You are on page 1of 26
L9ETOO Annexure-t ‘SCHEDULE:A ‘SCHED -ACCOUNT PAYMENTS UNDER LUMP SUM PORTION “The payment would be governed by the stage payirantechadule as cetaled below: (viaouer Miaduct fortwo tracks al uniform / vaable soacng is Between Chanage 14£80:00 mi to 15567.492 mt. and Cheinage 17996.220 mi, tc 18760.00. The Tol length of Viaduct including Elevated amps on both ske is “361.188 mt, Elevated siding Ine at Sangam Vinar (260.00 mt), Vaidue for lajpat nagar to sakel G line (000 mis). Crossovers and seecore, (i) integrates viaduct with 6 lane flyover, Ramp en Bath side for Fyover, 2 lane approach from BRT corridor toFly over ogres Vieguet wih 3 lane Flyover ( Double deck system) from chenage 15567.492 mi to chainage 17986326 mt, Total length 2418.834 mt . Elevated ramps on bot side for Flyover, 2 lane ‘elevated spproach from BRT corde a Fyover (ii) STATIONS ‘There wi be four Elevated stations namely Sengam Vihar, Khanpur, Ambedkar Nagar and Saket G, Saket G wil be iegrated/ interchange sation fr Aero ly -Tugakabad condor and Lapat nagar Saket G condor. (iv) lane underpass at saket G and 2 lane underpass from MB Road to BRT corridor including Ramps on both side for underpass, Overall percentage 100% i.e quoted lumpsum price has been divided in Five Sub-Schedules (At, A2, A3, Ad & AS). The Percentage breakup of cost Component for Sub Schedule A1 (General) is 5% of lumpsum quoted price, for Sub Schedule A2 (Viaduct) is 15% of lumpsum quoted price, for Sub Schedule AG (Integrated Viaduct) is 50% of lumpsum quoted price, for Sub Schedule A4 (Stations) is 18% of lumpsum quoted price and for Sub Schedule AS (Underpass) is 12% of lumpsum quoted price, Mage BREAKUP OF S.No. DESCRIPTION OF ITEMS PAYABLE UNIT! “LumPsum [PERCENTAGE BREAKUP OF EACH} SUB-HEAD ‘quoteo PRICE ¥ [Sub schedule AT" (GEWERAL] 00% ‘Sub Hoss, [Sot invexigation for design purpose, Design of Viaduct, Ramp, Staton Bulking, Anclary balding ete, buldva| AN _|eonditon survey and monitoring scheme any fe 1aD0% ‘ana [Pateing ar. casing yar, ste ladostay. edbmisn of quliy, soley, envrenen and pubic Peath] —,g Aan Imaruatssuy approved by the employer and submission of instrumentation schemes if any [Submissi= of quarry audit repo cf safety, qualiy and envioment and pubice healt and Acton Taken on| 181.3. [non-comp iance of non-conformance report and its closu'e during last month ls 10.00% [Tobe pas quarterly on pro-rata asi fr submission of querterly aut report Submission of utity Seniicatiorrepor after actual trenching and making good ee. complete and subriesion ata 7 to utity onning agency is 50% [Repair & maintanance of Roads! service roads including de-siting of drains, fooipats, street igs ele latecies by me construction actos during constructor period. ‘Complete road along aligameny/ version ot fs [atlted te te constuston acts during constuctor pers. ‘Compete oad along akon” everson of] g sata road as pa diversion scheme) |Note : To artery en pre-rata basis eid quartery on p =| a gget JReinstatoment / Restoration of Road, Footpath, Green area, Services. Signalrg, Bus shelter, FOB et. fr fal lnanaing over to concerted authorities after compleon of work. (Area wininvamicading) is 27.50% Note: in case of handing over of Roads In phases. the payment shalbe mada on prota basis TOTAL 0.00% |Nots The valve of each sub-head aval be 5% multiplied by the respective percentago ine 9. for subhead AT.1. the valve is 6% of lumpsum qucted price multiplied by 10%. ‘sage BREAKU? OF S.No. DESCRIPTION OF ITEMS PayaaLe UNIT| “LuMPsuM |PERCENTAGE SREAKUP OF EACH SUB-HEAD ‘uoreo PRICE ¥ ub echedio AZ Viaduct, Elevates ramps, Elovatd sing in at Sangam Vika, Valduat for tajpat nagar to saket 6 line, Cross overs and Seissors& Epecial Spans 8s shown in GAD, TENDER DRAWING ANDY OR SPECIFIED IN THE 15.00% EMPLOYERS REQUIREMENT-FUNGTIONAL) Sub Heads 72 11a case of Pa Foun A235 ing Paria Sa oo A212 [Bie Cape Perle Cap 73.00% oR "RE [nae ot opan foundation ike Baad ah oundaons, PerFoundaion oe (Az 2 — [Pere neusing Per Ca, rash barr & Shea Keys OSS er Pe 00% ‘A2.3—asing of Goer der ncuding svessirg ruling et. scope er span 71.00% ‘Az:4 —TTrensperaion & Erecion of UGiret FGrser eran 0 ‘2.5 —[Fabecaon of Sie! SoaraSpecal pans Her span 50% ‘£26 [Erecion of see spanspecel span ncuding Wess, arauina os Sppicabe Se SOME Per span 20% ‘827 — [Cos Testing of spans 36 pe scope of work or span 50% [castn stu elevated amp complete in all esnee, ) Foundation Gi. somplte 30% 4 728 Joy GL to, Rasing compete - 20% ea s a) Track sab comple - 40% |Beanng Supty and ng ora spans elucing See spans epoca Spare waa 7 42.9 |no 5% on suppy ane 50% on ng ile Laid [compotion of fe were inal respects auang raling, Gl. Braces or Gable, earing, Mano, FOURAl pgs an soo% later recharging ete es s [rowing & Fung Expansion Janis Tarepan 700m Payments on clearing ote ate nal ape and handing over to Salen convanor Tor working er span 200% Jt ctr eslance wer o complet the ene wk as per the Emgoyes renuiement, 35 detaled in tender Jerawngs & specticatone , handing over of vaduet to OMRC ,suamission of a¢ buld Grawngs Yo be pac] LS. 200% stangeth frat TOTAL wom Note (For VADUCT. EMERGENCY SIDING LINE, ELEVATED VERS REQUIREMENT. (© _]Prevata ofeach sub-head sha be 15% multiplied by te respective percentage n"Y€.9. fr subhess 2.1.1.1 the values 15% of umpsum quoted price muliped by 12% in case of variation inthe length of viaduct on either sice, ie, increase or decrease, the ill value of vaducl, fe. 16%, wil get madiied accordingly on prorata ais for payment purpose (i) [Maaduct Emergency Siaing Line, Elevated ramp & Special Spans as shown In GAD and tpectied in scope of work ate inckued in the Viaduct. Varation in siding Ine sro we atracteny variation for payment [The successful Contractor wil ubme @ quantity schedule fr the work as pe he deals raised by them or the componente leted above. Unt payment ol the lems shal be gover by (iy fre Quantiy schedule within the tota % payment specited against that item. For example there are ¥W number of ple groupsin the viaduct the payment doe on competion'y nolvcieg pte grous would be 0.15 x 0.12 Vit of total quoted pce under Schedule A (umpaum). [The quantity schedule ater berg approved by the Engineer wil be used for making all staye paymens. The Contractor shaud note that while stage payment wil be goverxed by tel (0) auantiyscneaie, total cot of fe ‘Lamp Sun’ component would remain unchanged fr tne speced work suboct to axjutmer forthe length of he vadoc | These percentages may be furer dstibuted ater approval ofthe Engineer. Proposal for he seme shal be submited by the conracior The decksion af he Engineer, mths raya, shal (oe tinal and binding [sub schedule Ad intezrated viaduct wit 6 lane flyover, Ramp on Both sid for Fiver, 2 lane approach rom BRT ary corridor to Fly overs shown in GAD, TENDER DRAWING ANOY GR SPEC FIEDIN THE EMPLOYER'S REQUIREMENT) Sub Hoods At Founda 73.11 [incase of Pe Foundation as |Pang Per Pie Gry ICTS Aa 117 [poe Cape Pec Pie Cap 50.00% oR TE ase ol pon oundaton es led [ral Tousen Fer Foundation Toe ‘3.2 — [Pars nding Pir Caps, cashbarisr & Shear Key Sopa ParPier 00% AS [Gesing of U-Grded rte incudng sessing gross aT cORpRTS Per span 76 00% AGA —_[ranspotaton & Erecion of U-Gréet Grier Per TO ‘ASS —[Fabcaton of Steel Spans/Spesal sans Perspan 10% 35 —|Evecione tel soavspec! san ruc Heating, Toung 6: SGN ac al Song Persp 200% °o (AS? — Load Tesing of sans a pr seage c work Perspan 150% Ss [Castinsiu eevated ramp complete val expect [— Founeston to G.. complete 30% nt a, 438 lincurt Rating complete -0% R a 3 Io Taet eb compat 0% [Bean Supt and fang for aT pave dig lol ans TSPRATSpaTE = et 43.9 Inte | 50% on supply and 60% en fixing ree 200% eareieten othe wat m a specie dg Tang S. Saias Ge, COAG, TAAATER GA] pean A310 Iyater recharging etc. for viaduct nas S008 TST — Proving & Fig Expansion Joh Parapen 20m 23.12 [Payants on compotion of fyver and Hl apes ung oetg Perepan 208 J otter balance works 1 compte te ene work ss per Te smployrsTRGNT@nA, as Golaiod Waal 49.12 féranings& speceatons .hansng over of vaduct 12 OMRG submission of a8 bald Gownge tote pe] LS 200% lcm final Tora 000% ST We for intersted vaguet wn 6 lane tvover, Ramp on Fivever lane approach from BRT corr ia (WIN GAD, TENDER DRAWING ANO/ OR SFECIFIED =~ [INTHE enPL OVERS REQUIREMENT! == re ( A (|e vate ot each su-nead shat be 50% mulinid by te respective percentage n°. 9 for subhead AR. 1.1.1, he vale ie SDK of umpaum quoted ace mulipies by 10% lrseynot paper coca Vasey oases Enon te, Se Te. poat a osuan bel av of ad wl pl ed SSG WSS Do ne fectedue "POE! Vat tn Frover,Eveed ps fr tov & Spec Spans meted sa shown m ob a ace no aba iw AS ocho ne sry seus etn mes cdl he was eth as ale by hn rh camps Ted av Un pai oe Tons WATDO GOO > pic soup woud tee soe seine an cee sae! alam. or xa er ae rumbe ope rupee none Bee aa ee [ple wou wou 8500.10 YN ofa quoted pce unr Schedule (onseens any ct ware oy ae em ETON wd mai a gn poynans, Te Gacy Sol vi Gl wa Sage pormo we Good te fart save weet ote tone Sun conenant ween ncarged trie Speed wa ij sSiawet obese i peal annang 7 Aten spol oie ree Propose sae al be ibd by conta Te dao ane ogee WS regard, sal be fat and dg socied itu entoara ree atone Sangam Vr Rhanpicsntedhar Naar an Sta @ (erchenge Wgaiod~ AV wana Galea We TOGO rawinge ana sbeciodn th employer Requrement ‘age BREAKUP OF PERCENTAGE BREAK UP OF ay DESCRIPTION OF ITEMS ava un “tnt aces ak PRICE z [fab Setette At (STATIONS) - For 4 aaions Le. Sangam Vist, Kharpur,Armbedlay agar and Saiar 61 [atestarse! Imearted = All wera an Geta inthe Tender ering and ar apcteg'e fe ate 18% equiromert. S |ron o [Sup renar act [eoaaton Basin case of ie onion mati piee 2) [Sangam nar Staton Pe up of ple % )__|knanpur Staton Per yup a pie 2% 6) __fpmbeckar Nagar Per group ot pe *% @_|sateto staton Per group of pe % ea ry Te Cap ‘Sy ‘ [Sangam vinar Station Pet pile Cap 256 D-inenpu Sisto Pe pie Cap 2% 21 —[ambedar ona Per pie Cap 2 7 — sake G Satan Per pe Cap a Fre oe “or inne aftom ne RELL E ET Tizatove) aa ‘ABTA ese of open fudaiin a lated at eee a)_—[Sengan vio Stein Perboniaan er bt fear Per puncton 3 lamba Nagar Per nie oh 2 2 — sa - omar csi Parana Tom ic a para [Stour Laver” Ai ora as deliedw te Trier ravings and pecs Eppes ROGUE Wer toon Ground Foran Corea oa Ferro a 2) | sangen iter sation Grou Pow oe evel , Faraatan ae \»—fananou staton roma Few om toe Farman [ambush nagar ‘round Foor 06% lea Pawan aT ©) |setetsision round Hor 12% evel Ta a 11.3 [Btaeases, Li shata & Excsator Pie (Grond awl to concourse level): Al works 68 dealec Wt [ender vgs and/or speed ie Ener Requemen a] |Sersamrar Sao Fara Ta roa as B erate aa 4 Peso aoe ae |Concouso. Cove Al works w ceed He Toner Sais and [or wpooter Te ERO ‘4-14 [Requronent. Woks Semcon Concute eel ard ptorm evalu ca wet os Us secaes ea sacar) 3] sansa aa Salen Fare x 3) fessagor sar Par os }_—Jamesr Nags Persea os o} —IsateG Sates er eston ma Tout a0 ‘n+15 [Plstormvel: Awake a8 dtd inthe Tener doings and/or specie i te Employers Requrzment Jit wos on /bove paternal cing ning fs nce for PED ool ue 3] [Senger rar Sater = 3] rata om | Tabor ag a od} ferro Sates ra rar 2% 7:18 _[Paymeris on dosing afte ster spac and andy overie syson cotaror fo waning a1_—[Songam war Sato Pera om 81g tar Pe aon aa | lana Nigar er sor oe a] — [saat cote Persia cee Fat = ator tlre wats fo corp We ei nak as pra Enpioer reqeren ba clad hen] 1417 lérings & specteatere, handng rer of stason fo SUR, submesin ose and rsa ste along inal bi 2) [Sangam vnar Staion Per station 00% knanpur Station Perstation 06% © ambeakar Nagar Pr station 00% ccnaas ae a Tm, TOTAL 700% |rne toa! proportion a the cost for 4 stations is 18% ofthe Lump sur contract value of Schedule-A. The value of each sub-head shall be 13% mulipied by the respective percentage in] [7e.9, for subhead A4-1.1.1.1 (a), the values 1876 of lumpsum quoted price muted by 3%. 0 Gi _]rorata payment for each tem fr on account payment wil be decides by the Engineer based on contrscor submission. Irhese units of measurement would not mean confinement of he statin work nthe stations forthe measurable areas only. The Contractor has to carry out the enie work specified in the| (W_} Fender rawangs andic specie in the Scope of Work bu only for re purposs of payment, would get pld as per the procedure speciied line successful contractor wil prepare the quanity schedule and submit a quantty schedule 2s per the deta fnaized by them forthe camponents sted below. Unit payment ofthe] (Theme shal be governed bythe quankly schedule within percentage payment specie for that tem. Al pla group and pile cap would be consitered equal uns for payment purposes, [The succescial convadior wil propare a quantly sched Tor paymant of micidual lems witia The main Tom as per the payable uni dated above within te pereeniage paymeni |payable on completion of individual units. Al the payments would be mage 28 per ts quantty schedule after approval ofthe same by th Engineer. The Contretor should nate thal (hie stage payments shal be governed by the auantty schedule, foal cst of the Lump Sum component assigned to individual station and thus forall the stations would remain unchanged! forthe speifld work. ln case of change in te for area of station wth respect othe area showm in she tender drawing. the cos ofthe station wil be increased ldcoreased onthe prorata bass of th area, The| (percentage break up a the cost component (stage payment) shall renain sam as shown as above and shall be caloated wth respect to the revised cost incase of combination of open foundation and pies ot! percantage of foundation Le. 25% willbe proportionate in tems of the unt of pile cap and open foundation | nase pereantages may be further distributes ater approval of the Engineer. Proposal forthe same shal be submited by the contractor. The decision of the Engines, inthis regard, shall le final and dining lane Underpass at saket G and 2 lane under pass from MB Road te BRT corridor including ees jth sides as shown in Tender drawing, GAD scope of work in Employer Requiromonts, Foundation lDws Ri 500% Excavation, um 0.00% [casting of Base Slab Por sam 40.00% [Casting of Top Slab Per sam 70.00% [Carpeting of Road Per sgn 0% RES [Block werk non f D wall Barca 00% balance works not inctuded abo7e auch as Sump constucton, inserts, restoration ofraods, feotpath, medlans| 457 _|eic. as sown in the Tender draing and specied in Employer's Requirements cs 7.00% TOTAL 700.00% Note (For 2 Lane Underpass & 6 Lane Underpesa) = 0 |The vale of each sub-head shal be 12% mutipied by be respective perentage in Ye, for subhiead A611 the value is 12% of lumpsum quoted pice multiple by 15% g ® in case o variation inthe feng of urderpass on ether sige, .e ncrease or decrease, the total value a Underpacs Le. 12%, wil get masied accorlngly on povata basis fr payment purpose. Dost of 2 lane underpass and that of 6 lane undorpass wil be divided as 40% and 60% rato ol total lmpsump value cf 12% # [rhe successful Contractor wil submit a quantity schedule for the work as per the deals finalised by then for the component ted above. Un payment of the items shall be gavered by ne Quanity scradule wihin the total % payment spected against that tem, w |The quartty schedule after being approved by the Engineer willbe used for meking all sage paymerts. The Contractor should note that while stage payment wil be goverced by the [auanity schedule total cost ofthe ‘Lump Sum component would remain unchanged forthe specified work subject to adjustment orth length ofthe underpass. ” These percentages may be lurher atibuted after appravalof te Engineer. Proposal forthe same shal be submitted bythe contractor. The decision ct the Engineer, n this regard, shall lo Salen ining, ‘Summary of Schedule-B (Non DSR Items) S.No. SUB HEAD DESCRIPTION ‘AMOUNT (Rs) 1 ‘SubHead 8-1 |MISCELLANEOUS WORKS £9,33,00,000.10 2 SuibHead8.2 [DIVERSION OF UTILITIES 10,00,00,000.00 [rotal Amount of Schedule-6 18,33,00,000.10 ‘SCHEDULE-B (SUB HEAD - 1 -MISCELLANEOUS WORKS) [Description of items Unit Quantity Rate (Rs) ‘Amount (Rs.) SUB HEAD - B2 - MISCELLANEOUS WORKS: [Cutting, tensporing of trees, stacking and handing over 70 the concemed epariment as per Th] instruction of Engineer Incharge a) Gi cto 30 om Each sro ERIE (b) Girth more than 30cm but up S0em Each 1334.29] 133,466.35] (c) Girth more than 60 cm but ueto 75 em Each 1617.42 323,919.50] [6) Girth more than 75 cm but usto-1 25 m Each 2802-39] 6,35,022.00] SLETOO {fe} Girth more than 1.25 m but usto 2.40 mis Each 4627 47] 4,52,747 00] () Girth mors than 2.40 mis Each 4627-47] 23.137.35 Transplanting the marked trees of various species and girth to the place shown by Engineer/Enginee?s| Fepresentatve within a lead o' 1.6 km, with all ols, plants, man & machinery and nesessary| lpreparation such as [Preparation of earth ball of tree roots of desired depth diameters [Dislodging iting. transportation and transplanting tee from original place to the new place including all larrangemert, T&P Labour etc for successfully completing the work. The work will Include Excavating cits of adequate size, arranging loose sol, mixing of manure, fertilizer, insecticides ete. to lensure survval ofthe trees being transplanted [Maintenance of tee le. watering, manuring, soll heaping, Spray of insecticides for six months All |sbove operetons shall be executed a3 per specification {@) Girth upts 30 om. Each 1082579] 52,288 50] (b) Girth move than 30cm but upto Soem 13736.25| 8.25.175.00] (©) Gith more than 50 om but uot 75 em Each 17927 -41 76, 13.46.99] (6) Girth more than 7 cm but upto 1.25 m- Each 2483757 20.77.18 35| [(e) Girth more than 1.25 m but upto 2.00 mis Each 28325 .02] 47.5850 20 9 Girth 201 cm to 500 em Each /3)e8)a/s| 35841 69] 175,208. 45| [Stage wise zayment of item no. 2 fer the work will be as following: 0) 30% after tee transpanted, (| 40% afler sprouting & establishment of wees Li) 30% afte” completion of mainisnar ce period of one year \v)This is being Biological work, ris Understood that there willbe 20% morally ofthe wees, Moraliy 20% wil be accepted. () I rate of mortality is more thar 20%, no payment wil be made to the contractors for the no. of tees] which are mere than 20% of the tses wansplanted, Provising 2.0 m high tenporary barricade and arrangement for trafic diversion such as trafic signals| curing construction at sit, for day and night as per requirement and drawings. During construction, barricading and arrangament for tratfic diversion has to be kest continuously and maintained. and| painted property bl the completion ofall the actvties. The construction barricading will have a width of] 2px (outside to Cutside of barricading), This ean be increased at specific locations where the more width| quired for constructon with approval of Engineer Keeping i view the movement of traffic at the| 1d level and minimum inconvenience to and safety of public. Ths item includes cismanting, re-| ting, shitting from one location to any location as per the instruction 2f Engineer, writing, painting, ning, arrangement ‘or trafic diversion such as rope ligt, traffic signals during construction at site ‘day and night, glow lamps, reflective signs, marking, flags, cattion tape as directed by the Engineer] in-charge. Metre 10000 3547.38) 3,54,73,800.00] |The barricading provides shall be retained in pos tion at site continuously /c shifting of bericading from| Jone location o another ecation as many times as required during the execution ofthe entre work tilts Jcomplation and as per the direction of Engineer-in-charge. Rate include its mainterance for damages, caintng, repairing, shiting, allincidentals, labour materials, loquipments, all Tools, plants & machineries “equ red for shifting etc. and works required to execute the| ot. The baricading shell not be removed witno.t prior approval of Engineer-in-Charge. Nothing extra| shall be payable, The berricading material wil be property of contractor after complection of work. Notel “The payment schedule for itom shall be ae followe: (a Providing barricading for a given stage and aporoval ofthe same by Engineer : 70% of the accepted) famount for item 3 (in Aer completion of al activities of stage for which barricading was erected : 30% of the accepted] Jamount for item 3 ETOO [Providing 1.0 m high temporary barricade and arrangement for tafic diversion such as trafic signals| lduring construction at site, for day and night as per requirement and drawings. During construction, lbaricading and arrangement for traffic diversion has to be kept continuously and maintained and| lpanted propery til the sompletion of al the activites. The construction barricading will have a wicth of lam (outside to outside cf barricading), This can be increased at specific ccations where the more width] is required for construction with approval of Engineer keeping in view the movement of traffic at the| lground lave! and minimum inconvenience to and safety of public. This tem includes cismantiing, re} erecting, shitting from cne location to any locaticn 2s per the insruction of Engineer, writing, painting lceaning, arrangement ‘or traffic diversion such as rope light, trafic signals during construction at site| for day and night, glow amps, reflective signs, marking, fags, caution tape as directed by the Engineer| lin charge. The construction barricading will ave different width indifferent portion ofthe alignment as| ldrected by the enginear keeping in view the movement of trafic at the ground level and minimum] inconvenience to pubicand safety of public. Metre 1000 2109.38 21,09,380.09] 2 So = wo a = The barriceding provided shall te rexained in position at site continuously Uc shifting of barricading from| Jone locatio" to enother location as many times as required during the execution of the entire work tl its |compietion and as per the direction of Engineer-in-charge. Rate include its maintenance for damages, painting, repairing, shifting, all incidentals, labour materials, lequipments. all Tools, plants & machineries required for shifting ete. and works required to execute the| ,b. The ba icading shall nat be removed without por app‘oval of Engineer-in-Charge. Nothing extra Ishall be payable. The barricading material will be property of contractor after complection of work. Note| ‘The payment schedule for iter shall be as follows: i) Providing barricading for a given stage and approval ofthe same by Engineer : 70% of the accepted| [amount foritem 4 (i) After completion of ail activites of stage for which barricading was erected : 30% of the accepted| [amount foritem 4 5 _ [Traffic signsis, signage's & othe traffic ads (as per IRC specification) [Providing & fixing of retro-refiecive Waffic sign boards as per IRC recommendations and ISI arproved 5.1 |The rate includes all labour, material, T&P, machineries, cavTiage etc. complete in all respect and as| Sqm 250 1158647] 28,98,617.50 lper the direction of Engineer-in-charge, ‘52. [Providing and fing and mainaining the road Wfastructure during executions, refiing ae where| required. 521 |(e) Road detinator Each 124 7128.99 7 Be8475] 522 |(o) Portable Signages Each 124 7232 72| 8,96,857.28) ‘5.23 l(c) Reflecthe lights Each 125 2855.25] 3,56,906 25] 524 |(@) Trafic cones. Each 500 4295 50 6.47,750.00] Deployment of adequate manpower for 8 hrs. shift for cay and night management of traffic in 6 intersection. roadway influenced by contractor and traffic diversions at various levels complete in all respect anc as per the direction af Engineer-in-Charge Si_|e]Supenisar Shits _| 7500 77400] 68,05,000.00) 62 l(b) Trafic G sarde/ Marehalls ‘Shifts [32350 7700 80 2,26,79,880.00] INote : The deployment to be dane with prior approval of DMRC. The personnel at (a) & (bi above] should be familiar with trafic rules and regulations. The rate includes providing of all safely accessories| such as lightbattens, flags, all PPE's otc Providing , fabricating t> required profile and shape, transportrg, erecting and fixing in position MS| members made of Bul: up ‘rolled! hollow strustural steel sections to be used as inserts! fixtures! [supports hangers etc. for System contractors including E&M contractor, OHE contractor and S87| contractor etc) at any location including procurement of all raw steel materials, bots, nuts & washer is testing, allowanze for all ypes of wastages, tightening, cutting, welding, threading, bending of a whereever spend, eiling hale, boting powson of racereay lode or as decd Dy [Engineer in Charge. Cost to include but not limited to. el materials including wastages, all isumables, fasteners of all types for both temporary works including staging, scaffolding, tools, plant)“ a8 ee) ate land equipment, and acditional costs of all ncidentals and necessary testing of material etc including lcost of painting @s per specifications. (The rate includes all labour, material, Tools &Plants| lmachinaries, consumabes, welding, cariage, shifting, work at any level, scaffolding, application of lprmer & paint as per szeciication etc. complete in all respect and as per the direction of Engineer-in |crarge. Nothing extra sll be payable.) Providing and laying Cobble stone of approved size 100 mm x 190 mm x75 mm of approved colour i Black over 30 mm thiex compacted bed cemext mortar 1:4 (1 cement °4 coarse sand) along with lorouting with cement mortar 1:2 (1 cement : 2 course sand) complete as per direction of Engineer| lIincharge, Sam. 100 2530.92) 2,53,992.00] JProviding and fixing Anchor Bolts M24mm dia. x 1550 mm Lengh (G.1) with double nut, washers and| IGI Piate of S0x50x16mm thk. in base for roof portal columns. Bolts shall be confirming to |S:1367-1991| 9 Jorade 8.8 and base plate confirmmig to 1$2062-2008 of grade Fe110 W and yield strength of 250 Mpa.| Nos. 2500 456.38) 11,40,950.00] The rate includes mate‘al, labour, xing, templa‘e, carriage, welding, threading, nuts-2 nos., washer-2| rcs. shiting, galvanizing etc. complete in al respect and as per he direction of Engineer-in-Charge, Esra for galvanizing over structural steel as per the drawing & specification etc. complete in all respect lard as per the direction of Engineer-in-Charge Si G4eo kg | 67527 1282 8,521.91] Total of Sub Head B-2 8,33,00,000.10 SCHEDULE-B (SUB HEAD B-2 - DIVERSION OF UTILITIES) S.No. Description af items Unit Rate (Rs) 'SUB HEAD B-2- DIVERSION OF UTILITIES B-2 _|(Note + In this sub head quantity of any item can be executed to any extent and variation in quantity as per GCC shall be applicable on the total amount of this sub head after quoted percentage.) [Taking out and tansportation of CI/MS/PSC/HS. pipes including djointng| land transportation upto al its and a lead of Ska (The Scrap shall be the propery lor Dsarc), 1. |The rate includes all abour, material, Tools & Plants, machinaris, consumables, welding, carnage shiting to designated location, work at any evel, at any lent ek omplete inal respect ail as per the direction of Engineer in-charge Nothing exe hall be pai to complete this job, AL a) apie Sm Bs pipe ne mate 5) 1) upto 400-00 mm di pip i mete 3879) 8) lor interconnection posnt YT] Valve 3) upto 300mm cia ae sa 1) Jupto 400-600 mr di each, 33855 [Providing ond laying SES NPS ROG, pipes manlactared by waing lpia resistant coment including jointing with rubber ing an filing joins with cement lmortar 1.2 2 Ihe fate includes all labour, material, Toole & Plants, machinaries, carage| shin, wouk at any Tevet ete. complete in all respect and a por the dirction ‘Nothineexta shal be navable a eal » 7370) FI a7) ay 1557.5] ot 24755 2) [00mm dis pipe wiz] Providing ane Taying S&S NPA RCC pipes manufactured by using sulphate resistant coment including jointing with rable ring and filing joints with coment 3 frmonar2 |The rate includes all labour, material, Tools & Plants, machinaries, carriage) [ting, work at any level ee. complete in all respect an as per the ditecton of Eneineer-inshasse, Nothing eta shall be pavabl [smi cia pipe ‘meee was| [ison pie cre 21243 <) [400 mn dia pipe ce 91637] 2) poo mm dia pipe metre 157. fe) 250 mm dis pipe elie 7] Plugging of water main with taloon of adequate sie by Wvlaing with a] Jompressor including transportation of ae compressor a site 4 fhe rate includes all labour, materi, Tools & Plants, machinaies, carriage siting, work at any levelete. compete tn all respect andl as per the direction of Esnes-iashatses Nothing eta shall be pavabl 3400 mn ais ro Tse] i) fsoome sie ro BaD | Plugging the Toad sewerage fom the evisting sewer Tine eo a8 to reduce te arsinage of sewer line to minimum in wet and foul condition by placing gunry bogs filled up with earth and stacked propery including suppying and laying the [ited up gunny bogs upto fall length an required height as cect by Engineer 5 fond subsequent removal ofthe same after completion of the job to the entire Jatisfaction of the Enginecrin-charge, including pumping & baling out of the [water complete [the rate includes all labour, material, Tools de Plants, machinaris, carriage shining, work at any eve ec. complete in all respect and as per the diection of L:sginsincharon Nothine risa shall nasa soem dia pipe rm TE » mda pipe job 27: <) 00 mum dia pipe ob 8 4) [450mm dia pipe job 355 e)—fooomm dis pipe fob 521.0) [room eis pipe job 1277585 001379 [Fogging the total stormwater rain fom the existing storm water Hine as Jeedace the drainage of storm line sewer lie to minimum ia wet an foul condition| by placing. gummy bags filed up with earth and stacked propery including [supplying a laying the fled up gunny bogs upto Fl length and required height fs tirvctd by Enginoor and subsequent removal ofthe same alter completion ofthe fo to the enti saisfation of the Engineer, cing pumping & bailing ont ofthe water complete [Tho rate includes all labour, material, Tools & Plants, machineries, cariage| lating wet at ary level ec complot in all rxpoct and ae por the diection el nena shall hase [150mm da pipe ro [250 mm dia pipe isi. [0 mm dia pipe 120 mm dia pipe 307.95 150 mm dia pipe 3525.5 [00 sm dia ips 891.9 [0 mm ia pipe 220985] [Providing lea cau joints tacluding the cost of pig Fea supply and aig a lubber gaskets welding. and cating of MS pipes and specials sneuding the eto IH/P of T&P at site (For watermains at interconnection point / Yace/ valve) including cost of dewatering [The rate includes all labour, material, Tools & Plants, machinaies, carnge| shitting, work at any level etc. complete in all respect and as pe the diction a ineeinchawme. Nose extra shal be nasabl Jupio 300mm dix Ea Toa [a= 600 mm di 254 [Supply and instalation of MS pipe with 730 Micorn PU coating internally and 250 lnieron anti corosive bituminous pnt externally with a tolerance of 6 in gradient by tenes eluology stein! a am avenge ep 3 ts oe Une a eve including excavation & filing of pits, dewatering arrangements, supporting systems foe so, including the approval from the concemed department. The iy will also supply the test certificate w-et MS. Pip, design of PU coating te. The work also involves under ground mapping of services, welding, barcading| installation of Hickering lights etc, clearing ste in all respects after sulting ICCTV survey report fom u/s to d/s, connection manhole along with the sit ol drawing shoseng wor coeyplet al respect [The rte includes al labour, material, Tools fe Plans, machinarics, consumables welding, carsage shifting, workat any level scaffolding, coating. primer painting stingy all lead and lift, excavation, backing, dewatering, restoration boeriading, support for si te complet i all respect and as per the direction of [Enginerivchange: Nothing extra shall be pai on this account to complete the jo, a 230m cin an Tie ow [500 ma dia (10mm thick 726705 Providing, aut laying, of TOO mam GT pipe, mean cass, Jindal make, with al accessories ike bonds, sockets. te all complete iy 74240) 10 P/ of MS pipe of 10 mm wall thickness on agreed line andgrade (a per 1: 3583) Jal made fom stel conireing to 1S: 2062} the stl pipe susface internal anal jexteral salt he blastn! to neat sete and then coated with sowed ese PU [cating of nominal 750 microns and ominal 1000 microns an exterior and interior [surface respectively all approved/used by raway/ DDA's/RDA's projec for sever fand water lines with design and construction of Man holes at approximate 39 meter interval or required distance with trenchless construction technique below] the water table prefrably without the need of dewatering, Accuracy of level at requited gradient/slope to be achieved by use of Laser/OCTV controled by| [stable equipment. the last pit the equipment to be position at surface ina Jingle trafic lane. The work shall be dane in such a manner that it will not distur the smooth moversent of tfc. The item includes excavation of trenches and] recovery pitwelding. and backing after work completed at the site of work |moblzation and demobilization of equipment consumable ete as nocded [complete the work 901380 [and cleaning of ste complete including disposal of surplus earth within 10 km lea land making, water and manhole connections Trafic control arrangement al lighting display of sign board. Insurance of work man ete complete inclading| Iemovai of all hindrances, unforeseen items permission of ether dept. (dept. shall only assist in geting permissions etc) he rate includes all bour, material, Tools & Plats, machinares,consumables| welding, carsiage, shifting, work at any level, scalfoklng, coating, primer, painting Nesting, all lad and it, excavation, buckling, dewatering, restoration baricading, support fr soil et. complete i all respect and as per the direction of [Enginer-in-harge. Nothing extra shall be paid on this account to complete the ob. a [pimm dia pipe by trenches tenalogy ‘ete CSU] by [100 mom dia pipe by trenchless vechnologe T1007 u [proving and laying MS pipes/barels made out of required thickness MS pat ncucting painting with epoxy paint of approved qually outside and inside teste to a head of 15kg/em squate suitable for welding joints conforming to 153589 isa 1$ 784-1974 including testing ofthe spect heal as directed bythe Engineer. [he rate includes all lbour, materia, Tools & Plans, machinares, consumable welding, testing, carriage shifting, work at any level, scaffolding, application ef Jpvimer & paint as per specification etc. complete in all respect and as por the |tivecton of Engineer-ivcharge. Nothing eta shall be paid on this account to} [compete the jot a Pipes made up of NS aheo(omm toldmum th] Ti 2 Providing ane aying MS special such as tos, Bends, collars, tails pices eke mae owt of required thickness MS sheet including. psinting with epony paint of approved quality outside and inside tested to a head of 15kg/sjem suitable fr wetting joints conforming to 15 3589-1961, 15 781-1974 including welding, esting the specie head as iret by the Engineer, [ihe rate includes all labour, material, Tools & Plants, machinaris, consumables, welding, testing, caerage, shilling, work at any level, scafoldng, application of primer é paint as por specifeation etc, complete in all respect and 9s per the sirection of Engincerincharge. Nothing extra shall be pat on this account to [complete the jb. a (Specs made up of MS shet{omm to Tam Th) 7 17) B roving HS. Pipe, made out of 6 me thick MS plate with inside cement morta ining of 25 men thick an 25 mmm thick ouside coating a per I 1916 of following} ameter [The ate includes all mater, Tools fe Plants, machinares, consumables, coating fasrioge, labour shifting et, complete in all respect and as per the direction of Enginer-in-harge. Nothing extsa sll be paid om this account to complete the job. sm dia wipe aie rosa > 00 nm dia pipe Metre S182. a. 0 sm dia pine Metre 119773 1 Laying 1S. Pipe, mace out of 6 mm thick MS plate with iside cement morta] ning of 25mm thick an! 25 mam thick outside coating as per 151916 [The rate inches al labout, Tools & Plats, machinares, consumables, welding sting, carriage, shifting, work at any level etc. complete in all respect and as pe} the ditcton of Engineer incharge. Nothing extra sll be pi on this account to feompete the job. man da pipe nam 5 by 00 um dia pipe 319.9 Pl ean is pipe Metre 35.05 15 Providing and fixing 1VC brand 400 mm dia D/F nou return / check valve of PN 1.0 rating having Body /Door of Cl Gr. 20, TRUNNION shaft AIS 410, Face & Seat ring of GM ie metal to metal soa not Rabber to metal, generay confirming to 15 1812, Fainge at face dled to 51538 Part IV & VI/BS 10 Table". [he rate includes all labour, material, Tools & Plants, machinaries, consumables, |welding, testing, cariage, shifting work a any level ete complete in all espe! nnd os per the direction of Engineer-i-charge: Nothing extra shall be paid on this account to complete the ob 186918 33 [Providing and fixing C1D/F Sluice Valve with S&S (1S 6608 12 S12) stain ang jgen metal Pats confirming to 15 18846 of approved make/ of approved brand feithcap) in the exiting pipe with bolls nuts rubber insertions ec compete [The ate includes al labour, material, Tools & Plans, machinares, consumables, welding, testing carviage silting, work at any level ec complet all respect and] fas per the ditection of Engineer in-charge. Nothing. extra shall be pai on th lccount to complete the ob a Lam da Dy 0 a da et Each Ta) zrssiaa| Supply and Tatalation of 10 mm da NS pipe of TO mn wall thicknows confirming jo 152062 witable for welding joints with 750 Micron PL. coating internally an lai- corrosive bituminous paint on extemal surface, with tolerance of 6 ine |graient by trenchless technology method at an average depth of 445m below the fond level incading inlerconnecton vith existing chambes ( with require lexcavation and iis restoration including, dewatering arrangement) — including itust pit and receiving pit and the supporting system of soil shoul! be got approved from the department before execution. The trenchless has to be cari Jot below existing devp nallah below road, in aubeol snd enilingrervlcon He frm wil leo supply the test certificate wrt MS pipe design and P-U coating let, during the execation of work, The work alo invalved necessary numberof Iuhrust pit and receiving pit as per the site condition to perform boring inclaing oad cating under ground mapping of sevice, [Dewatering of pit and making geod by tock filing in layers of 20m each las per the televant CPWD specifications and disposal of surplus earth as per [direction of Engineerin charge. The fim has to make connections inthe u/s aa Metre 8 Iroviding and Laying mi stee! pipe 100mm internal di made fom 2m thc IME Plate conforming to 18 700, Interne lining with cement morlar and extriog [surface treated with coating and seraping, confi to 158589 2001, 15. 10271-1982 ]1905-1986, specifications ifc all lead and lift complete as per direction of the lingineersin-charge [he rate includes all Ibo, material, Tools & Plants, machinares, consumabls| welding, carriage, shifting, work at aay level, saffolding, cowting| ferappingitsting, ll lead and litet. complete in all respect and a6 per th| |sirction of Engineerincharge. Nothing ext shall be pail on this account to Meter 177589] » tai fxs for Providing and Laying of 1100 mim dia NS pipe of 1 mam wall Heke] oy Trenches Technology am agreed line nad gral (x por 15: WA0 ae made rem] [tet confirming to 1S 206) the stool pipe surface intemal and external shall be bast! to near wie and then internal conting of 750 mizron food grade whi Jpsint and external coting of 250 micron bitumin paint all approved/used y| Jilway/DDA'/RDA's/DJBs project for ower and water lines with design and] onstruction of Man holes at approximate 30 meter interval or required distance with trenchless construction techn below the water table preferably without the Jnced of deveatering, Accuracy of level at required gradnt/slope 1 be achieved by se of Laser/CCTY controlled by suitable equipment, Jn te last pi, the Jaquipment to be positioned at surface in a single talc lane. The work shall be Jdone such a manner hat wil not distur te soe maemo ae Tn tern includes excavation of trenches and recovery pit and backflling after work Jcompleted at the ste of work mobilization and demobilization of equipment Jeonsumable ete as needed to complete the work and cleaning of site complete including disposal of surplus earth at any leed and making. water and manhole Meter v0: Ike rate incluls all labour, material, Tools & Plats, machinaries, consumables] welding, carriage, shiing, work at any’ level sctfoling, coating, primer, painting lstng, all lead and if, exexvation, backfilling, dewatering, estration| Iscricading support for so et. compete in all respect ard as per the direction of JEngincerin-charge, Nothing extra shall be pad on this account to complete the job. 01382 [Esta for Providing and Laying, oF 900 mn dia MS pipe of 12 mm wall hikes by [Trenchless Technology on agreed line and grade (as per 15: 3589 and made fom sto! confirming 10 1S: 2062) the steel pipe surface internal and external shall be [blasted to near white and then internal coating of 750 micton food grade whit [paint ane external coting of 250 micron bitumin paint all approved/used by |alway/DDA'/RDA'S/DJBs project for sewer and water lines with design and lconstruction of Man holes at approximate 30 meter interval or requited distance with trenchless construction technique below the water table preferably without the need of dewatering, Accuracy of level tsequted gradient slope to be achieved by lose of Laser/CCTV controlled by suitable equipment. In the last pi the lequipment to be positioned at surface in a single taffi lane. The work shal be [done in such a mance that twill not disturb the smooth movement of atic, The tem includes excavation of trenches and secowery pit and acing ater work Jeompcted ot the site of work mabiieation and demebiication of equipment consumable etc as necdes to complete the work and cleaning of site complete] Metre sazr9ss| The rate includes all labour, material, Tools & Plants, machinaries, consumables | welding, careage shit, work at any level scaffolding coating, primet, panting lesting, all lead and ‘it, excavation, backfiling, dewatering, relocation} [arricaing, suppor for sole. complete inal respect and as pr the direction of [Engincer-in-chayge. Nothing, extra shal be poi om this account to complet te jo, a [Providing and laying of precast box drain of approved MAB grade of coneete off jinternal size 140m x 2.10m as per approved design fe providing. & fixing} lcinforcoment as per the approved drving, centring & shuttering, loading} fanoading and transportation a site and placing in the final position an jointing} with cement mortar (Ieement2 fine sand) complete as directo by the Engincer| lincharge (The rate includes all labour, material Tools & Plan's, machinates, carriage} shin, work at any level, scaffolding al ead and ite. compete in all respect nd as per the direction of Engineer-in-charge. Nothing extra shall be paid ths} 5926. Povting& laping of 1600 om Gate ME pipe ade wp PTT mm TRE NS pate as per 15 282 though tence ln hogy’ hy sprite cer pit ance ring Machine wi steering i to cow the cog way i/c maa lees with te po er ged equipment excvatin of xine and tr pil te shoring, proving hut Hock welding cating these! pipe rae sera external pines be Mase omer we tated wh 750 mio] [PU contng pain each face of mete 120 pie filing back compaction, dipos! f frien arth, fc gonorator JCB, cram, wench less machi, jks hyd lechology tering all mater aor sn Ta complet os er dscton of lnginerincharge Deploy of sgn tou nara of workean te complet ie jemova ofa hindranesuaorten en, perminon of ther sept ep shal [say eminsngeing piri ck) mahig eae sa pal wait anno [ptt hej [heme ncades all koe, materi, Tots & Pants, machina, consumables] riding caries work at ay evel sesflding coating, pines, Ping] Metre sss30052 [Providing Taving of 10 diameter MS pipe of 11 men wall ackneseon agro flne and grade (as per 15.9589 and made from sel confnming to 1.2062} the ste Jine surface internal and extemal shall be Basted to nese white and then coat win solvent less P-U. coating of nominal thickness 750 microns and nominal thickness 1000 microns on exterior an interior surtace respectively of a approve Js wed by railwayIDDA2/ RDA in wer and water lines projects with deg Jad construction of Man holes at required distance. Pipe tobe In with tench lee fonsiruetion technique, Accuracy of lave at required gradient/slope to be achiev Joy use of liser/CCTV controlled by suitable equipment In the lst pi, the Jcauipment to be positioned at surface na single ali lane for the work. The item includes excavation of trenches and recovery pis, excavated earth taken ott an eis backing after work complete at the sit. Work includes mobilization andl [demobilization of equipment consuaable etc as reve to complete the work ana Jeaning of site complete including dinposal of surplus earth a any lead an Metre 13558227) 001383 Nothing extra shall be pal on this account to complete the fob. The frm wil als} Jupply the test certificate wrt MS pipe design & PU coating et. during the] lexccution of work, Dewatering of pital making good by back filing in layers off f2cm each as per relevant CPWD specifications and disposal of susp earth a pe |icction of engincern- charge. The fir has to make connections in the U/s and [D/s manholes atthe same existing invert level including necessary plogging inthe] lvsting line by dismantling and restoration of connection manholes complete [the rate includes al labour, material, Tools & Plans, machinarce, consumables lwcising,carige, shifting, work at any eve scaffolding, costing primer, panting listing, all lead and it, excavation, backfilling, dewatering, restocation, seceding, support for soil et. complete in ll respect and os per he direction of enginer-in-charge. Nothing extra shall be paid gm this account to complet the fob [Providing © Toying im positon oF 5000 me Teimcter nonpressare NP caw neavy Duty) OC pipe with rubber rng joined with stilt mixture of cement mora inthe proportion of 1:2 (1 coment: 2 fine sand) RCC pipes conforming 4 1: 456 s88- complete ae directed by Engineer in charge. The ate includes all lbour. materi Tonks & Plants marhinaing carriage, teatng | siting, work a any level, scaffolding al lad an ite. complete in all respec ul as per the direction of Engineeri-charge. Nothing extua shall be paid om this sHacomalte the ob Mette 22985 9 Providing and Laying mild steel pipe Om internal dia. made from Som thik IMS Pate conforming to 15 2062 Interior lining with cement mortar and exter Jsefce treated! with coating and wraping coufim to 1535692001, 1S: 10221-1982 150-1986, specifications i/e all lead and itt complete as por diection of the Engineer charge [The rate includes al labour, material, Tools & Plans, machinares, consumables lwciding, carnage, siuting, work at any lve, testing, coving, wrapping ll les land lite. complete in all respect ant as per the ditetion of Enginceri-change Noting, extra shall be paid on this account complet the fb, 017007 2% Providing and Laying mil ste! pipe 00mm internal dia, made fom 10m thik IMS Plate conforming 10 15 2062, Interior lining with cement mortar and exter [surface treated! with coating and wraping confirm to 158589 2001, 15: 10221-1982] 11909-1986, specifications i/c all lead and Lift complete as per direction of the Engincerinchange [he rate includes al labour, material, Tools & Plants, machinaries, consumables welding, carnage, shutng, work at any lve, testing, conting, wrapping all lea land lit etc. complete in all respect and as er the direction of Engieern-change, [Nothing exta shall be paid on this account to complete the jl, Metre 196313] [roving and Laying mill see pipe 100mm internal dia, made from 12mm thick] IMS Plate conforming to 1S 2062 Interior lining with cement mortar and extercr] surface treated with coating and weraping confirm to TS3549 200, S-10221-198 11909-1986, speciation i/c all lead and lift complete as per direction of the [Engineerincharge Ihe rate includes all labour, materia, Tools & Plants, machinarics, consumable |welding, carriage, shiting, work at any level, testing, coating, wrapping all lead land lt ete. complete in all espoct and as per the direction of Engineer sn-charge, [Nothing extra shall bo pai on this account to complete the jo Metre 9262.7 Providing, & Cayng of Some dia made wp OF Tom ice NIS plate ve por TS 209 lavough trenches technology by Specialized Auger boring machine with staring it to cross the carriage way ile maintain levela with the help of laser guided lquipment, excavation of trust de receiving pit side shoring, proving Unust bed ke blocks welding, cuting the ste pipes surface internal & external painted with} 250 micron epony coating on each face of pipe ling back compaction, disposal lores orth, i generator, JCB, Cranen, trenchless machine, jacks, Kydsoul lechnology, testing et all materi Inbour and T&D complete jasper direction [Engineer-in-Charge, Deploy of signboard, Insurance of work man ete completes removal of ll hindsances unforeseen items permission of other department (dept [shall only assist in geting permissions ste) nothing extra stall be pakd on the} [account to complet theo. [rhe vate includes al labour, mater, Tools & Plans, machinares, consumables ate re a, work at any level, scaffolding coating, primer, pati] 3466.6] fall-lead and lft, excavation, backing, dewatering, restration| 001384 Jevoviding ar ying mild tet pipe 800mm internal dia. Made from 20m thik IMS plate conforming to IS 2062 interior Ting with cement mortar andl exterior Jnuface treated with coating and veraping onlin to 153589.2001, 1:10221-19%2| fi90e 986, specification i/e all lead and It complete ae per direction of tho lEngineer-iv-

You might also like