PREVENTIVE MAINTENANCE (INST.) NDWTP - CHECKLIST ¢ DOCUMENT REFERENCE: WP/MIC/QAQC-002 seed Contract No: 6623105600 Contract Title: OPERATION AND MAINTENANCE OF SEWERAGE SYSTEM AND TREATMENT FACILITIES AT MIC LOCATION: AERATION TANK - N- DWTP DATE: 9 - 39% ‘m Activities: Frequency | Executed Remarks D.O ANALYZERS, 1 |(407-QrT-411, 407-QIT-431, 407-QIT-421, 407- \QrT-412, 407-QIT-422, 407-QIT-432) yoy O17 - 40) a |Clean the sensor and check the reading Monthly | one dvemgly ¢ _|Check any error in the programme and rectify if required.| Monthly |Done [yoy wyr- 4a d__|calibrate the analysers Monthly | Done tab mal) 2 MLSS (407-QIT-441, 407-QIT-442) a__ Clean the sensor and check the reading Monthly | one. [Check any error in the programme and rectify if required.| Monthly | pono, Every 3 d__ |calibrate the analysers month | Done 3 | pHANALYSER (407-QIT-401, 407-QIT-402) a |clean the sensor and check the reading Monthly | Done |yori—-@rr- kel ¢ [check any error in the programme and rectify ifrequired.| Monthly | pono &4 PH Every 6 ~ d__ [Calibrate the analysers ‘worth | Done. AMMONIA ANALYSER (407-QIT-401A, 407-QIT- 402A) a |Clean the transmitter. Monthly | done |Ao1- vr horn b _|check its Readings Monthly [5,0 tel aly Icheck any error in the programme and rectify if © lrequired. Monthly | Done Every 6 ci nal d__ {calibrate the analysers month | Done. SAFETY: Ensure the motor is Isolated before any maintenance is carried out. NOTE: Instrumentation | Instrumentation . QatarEneray Technician bali @Agcengineer | Facilities In-Charge peneceneative Saravana Yura SHARAFUDEEN | BABU MALADATHU |SHAMEER ABDUL KAREEM| Meta * So! ff § U7 Form No: F065-JUNE2022-RO Page 1 of 1 PREVENTIVE MAINTENANCE (INST) NOWTP - CHECKLIST REE | contact les openaTion ane Haantenaner or sewenace svsrew ano | SRGIRAGT TREATMENT FACILITIES AY MIC LOCATION ‘SAND FILTER & COMPRESSORS -N- OWTP Date? SS ap em neti Freqwency | Executed Remarks 1 MAGNETIC FLOW TRANSOUTTERS (407-FF-206, 407-717-209) neck an caret no pa vrei mean ror ine pogranme and ey eure ot vec acre ean acy. wey [pone |koy- FYY- 204 4 [ete the Transmttar wey | Bone Sat w/b «eect Rens we | pone. 2 prassuns anvees ocean the aunes wey | Done. 0 [ereccne operate, wey (Done. 3 PRESSURE TRANSMITTERS (407-PIT-002) 2 recs an spon ae dot - PIT oon, + [oe oormame way | Done. 53 bo <¢_oheckits Readings weetty | Done ‘ Level TeANSMUTTERS (407-UT-34) 3 [tncang Graz ard a, an sree ety bb |check any error in the programme and rectify if required, wey [Done hot -Lir ~ iy [Clan the Tansouer wos Done. | avon 4 [event hadegs wear Fone. : Leva capncrranen (40740-126) 1 xeccan core sean 9, den senor. ent > eae on ror inthe paroner and rect recurs tenis «ican the Transmitter wey | Done. 4 [eect Rags wey (Done. ‘ Tana Ainodsveren (as7-ecr-o02) 2 [oan at etectrs and panels ory [eect the operat, watt [Done [elon ond ene he baer and sensors of fir lam sstem ony 4 tea ane eeck the OFC unt weaty [Done tose an check ne eater ncn bees ety ? TM DETECTORS 2 fects opeanene wey [Done . sano rrren conrots a fenecee eaten of snd er one ut weer pone © roman an serene ain aes wee [Done. «fan te compere wea | Done. 4+ feneeene ressure gauges, rnsmiter ad woking weer Done. tec ning Tengestie wer Bone. + [eteanen beck re. pane wey ‘Bone o_loconatttmeeers wesw [Done SAFETY: ensure te motors ied Defoe ony ranienance aed oa NOTE: ‘aerunesttee Yenc | _Jneeunerneo omen tC nce roams ora KSmavara vores |, samen fasunacaoaray | SHANE ARDULKAREEN Mm: Ff Soot 6 be Form No: FO61JUNE2022-RO Pega t oft PREVENTIVE MAINTENANCE (INST.) DWTP - CHECKLIST ¢ . DOCUMENT REFERENCE: WP/MIC/QAQC-002 «&€ WABAG A Contract No: GC21105800 Sornuse fit jb_ a QatarEnergy Contract Title : OPERATION AND MAINTENANCE OF a 2 ‘SEWERAGE SYSTEM AND TREATMENT FACILITIES AT MIC LOCATION: SAND FILTER & COMPRESSORS - E- DWTP- DATE: 4-3-2) em ‘etivities Frequency | Executed | __ Remarks 1 | MAGNETIC FLOW TRANSMITTERS 407-FIT-2098 a [check and correct zero & span. Monthiy b_|check any error in the programme and rectiy ifrequired. | Weekly |oone |Jyp}-FrT-2099 c_ |Check the electrode cleaning facility. Weekly [pone Isomelh 4. |clean the Transmitter weekly | pone. © |check the Readings weekly | pone. 2 _ LEVEL CONTROL - 4, [eek the ental operation by rising and lowering wet | onan wet level clean the dip tbe using by compressed air weetty [pone c._ felean level Control unit and Check reading weekly |pone, 4. [Service and lubricate air pump. Monthly 3 SAND FILTER CONTROLS a [check the operation of sand fiter control unit Monthly > orain and clean Electronic drain valves weet pone. * ¢ |Clean the compressor weekly [Done | _ Suicdel wiolimc Gousiiny otfive) 3-25 No. Equipment / Description of Work Frequency | Executed Remarks 1 PRESSURE SWITCH a |Clean & Check the Pressure Switch. Bi-Monthly | dono b [Check its working. Bi-Monthly | pono. [Check its cut Off and cut On. BiMonthly | Done 2 PRESSURE GAUGES _ ‘a |Check the operation and clean the pipe. Bi-Monthly | Done iCheck pressure gauges for any defect and abnormal © reading Bi-Monthly | Hone 3 _FLOW METER a {Check any error in the program. Bi-Monthly, NA b |Check any loose connection in Meter head. Bi-Monthly No Check flow meter reading of equalization for any © abnormality. Bi-Monthly NA Note: \SAFETY: Ensure the motor is Isolated before any maintenance is carried out. 7 Instrumentation | Instrumentation | Pumping Station and y Qatarénergy Technician Foreman | ysitenance conranator | Pocutes #R-ChArGE | Representative ZAHOOR AHMED SHAMEER ABDUL PRASAD Karavang Yorray |SHARAFUDEEN KHAN KAREEM GUNASEKARAN fot mga t | Saber Ge ¢ We ¢ U Ly Form No: F090-JUNE2022-RO Page 1 of 1 PREVENTIVE MAINTENANCE (INST.) P.S. - MONTHLY CHECKLIST ¢ DOCUMENT REFERENCE: WP/MIC/QAQC-002 | GR wasas erty Contract No: GC21105800 Contract Title : OPERATION AND MAINTENANCE OF SEWERAGE ‘SYSTEM AND TREATMENT FACILITIES AT MIC Serna meat “ibn: Ge. Mips ~ DATE: 5 ~ 3-94 Activities Frequency | Executed Remarks 1h [Check all Paten panels. - monty | Done — 1 [cheek at opte ethernet converters. entty | pone 5 |onece Versamax Gentus niu month | pone i |ctean and check the OFC unit Monthiy | Done 6 CCTV CAMERA [check the operation wonthiy | Dono. (clean and check the working of Encoder Monthly | Done. c. _feneck the working of Optic /Ethernet converters. wrontty | pone. 4. [Clean camera and connection terminals wont | none. e [check the camera cleaning water level.efili#itnecessary | enthly | ono 7 OUTLET FLOW METER 1 [oiean and check the transmitter won'y lone [jie — Fr — 00) [check any errorin the program wont | Done. 51 3/p . _ foreck any loose connection in Meter head wonty | Done 4. [check fow meter reading of equalization for any abnormality Monthly | Dono 8 DEODORIZATION UNIT 2. feheck all instruments, pipe work & pipe connections monty | Done. v._ fete eotonaton ant anaer and cbse fr any rus venir | nome. |SAFETY: Ensure the motor is Isolated before any maintenance is carried out. INoTE... Instramentation Tstrumentation | jarworkoperovions & | Fact Incharge | QutarEneray Representative etonance Coordinator SmtaNang Yornar | ‘SHARAFUDEEN ZAHOOR AHMED KHAN | SHAMEER ABDUL KAREEM | PRASAD GUNASEKA! QW F991-B-JUNE2022-RO Page 2 0f2 PREVENTIVE MAINTENANCE (INST.) P.S. - MONTHLY CHECKLIST DOCUMENT REFERENCE: WP/MIC/QAQC-002 Contract No: GC21105800 Contract Title : OPERATION AND MAINTENANCE OF SEWERAGE ‘SYSTEM AND TREATMENT FACILITIES AT MIC EK wrvrc Serna MIPS -% [pate 5 aay Activities Frequency | Executed Remarks LEVEL CONTROL - - |cneck the control operation by rising and lowering wet wll evel Done |g —taT — 001 team the dip tbe using by compressed ar Done. Iegqan {clean and Check level ransmiter reading Done. lash the electrodes mith mash water et without removing the some Done. PRESSURE GAUGES & TRANSMITTERS Check the operation and clean the pine nontly | Done ck nung ese sass or orontestorany dete | gentty | ong pert anne or wrnites when ume ning andrea | oy | Done WASH WATER SYSTEM | lcneck start and stop lvel asst if necessary wontny | Done check te arin the bladder il it necessary wont | pone FIRE ALARM SYSTEM check the operations worthy | Done. eck the batery voltage ony |yone. \cneck 200 Panel and its operations Noathiy |ciean and check the smoke detectors monthiy | DONE. Liean and check the HSSO unit | onthiy Pic | {lean and Check the operation worthy | Dong \isual inspection of LC system and check for abnormality, wont | none {check the CU and its working worthy | Done, cheek the power supply unit wont | Don lcneck Genius Bus controler monty | Done. leneck ethernet Nocule wert» Song. loneck Ht pane ont” | Done F091-B-JUNE2022-R0 Page 1 of 2 PREVENTIVE MAINTENANCE (INST.) NOWTP - CHECKLIST RK wars DOCUMENT REFERENCE: WP/MIC/QAQC-002 Contract no: 623105800 Sou @atSH!A5%=? | contract Title: OPERATION AND MAINTENANCE OF SEWERAGE SYSTEM SIRES [AND TREATMENT FACILITIES AT MIC LOCATION: CHLORINATION SYSTEM = N-DWTP va: 5 32h = Activities Frequency | Executed Remarks ‘HILORINE VACUUM GAS METERING SYSTEM (407-V6DS-001, 407-VGDS- 1 | 002, 407-va0s-003, 07-vas-008, 407-Ve0s-005, 407-VaDS-006, 407- we0s-007, 407-VG08-008) lene tne operation auto and hand ony © feneck or oa ak weety Done 2 ‘CHLORINE ANALYSERS (407-MCS-001, 407-HCS-002) Gea he Analyzer an checthe funcrons weeiy [Done beece zero ane pan, weeiy Done [en ts fer asng water wey [Done 3 ‘LORIE FUNE DETECTOR ‘a |check sensor, check for any capillary blockage Monthly | [erect tae detection and senstivy. Monthy a [emmoney-a08, 407-Sv-009, 407-9V-040, 407-9V- 011, 407-90-012) || acon and cnc te worn wey (Done feck tor gas eo 5 ACCUM REGULATOR (407-VR-003,407-VR-002/407-VR-003) a fock tr 92s tak weeey [Tone 6 PRESSURE GAUGES ten and check te operation weary [Done tan a te ters of asin ine weetty | Done. 8 LEVEL TRANSMITTERS. (407-L17-200) 2 hace ond corect zr and span, clean sensor vent 1b |oneck any error in the programmer and rectity i required, Monthy Aot-LIT~ 200 _{olean the Transmiter weewy [Done 2.43 ened the Resengs weesy [Dono 8 FIRE ALARH SYSTEM (407-F6P-003) 2 [Clean al detectors and panes. Henthne [check the operation wesk'y [yn € _|otean and check the operetion of FM-200 pane! onshy clean and check the operation of HSSD week'y [Done fe _|ctean ts fiter Mone 1 [clean and check the battery of fire alarm system weekly | Done. 4 [Clean and check the OFC unit weerty |Done th |ctean and check the smoke detectors and heat detectors weery | Dore so | MORNE WEIGHT MEASUREMENT SYSTEM (47-17-00, 407-002, a ovect any eror one programmer and recy requred Morty _[eneck and corectrescing Moriy n ruc 2 foean ane creck tne Puc ony > fear ts working sere feck tne KM and carat the dpa needee only [5AFETY: Ensure the motor Isolated before any maintenance is cared out. Tostrmentation Technicon | Instrumentation Foreman ‘GAC Ensineer Facilities in-charge | Qatertreray Represeyttive| Savavana kormay | 6 ¢ x U . A mesh be |= Form No: FOB2-JUNE2022:Ri Page 1 oft CHECKLIST PREVENTIVE MAINTENANCE (INST.) IRGG. P.S. - DOCUMENT REFERENCE: WP/MIC/QAQC-002 Satare Contract No: GC21105800 Contract Title : OPERATION AND MAINTENANCE OF SEWERAGE SYSTEM AND TREATMENT FACILITIES AT MIC RK morc ART MCTS Location: IRRIGATION PUMPING STATION [meseieed Media contye Date: 06.03-2 Network Operations & Facilities In-Charge T No. Equipment / Description of Work Frequency | Executed Remarks 1 PRESSURE SWITCH a |Clean & Check the Pressure Switch. Bi-Monthly DowE b [Check its working. Bi-Monthly_ DowE cc [Check its cut Off and cut On. Bi-Monthly | po we 2 PRESSURE GAUGES a |Check the operation and clean the pipe. BiMonthly |p. 9 [Check pressure gauges for any defect and abnormal] o, wontniy | Dowe reading 3 FLOW METER a. |Check any error in the program. Bi-Monthly | jy /4 b |Check any loose connection in Meter head. Bi-Monthly | jy |Check flow meter reading of equalization for any ol . © |bnormality Bi-Monthly |» /4 Note: SAFETY: Ensure the motor is Isolated before any maintenance is carried out. Instrumentation | Instrumentation Pumping Station and QatarEnergy Technician Foreman | saintenance Coordinator Representative ZAHOOR AHMED ‘SHAMEER ABDUL PRASAD Navan (au etc] SHARAFUDEEN KHAN KAREEM GUNASEKARAN Mw af Saya: &. f joy Form No: FO80-JUNE2022-R0 Page 1 of 1 ¢ PREVENTIVE MAINTENANCE (INST.) NDWTP - CHECKLIST DOCUMENT REFERENCE: WP/MIC/QAQC-002 Contract No: GC21105800 Saearltinay Contract Ttie : OPERATION AND MAINTENANCE OF SEWERAGE SYSTEM AND TREATMENT FACILITIES AT MIC LOCATION: INLET WORKS -N- DWTP DATE: G- 3-2) a Activities [Frequency | Executed | Remarks 1 [MAGNETIC FLOW TRANSMITTERS (407-FIT-20%, 407-F1T-202, 407- | rr-203) 2 [oiean and check te tronsmitter west lpone laoy- €1T-20) »lereceard comet zero & san “Morty (as nlp €|oveck ony err in the programme and recy I require wey pone {yoy pur -200. 4 [creck the eicroe cleaning fei wonriy 451.3 8/h 2 | OPEN CHANNEL ULTRASONIC FLOW METERS (407-FIT-222) + forece and comet zero ane san, clean sensor Monts 2 fone ony errorin the aogremme and rect i requed. wety pone | Apt- Prt 920 <_ flea the flow channels wth mash wter et. omy 350 ly 4 [ocean ans eneck ene transrter weetty | pono. 3. | VETRASONEC LEVEL TRANSMITTERS (407-401"302, 407.01 a [oneckand correct zeo and sean cleen sensor. ern Avt- LOIN = 103 2 [exec any erorin the programme and rey Freques wey IDone | to aran «<_lean he channels wth wash water et omy lle | [clean and check te transmiter | wecky Done © 4 Pic a |ctean and eheck the Pic weet | Done. » [ene its working weaty | pone 5 OC UNIT(407-DPIS-001,407-DPIS-002,407-DPIS-003) | a feneck and conse zero and span, clean OPIS Monthy o_foneck the Reading weer | Dey ¢ [Clean and check the instrument junction boxes Mentniy 7 IsaFeTy: Ersure the motor is Isolated before ay maintenance is cared out. ot aevenictan | Tstzamentation | aac Engineer | Facilities 1n-charge 4 [avonana Yeornasy | SMARAFUDEEN | sasuMaLanaay | SHAMEERABDUL | peasan cunascn Ran Fos KX meat Sebo é a Qe ) Form No: FOS6-JULY2022-R0 7 Page tof 1 PREVENTIVE MAINTENANCE (INST.) DWTP - CHECKLIST, DOCUMENT REFERENCE: WP/MIC/QAQC-002 ¢ Contract No: GC21105800 GK rss Galil yo 8 0° QatarEnergy Contract Title : OPERATION AND MAINTENANCE OF SEWERAGE SYSTEM AND TREATMENT FACILITIES AT MIC LOCATION: AREATION TANK(430-T-02 & 03) & SCREW PUMP DATE: (430) PT-3-an Hers Activities Frequency | Executed Remarks 1 LEVEL CONTROL UNITS lwash electrodes with wash water jet of Effluent Pumping 2 |station wet well Monthly Ip one b_|wash electrodes with wash water jet of Screw pumps. Monthly | pone cc |Wash the electrodes with wash water jet Monthly | pone D.O ANALYZERS 1 |(430-23-AG0-001,430-23-AGO-002,430-23-AGO- 003) A380 -28-AG0-00 a [Check the reading Monthly | pon hal wal cc [Clean the transmitter. Monthly Done Ih 20-23 ALD-D0D. d__|Check any error in the programme and rectify ifrequired. | Monthly | bone 5.2. rly d_ [Calibrate the analysers Monthly | pong 3 RAS FLOW METER: a. |eneck tne reading Monthly | pone b. [Service and lubricate air pump. Monthly | ono c, [Clean the dip tube and check Zero and span. Monthly Done. d_ {Clean the transmitter. Monthly Done. ‘SAFETY: Ensure the motor is Isolated before any maintenance is carried out. NOTE: rostmician | Metzamentation | qngcengineer | Facilites in-charge | ,2marEneray | acaang Yower | SWARAFUOEEN | oapuMaLAparau | SHAMEER ABDUL | PRASAD, for way [see | A Se We Form No:F066-A-JULY2022-RO Page 7 of 7 PREVENTIVE WAINTENANE CNST) NOWTP CHEERLIST ¢ DoNENT ERENCE: WPNraARE a8 Knee BREA | conmace vive: openarion ano HaINTaNANCE OF SEWERAGE SvSTEM AND | SCRVIREET? onrey scneiee ee {LOCATION ;SAND FILTER & COMPRESSORS - N- DWTP Date: 4- B-9y an Activities Frequency | Executed | __ Remarks 1 | bane raw TRANGWETENS (@e7eI-aN6 4O74TaGD, 4O7-TORN) 5 {aches eee wore lpone hyp ger -20 © festenrerar ne grenade vue; [pone fh bites > th + eect von | Done. : presume onuces > foun ne caee won [Done a eee ey Hoon : PRESSURE RANTES (07-71-02) 2 foecanoantson wom lpone yor ~ prt ool momen wom [Done a = Veeaasasats eed ‘ Leven eaNSHETERS anya) 2 eneck on caec rand san clean sensor vestiy [Dome ygt-2¥T 1934 Sees room |Bone_[Reptay 2 fatse a ranonmer vera [DOE 4 [ocuteneaay vom Done, : aT 2 lock anecont ee atau sone veo | Done fyot-v0 18 ¢ [omasycosn we nomesnarnt any tages room Done [ppg See = « fonunescanee wee | pore. ‘ rane Aan ste (o7-466-082) a |ctean ait detectors and panels wenn [Done 2 femecmocnranen | seer [pons «Jomo on check tery an ser re lnm stem wea [pone & eeonanssreainore ne vom | Rone Been ican tan ne ran | Done ; wear oevecrons Slaten sales ° sano rurencontnots 5 | sect spear ten ter svete wows | pone = ssemecmaane aoe © fecormecmeene wero [ONE « [ocoene ance ge, rant mia von pone + uw nt te pn wow | pone Eater Gai he nw bial Daa ny Ee OT hove a SS Saravana \ereas so ous pom xanaen TN mere, WAY Form No: FO61-JUNE2022-R0 Page tof 1 PREVENTIVE MAINTENANCE (INST.) DWTP - CHECKLIST] DOCUMENT REFERENCE: WP/MIC/QAQC-002 ¢ Contract No: GC21105800 ddibl yh 6 Ys QatarEnergy Contract Title : OPERATION AND MAINTENANCE OF PORE ‘SEWERAGE SYSTEM AND TREATMENT FACILITIES AT MIC LOCATION: SAND FILTER & COMPRESSORS - E- DWTP- DATE: q9-3- a Rem activites Frequency | &xecuted | __nemarks 1 | MAGNETIC FLOW TRANSMITTERS 407-FIT-2098 ‘a |check and correct zero & span. Monthly: b |check any error in the programme and rectify if required. | Weekly ne Dome I rot- Fry -909A cc |Check the electrode cleaning facility. Weeki Y |done | ab 3th 4 |clean the transmitter Weekly | pone. eCheck the Readings Weekly | Done 2 LEVEL CONTROL check the control operation by raising and lowering wet 3 |well level Monthy b. [clean the dip tube using by compressed air. weekty {pone c._ lean level Control unit and Check reading. weekly pono. 4. [Service and tubrcate air pump. Monthiy 3 SAND FILTER CONTROLS check the operation of sand fiter control unit romehiy brain and clean Electronic drain valves weekly |pone [clean the compressor weerty |Done. 4 |check the pressure gauges, Transmitter and its working | Monthly fe |check the running Temperature weekly | Done. [clean and check the LCP panel week | pone g |Clean all Rotameters Montily SAFETY: Ensure the motor is Isolated before any maintenance is carried out. NOTE: Tnstrumentation | Tastrumentation QatarEneray ‘Technician Foreman QAQC Engineer Facilities In-Charge Representative SHAMEER ABDUL PRASAD SHARAFUDEEN | BABU MALADATHU , KAREEM unaseKaran \\ waver Wor] 5 Z ~ : Subir} Wf Al MSH = Form No:F171-JUNE2023-RO Page 1 of 1 ¢ PREVENTIVE MAINTENANCE (INST.) P.S. - Bi-MONTHLY (CHECKLIST DOCUMENT REFERENCE: WP/MIC/QAQC-002 ] ER wavas same Contract Nor 6C21105600 Cernaas Contract Title : OPERATION AND MAINTENANCE OF SEWERAGE SYSTEM AND TREATMENT FACILITIES AT MIC ‘Pumping Station No’ ips) bate: jo. a 24 Teme ‘Activities | Freaueney | executed Remarks ny leheck al Patch panes sero | one. 4 lcneck al optic ethemet converters surenthy | Done 5 |bneckversmox Genus tu sumenty | fone 1 [oiean and check the OFC unit | enon | None 6 CCTV CAMERA a. fomeck the operation serenty | pone b.|ctean and check the working of Encoder werent | Sone _loheck the working of Optic ethernet convenes semen | Done 4. ctean camera and connection terminals eeronty | Done «[Checkthe comer clearing water evelrefilif enecessory | BiMonthl | Tone 7 OUTLET FLOW METER | 2. team ache the ransmiter svwonty | on0 fone Er 00) b. _ |Check any error in the program Bi-Monthly. Done To. m?/p c_fonek any lose connection n Meter head werent | ono 46 esk Ron metering eFeeuaiaton foray abormaity. | sHeny | Done . DEODORIZATION UNIT 2. [check al instruments, pipe work & pipe connectors axon | jp) v igesewrtenuntnaerenebenerer amis! | saoty | JsaFETY: Ensure the motor i Isolated before any maintenance is carried out. — snaumertaton | nsuumemanon | guminesteners | uweomennge | gatrtneay Rpresenatne Sacovang forme) Stmroate | eawonsiee umn | eumenston ear | macros os nda} Sub G.. yw F091-JUNE2022-RO Page 2 0f2 PREVENTIVE MAINTENANCE (INST.) P.S. - Bi-MONTHLY ‘CHECKLIST ata yaa ‘Gatareteray DOCUMENT REFERENCE: WP/MIC/QAQC-002 Contract No: GC21105800 Contract Title : OPERATION AND MAINTENANCE OF SEWERAGE ‘SYSTEM AND TREATMENT FACILITIES AT MIC «KK WABAG Poona lo-3- 2» Pumping Station No Mp9 _ 1a. part Heme Activities Frequency | Executed Remarks 1 LEVEL CONTROL 2 feekte cont operation by rating andlowering met wetivel | a¥onthy Lone pa 149 Qo) b. —|clean the ap tue using by compressed air sven |Done | Dupiay fete «. _|etean ang check level transmitter reading BiMonthiy | None 4. |wash he electrodes with wash waterjet without removing the same BMonAY | Dono 2 PRESSURE GAUGES & TRANSMITTERS 2, [check the operation and clean the pipe BiMtonthly | j jy o, Ebeskall name pesue gauges ortansmtes remy e668 | auaoty | <._ Prete aaugsortansnits when pump unig andro | vent | 3 WASH WATER SYSTEM a. |eneck start and stop level adjust if necessary Bi-Monthly | Arp . loheck te arn the blader fl rnecessary s-wonthiy | yp) 4 FIRE ALARM SYSTEM 1a. _|cheak the operations aimonthiy | Done t.—|eneck the battery voltage seventh |p ono c. [check £4200 Panel and its operations srnontnly | Done 4. [clean and check the smoke detectors aitionty | Dong ¢{ctean and check the HSSD unit simonty | Done 5 pic a, [clean and Check the operation arnontiy | Done [visual inspection of PLC system and check for abnormality. sewony | none c._eneck the CPU and its working Biwenthly | pono 4. foneck the poner suppiy unit siontly | Sone check Geniue Bus controler aeentaly | one + feneck etnernet Module senontily | Done [creck Hit panel acwonthiy | Done. F091-JUNEZ022-RO Page 1 of 2 PREVENTIVE MAINTENANCE (INST.) IRGG. P.S. - CHECKLIST ¢ DOCUMENT REFERENCE: WP/MIC/QAQC-002 Gaterteray Contract No: GC21105800 ners Contract Title : OPERATION AND MAINTENANCE OF SEWERAGE SYSTEM AND TREATMENT FACILITIES AT MIC Location: IRRIGATION PUMPING STATION ~ ReCoYd ¢ontye Date: (| 3-25 No. Equipment / Description of Work Frequency| Executed] Remarks 1 PRESSURE SWITCH a [Clean & Check the Pressure Switch. BeMonthly | Dono b Check its working Bi-Monthy | Done Check its cut Off and cut On Bi-Monthiy | Done 2 PRESSURE GAUGES a {check the operation and clean the pipe. BiMonthly | Done. Check pressure gauges for any defect and abnormal > [creck BiMonthly | Done 3 FLOW METER a [Check any error in the program Bi-Monthly Na b_ |check any loose connection in Meter head. Br-monthiy | 4. check flow meter reading of equalization for any , © Jabnormaity. BrMonthly | NA Note: SAFETY: Ensure the motor is Isolated before any maintenance is carried out. Pumping Staton and Instrumentation | Instrumentation | etwork Operations & | Facilities In-Charge | ,atarEneray Technician Foreman | yess ree Representative ZAHOOR AHMED | SHAMEER ABDUL PRASAD ISHARAFUDEEN KHAN KAREEM GUNASEKARAN Kavavara Yuma Mga G rw Form No: F090-JUNE2022-RO Page 1 of 1 (407-LIT-140, 407-LIT-141) a [Check and Correct zero and span, clean sensor. [Clean the transmitter [Check the readings 2 PH ANALYSER ( 407-QIT- 461) a |Clean the transmitter [Check the readings ¢ [Clean the sensor using distilled water 3 CHEMICAL OXYGEN DEMAND (407-QIT-481) a _|Clean the transmitter b [Check the readings [Clean the sensor using wash water PREVENTIVE MAINTENANCE (INST.) NDWTP - CHECKLIST ¢ DOCUMENT REFERENCE: WP/MIC/QAQC-002 ainda Contract No: GC21105800 Qatarénerg: Contract Title : OPERATION AND MAINTENANCE OF ‘SEWERAGE SYSTEM AND TREATMENT FACILITIES AT MIC LOCATION: TANKER DISCHARGE - N- DWTP DATE: || ~ 3-9 ye Equipment Tag No: Rem waives rreqency | ereated | Remaria 1 ULTRASONIC LEVEL TRANSMITTERS | monthly |p ono. monthly [one Monthly | Done. monthly Monthly Monthly Monthly | Done Monthly |p one. Monthly |Done frot- LT 14O 0.2400 aot LIT tay O.bam hot - QT 4b} Undes maintqrane hor- O17 - 48) 54 3Ppm be | 7 MGanf 4 CONDUCTIVITY METER (407-917-471) a [clean the transmitter monty one |aoy qr eat) b_feneck the readings wonty [pone | isos mslem _|ctean the sensor using wash water monthly | pone s | ocunrr(407-pp1s-001, 407-pP1s-602) a |cneck and Correct zero and span, clean DPIS monthly |D)ono b |Check the Reading Monthly: ‘Done. ¢ _|Clean and check the instrument junction boxes Monthly | None |SAFETY: Ensure the motor is Isolated before any maintenance is carried out. nore Testrumentation | Instrumentation | onocengineer | Facts tn-charge | ,getareneray Sesion Yom | SHARATUDEEN | BABU MALADATIU |SNAMEER ARDULKAREER| Gy RASAD yp be Uh Form No:FO57-JUNE2022-RO Page 1 of 1 PREVENTIVE MAINTENANCE (INST.) NDWTP - | CHECKLIST j © WABAG cétliyh 8 Contract No: GC21105800 _ QatarEnergy Contract Title : OPERATION AND MAINTENANCE OF PAA AV ir SEWERAGE SYSTEM AND TREATMENT FACILITIES AT MIC LOCATION:FINAL SETTLEMENT TANK - N- DWTP. DATE: (2 - 3- 2} atem Activities Frequency | Executed Remarks No. 1 OPEN CHANNEL RADAR FLOW METERS (407-F1T-231, 407-FIT-232) a Check zero and range. Monthly * not - FT -93) ICheck any error in the programme and rectify if © required. Monthly 10-20] h ¢_|Clean the Sensor and Transmitter weekly Done last. ey 232 a |check the Readings weekly Done 64-6 wh [clean the flow channels with wash water jet Monthly 2. | ULTRASONIC SLUDGE LEVEL TRANSMITTERS (407-117-121, 407-L1T-122) a |check and Correct zero and span, clean sensor. Monthly. by feckany error inne programme and rectiy cc |Clean the Transmitter weekly | Tone bot -Lty- 121 d_ |check the Readings weekly | None oay yn [Clean and check the wireless communication © |poxes of LDIT's weekly | Done |yot- iT - 199. [clean and check the instrument junction boxes Montinly, o-3hM ‘SAFETY: Ensure the motor is Isolated before any maintenance is carried out. NOTE... Instrumentation | Instrumentation lites tne QatarEnergy Technician Foreman | @AQC Engineer | Facilities In-Charge Representative ? Saewaina Lormar | SHARAFUDEEN neu MALADATHU | SHAMEER ABDUL KAREEM | PRASAD coin + es \ Al (\ gs + ad $ Q) ! ¢d 7 Form No: F058-JUNE2022-RO Page 1 of 1 PREVENTIVE MAINTENANCE (INST.) P.S. - Bi-MONTHLY (CHECKLIST fe WABAG DOCUMENT REFERENCE: WP/MIC/QAQC-002 Games Contract No: GC21105800 K Cis Contract Title : OPERATION AND MAINTENANCE OF SEWERAGE SYSTEM AND TREATMENT FACILITIES AT MIC Pumping Station Now! ))\p@_ Jy PATE: \9,- 3 - a vee Activities, Frequency Executed Remarks: hy [heck a Patch panels arwonty [Done i |eneck a onic ethernet converters autonty | Done. 1 eek versamax Gents MIU arwontny [Done i |etean and check the OFC unit cewonty | one . CCTV CAMERA Check the operation | Bi-Monthly Done [08-01 — comer b. [clean and check the working of Encoder seven |Done finder saaktanane c. _femeckthe working of Optic ethernet converters, sion | Done, 4. |ctean camera and connection terminals sont | Done. &[checkte emer cleaning waterevelre fitrecessary | se¥entWy | yore 7 ourter FLow METER 2. [ean and check the transmitter Bi Monthy laos Ft - nor b._feteck any error in the program Bi-Hontly onder Meintarano c.__oheck any lose connection In Meter head eemonthiy 4, [eck Now meter reading of equalization for any abnormality si-Monthiy 8 DEODORIZATION UNIT 2. [heck alt instruments, pipe work & pipe connections arwontny | Done v. _Pigpkgentocavonuntanaiseratotsenetoranrumsis! | ay | Bon ISAFETY: Ensure the motor is Isolated before any maintenance is caried out NOTE Testrumentation | Instrumentation denen Facites in-charge | gatareneray Representative sawn Yomayr| —SNARAPUOEEN | ZANOORANMED KHAN | SHAMEER ABDUL KAREEH | PRASAD GUNASECA mgag [See Ve | Oe 0 F091-JUNE2022-RO Page 2 of2 ‘PREVENTIVE MAINTENANCE (INST.) P.S. - B-MONTHLY ¢ CHECKLIST K ere 3 DOCUMENT REFERENCE: WP/MIC/QAQC-002, aes Contract No: 6¢21105800 Seonrae Contract Title : OPERATION AND MAINTENANCE OF SEWERAGE I SYSTEM AND TREATMENT FACILITIES AT MIC Pumping Station No: Mi DS — DATE: 1 - 3-24 [Bene Activites Frequency | executed Remarks 1 LEVEL CONTROL a, fereccie control operation yang and towering wetwenievel | aitonthy Dome |yiog yer — ol b.ftean the ap tube using by compressed air hMonthty lave cc. _ [ctean and Check evel transmitter reeding acronthy |Done 4. _ ash the electrodes wth mash water et without removing the ame] ehMionthy [Done 2 PRESSURE GAUGES & TRANSMITTERS a. [check the operation ane ciean the pipe aunoniny Ipone |yog pry - hos v._[eeeeat nmp rsue gauges oruonmites Granda | asenny pono — c.__ [Pasa sbues or tanamtter wen sump nig ane | ato | Dong 3 WASH WATER SYSTEM | 2, [eneck start and stop level acjust if necessary seventhly | Done | |b. femeck ie alin the badder fl necessary aiwonty | Done 4 FIRE ALARM SYSTEM 2. leneck ene operations s-montily | Done [check the hater voltage BrHenthy | Done (Check F200 Pane! and its operations Bi-Monthly lbone. 4, [clean and check the smoke detectors Bereonthly | Done © |ctean and cneck the HSSD unit s-wonthiy | Done 5 Puc 2. _[ctean and check the operation snot | Done », _ Misual inspection of PLC system and check for abnormality. Bison | Dono c. _foneck the CPU and its working sextentily [Done 4. —_feheck the power supply unit sexionty Lone © |eneck Gents Bus controler sittonthly [Dono + |eneck ethernet Module aevontiy | Done 9 [check Hit panel Bi-Monthly | Done F091-JUNE2022-RO Page 1 of 2 PREVENTIVE MAINTENANCE (INST.) NDWTP - CHECKLIST DOCUMENT REFERENCE: WP/MIC/QAQC-002 KR wavs Contract No: GC21105800 Contract Title : OPERATION AND MAINTENANCE OF SEWERAGE ‘SYSTEM AND TREATMENT FACILITIES AT MIC g Roy cis LOCATION: INLET WORKS -N- DWTP PATE: (3.3. 24 woh [Tt 7 For No: FOSB-JULY2022-R0 Page 1 of ead Activities “Frequency | Executed | _ Remarks «| WAGHETIC FLOW TRANSWATERS (407-FIF-201, 407-F17-202, 407- Frr-203) | lkot - 17 - 20! tan ans ence te vans wey ope ine wh © eneck ana correct er & sp. Monty lAest- £1 209. ¢_|eheck any ero in he programme and ety recur. westy lone | aio wel 4 fenac he elacrode deaing acy Money 2 | OPEN CHANNEL ULTRASONIC FLOW METERS (407-F17-222) a eneck and Correct sero and san eon senor Month + Eheck any erorin the prgrarime and ety required weety [Done [Ast- pyr 299 ¢_[elean the flow channels with wash water jt. Monthly, 351 relh a fbeon and ence ne wansmter weer | Done, 9. | UeTRASONICLEVEL TRANSMITTERS (07-40rT-I02, 407401" a fone an crrect and span eon sensor. ont Hot-LDIT -103 »_ohece any err inthe programme and rei fregured. weeby | He 4 Caan and check he tranamiter weery [Done ‘ pic [Clean and check the PLC wey Ipone [check its working weet | o. 5 (0c unr1(407-0e1S-001,407-0P1S-002,407-DP1S-003) a feneck nd correct eo and sot, cea DPS Monty > [check the Reading west lon ten on eect tne nstrumen suet boxes Monty SAFETY: Ensure the motor i Isolated before any maintenance i cared ou Note: voechician” |S roromaat’” | @AQCEngineer | Facilites 1n-Charge aoerenergy | lescavana ory | SHARAFUDEEN | eaBUMaLADATHU | SHAMEER-AEOUL | paasan cunaseiantin pa PREVENTIVE MAINTENANCE (INST.) NDWTP - CHECKLIST C: DOCUMENT REFERENCE: WP/MIC/@nqc-o02 aunts Contract No; 6¢21205800 SESEAES! contract Title : OPERATION AND MAINTENANCE OF SEWERAGE SYSTEM AND TREATMENT FACILITIES AT MIC Rwsers Sarma LOCATION: CHLORINATION SYSTEM - N- DWTP. DATE: (203-24 Tew Activities Frequency [Executed] Remark CHLORINE VACUUM GAS METERING SYSTEM (407-VGDS-001, 407-VGDS- —_ 1. | RDM SaPaaN Sn ues ernesS ea nese ost. beats pein ae weno [pone > freuee secon reno Bore : cotonme rune reco 1 [enone sourone vee (or 5-03, 7-06 407-5700, 0 re 3 | ence maton (7-01 A07-4R2 407-89) ee veer pone 2 been cee czein voy : Ceve MANSMOTERS Gor * fomaenscomet ewan ene seer sow lhiore Ince ase > fntanyone no pevener tear vous wove [Pees Og « foconte roar voor Bebe. «fone sen very [Bons ; vine aan ese 0-120) = orem nee ven fone [check the operation montny [Done ce |Ctean its fter rrontny [Sone + [ear ad ek he tre am system venmy one « foconand ena ore weray Pore 1 reer a RES vero [Rone fy esconne watonrncasoanant ern oro, 4o-r-an, "eran > [oma owomectraane voy pons © ean enn nee wero {pone bere Se a [Ssvavana Vaymar Th ‘BABU MALADATHU ‘SHAMEER ABDUL KAREEM mananaenan\ gp (et OW Mo gah | Ww — Form No: FO&2JUNE2022-Ri Page {off PREVENTIVE MAINTENANCE (INST.) NDWTP - CHECKLIST ¢é KH WABAG DOCUMENT REFERENCE: WP/MIC/QAQC-002 ‘ Sorat BEES | cna me NINOS REE op ceuemce | SORE ‘SYSTEM AND TREATMENT FACILITIES AT MIC LOCATION : RAS,SAS,SCUM - N- DWTP DATE: 1) 3 9 3, a Activities Frequency | Executed. Remarks 1 MAGNETIC FLOW TRANSMITTERS (407-F1T-205, 407-FIT-204, 407-FIT-205A) 2 [Chock and corect zero & span, monthly — Done [hot -F IT -205) 2 [cneck any rrr in the programme and rectly require, nonty — lnone | y.5 o/h [check the electrode cleaning facity nontriy [Done [pot — Fev - Sob 4 2a [Clean the Transmitter monty |DOne | 234 14 m2!h fe [check the Readings monty /Spne | ba ed |b 2 PRESSURE GAUGES 2 [Clean the Gauges wontty — Done. » [oneck its Readings monty Done 4 | tevet reansmrrrens (407-UT-111, 407-U17-113) | a |ereck and correct zero ans span, clan sensr. monty Ippne | o1-LyT —10) 1b _[eeck any error in the programme and rect required vor — fone | Display faces) <¢ _[ciean the Transmiter monty — [Done | yor Lit 13 6 |Check the Readings Monthly Done. Display Pacled, 5 LEVEL CAPACITANCE (4071-131, 407-LC-133) a [check and Correct zero and span, clean sensor: vonty — [Done | ote - 13) > |check any error in the programme and rectly if required, Monty — Dane | Display fadeo} «¢_|Glean the Transmitter monty Done |Aot-Le — 133 {check ene Readings vowry [Done | Display Pade ‘ FIRE ALARM SYSTEM (407-FGP-004) 2 [otean at detectors and panels. Monthy | Done > |oncck ene operations. Monty | Done € [clean ane check the battery of fire alarm system monthly — | Opne [clean ane eneck te OFC unt wonthiy | ono 7 SMOKE DETECTOR 2 [oneck the operations monty — | Done. [clean the unit monthly Tone. <¢ _ [Clean ane check the instrament junction boxes Monthy | Done 8 Gor Derectors 2 [Cleanthe ors nrontny | Done. b_|cneck ts operations vont _ [Done [SAFETY: Ensure the motors Iolted before any maintenance Is carried out |Nore: Trerumentauon | Ttrumentation | aoc engineer | races n-charge aorereneray SHARAFUDEEN fsanuMALADATHU | SHAMEER ABDUL KAREEM | PRASAD GUNASEKAY Soxavarg voray| nae [AY OW Form No: FOS9xJUNEZ022-RO Page tof t PREVENTIVE MAINTENANCE (INST.) DWTP. ¢ Contract No: GC21105800 datiallyo 8 Qataréneray Contract Title : OPERATION AND MAINTENANCE OF SEWERAGE SYSTEM AND TREATMENT FACILITIES AT MIC DOCUMENT REFERENCE: WP/MIC/QAQC-002 ~ CHECKLIST) = | « WABAG LOCATION: AREATION TANK(430-T-02 & 03) & SCREW PUMP (430) DATE: |). 3. 94 tem Activities | Frequency | Executed Remarks 1 LEVEL CONTROL UNITS a |Wash electrodes with wash water jet of Screw pumps. Monthty: b [Check the electrode cable terminals Weekly | Dane [Ensure level control operations Weekly |Qone D.O ANALYZERS 1 |(430-23-aGo-001,430-23-AGO-002,430-23-AGO- /003) 30 -23-AKo-Do} a |Clean the sensor and check the reading Monthly 4.8 mah ¢_ |clean the transmitter. Weekly [DONe neo 3 qup -ppa + 23AbD -o0: d_ {check any error in the programme and rectify if required. | Weekly | Done. AV Bl d_ |Calibrate the analysers Monthly 3 RAS FLOW METER a. |check and correct Zero and span, Weekly | Done b. {Service and lubricate air pump. Monthly c, |Clean the dip tube and check Zero and span, Weekly [Done 4 |check flow meter reading and observe for any abnormality.| Weekly | cone |SAFETY: Ensure the motor is Isolated before any maintenance is carried out. NOTE: Instrumentation | Instrumentation Qatarenersy Technician Foreman QAQC Engineer | Facilities In-Charge | Representative sHARAFUDEEN | BABU MALADATHU | SMA! [Saravana \eyrray wait See ldt 7 MEER ABDUL PRASAD KAREEM GUNASEKAI Qi Form No:F086-A-JULY2022-RO Page 1 off PREVENTIVE MAINTENANCE (INST) NOWTP ~ CHECKLIST COGENT REFEREE WORE RKvaere SEEEHAT! —_| contact Tle: OPERATION AND MAINTENANCE OF Sewerace sysrem AnD | SABRE? TREATMENT FACILITIES AT MIC LOCATION ‘SAND FILTER & COMPRESSORS -N- WTP pare: Jo - 3- Dy en ttles Treqencr | executed | Remarta 1 MAGNETIC FLOW TRANSMITTERS (407-F-206, 47-1208) 2 fenekana coc 200 8 spon ven 1 foneck ny enrin he ropremmer and ey ee son eee the ecru en cy. weet” [Done [so1 ~ F5-304 team te Transmitter way |Sone | aersly «sect ee esaege wey [Sone 2 bressune causes 2 fetan tn canes weaty | Done fect cpr. wea | Hone 3 PRESSURE TRANSMITTERS (407-PT-002) 2 feneck ze ane sm, toneer > |cicon tne vanzmeae way [pone | Ro1-prT-ov2. ¢_fomecetsRessings wey | Sone. 5.8 bar ‘ LEVEL TRANSMITTERS (407-417-118) 1 fone end comer seo ana san ea esr, ont 2 foneck any evr in ne pragma es if ere way Done lot Ley ny & [ocanthe raemater vweir [Bone | 5 5a hs 2 owe he Renan west [Done | ' Lave caPacrTANCE (407-L6138) 2 |oheckané comet ee an sb, con en. ime foc any erin be pooner ancy outed sty [Gleam the Transmiter wewey | Done, fence tne sang way [Done ‘ FIRE ALARM SvSTEM (407-F0P-002) a fctean at detectors an parts sant b_ |check the operation. weety | Done lean and check the batery and senor of re lar sytem vont 4 [Clean and check the OFC unit weety | Done foam and check he nstumen unten bones se ; mar oerecvoms a [eneceits operations wey [Done 8 SaNO FILTER CONTROLS [once ne epee fae ecru wey [Done fran and dean conc ran ves wey [Done ¢_foean econo weety [Done 4 check tm pressive goges, Taster ord working weet [Bone fence ne ring Tenperre wey [Done 1 ean and neck 1? pe wety [pone | 6 _foeanatseureens wenty_ | DONE SAPETY: Ensure the motor s Tabled bear any maltenance aed ot fore: —_ —— eS 006 eer Faces hse | ttnery Rewevnne oravera ora aay waaparay | SHAMEER ABDUL KaREEN mspemerat Me FS = uz QV — Fr No: F061 JUNE2022-R0 Pago t oft PREVENTIVE MAINTENANCE (INST.) DWTP - CHECKLIST} ¢ DOCUMENT REFERENCE: Wr/MiC/@u-002 Asta & Contract No: GC21105800 QatarEnergy Contract Title : OPERATION AND MAINTENANCE OF SEWERAGE SYSTEM AND TREATMENT FACILITIES AT MIC LOCATION: SAND FILTER & COMPRESSORS - E- DWTP. DATE: |, - 3-2 & Tem actives Frequency | executed | __ Remarks 1 | MAGNETIC FLOW TRANSMITTERS 407-FIT-2098 2 fonec and correct zero & span. onthiy None . otf 17 -209A b |check any error in the programme and rectify f required. | Monthly | pono (20 m3} n ¢ [Check the electrode cleaning facllity. Monthly | Done d= [Clean the Transmitter Monthly Done e- |check the Readings Monthly | pone 2 LEVEL CONTROL creck te control operation by rlsing and lowering wet well level Monthly | Done b. [clan heap tube using by compressed ar vonttly | Done «. [cteanteve Control unit and check reading wronty yo ne 4. {service and iubricat ar pump. worthy [Done 3 SAND FILTER CONTROLS a fcheck the operation of sand fitercotrl unt worthy” [Done brain ad clean Electronic dain vaves wonthy lone lean the compressor wonthiy | pone <:_oneck tne pressure gauges, Transmiter and its working | Monthly pone. e-_check the running Temperature vent [ono + |ctean and eck the LCP pane wont | Sone 4 |etean an notameters worthy | Done ‘SAFETY: Ensure the motor is Isolated before any maintenance is carried out. Nore: Tnairmmenation | Tnermentation Qatarve “technician” | "Foreman Grac engineer | Facities tr-cnarve | goprecemtative Sriavara Yoray| swaRArUDEEN | easumacaparny | SHAMEER ABDUL cw . Shh] (Z% wy mega {Sek Su QW Form No:F171-JUNE2023-RO PREVENTIVE MAINTENANCE (INST.) P.S. - MONTHLY CHECKLIST DOCUMENT REFERENCE: WP/MIC/QAQC-002 EK wars Contract No: GC21105800 Contract Title : OPERATION AND MAINTENANCE OF SEWERAGE SYSTEM AND TREATMENT FACILITIES AT MIC Rernnne Mainenance Coordinator Pumping Station Now! b\\p 4 DATE: 7. 3 Oy Reine Activites Frequency | executed Remarks h (Check all Patch panels. - Monthly Done 1 (Chek a opti ethernet converters wonty [pone 1 |eneckversama Genius ny wontiy | Nope 4 [Clean and check the OF unt wont | Done. 6 CCTV CAMERA 2. fonecethe operation wontiy none. 2, |Ctean and check the working of Encoder Morty | Dene &_[enece he working of Optic ethernet converters wont | Done. 4. |Gean camera and connection terminals won | Done © (Checthe camera cleaning water eveeflifitnecessary | Monthy | HOWE 7 ourter FLow mevER 2. fetean and check te transmiter worty Ione {18 — ¢iy-001 ened any err in the rogram Went” ome 318 0/h <_ [psec any loose connection n Meter head worthy Nene. 6. [erect now meter reading of equalization for any abnormality Hon Sone 8 DEODORIZATION UNIT a. feheck at insuruments, pipe work & pipe connections vert” | One. 2 eikgeeratoneitntaeanctene tran emt! | wey | ISAFETY: Ensure the motors Tsolated before any maintenance is carried out Nore ecumentation | testumentavon | atwort Operations | Faces in-charge | QatarEnergy Representative Syumang bowoy| — SHARAFUBEEN v0. 3a Sealy _ZAHOOR AHMED KHAN. & SHAMEER ABDUL KAREEM Fo9t-B-JUNE2022-R0 Page20f2 6 gales PREVENTIVE MAINTENANCE (INST.) P.: Contract Title : OPERATION AND MAINTENANCE OF SEWERAGE ‘SYSTEM AND TREATMENT FACILITIES AT MIC DOCUMENT REFERENCE: WP/MIC/QAQC-002 MONTHLY CHECKLIST ee Activities | Frequency | Executed Remarks: 2, [enecete ental operation by rising andonenng wetwetlevel | Morhy Ione |g sy OO) F091-B-JUNE2022-RO Paget of 2 PREVENTIVE MAINTENANCE (INST.) NDWTP - CHECKLIST DOCUMENT REFERENCE: WP/MIC/QAQC-002 ¢ Kine S.stiaM ab Contract No: GC21105800 QatarEnergy Contract Title : OPERATION AND MAINTENANCE OF POSITS SEWERAGE SYSTEM AND TREATMENT FACILITIES AT MIC LOCATION: FINAL SETTLEMENT TANK - N- DWTP DATE: | 9. fo 3 / ay al Activities Frequency | Executed Remarks OPEN CHANNEL RADAR FLOW METERS 2 (407-FIT-231, 407-FIT-232) a |Check zero. Monthly | Sone ICheck any error in the programme and rectify if > requires. Monthly | Done. cc |Clean the Sensor and Transmitter monthly | Done d- |check the Readings Monthly | Dono. {clean the flow channets with wash water jet, Monthly | Done ULTRASONIC SLUDGE LEVEL TRANSMITTERS (407-L1T-121, 407-L1T-122) Check any error in the programme and rectify if ¥ Pros ty Monthly |Done. required. b [Clean the Transmitter Monthly | one c [Check the Readings Monthly |pone Clean and check the wireless communication AOT- FT - 23) 3.4 nel rol -f1T - 23, 120.3. o/h dot -LIT -)a1 0-36) Rot -Liy -192 © Iboxes of LIT's Monthly !Done b.abm [clean and check the instrument junction boxes Monthly | Done. SAFETY: Ensure the motor is Isolated before any maintenance is carried out. NOTE: Instrumentation | Instrumentation jes In-char, Qatarenergy Technician Foreman QAQC Engineer | Facilities In-Charge Representative rove \ornqy | SHARAFUDEEN | BABU MALADATHU |SHAMEER ABDUL KAREEM Le | Mga y PRASAD GUNASER@RAN Oe Form No: FO58-JUNE2022-RO Page 1 of 1 CHECKLIST PREVENTIVE MAINTENANCE (INST) P.S. ‘Bi-MONTHLY DOCUMENT REFERENCE: WP/MIC/QAQC-002 ERK wrens Contract No: GC21105800 Contract Title : OPERATION AND MAINTENANCE OF SEWERAGE ‘SYSTEM AND TREATMENT FACILITIES AT MIC Soren ‘Pumping Station Nos Mp9 — 5 Pate: 9-53-94 Tems Activities Frequency | Executed Remarks 1 LEVEL CONTROL fone te contol operation by aig andiowerng wet wate | aimonthy |Done |yx0q_y)7- BO) [clean the aip tbe using by compresse air BiMonthy 2am c._ [etean and Check level transmitter reading aivonthy | Done wasn ee cocrodes wth nan waterjet witout removing te some] aixenty | Dono 2 PRESSURE GAUGES & TRANSMITTERS [check the operation nd clean the pipe sues |Sone. |yoq - pir — Soy o. [eealoums oss oe orvansmtestorany eta | ase | Nong, a c._eamate mies rtaremites wien umprinang andre | aenay | one 3 WASH WATER SYSTEM (check start and stop level adjust i necessary scneonthiy | one. 1. [check the air inthe bladder lf necessary Brtonthly | Done. 4 FIRE ALARM SYSTEM a. _|eheck the operations ittentnly | Dono. >. check the battery votage arnontiy | done «c.[eneck i200 Pane! and its operations sisinthly | Done. 4. _|etean ond check the smoke detectors sisonthly | one [clean and check the HSSO unit Monthy 5 pic 2. |ctean and check the operation sevonthly | Done, b. _ Misuat inspection of LC system and check for abnormality. sro | Done cx [eneck the ceu ane ts working ations | Done, 4. [neck the power supply unt error | one. @_|ncck Genius aus controler suvontty | Done. £ oneck etnemet Module wvonty [Done @_forece near aistnthly | Done. F091-JUNE2022-RO Page 1 of 2 PREVENTIVE MAINTENANCE (INST.) P.S. - Bi-MONTHLY ‘CHECKLIST «K ere DOCUMENT REFERENCE: WP/MIC/QAQC-002 eis Contract No: 6¢21105600 eran? Contract Title : OPERATION AND MAINTENANCE OF SEWERAGE ‘SYSTEM AND TREATMENT FACILITIES AT MIC Pumping Station No: M))P9 5 DATE: |g - 3- 24 “ee Activities Frequency | Executed Remarks th [check at Patch panels s-vonthiy | Done, 1 check all Optic Ethernet converters Bemontiy | Dong 5 |check versemax Genius niu sewontiy | Done k — |clean and check the OFC unit serontiy | Done. ‘ CCTV CAMERA a, _|check the operation arwonthly | Done . [clean and check the working of Encoder ecronthly | Done. Check the working of Optic /Ethernet converters Bementhiy | None 4. [Clean camera and connection terminals eewontny | Done. [cheek the camera cleaning woter lever it necessary | aitonty | m9 7 OUTLET FLOW METER 1. (Clean and check the transmitter auronny Done lAog- pir- 50) b. [Check any error in the program BeMonthly | Done BIA mn? /h c. _[eheck any lose connection in Meter head seonthly | Done. 4. |check tow meter reading of equalization for any abnormally atten | Sone, ® DEODORIZATION UNIT a. [Check all instruments, pine work & pipe connections aewontty | Dono. {check deodorzation unit analyser and observe for any unusual veka aitenty | Dong. ; - ISAFETY: Ensure the motor is Isolated before any maintenance is carcied out. INOTE: Pumping Station and | Tnstramentation resumemaion | yatwortOperatona Facies i-charge | eutrtnera Reps Soyavan SHARAFUDEEN | ZAMOOR AHMED KHAN | SHAMEER ABDUL KAREEM | PRASAD GUNASEK ARAN rand Lasroay ri ny Sb She ¢,. \ ae FO91-JUNE2022-RO Page 2 of 2 PREVENTIVE MAINTENANCE (INST.) NDWTP - CHECKLIST ¢: DOCUMENT REFERENCE: WP/MIC) gasel iy Contract No: 621105800 Gaeareteray Contract Title : OPERATION AND MAINTENANCE OF SEWERAGE ‘SYSTEM AND TREATMENT FACILITIES AT MIC "/QAQ¢-002 LOCATION: INLET WORKS -N- DWTP pate: 20/2 Jon. 2 | OPEN CHANNEL ULTRASONIC FLOW METERS (407-F1T-222) 2 (Check and Correct ze and spen, clean sensor bb |oneck any error inthe arogramme and rectiy if required. _[ctean the flow channels with wash water jt [Clean and check the tansmiter | ULTRASONIC LEVEL TRANSMITTERS (407-L01T-102, 407-LDIT- 403) 1 |eneck and Correct zero and span, clean sensor. Rem Activities Frequeney | Executed Remarks 1 [MAGNETIC FLOW TRANSMITTERS (407 FIT-201, 407-FIT-202, 407. #1T-203) |AOT-FIT- 201 2 cean and check te transmiter not Done. 50 wel > ferece and corect reco 8 san veo | Done |207-F15-202,; &_[eheck any erorin the programme and ret resis wee Tone | iy m/h 4 |oneck the electrode caning fei weary | Done wonty | Done | pot- fit - 222. vonrsy | Done 212 ma/h Monthy | Done wonty | Done were Done |sjo-207-103 [cnet any erin te programme and rc equ vent |rone | hiqe €[etan te channets wah wash water et. vont» Tpone | tirag [ean and cock tne ransmiter veer | Done ba Puc 2 [tenn and check the PLC venir | pone [neck ts working nent | Done : (0c unrr(407-0ets-003,407-DP1S-002,407-0935-003) 2 lereckane coret xr and soa, clean OPIS restr | Done (Check te Resding wendy | none €|Cean ang eect trent uncon boxes vent | Dono SAFETY: Ensure the motors olated before any intenance is arid out. no Torrummmanon | Testumentation | qagcengineer | races imcharge |, QvtarEnergy | SHARAFUDEEN | BABU MALADATHU feneck any error in tne programmer and recy required onthy Aot-LiT- 200 ¢ fetean the Tansmiter wey | Done. 2.909 5 pet sone : senso arses > [creck tne operation weekly | Done. 4 [cleen and check the operation of HSSO Welly | Done ee war |pone eaueeere nae eel pores aaa et a ara areas S exeremrmrreorrS ee re a ia enon ones eecmaaneas | asians [panes omcomroeee coor hon) ry, | | — eT yp J> we dah = Se | Ov Form No: FO82-JUNE2022-Ri Page tof t ¢ ala bd Qatarénorgy PREVENTIVE MAINTENANCE (INST.) DWTP - CHECKLIST DOCUMENT REFERENCE: WP/MIC/QAQC-002 Contract No: GC21105800 Contract Title : OPERATION AND MAINTENANCE OF SEWERAGE SYSTEM AND TREATMENT FACILITIES AT Ks MIC LOCATION: AREATION TANK(430-T-02 & 03) & SCREW PUMP ATE: 9) ~ (430) Le 21-3 a4 sar Activities Frequency | Executed | Remarks 1 LEVEL CONTROL UNITS 2 |Wash electrodes with wash water jet of Screw pumps. Monthly b [Check the electrode cable terminals Weekly Done ¢ [Ensure level control operations Weekly |Done D.O ANALYZERS 1 |(430-23-AGO-001,430-23-AGO-002,430-23-AGO- (003) [430 ~23-Adr0 ~00) a _|Clean the sensor and check the reading Monthly ACT) Mg) ¢ [Clean the transmitter. Weekly Done bya5 -23-aao ~cox] {check any error in the programme and rectify frequired. | Weekly [Dono Ao 9409) yg) 4 |Calibrate the analysers Monthly 3 RAS FLOW METER ICheck and correct Zero and span, Weekly |Done. b. [Service and lubricate air pump. Monthly: cc. |Clean the dip tube and check Zero and span. weekly |Done _|eheck flow meter reading and observe for any abnormality. Weekly [yor 6 SAFETY: Ensure the motor is Isolated before any maintenance is carried out. INoTE Instrumentation | Instrumentation QatarEneray Technician Foreman QARC Engineer Facilities In-Charge Representative swanaruoeen | easumataparay | SWAMEER ABDUL | RASA Baovara Yor a4 op Koo} \ Ae, Y ne Form No:F066-A-JULY2022-RO Page 7 of 1 PREVENTIVE MAINTENANCE (INST.) (NDWTP - CHECKLIST ¢ San TS SEE icreoan EKwrvrc SERESE | gm eons ROO ccvease sytem an) SRRETE rig tatnear \LOCATION: FINAL EFFLUENT PUMPING STATION - N- OWTP. pares 2) ~ 3-2), [Ren ‘Activities - Frequency | Executed Remarks ° iraoo aera bee ke 2 [Clean and check the reading of analyser Monthy =| Done Display fade. € eck any ero in he programme and ret irre wontty | Done, 9 QIT-TSS (407-QIT-601) » eam on ona veasnrnane ww pone hot on bo1 «onan me poy re rege ww [pone | soppm , rine ats seven aor. 00 « lomateananr syne won Ipone | beaeeenne won [pone « Loormesnete wey ate mere wy [pone | © leamemoanc oe ev wean [pone «oon nc onnanoticn a smi [pone f — [Clean and check the operation of HSSD ‘Monthly Done | so moee mst pone «mentors ences ont ene wis |pone a wo wor nee » bematcutitocmnncinimertamr ane} sow | pone come warn |rone 2 vets eo oie) © oct eeeene wi pees [SAFETY: Ensure the motor is Isolated before any maintenance js carried out. hore sstrumentation iment ] atarEnet marcas” | qumemtaton | gayqcengneer | recttentmenarge | gMerEnery SHARAFUDEEN | BAU MALADATHU | SHAMEER ABDUL KAREEM | PRASAD GUNASEKARAN [Saravana lamar 459 | shad Z 0» Ow Form No. F63-JUNE2022-R1 Page 2012 PREVENTIVE MAINTENANCE (INST.) NDWTP - CHECKLIST. ¢ DOCUMENT REFERENCE: WP/MIC/QAQC-002 EK wr0r0 Serna? aunts Contract No: 6c21105000 Garsr= 257 | contract Tile: OPERATION AND MAINTENANCE OF SEWERAGE SYSTEM AND TREATMENT FACILITIES AT MIC LOCATION: FINAL EFFLUENT PUMPING STATION - W- DWTP pate: 2). 3. 2lp ikea Activities Frequency | Exocuted Remarks 3 MAGNETIC FLOW TRANSMITTERS (407-FIT-212) 1 [coon ane check the transmitter wontty |Done |apt-Fry 21 b> eneck an rect eo 8 pen woe done | taro mt/h ¢ _feneck any erorin he programme ard ret require. worty [Done [creak te electrode cleaning fectty, woray [Done | ULTRASONIC LEVEL TRANSMITTERS (407-L1T-135, 407-UT- 139,407-LIT-160, 407-LIT-160A) Prot -21T - 135 2 [Creek ae Correct zero end span, dean sensor wonr'y |Done | aise |eneak any err in ne programme and ect require wonty pone |yoq-2 17 -1boR 6 |Cean and check the transmitter won |Done | tos na 3 LEVEL CAPACITANCE (407-L6-105, 407-L6-107) a [ened and Cores er and span, clean err. von pone | or-.e 105 [check any err in the programme and ret require. wor Ipone |isplay fade (Clean the Transmitter woatny lone [aot Le -10F 4 |eneck tne Readings vow |Done |pispay fade 4. | PRESSURE TRANSMITTERS (407-PIT-305, 407-PIT-306) 2 |check zero and range won |Done |ot= piT -305 [clean the transmitter. monly | Done. Ast av [check the Reasing. worry | Done hor - prr-3ob 4 |ctean and check the Pressure Gauges tony [Done A.D Bay 5 CHLORINE (407-917-604) 2 |otean and check the reading of analyser money | Done €_|eneck any error inthe programme and rectly i required wentty lone 6 NITRATE (407-QIT-603) 2 [clean and check the reading of analyser worthy Done ¢_|cneck any errorin the programme and rectly i required. wonrty | Done. 7 AMMONIA (407-QIT-602) 2 [ctan and check the reading of analyser wetly Done ¢ _[oveck any ero nthe programme and recty if equired wort | Done. Form No. FO63-JUNE2022-R1 Page 10f2 PREVENTIVE MAINTENANCE (INST.) IRGG. P.S. - CHECKLIST 2 SS eee « WABAG 2 DOCUMENT REFERENCE: WP/MIC/QAQC-002 galas Contract No: GC21105800 atares ooniee atares Contract le : OPERATION AND MAINTENANCE OF ENG NNT SEWERAGE SYSTEM AND TREATMENT FACILITIES AT MIC Location: IRRIGATION PUMPING STATION ~ [\yceq 5 Date:9) _ 9 _ 24] No. Equipment / Description of Work Frequency | Executed Remarks 1 PRESSURE SWITCH \Clean & Check the Pressure Switch Bi-Monthly | Np ne b |Check its working Bi-Monthly | Done Check its cut Off and cut On. Bi-Monthly | Done 2 PRESSURE GAUGES a |Check the operation and clean the pipe. Bi-Monthly Preseure gauge hs Check pressure gauges for any defect and abnormal]. b reading. Bi-Monthly nor aor ki rg 3 FLOW a |Check any error in the program. BeMonthly | i) 9 b {Check any loose connection in Meter head. Bi-Monthly le Check flow meter reading of equalization for any © |abnormality Bi-Monthly | jy) (9) Note SAFETY: Ensure the motor is Isolated before any maintenance is carried out. Instrumentation | Instrumentation Pumping Station and QatarEnergy Network Operations & Technician Foreman Maintenance Coordinator Facllities In-Charge Representative Sul ZAHOOR AHMED KHAN ud LL nen bin veg he*¢ |SHARAFUDEEN Sb ‘SHAMEER ABDUL KAREEM. PRASAD. GUNASEKAY Form No: F090-JUNE2022-RO Page 1 of 1 PREVENTIVE MAINTENANCE (INST.) NDWTP - CHECKLIST Knees ‘DOCUMENT REFERENCE: WP/>¢/@aqC-o02 Crise Geni Tsa00 Kom Contract Title : OPERATION AND MAINTENANCE OF SEWERAGE SYSTEM ‘AND TREATMENT FACILITIES AT MIC \LOCATION: BALANCING TANK - N= DWTP DATE! 23. a_ ou [Equipment Tag No: - a Activities Frequency | Executed Remarks 1 | ULTRASONIC LEVEL TRANSMITTERS (407-497-310, 407-477-313) hot Lir-sio 2 [eveckand caret eo an san, cleanses, vorey | Done | irom © eve ny ear in ee rogram an ety ese very | one lgor-etr- an © een and check te transniter roo TDone |" pray sn 4 [eneck ne Rennes v | Done 2 LEVEL CAPACITANCE (407.1612, 40740313) 2 |crecc ane covec 2 and spa, clan sense woty | Done ere any eon te programmer and recy ered wont | Done <_ |clean the Trensmiter vensiy | Dope 4 {creck tne Rass oy [Done | 3 | MAONETzC FLow TRANSMITTERS (407-FIT222h, 407-717-2228) 2 fereck and corect 28 span vow Done hor-pr-oazal © [ove any ear in te programmer and ett # eared reaty Done [hae ad/r «_fehec tne ceed cesning ty. vow |Done Iyer Fit-Da2A 4 |ctean the Transmitter very [Done Pave 1 acdf hy © [creck tne neacnas voy | Done ‘ pressure cnuces > [econ tne Ses vent | Done ofeekte Reading worty | Done. 5 ‘oc unrr(407-0015-007,407-015-008) 2 [ere and carect zr ana span, con OFS rene | None. b feneck the Reading wonity | Done ‘ FAIRE ALARM SYSTEM (407-FoP-008) 2 |ctean at detectors nd pane vonsy | Done w[eneck its aperatons nowy | Hone [olen ane check the beter offre alarm system wort | Done [clean and check the OFC unit vonsy | Done _|cean and chet insvumentjimeton boxes voy | Hone > HOKE DETECTOR > |ctean the detectors. vorsy | Done {creck the operation vont | Done 3 or orrectons 2 fosen te cors rey | Done. © fereck ts operators vwoner | Hono c_feeants senso wri | Dono ISAFETY: Ensure the motor lsolated before any maintenance scored uk nove, ~ on co Termumemaen | Trewmenttion | gaa engineer | Foilien mcharge esa suanaruocen | sasuwataoarwy | sianEen BOUL KAREEN | pnasao GUNASEKARN avovana \wrrar Tol) |e ee Wit ey Form No: FO80-JUNE2022-RO Page tof 1 PREVENTIVE MAINTENANCE (INST.) DWTP - CHECKLIST! « WABAG ¢ DOCUMENT REFERENCE: WP/MIC/QAQC-002 Contract No: GC21105800 ARTE Qatar Contract Title : OPERATION AND MAINTENANCE OF ‘SEWERAGE SYSTEM AND TREATMENT FACILITIES AT MIc LOCATION: SAND FILTER & COMPRESSORS - E- DWTP DATE: 22-3 9% en ‘Activities Frequency | Executed | Remarks 1 | MAGNETIC FLOW TRANSMITTERS 407-FIT-209A a |check and correct zero & span Monthty 5 |Check any error in the programme and rectify if required. | Weekly |Done AO1- FT -209 9 € _|Check the electrode cleaning facility Weekly |Done 126 m/h 4 |clean the Transmitter weekly | Done © Check the Readings Weekly [Done 2 LEVEL CONTROL 2, [Sheek the control operation by rasing and lowering wet | eran \well level (Clean the dip tube using by compressed air. weekly |Done c. |Clean level Control unit and Check reading week'y one 4. |Service and lubricate air pump. Monthly 3 SAND FILTER CONTROLS a |Check the operation of sand filter control unit Monthly b- |prain and clean Electronic drain valves weekly | ono c_ |Clean the compressor Weekly | Done 4 |Check the pressure gauges, Transmitter and its working | Monthly. [Check the running Temperature Weekly [ono £ |clean and check the LCP panel Weekly | ong [Clean all Rotameters Monthly ‘SAFETY: Ensure the motor is Isolated before any maintenance is carried out. Note: ‘yecmctan” | T™*rarmemater | qugcensineer | recites charge | ,@stsrEneroy ‘SHAMEER ABDUL PRASAD SHARAFUDEEN | BABU MALADATHU Secavang loomear “ GUNASEKARAN _ = Nt v3 / \y poy wit we Nd Form No:F066-A-JULY2022-RO Page 1 of 1 PREVENTIVE MAINTENANCE (INST.) NOWTP - CHECKLIST Oe (a Co ‘DOCUMENT REFERENCE: WP/MICIQAQC-002 SAMA? | contract ttle: OPERATION AND MAINTENANCE OF SEWERAGE System ano RIVETS ‘TREATMENT FACILITIES AT MIC LOCATION :SAND FILTER & COMPRESSORS - N- DWTP paTe: 23 - 3 - Ou = Activities Frequency | Executed Remarks 1 MAGNETIC FLOW TRANSMITTERS (407-F17-206, 407-FIT-209) 2 |eneck and core zero span Monti 2 fomece any error inthe programmer and ret if quired. ony €_|eneak te wectroteceaniog eit. wey Done |ho1-pii ~209 6 [Clean the Transmitter wey [Done | saz md/p, © |oeccthe Readings weer [one 2 PRESSURE GAUGES a |cean the Geuses weeey | Done 1» [ence ne operation wey | Done 3 PRESSURE TRANSMITTERS (407-P1T-002) 2 |oneck sero and spon. Monit 1 |ctean ene transmitter wey [Done | hot-prt -oo2 [neck ts Reacings wey | Done 5.0. bay 4 LEVEL TRANSMITTERS —(407-LIT-114) 2 [check and correct zero and spn, ciean sensor. Monty > [cheek any error in the programme and recy f aquired. weer Done [iyot-L tg [Clean the Transmitter weewy /Done | display Pde 4 [ere the Redings weeey [Done 5 LEVEL CAPACITANCE (407-L6-134) [check and corect2ero and sp, clean sensor. Monty 5 |oheck any error inthe programmer ard rctty¥ equred ort hoi Le 13} ¢ _|clean the Transmitter Weekly Done Dispiog fade, 4 [check the Reacings weety Done. ‘ FIRE ALARM SYSTEM (407-FaP-002) 2 |Ctean all detectors and panels eciiy [check the operation. weary |Done [clean and check the batery and sensors offre alarm system one [clean and check the OFC unt weewy [Done [clean anc eneck the instrument junction boxes nent | Done 7 Hear DETECTORS. a |creck ts operations weeky Done 8 ‘SAND FILTER CONTROLS 2 |cnecc he operation of snd iter contra uni wey | Done 1» [Oran and cian electronic arin valves weety | Hone € |cean the compressor weet | Bone _|evecc he oresure gauges, Transmit and ks working weety | Done © |eheek the rsaning Temperature weetty | Done 1 [team and check te LcP pane! weety | Done 2 [oiean at rotameters weety [Dono ISAFETY: Ensure the motor is isolated before any maintenance ls cared out. INOFE : 7 7 Instrumentation Technician | Instrumentation Foreman ‘QAQ€ Enoneer Facies tmcharge aLAoariu “SHAMEER ABDUL KAREEM li U Frm No: F061 JUNE2022.RO Page tof CHECKLIST PREVENTIVE MAINTENANCE (INST.) IRGG. P.S. - DOCUMENT REFERENCE: WP/MIC/QAQC-002 Contract No: GC211 Contract Title : OPERATION AND MAINTENANCE OF SEWERAGE SYSTEM AND TREATMENT FACILITIES AT MIC 05800 jRwacrs Cra Location: IRRIGATION PUMPING STATION ~ f\yoq- Date: 9) 3-94) No. Equipment / Description of Work Frequency | Executed Remarks 1 PRESSURE SWITCH a [Clean & Check the Pressure Switch, Bi-Monthly | tyne. b [Check its working Bi-Monthly | Done ¢ |Check its cut Off and cut On. Bi-Monthly | Done. 2 PRESSURI ES a |Check the operation and clean the pipe. Bi-Monthly Ino no Check pressure gauges for any defect and abnormal| > reading. BiMonthly | Done 3 FLOW METEI a [Check any error in the program Bi-Monthly | NJ) 9) b_ [Check any loose connection in Meter head. BieMonthly | 5 6 Check flow meter reading of equalization for any © |abnormality. BrMonthly |W] A Note: SAFETY: Ensure the motor is Isolated before any maintenance is carried out. Instrumentation | Instrumentation | Pumping Staton ang QatarEnergy Technician Foreman | waimnance coordinator | Pecuities In-Charge | ao esentative ZAHOOR AHMED | SHAMEER ABDUL PRASAD S ubto Verge SHARAFUDEEN KHAN KAREEM ounaseeae\ > / ) wo (Sel ee ( cle Form No: FO90-JUNE2022-RO Page 1 of 1 PREVENTIVE MAINTENANCE (INST.) P.S. - MONTHLY CI DOCUMENT REFERENCE: WP/MIC/QAQC-002 HECKLIST ERK wavas Contract No: GC21105800 Contract Title : OPERATION AND MAINTENANCE OF SE\ ‘SYSTEM AND TREATMENT FACILITIES AT MIC WERAGE Roonae is [pumping Station Nox? fob g- > DATE? De Soy Teme Activities Frequency | Executed Remarks 1 lenecea Patch panes wont Sone. 1 cnet a opti eter converters Honty Sooo [erect versa Gents wont nine, [Clean and check the OFC unit ony | Done. . CCTV CAMERA a. [check the operation wont” | Dope 8. [Clean and check the working of Encoder wonty | Dono, c._foeck the working of Optc ethernet converters nonth | Done, [clean camera and connection terminals wenty | Done «fone tne camer clearing weter vert Fitneessay | mentiy | Dono 7 ourter sLow mere 2, |ceanandeneck the transmiter rena | Done any GiT- 401 b. [Check any error in the program Monthly, Done yes rP/h &_foseck any lose connection n Meter head rent | Dome 6. fonec tow meter reading of evaization or any abnormaty vont | Done ® DEODORIZATION UNET a _[check at instruments, pine wrk 8 pipe connectors ventty | Done [kseeomonuncanierentaseetram init | wee | Erne | SAFETY: Ensure the motor isolated before any maintenance is caried out Nore weiCcmncian* | ™stumentation | etwort operons & | recites charge | qatarenergy Representative vaincanonc cordator ricwana Vornmy| SHARAFUOEEN | ZAHOOR ARMED HAN | SHAMEER BOUL AREEM | PRASAD GUNASEKARAN Se) Mae |= Page 2 of2

You might also like