fuse unt MCB MCB, MCCB, 8 Monty > ee cra ay ec ei ines nd can CESS |g pony 4 [heck the ovr ad relay tp seting B Nonny 6 [eneck sect niches ac push puto unten BiMony 6 Check incaton lamp itreques etoce Monty “>” |Gieen motor & Open the moto fan cover clean fan and Check the cooling Tan for 7 ‘healthy condition. Bi Monthly. 8 |ehockiheconitonofteminal connects of Motor emia ox winery « [check wing eistance, insulation esstance hermtance resistance ané record | BiManhiy > WASH WATER & DOMESTIC WATER MOTOR [cae feeder om powe supply and conte! spp respec a properiockout a > + oie te ace aimenny | ont 2 eneck tantess telat and Fuse unt MCB MPCB, MCCB, aimontiy | ane > Shc power cola & andar nat cbl thre and cen coin i 7 3 tac” ” ‘gin 0) eimonny | Deve | cluke wud LyAF 4 [heck the over aa relay seting Bivionniy 5 [Check selector thes and push Butonfncton Bonny 6 [Ceckincaton amp required replace amon (ean mor & Open the moto Ton cover ean fan and Check the oo an or Cucd 7 Reena 0 Bion [ cleme «fovea canton atonal cxrmacirs of Maral box einen | Doak 9 |Check winding resistance, insulation resistance and record Bimontny | ow ISAFETY: Enoure the motor is olated before any maintenance scare ou. nore: Pumping Staton and Network wctricl Technician | Electrical Foreman | Operations Maintonance Facites Incharge | atarneray Representative Coordinator Jue 1! < als we t. | be wo y Uv a Form No: F88-JUNE2022-R0 Poge 2015 a PREVENTIVE MAINTENANCE (ELE) WINDING VALUE - CHECKLIST; vy [ DOCUMENT REFERENCE: WP/MICIQAQC-0039/22 __| asunoe Contract 21105800 QEESPEAESY | Contract Te : OPERATION AND MAINTENANCE OF SEWERAGE SYSTEM AND TREATMENT FACILITIES AT MIC ! Location: = 4/d:— ASP S- Date: 93/02/24 Motor TagNo: I~ DM— sof, 092 M9°S pyy par | KW: |) Motor Winding Insulation Results No.tMator No2Motor | No3Motor | Nod Motor remarks Moga a Mega a Mega Mega. Rae 7000 Ms | Jooom~ | JooaM™ | Qa hw Yee panous | (00K | gp5V A | Somem Bae 000 MA [oeMRT po oa] go i Motor Winding Resistance Results Not Motor No2motor | No.3 Motor A a M No Motor a Remarks Ray Qs Bue a4 | dese 9a yas Er ar | ar Pere BaR aan [| aan | aor [ere Motor Thermostat Resistance Results — No.1 Motor No.2 Motor No.3 Motor ‘ me “ Nos Motor 2 Remarks 12 VASE LO VATR KT Jy A Motor Running Current 7 No.t Motor No motor | Nod Motor ae No2 Motor Amp| No ot a Remarks R (8°24 19°98 10.44 a3Aa (224 (0°34 0-44 A539 8 [e494 19-39 jo-4n | A3H ‘Measureing Equipments Details Calibration Details KYORITSU ACIDC CLAMP METER 2056R [cal Date -03~uy-2023. Due Date - 02-Jul-2024 KVORITSU INSULATION TESTER KEWAS528T ‘cal Date 03-04-2023 Due Date -02-Juy-2024 ‘SAFETY: Ensure the motor I Isolated before any maintenance is caried out, NOTE: - ‘Pumping Station & Network T Electrical 5 i GatarEnergy Electrical Foreman | Operations & Maintenance | Facilites in-charge Technician ions & Maint Representative gee : - Cow J he "| Nw . oO [ Form No: F039-JUNE2022-RO Page sts PREVENTIVE MAINTENANCE (ELE) WINDING VALUE -CHECKLIST; = WABAG DOGMA EPRICE WREST < sau. aac No: GE2TTOS0 SEPTATE | commer tan: OPeRATON ANOMANTENANCE OF SoncbNcESveTEM NO REATUENT acurEsat || SERES7IRATTE me. Location: iy Mis Date: 03/03/24 [Motor Tag No: Yer - x EFM ot) qi HME 02, Wty PMO 2 yy KW oy Motor Winding Insulation Results | Wostmetor No2Motor | NosMotor | No Motor Mega 2 ‘Mega Q ‘Mega Q Mega 2 Remarks Rae as Ma | Joosmn| Zoom | Jooone| YaE asm [Gcokkee | Godpre Bae asMe | oot~| Foor Motor Winding Resistance Results 7 Noa Motor | Noawtor | Woawotor |e steer 0 Remarks Ray Faw | Ryan} Faw | pare vas san aS Rel 37a BaR FS-ase | P2TAM 3-7 Ea Motor Running Current Noa Motor Nos Motor | Not Motor ra NozMotor Amp | No Me ae Remarks R ov bed Oko $e Qn Y 2 Groening ove votre werny | Done | ofcle wed Ay Gemnnst 8 Ormiston comrceantanantcnck a) © Shromas omae wtiny | Dive | cleaned ‘ check for prope eating connection othe motor wey | Denk | «tne mtr and cae cnet sane wy Devt | Worn oToR PANELS | —- — i 8 . of a Check tightness of olators, Fuse unit MCB,MPCB, MCB, Morty | yond Bll Frases 5 > . Ensure general ianing of contr pa wey | Qya2 wen owe socio and & wan ont » | Oar © heat he went, | Deak ‘ ‘Check all contro relays, Timers, selector switch, indication Bi Dene | fame monty 70 able ghness BAe . [heck power chet and coral cel cable igh wey | Dbat ' [Check motor operation in aut & manu a at monty | 12: Not — SAFETY: Ensure te motoris elated before any maintenance i cate out. — pat San ana lecieal Technician _—_Elecrcal Foreman Network Operation & Facies Incharge _QatrEnergyRepasetatve Form No: FOB5-JUNE2022-RO | arenes Corner PREVENTIVE MAINTENANCE (ELE.) Winding Value- CHECKLIST jRewsrc DOCUMENT REFERENCE: WP/MIC/QAQC-0086/22 ¢ Contract No: 621105800 — BENE coma re orenaron SS eTeER SE sewensceaveren ann | SRRVIRIS TREATMENT PACILITIES AT MIC pe Location: Coutya) Offrce- Puildeay Ccen) Date: 04/03) 24 Tagumber: (1401 Q 02 Kw 55 Motor Winding Insulation Results Nod Motor | No2Motor No Motor Noa Motor nomorke ‘Megs Mega Mega. toga Rae Joos fo00t | Yae [000 | (000 f-— Bae pooowm | poxemT be Motor Winding Resistance Results: = oO Nod Motor @ No2 Motor @ | totMotor ‘Noa Motor. Remarks Ray PPS) pry se vee DS py I = - Bar Pee | ge . oto currents readings amp Amp Amp: Amp sears | | | R a-8o 918 = v yen) era >< = Ss 8 nya 44 a * Measuring Equipments Details Calibration Det KYORITSU AC/DC CLAMP METER 2056R Cal Date -03-Juy-2023 Due Date -02-July-2024 KYORITSU INSULATION TESTER KEWS5528T Cal Date -09-July-2023. Due Date -03-Juy-2024 |SAFETY: Ensure the motor is Isolated before any maintenancs is carried out NOTE: Pumping Station and Electrical Technician Electrical Foreman Network Operations & Facilities Incharge __QatarEnergy Representative Maintenanes Coordinator full : naw v og Frm No: FOBE-JUNE2022-R0 PREVENTIVE MAINTENANCE (ELECT, IRGG. P.S. - CHECKLIST DOCUMENT REFERENCE: WP/MICIQAQC.0085/22 Qatarenersy Contract No: GC21105800 Contract Title : OPERATION AND MAINTENANCE OF SEWERAGE SYSTEM AND ‘TREATMENT FACILITIES AT MIC weve Bucllooy ionte (MiG Sewiity OPhex) pew o¥foa) a4 MotorTagne: P yy of ago. vo. avin escipton ot Work [reser | ees semis 1 oUETON MoroRS Laecioaue rome powrsuppy aconeraupey mere | wt - = to a proper lockout tagout procedure Monthly, owe | 5 ‘Open motor termina box and Check cable termination forany gh) ‘sign of overheating, looseness and water ingress. ‘Monthly Le ‘Clean motor & Open the motor fan cover clean fan and chock Bi Dank cle J . the cooling fan condition Monthly Dow one | 4 Ghecktor proper eating enneaion ote moor uty | Dot | foo’ Pe / | + hetenteca tema vy Dawe | Ronee - | _| wotorPaneis . Chock tightness of lolators, Fuse unit MCB.MPCB, MCCB, 5 Dort ; tMCBLMPCB, Montnly 120 a ; ene b Ensure general cleaning of control panel Monthly Deak Chane Lec pow conection = IL dy © azeheoun camara un un DeeE | O 4 £_eckaeotn Tews edna enon a) Iam Monthly | Ja « : + emeatpomr cent andconatrcatenotomness yy aul a |s i SAFETY: roe te mtorisbled fore any maine aed ou —— Tt [ewes Tecican | CeticniForman | _ nomena Feces iCharge | ature Representa | Maintenance Coordi Form No: F085-JUNE2022-R0 PREVENTIVE MAINTENANCE (ELE.) Winding Value- CHECKLIST = | NT REFER CC wana ¢ DOCUMENT REFERENCE: WP/MICIQAQC-0086/22 7 Contract No: Go2"105800 Sonn Qatarederay Contract Tite : OPERATION AND MAINTENANCE OF SEWERAGE SYSTEM AND IMT ‘TREATMENT FACILITIES AT MIC a teceton A2.iling We-lo (Mic Secuvihy pre) ome og/oshy Tag number: Purol alert a kw: Motor Winding Insulation Results No.t Motor No.2Motor No.3 Motor No.4 Motor Remarks Mega © Mega a Mega 0 Mega Ree oootm | (ogame Yee [oooh [300K — Bae (G00 (goon Motor Winding Resistance Results No.t Motor 2 No2Motor 2 No.3 Motor 0 No Motor O Remarks Rey pps, PB vas reameee nar eee - a Motors currents readings - vega | neg | gow | Hog ome k jos] po-ka | y 1019] pork - - 8 to) joka : tesering Easpnat Detale Caitsionbonie KKYORTSU_ACIDC CLAMP METER 2056R CalDate-03ly.2023 Due Date 02.2024 ICYORITSU INSULATION TESTER KEWSS5267 ‘cat Date-03~uy2t23_ Due Date -0Suy.2024 SSAFETY: Ensure the motor is Isolated before any maintenanes is carried out. NOTE: 7 ‘Pumping Station and Electrical Technician Electrical Foreman Network Operations & Facilities in-charge _atarEnergy Representative Maintenance Coordinator ye G. Ce yy Form No: FO8EJUNEZ022-RO PREVENTIVE MANTENANCE (ELE) UPS CHECKLIST = fm «. * ockout and tapout procecure Bimonity | owe ‘Open moter terminal box and Check cable termination for any sign of —TigF7) 2 jverheating, looseness and water ingress. simontny | deve | clack ond? q a [len an tae cai comets ot pone able, Hemost 8 ester | wang | x2 4 |Check winding resistance, insulation resistance aimonty [Dove | chek and 5 [Check thermostat resistence value or open &close condition Bimontny | owe | Lee ye Clean motor & Open the motor fan cover clean fen and Check the cooling 5 Iran condition ‘Bi Monthy owe Cle ane J 7 (Check motor for proper earthing BiMonthly | ‘)oa€ ige vy by iE 0 Form No: F88-JUNE2022-RO Page tot PREVENTIVE MAINTENANCE (ELE.) P. ’ ‘Contract No: GC21105800 = CHECKLIST ¢ DOCUMENT REFERENCE: WP/MICIQAQC-0088/22 Sateett2ay | Contract Title : OPERATION AND MAINTENANCE OF SEWERAGE SYSTEM AND TREATMENT Rewrere Pera [Check power contacter & auxdlary contactor cable Ughiness and clean contacts using : FACILITIES AT MIC = Locstion: Jp 37 MIPS S Date: os/ealea Motortagner 4/5~ XEFM~ OL, Ie Pom on, Kw: 4S“ Pm-03 le DEODORIZER MOTOR &CONTOL PANEL 1 ERR iin aan mea ROE ROT Toy | Tne : 7 [heck ges of las ana Fave kB MPC, MCC, winontwy | eae rchh wel We {agout procedure 3 [ee Monty 4, [onwsx tne ovr on lay tp setng a : | aitory 5 [enese selector ines ana push pston uncon iMoney 6 Checindcaton tmp if reqied replace Bimonty 7 int ae nr caver cen ond CES HPS Toney «| cheskine condition of trial connections f Motori box si Neréwy 2 [checksindng resisance,rsuatonesitance,eisane ressanceandrecord | Si Mothy ° WASH WATER & DOMESTIC WATER MOTOR _ lat ear fam power supply and consol appr rapaclaproperiodkowond | ainenay | Same 2 Check tightness of Isolators and Fuse unitNIC8,MPCB, MCCB, BiMonthy | Dowe (Gheck power contactor & audary conaca cable ighiness ard oan corto sing 3 {Chee BiMontly | Dowt 4 |chook ne overload relay tip seting eimontiy | Nowe 5 |check selector switches and push Button function BiMontny | Dowe 6 check indication lamp if required repiace Bi Monthiy | owe (Glean motor & Open the motor fan cover clean fan and Check the cooing fan for Ineathy condition, 8 |Check the condition of terminal connections of Motor teninal box Bimonthy | 2 Bimonthy | {Joa ne 9 | Check winding resistance, insulation resistance and record Bimonty |.) awe |SAFETY: Ensure the motor s Isolated before any maintenance is carried out. ote: Pumping Station and Network Electrical Technician Electrical Foreman. Operations & Maintenance | Coordinator Facilites in-Charge atarEnergy Representative v je wer Van a Form No: F88JUNE2022-RO Page 2015 PREVENTIVE MAINTENANCE ELE) WINDING VALUE -CHECKLIST, = ese —WABAG C: OCUNENT REFERENCE: wma a < = ctr a t85800 ——_— Son BeeSeHRETSY | contact Tue: OPERATION AND MANTENANCE OF SEWERAGE SYSTEM AND TREATNENTFAGILTIE AT |_ Svea L- fr Location: 4 1° Msfs~ 3 date: «7/03/24 [Motor Tag no: 4°5- %EFM=O1) yes HME 08 ) dpe S PMOL pes pao? KW: Motor Winding Insulation Results No Motor | No3Motor | No Motor Mega 2 Mega O Mega Q Remarks Ree SeK—| loos hee | (000 Yee eee | fagoar} BaE | foot] goo | Motor Winding Resistance Results Nos Motor Neawerr | Wester Nha emotr 0 Remarks Ray FHP | Qhe-sny Fon F 2. yas SH FH | ARESM 2.6 Ww BaR Sere | aks 307 | I Motor Running Current No. Motor No.3 Motor | Noa Motor ‘Me Noa Motor Amp N03 Ma ue Remarks R aa aroun | 2-90 a9 Y e-bea 0-409 ayer 5 o-Got o-4oA 3-944 VN Measureing Equipments Details Calibration Details IKVORITSUACIDC CLAMP METER 2056R (Cal Date -03siuy.2023 Due Date -O2uy 2026 {KYORITSU INSULATION TESTER KEW35528T (Cal Date -03uly-2023 Due Date -02uy.2024 |SAFETY: Ensure the motor I Isolated before any maintenance is carried ott. Note: a Pumping Station & Network 1 JechsiGan | ElecticalForeman | Operations & Maintenance, | Facities nCharge | ORtaEneray _____ Coordinator _ a yer on te | Form No: F039JUNE2022-RO Page dor ‘PREVENTIVE MAINTENANCE (ELE) WINDING VALUE - CHECKLIST; Cs DOCUMENT REFERENCE: WP/MIGIQAQC-0039/22 —_ au ‘Contract No: GC71105800 SSCSTEASTaY | contract Tite: OPERATION AND MAINTENANCE OF SEWERAGE SYSTEM AND TREATMENT FACILITIES AT MIC Location: §4(0- MiVS~ 3 Date: 5 J o3/ ry Motor TagNo: 405 PM 29(, o92- werd, 4c pmo} Kw: Motor Wi ig Insulation Results: No.tMotor NozMotor | No3Motor | No Motor ‘Mega Q ‘Mega Q ‘Mega Mega 0 Remarks: Rae 7600 A 7000 | Jp 00K | hook] Yae [ovo MX laaekr-| fowhk | pooh Bae 1a00 | (900 gee MA | foo BE Motor Winding Resistance Results No.t Motor No.2Motor | No.3 Motor " u u No Motor 0 Remarks REY Pas os pyre 1g vas Pe rs leh 1 bar eo | ree Motor Thermostat Resistance Results Ned Motor Noawoor | NSM" Nes maer a emarne TWT2 Loo 224k 1: 34hoken] rey oe | Motor Running Curent weg weter —Twazwotr amp] Neaiotr | Note amare R jo-14 (0-4 Jo-4a | 39 _| joa Jol? 49 | 239 | 8 la orf jo 4d aa4 Measureing Equipments Details Gs ion Details. KYORITSU AC/DC CLAMP METER 2056R. |Cal Date -03-July-2023 Due Date - 03-July-2024 {KYORITSU INSULATION TESTER KEW3S5281 (cal Date-03-Juy.2023 Duo Date -02-Juy-2024 ‘SAFETY: Ensure the motor is Isolated before any maintenance Is carried out. NOTE: Pumping Station & Network | Electrical itt QatarEnergy Technician | Electrical Foreman | Operations & Maintenance __‘Faciliies In-Charge Roptocentatve Coordinator ) pale” wor GB wy oa Form No: F039-JUNE2022-R0 aos DOCUMENT REFERENCE: WeMICIQAaC-004t/22 [PREVENTIVE MAINTENANCE (ELE.) - CHECKLIST; GENERATOR ER wasas ‘Contract No: 6621106000 FACILITIES AT MIC Contract Tite: OPERATION AND MAINTENANCE OF SEWERAGE SYSTEM AND TREATMENT fois YI Mas 4~ Dg- 03 Ne Eipment/Dexcripon of Work Fraqumncy | executed Remark 1 [bot grrr ter fom ihe bay avesstringamgnahrace anere etary | Fotahiy) |) jtorminal +Ve.-Ve) ‘Menthiy— “ 2. (Check ator setae andar ein remove |e | aaeV 3 look stony slecrohee eel, tp routed reananey | e 4 Foropen cot batery chock spect gravy. hightght any abrormalty (value less than 1.25) {check baterytorminals and itor cls connections for corrosion and weak ighiness, recy reauted Chae oad ih 6 [chock onuncietorpanel and thermostat conection, \check ATS panel or loose connections, fuses blown, VSR setings, timers eatngs, Recty ny [abnormality {Use air blower and vaccum cleaner fo clean gonortor contre! panel, generator body and [generate oom 9 |Deisolate the generator by connecting battery terminal 10 [Run generator vvondvithout load and check 11 |Atstantng te check batery voltage and record (SRV 12 chock generator oulgeing votage and record Aes perationfmaintenance coordinator 13. [Chock generator doivered current and cord. on 14 [Shutdown generator and record hour meter reading 963 15 [Ensure the gonoratar switch ain aus poston Wore: Paraping sation & network Electrical Technician Electrical Foreman Facilites Incharge | QatarGnergy Representative AM | seigw Ge Form Ne FOS JONEAIZ2RO PREVENTIVE MAINTENANCE (ELECT,) IRGG. P.S. - CHECKLIST Gdthl jh 6 QatarEbery Contract No: GC21105800 Contract Title: OPERATION AND MAINTENANCE OF SEWERAGE SYSTEM AND TREATMENT FACILITIES AT MIC luccato: Me Suiced Medical Centre paw: 0 6 Jo2 ayy Morortagro: PD M- 9} @0or ven; 2° No. Equipment / Description of Work Frequency ] ‘Executed Remarks 1 IwoucrioN Morons Checkislate rm the power suppl & contol sul cespest | Bi Se a to. proper lockout tagout procedure Monthly | _! owe i 4 ‘pen metorwminl bx and Check esbleeminaon rary wi | Lab oud Ayhh » ——_Rnarettinsnccoas talc ies wong | Deve | Chab oul hye ‘lean motor & Open the motor fan cover cian fan and check OD © ie eatngtan conason wenty | owt Chemed ‘ enact prope eating connection tothe motor uct | Dowt | Proper Carley . ‘Testun the motor and check current easing nebiny | Dow Nove MOTOR PANELS 81 7 + cecktomnes oto Foenwnnmeampee.ucce, ys we » Ensure genera cleaning of contro pane! | noty | Dand cheumedl Cheek power contactor and & auxiliary contactor cable A é © tightness and contactor clean using CRC Monthy Dewt 4 [eck all onto reliys, Timers, slactor switch, nleaton 8 fame Monthy . {ceck al power cel and contro crcl cl oth 1 Check motor operation in auto & manual, Bi Monty ‘Note: ~ SAFETY: Ensure he motorielealated before any martnance ls eared out —— ping Staton and] —— =— leceal Technician _Eletcal Foreman Factesinciaee __cnarnrg Ropmeeatne full r : ¢ N bw VY Form No: FOBS-JUNE2022-R0 PREVENTIVE MAINTENANCE (ELE.) Winding Velue- CHECKLIST c DOCUMENT REFERENCE: WP/MICIQAQC-0086/22 ‘ Contract No: 6021105800 QBuEU eB contact Tle: OPERATION AND MANTENANGE OF SEWERAGE SYSTEM AND TREATMENT FACILITIES AT MIC ? 7 r o3)> tera Mescaived Medical Contre va: 06 =3)>F Prammies DM -O'/ Goer Kw: Do Motor Winding Insulation Resuts No2Motor No.3 Motor No Motor = egaa Wega Mega 2 Remarks Rae vee Bae oto Winding Resistance Reouts No.1 Motor @ No2Motor 9 NodMotor® No Motor 2 Remarks Ray PYM | WHR vee Cte | open Ber rIN WOR Motors currents reasings Nod Motor | No2Motor | No. Motor No Motor ma amp amp Amp amp Remarks R 3va 3 Ge Y aya | 3be 8 ase | ata ‘Measuring Equipments Detalls Calibration Details, KYORITSU AC/DC CLAMP METER 2056R Cal Date -03-July-2023. Due Date - 03-July-2024 T KKYORITSU INSULATION TESTER KEW35526T (Cal Date -03-July-2023 Due Date -03July-2024 'SAFETY: Ensure the motor is Isolated before any maintenance is carried out. NOTE: - Pumping Station and - Network Operations & Facilties Incharge __GatarEnergy Reprosentative Electrical Technician Electrical Foreman | Maintenanes Coordinator _— Ay Nb : \ y Form No: FOB6JUNEZ022-R0 PREVENTIVE MAINTENANCE (ELE) - CHECKLIST; GENERATOR ¢ }Rwsvrs aunlipe a Gonrac No: G62 Tao —— Contract Title : OPERATION AND MAINTENANCE OF SEWERAGE SYSTEM AND TREATMENT PAcuITIE ATG lbocation: 4) 2 — MIP S- ¥ lpotaene: y)2- ta- 08! No. Equipment / Description of Work. | Frequency Executed, ‘Remark Tact generator star fom he bate veld sng ung matnance (wove bakery | —Fotghy/ + terminal +Ve-Vo) ‘Menthty, Dowe 2 hook bate otage and record eacng Fowriy! | Douc | IR2v 7 - 2 meet eee Sp ee remy’ | oui 4+ fropen nt ato cc pct ay gg anyabromaliy ae wsinan 25) | Fatman? | Se baer inal and tr cs connec fr corel and weak ines, cy | Foi s Rekbatey Dowt Chul webby hd [Check enuniaorpanl and themostat conezton, Fear! |S) our 7 Check ATS pane ors conection, tse ove, VR ating, mare stngs. Rect any| Format? |), abnormality ‘Monthly: “ &Ueearcomantvecim canst can gtr ee eomcerbearens | aan’ |S] oa, 2 + esse epson by ri ragige” | Dow 10 [Run generator with oadiwithout lad and check. Foamigtty! | owe 11 [asta te cacti votge ond cot Few | Done] ye sy 12 ck gomtr ougeng tgs nea renin | Dove] Gusv 13. mek gener dor currtandecr rome |] 0 8 14 [onasoun gnetor end cd tu met edng reppin | Dand 22rd 15. |Enure he goer ich nat poston Fossahiy! |" Dow nore Eien Tecncin | Becca Foeman |, CURB SRBOT IEG. Tracer nchaaeatrner Reena 4y ee we ee Ne x Fon No: FDST-HNESORE RO QatarEnergy PREVENTIVE MAINTENANCE (ELE.) DWTP - CHECKLIST DOCUMENT REFERENCE: WP/MICIQAQC-0046/22 fall Contract No: GC21105800, Contract Title: OPERATION AND MAINTENANCE OF SEWERAGE SYSTEM ‘AND TREATMENT FACILITIES AT MIC tecatin: LOI 7,7 coer FeederTagNor Jio “dep [b/S, 02 WW 3627 No. Equipment / Description of Work Frequency | Executed Remarks 1 MOTOR CONTROL PANEL © eptperlocautanstagsur ocete NASHPAY FEIN] easy | Doni » [check tightness of Isolators, Fuse unit McB.MPCa, MCB, weety | ooue | Al) Poog on © —_|Enoure genera clearing of contol pane! werty | nowelc hee ee} 4 [check Power Fuse and control use wor | pow Ie locked © Pigeiporeenacor eng susan conscarcaetanmers Tyg | oon + |oneck slay and Thermal overload relays settings weety | Doni [check a contol relays and Times function weeity | Dowe h | check alt power circuit and control circuit cable tightness weekly | DoE i |check CT & PT tightness. weekly | Don j_|Check panel heater, tightnss and function weekly Done TiGhteh- cd nn Note: |SAFETY: Ensure the motor is Isolated before any maintenance is carried out. Etectical Technician | electrical Foreman | @NacEngineer | Facies Incharge pameteneroy Oh | owt | 6 bv Form No: -FO4S-JUNE2022-RO PREVENTIVE MAINTENANCE (ELE.) DWTP - CHECKLIST ¢ DOCUMENT REFERENCE: WPIMIC/aAaC-0048/22 pea) Contract No: GC21105800 Qatar: Aer Contract Title : OPERATION AND MAINTENANCE OF SEWERAGE SYSTEM AND TREATMENT FACILITIES AT MIC location: A257- Zrlb woovk Dod B5™-10718 JA 39 XSEM BOD [OWRD [HIS Kw:|)2, 3 3 O12 |Motor Tag No: Yor pm: 20-22 J40F -c1sm 21] Ach XB Em 2A-2B 9 No. Equipment / Description of Work Frequency | Executed Remarks 4 INDUCTION MOTORS Isolate the motor from the power supply and control supply @ and respect to a proper lockout tagout procedure Weeky | Dow b _|Clean and tighten cable connections of power cable, Weekly | Powe clean motor & Open the motor fan cover clean fan and © |Check the cooling fan condition Weekly Dow 4 | check motor proper earthing connection Weekly | Oswp- e {Cable gland earthing found ok Weekly | pom visual inspection Motor Abnormal sound And temperature £ lehecked ver Welly | awe |Local / remote emergency push button control tighten > h | SReckea Weekly | None Note: |SAFETY: Ensure the motor is Isolated before any maintenance is carried out. eiectiea Tectnician | eleteal Foreman | aNOCEngincer | Facies ncharge | ,QHMENay Rian ZB bw Form No: FO4S-JUNE2022.R0 PREVENTIVE MAINTENANCE (ELE.) OWTP - CHECKLIST ¢ Dicom een: wma auiktest Contract No: 621105800 Contract Title : OPERATION AND MAINTENANCE OF SEWERAGE SYSTEM AND TREATMENT FACILITIES AT MIC fswaton: Yo? CAlrrvnaddn Bs$iem pate: & 9.4 fee tagnes AST POTD] Lm SAS LIT PIAA yes, 6509-3 No. Equipment Description of Work Frequency | Executed Remarks 1 MOTOR CONTROL PANEL |'solate the feeder trom power supply and control supply respecting [2 proper lockout and tagout procedure wey | Dove > |oeok tightness of soars, Fuse unitMCB.MPCB, MCCB, weety | powe \AN furr © [Ensure genera cleaning of control panel weetty | Dow's. | Chomina, a [cheek Power Fuse and contra fuse weary | Dove. [Choched] (Check power contactor and & aunilary contacter cable tghiness, land clean contacts using GRC wey [Done | check al + [Check relay and Thermal overioad relays settings weekly | Dawe. [Check all contol relays and Timers function woetly | Dona h__ [Check al power crit and contol crit cable tightness weekly | Dona. i [Check CT & PT tightness weekly | Dow. i [hook pane! heater, tghtnss and function wety | Dong | cho chwl te _[Bheckandclean Voaiaton fn, atau en and clean the a weet | Donte. Note: |SAFETY: Ensure the motor Is Isolated before any maintenance Is carried out. QatarEnergy Electrical Technician | Electrical Foreman | QA/QC Engineer Facilities In-Charge renee cher Wor a K y Form No: FO46-JUNE2022-R0 PREVENTIVE MAINTENANCE (ELE) OWTP -CHECKLIST ¢ «€ WABAG DOCUMENT REFERENCE: WP/MICIQAQC.0045/22 “gata ys Gatareaers Contract No: 6621105800 Contract Title : OPERATION AND MAINTENANCE OF SEWERAGE SYSTEM AND TREATMENT FACILITIES AT MIC boswton: got Chlovinalicar Bydtem paw: £/3 ay IMotor tag no: 127 707° (19-1018, [104. peo 30-38 fhot-pm APB rene 2 65-5 a Equipment Description of Work Frequeney | Execute Remarks 1 INDUCTION WoTORS + femaenreertonnssem emeretemmteney | way | Jove c. [Clean ane tighten cable connections of power cable C loaning « foamtkgmemseowsmines [aay | Dove «-_|cneck motor proper eating connection woo | Dove lopecked 1 [Cable gland earthing found ok weery | Dove o_ [Yeitinseetontr Aine aouaénttmpertze | ey | Jian 1 bsatamst enegeney push bton contin west | Powe Wot: |sAFETY: ensure the motors isolated before any maintenance I cared out vette Tehaan | eerie Fromm | AGC Enger 7 Jer weer I3 y Form No: FO4S-.JNE2022-R0 Sates 8 PREVENTIVE MAINTENANCE (ELE.) DWTP - CHECKLIST DOCUMENT REFERENCE: WP/MICIQAQC-0045/22 ‘Contract No: GC21105800 Contract Title : OPERATION AND MAINTENANCE OF SEWERAGE SYSTEM AND TREATMENT FACILITIES AT MIC KR wavnc | Feramit flocation: 7 30- Preabiin Taak Date: "f - 3 dy [Motor Tag No: ABO- Mm. /00, Jol/ 7 9e — wm. 2.00- Do] No Equipment / Description of Work Frequency [Executed [Remarks MOTOR PANELS [isolate the feeder panel fom power supply & control supply and ensure a [Prope lockouttagout procedure Monthly |Dowe [Check tightness of isolators Fuse unt MCB.MPC8, MCCB Monthly | Dowe | py) fee ex [Ensure general cleaning of the contol pane! Monthy | Dow a [check Power Fuse and contol fuse continuity Monthiy | Dowie [check power contactor and auxilary contactor cable tightness and lean thelr [eontacts using CRC Monthly | Dowe [check Thermal over load relays settings montty | Done (Check al conto olays and Timers function. Monny | Dowe heck all power circuit and contol crcul cable lightness. (check indication famps, push buttons.selector svteh if required replace Monty | Dowe J [eneck or & Prtighiness Monitiy | Dow/e [Check panei heater tighiness monty | Pow 1 [Check & clean Local contro! isolator, control switch lightness and function. Monty | Poni mm [Release emergency push buttom and check control creut for proper warkhg | monty | Ove CAPACITOR UNITS: [Ensure cepactor is ischarged monly | Pons b_ |checkat connection tightness Monty | Soe | Tighten. |Check capacitor fuses. Monty | non |SAFETY: Ensure the feeder is Isolated before any maintenance is carried out. INoTE: Electrical qociaicien Electrical Foreman, QNC Engineer Facies in-charge atarEnergy Ober ware te Form No: FOSDUNE2022.20 6 Sibi yh 8 QatarEneray PREVENTIVE MAINTENANCE (ELE.) DTP = CHECKLIST DOCUMENT REFERENCE: WP/MIC/QAQC-0045/22 Contract No: 6621105800 Contract Title : OPERATION AND MAINTENANCE OF SEWERAGE SYSTEM AND TREATMENT FACILITIES AT MIC que jw locaton: 92- Dy pation Lani IMotor tego: 42.0- in. 100 fo), /p32- m1 \ho0.do Frequency [Executed [Remarks No Equipment / Description of Work 1 INDUCTION MOTORS [slate the motor rom the power eupoly and central supply andrespectt© | wsngiy | spov/ la eproper lockout tagout procedure onthy |Open motor terminal box and Check cable termination for any sign of io © overheating, looseness and water ingress. Monthly | Dome c. _|Clean and tighte cable connections of power cable Monthly | Dowie | C femme, 4. |Check winding resistance, insulation resistance Monthly | Dow e ean motor & Open the mater fan cover clean fan and Check the cooling oes mar Monthiy | Powe 1. | Check Motor Earthing Connsction Monthly | Dove Note: |SAFETY: Ensure the motors Isolated before any maintenance is carried out, ‘GatarEneray Electrical Technician | Electrical Foreman ‘ansac Engineer Facilities lnharge | Representative wer 5 Foxm¥o: FOASSUNE2022-80 PREVENTIVE MAINTENANCE (ELE}- CHECKLIST DOCUMENT REFERENCE: WPINIGIanaC 0006I22 ‘antec Wa: GCETTORRDD Contract Tite : OPERATION AND MAINTENANCE OF SEWERAGE SYSTEM AND TREATMENT FACILITIES AT Mc. ~ olin tow locaton, ABO ~ Nor ats "3 -Dty fragrumter, ADS” MM: 100, 106] h3o- MM dooce) — Motor Wining nultion Results No.1 Motor Mega No.2 Motor No.3 Motor NOIMobri, ° Mega nega @ Remarks Pee | peoomn Looms Looom-n. Joon Pree poco. Looe mo Wwoomn | joooment PEE | ovome | jooomn | tanom (osm. Noto Winding Resistance Reauts No.4 No.2 Nod NO Moioy woe a woer a moor a he emarts Rey | og} ok oe a ves — Or Oye O30 Pee oa | og Oye Ong Motors cures wadoge Wot Wier | Wo Waar Noster Je japy ‘ama ‘ame ‘amo i Remarks R | gpza | ROS am] 26 Tanps QT:0 mys . 238 ph Qp- Shr 2b. Seoph | a4. omy 8 QB pn Qb sip, Ab: 6 Amps | QR shop) Measuring Equipments Detae Calbraton Deas ITORTEU AGDG CLAMP TER on [catbue 03,2023 Due Dat 08-2024 ORTUINGULATION TESTER KEVOSSIBT [catbate-onjoy-2023 Due Dae 08 uy. 2024 {APETY Ener mtr red lr any maence cae ou frre Hectrical Technician, Electrical Foreman QA/QC Engineer Facilities inCharge QatarEnergy ge NOY ie ~~ ” Form No: FOS6-JUNEREZ2 RO PREVENTIVE MAINTENANCE (ELE.) DWTP - CHECKLIST DOCUMENT REFERENCE: WPIMICIQAQC-0045/22 Contract No: GC21105800 E Wa pac | Boy Gaull TO | contract Title: OPERATION AND MAINTENANCE OF SEWERAGE SYSTEM QatarEnersy [AND TREATMENT FACILITIES AT MIC J Location: J32- Sovew pimp date: 73°24 (Motor Tag No:_)Q0- C 2-2/,22, 03 No. Equipment Description of Work Frequency lexecuted |Remarks MOTOR PANELS 1 ft eaerrane for pve sup & cn spenders a wonny | Dowe b [Chock tightness of Isolators Fuse unit MCB,.MPCB, MCB montny |Pow/e | O// fs eee ¢ —|naure genera cleaning of he contol panel Monty | owe 4 [eveck Power Fuse and contol fuse continuty mortty | Dove | Chocheod + Gee omrcmacercmninm sane Tey [Dove |chchad f [check Thermal over load relays settings. Monthly | Dov & 9 [ereck a corrt relays and Timers tncton, Monthly heck a power creut and contol cut cable tightness Monty | Dane i [Check inleaton lamps, push butons selector sth required replace monty | Do we. i [Check CT & PT tightness. Monthy | Deow/E> k —_|Check pane! heater tightness. Monthy | Don/e 1 |heck & clean Local cont lator, contol eich tightness and function Monty | Dawe mm |Release emergency push buttom and check control circuit for proper working Monthly | Dow ‘SAFETY: Ensure the feeder is folated before any maintenance is carried out, INote: ‘Teniten Electrical Foreman QA/QC Engineer Facilities in-charge Ropar Pe into 7 Form Wo: FS0-JUNE2022-R0 PREVENTIVE MAINTENANCE (ELE.) DWTP - CHECKLIST DOCUMENT REFERENCE: WP/MIC/QAQC-0045122 Qataren ‘ay A Slbiyb 8 Contract No: 6621105800 asi Contract Title : OPERATION AND MAINTENANCE OF SEWERAGE SYSTEM ‘AND TREATMENT FACILITIES AT MIC Gun location: §430- S OVew pump Date: “JS IMotor Tag No: 30+ m7 01,02,03 No Equipment / Description of Work Frequency [Executed [Remarks INDUCTION MOTORS FeV leolate the motor from the power supply and contol supply and respect 10 | saan 3 Ja aproper lockout tagout procedure yO lopen motor terminal box and Check cable termination for any sign of w & [evemeating, looseness and water ingress. Mentiy Dow | co heestac! eu . [Clean and tighte cabie connections of power cable Monthy Tightens 4. check winding resistance, insulation resistance monty | Dave | Poome oe Iciean motor & Open the motor fan cover clean fan and Check the cooling Dene ® fan condition Monthy | Dowiz_ 4. |Check Motor Earthing Connection Monthly | Dane Note: |SAFETY: Ensure the motors Isolated betore any maintenance is caried out. GatarEneray Etectical Technician | Electrical Foreman awac Engineer Faciities Inparge | Representative Shr | yo i Form: FO45-JUNEZ0Z2-80 PREVENTIVE MAINTENANCE (ELE.)- CHECKLIST |= - «KK WABAG \CUMENT REFERENCE: WP/MICIQAQC-0086/22 | an ; ‘Contract No: GC2TT0S000 Garare sos | contact Tite: OPERATION AND MAINTENANGE OF SEWERAGE SYSTEM - AND TREATMENT FACILITIES AT MIC location: 30- Sewow pump fagmmber: 30° CPt 01,01, O% Motor Winding insulation Results Nos Motor Mega | Wa Wotar Na} Wotor Wega] Wo Wotar a Mega 2 2 Megan Remarics Rae Joe mc] Leeoms | Jom vee [ooo mx oom | Joo mm Bee y fooomy [O00 m—~ Se Motor Winding Resistance Resuits No.1 No.2 No.3 Nos ‘Motor ote 0 wor 0 Motor a a | Reman Ray ots 6.85 Orbe yas . CG oes | Boe 7 BERT gq CSS | oan | Motors currents readings No Wotor Noa Wotor Ames] Wot Matar Not Motor amps ant Remarks r | ta x) laa Y f lea (ea tae Zz PL lea (6a We ‘Measuring Equipments Details Calibration Details. [KVORITSU_AGIDC CLAMP METER 2066 [cat Date -03-tly2023 Due Date -03-Juy 2024 {KYORITSU INSULATION TESTER KEW35626T cat Date -03-Juy2023 Due Date -02-Juy-2024 [SAFETY: Ensure the motors isolated before any maintenance is cartied out. Electrical Foreman ‘QNAC Engineer Facilities In charge ‘GatarEneray Representative poo {% oe ¥ Form o: FOBSSUNE2022R0 PREVENTIVE MAINTENANCE (ELE) NOWTPCHEGRLST = Qa - een one aREEee — RE wrvre Packmes ar wie fection: Lot. Camel frlivedion 3ySteun Date: F3AL Meortapne: 4oT- prr- (80/121) 182 (83 [pot Ke O18 1 1B wwe SS = aupment Orin o Work Frewwncy | Executed Temarks 7 WOTOR CONTROL PaNeL 2 ES reales as Tapa wows | ore [Chock tghiness of ealator and Fuse unk MOB MPC, MCOB, Monty | Dove [An fy. OA [Chock Power Fuse and contol fuse continuity if requked replaced fused Monthly | Dowie eRe Poe cane an Kaa cotaior sake ines an Sear CTS THPG | — Yor | Dowie | @ ho DO re) 1 |Ohedc UM 22 ety and Thermal ove ad eay etngs wontty | Dome | Cha clval (Cok a cont lays and Toes ineton Monty Done 1_[Seck et power cult and contol cel abe ighness monty | Dow i [Check CT & PT tightness Monthly | Dow 1 [eek pane net, temo ighiness and uncon wontiy | Dove Wo | 1. [Visual checking of VFD panel for dirt or moisture signs Monihy [Dove 2 |Ceok a ccaton ten wring, eau fans cen fre Monty | Dene. 3. [Clean VFO panel using vaccum cleaner [Monthy | Bone 4 [check VED input ac voriage Monty [ewe | Ou '5_[eheck VFO output ac votoge Montrty [Deve | 2a y 6 [Check de voltage forthe VFD DC bus Monty | Done | Gog 2 7 _|Gheck Power cle ard cont cae hres Mentiy | Done [eck orn vaton ae noe Monty | Donic 9 check proper earthing of the VFD Monthy | Dow | Choob< cof 10 [Ensue cooing system ie propery working inthe VFO contol Pon! Monty | Dow ‘SUBMERSIBLE WOTOR 2 [Gen and gh cal tras comectons of ower cols hemor kate cabes | wendy | Dani 1b [Check winding resistance, insulation resistance Monthly — | ‘Done [check termostat resistence value or open &ciose condition Monthy | Deon & | TOT CRANE 2 chock operating sytem wonany | Dew [eck mover ard mts sichs incon Monty | Dene (Check cont eices ard cable laa monty | Bowe 4 ek metor for any abecrmay wontiy | DowA wore. SAFETY: Ensure the motor is Isolated before any maintenance is carried out. _ Electrical Technician Electrical Foreman QAIQC Engineer Facilities In-Charge | QatarEnergy Representative oe for | BS | = rm No: FO47-JUNE2022-RO ase PREVENTIVE MAINTENANCE (ELE) NDWTP - CHECKLIST «KK ¢ WABAG atl DOCUMENT REFERENCE: WPIMIC/aAQC-0045/22 ai renerSY ‘Contract No: Go21105800 i at Contract Tile: OPERATION AND MAINTENANCE OF SEWERAGE SYSTEM AND TREATMENT || "AZ ERES CD FACILITIES AT MIC foeiton 4o9- Sand f7l]rration Sydier ae: (51 | B\24y agnor ot ~ Par- Igo, ler, 182, 10S, hoT- KH O14 018 hw Ae, 15 No, Equipment / Description of Work Frequency | Executed Romarks. 1 INDUCTION MOTORS. T Isolate the motor from the power supply and control supply and respect toa ‘aproper lockout tagout procedure Monthly | Devve- © Sraeing oosras and wetness: nny Sant Monon | Dorie «. [Sieanand tai cbt comosion of por cbs, emosit & hstr wortiy | Donte e Let em naan tn cope ate tn Monthly | fone clean motor & Open te moor fan cover lan fan and Check he colin fan 4 conaton Monty | owls 1. Joneck motor for proper earthing connection Monty | Dore. WNote: 'SAFETY: Ensure the motor is Isolated before any maintenance is carried out. Electrical Technician | Electrical Foreman QN/QC Engineer Facilities In-Charge _| QatarEnergy Representative ake [we iG wy Form No: FO45-JUNE2022-RO Page 2

You might also like