You are on page 1of 12
YFc PROJECTS Work Order WO. No. YFC/DC-04/19-20/003 Dated: 10.01.2020 Shirish Patel & Associates - Indus Consultrans JV (A Joint Venture of Shrish Patel & Associate consultants Pvt Ltd And Indus Consultrans Pvt. Ltd) Dabur House, 3rd Floor,41-55 Nagindas Master Road Kort Mumbai-400001 spa@spacl.com ‘Mob. — 9910034450 Kind Attn: - Mr. DS Gadkari Project :- Contract DC-04: Part Design and Construction of Integrated structure consisting of Elevated Viaduct and 6 lane flyover ( Double Deck system), Viaduct and Elevated Ramps for viaduct and flyover, Siding lines, Under Pass at saket G, Elevated Ramp from BRT corridor to flyover and two pass road to BRY corridor E Stations viz, Sangam Vihar, Khanpur, Ambedkar Nagar and Saket G (Excluding Architectural Finishing works of stations and PEB works of stations) from Chainage 14480,00 m to 18760.00 m of Acro City to ‘Tuglakabad Corridor of Phase-IV of Delhi MRTS Subject: Detail Design Engineering Consultancy Services (DDC Services ) for the above project. Refs your offer & discussion with Director YFC Projects Dear Sir, With reference to the above discussion, we are pleased to issue here with this work order on you for Design Consultancy Services for the above-mentioned project with the following terms & conditions. For the sake of brevity, Y.F.C. Projects limited is being referred as “YFC”, And Shrish Patel & Associate consultants Pvt Ltd and Indus Consultrans Pvt Ltd is referred as SPA-INDUS JV hereunder 1. Scope of Work: The scope of work under this work order shall comprise of providing complete detailed engineering, including designs and drawings for the permanent elements of the structures within the purview of the above project. ‘TO COMPLETE THIS SCOPE OF WORK “VIADUCT & VIADUCT IN STATION, EMERGENCY SIDING LINE, ELEVATED RAMP & SPECIAL SPANS AS SHOWN kor zel]6 ‘YFC PROJECTS PRIVATE LIMITED P Registered office: VEC House, lOt# 1, Block 8, Infoxty, Sector-34, Gurgaon - 122001 (HR) INDIA Telephone : o124-4086717, 4369717, 4885717, 4368717 | Fax: O124-6579717 | Webs: wwrwyfeproject.com ‘cn: Ur4a99HR7e86 PTC 057072 IN GENERAL ARRANGEMENT DRAWING/ GENERAL ALIGNMENT DRAWING (GAD)” a) Design the span configuration (only) based upon his proposal subject to obligatory requirements as per provided alignment plan and Pier locations by DMRC. The Span arrangements of Viaduct & viaducts in station must be decided in such a way that pier locations do not disturb the road geometry, ROW, clear carriage width of roads, flow of nallah, utilities and traffic flow aii Design of viaduct fiom chainage 14480,00m to chainage 18760,000 ( 4260 Mts) which includes elevated ramps on both the sides, construction of integrated structure of 6 lane flyover and viaduct (double deck system) from chainage 15567.492m to 17986.326m and both side ramps for the flyover. ) Design of two-lane underpass from MB Road to BRT Corridor and 2 lane elevated approach from BRT corridor to flyover (T-Junction), 4) Design of 6 lane underpass at Saket-G partially integrated with Saket G station ©) Design of compete substructure & super structure of standard span and all other nonstandard spans for straight and spans for curves more than 300m radius as per tender drawing wherever necessary or as instructed by DMRC £) Viaduct span of 10 mts. Length adjacent to the station on both side will be with the use of I - girders and will have the facility to accommodate the maintenance stairs from platform to deck level of viaduct 8) Design & construction of Pile foundation, Pile cap, Pier, all type of Piers including Cantilever & Portals, Pedestals, Cross Arm, Extended Pier cap, Cantilever Pier cap, Tabletop Pier cap, Portal Beams and other structures which are part of this contract. h) Design of non-standard spans, I-Girder/T-Girder/U - Girder spans, spans at crossover iocation and spans in sharper curvature (radius jess than 300 mts). Wherever necessary or instructed by YFC/DMRC. i) Design, of special spans of 50.00 m at Ambedkar Nagar T-junction, 56 m at Saket G. Type of bridge and method of construction shall be approved by DMRC. The length of Special scope and J) Submission of Bearing forces and design of seismic restrainers for special spans approved by DMRC including GI brackets for cables laying, walkway, parapets & railing. The SPA-INDUS JV will review the design of Spherical/POT-PTEE bearings submitted by the supplier and offer comments if any. k) Design of emergency siding line, Elevated ramp as mentioned in tender drawing SCOPE OF WORK UNDER STATIONS a) Design of four clevated stations 140m in length with the provision of extension up to 210m in future at Saket-G, Ambedkar Nagar, Khanpur and Sangam Vihar including entry/exit structures, ancillary buildings and other structures as shown in the tender drawings, Ambedkar Nagar and Khanpur are combined to Double decker structure b) Design of Saket-G station as integrated station forboth Tughlagabad- Acrocity corridor and Lajpat Nagar-Saket-G corridor, as per the layout given in the tender drawings. This structure will have interchange facility as mentioned in tender document to facilitate the train interchange facility from one corridor to °) 4) 2) h) Jength 75 m each and one scissor cross-over ‘of length 210m will be included. Design the station with the provision of future extension of platform at each station longitudinally by 35 mt, each side or 70 mts. on one side. Design of all station building, additional floors within station premises, Ground, Concourse, Platform, entry/exit structures, corridor, ancillary building ic. Underground/surface water tank, Pump room & DG room, Lift shafts, escalator pits, staircases as shown in tender drawings. Design of structure work such as Entry/Exit structures, Lift shaft & escalator pit from ground to concourse, connecting corridor, Ancillary Building i.e. Underground/surface water tank, Pump room & DG room at all stations as shown in tender drawing. Design of Saket G station structure as it is different from other station structures. All structural works of this station including all floors of station building, connecting corridor, connecting passage, entry/exit structures, staircases, Ancillary building, lift shafts, escalator pits, concourse, platform and floor above platform as shown in the tender drawing. The necessary pr ns for connecting of proposed FOB’s in stations as shown in the tender drawings and design of brackets for supporting FOB. Design of Main holes, Sumps & drain etc. as required for automation based water supply scheme in Ancillary Building for E&M works. Design of ground water recharging /Rainwater harvesting systems two nos. at each station to cater all the station as per guidelines of Central Ground Water Authority for rainwater harvesting. sions of load imposed in design of st sions of load imposed in design of st ‘The major service to be provided shall include, but not necessarily limited to, the following. a. An alignment review, A review of the outline design, preliminary viaduct sizing, utility Supporting scheme fouling in the alignment. b. Preparation of Detailed Design and Drawings of permanent elements of all Structure covered under schedule A (Lump-sum) of the project work including conducting appropriate value engineering thereof to the extent possible so as to reduce the project cost ©. Provide the approved the GEC drawing accordance with Project ‘Team. d. Quality assurance programme for the design, submissions of design manual, , proposed specifications, identification of codes and standards e. Provision of revised Bill of Quantities for actual site execution with provision of revised drawings at least 3 time drawings the contract period irrespective of reasons f, Review and endorsement of designs for temporary structures as applicable for site work 2, Submission and approval of the “As built drawings” |. Itis understood under the meaning of this contract that. SPA-INDUS JV shall deploy experieaved tachninal penta deploy experienced technica! pers soft and hard copies of all the designs and drawings as per the requirements of the DMRC and YFC. SPA-INDUS JV shall liaise, coordinate with various authorities including DMRC and get the necessamcappypvals for the designs and drawings. All designs and drawing shall specifications as to deliver the above services and submit 3|6 obligated under the terms of the contract (between YFC and DMRC) as well as to all the prevailing codes and standards. i, SPA/Indus will set a team at Delhi itself for aforesaid work till streamline (Min. 10 Month from Date of LOA) the approval of GFC Drawing. j, All the Design & Drawing will be accordance to the Contract Employer requirement, Outline Design Specification and Drafting and cad standard as per contract agreement between YFC and DMRC. k. SPA-INDUS JV shall attend every meeting called by YFC/DMRC/GC and it should be attended by a Senior representative. 2. Fee a. The fee for carrying out the services within the scope of this work order shall be fixed price which stands at Rs. 6,82,00,000 (Rupees Six Crores Eighty-Two Lakhs Only) and 1,00,000 (One Lakh rupees) for Alignment Design ie rates are firm for the entire period till the completion of the Project. Nothing extra is payable on account of Extension of time period for actual completion of the project ¢. ‘The fee however does not cover the extra cost of re- design work, due to change in alignment by the Client if any or change in scope requiring additional design inputs. The same shall be paid at mutually agreed rates 3. Payment Terms: a, Payment for the services to be provided under this sub-contract (between YFC_ and SAP-INDUS JV ) shall be paid as per attached Annexure 1 b. invoices for the work carried out as per schedule above shall be raised by SPA~ INDUS JV on monthly basis. Payment for the same, shall be made within 30 days of receipt of the verified invoice ¢. 5% of total contract amount will be release after defect liability period of contract with DMRC however same can be released against the Bank Guarantee of same amount. 4. Completion period: a, SPA-INDUS JV shall commence the work immediately from the date of issue of this work order and submit all documents and drawings in manner that execution of the work at site do not get hindered on account of approved drawings and designs. In terms YFC target of completion, we intend to complete the entire works as per approval of design schedule. b. SPA-INDUS JV shall be required to take up the design process to commensurate with YFC intemnai expedited work schedules, a copy of which shali be handed over to them ¢. SPA-INDUS JV shall submit a schedule of drawings submission within a week of getting the work programme from YFC 5. incentives and disincentives a, In the event of delays being caused by SPA-INDUS JV in submission/obtaining approval of the design /drawings w.rt Design schedule ,YFC shall be entitled to recover compensation for damages caused to them for such delay @ 0.1% of the consultants fee for each week of delay per event subject to a maximum of 5% of the total fee, at the discretion of the Director YEC. The docision of the Director shall be final and binding. b. SPA-INDUS JV has worked out the BOQ in re tendering stage ( qty. is enciosed as Annexure of the whole work at the ceased by YFC. SPA-INDUS JV is entitled for the incentive for achieving saving over the quantities beyond normal variation of 2% and similarly a disincentive for excess over the quantity beyond 2% normal variation over BOQ quantity. YFC will share 30% of the total saving amount from tender as above explained or vice versa. The saving /loss shall be calculated at the rates i.e, for reinforcement- 42,000/-, Concrete — 5,500/- and Steel structure-45,000/- INR only. the saving/loss and adjusted in the final bill of the SAP-INDUS IV 6. Taxes: GST@12% shall be paid extra as per the prevailing rates at the time of payment of invoice form SAP-INDUS JV . Appropriate statutory deductions of taxes as per law of the land, as applicable for this type of contract, shall be made from your bills/invoices before releasing of payment ’. Other Terms and conditions. a. For successful completion of the project SPA-INDUS JV shall prepare working drawing for all elements of work including Foundation, Sub-structure, Super structure, Miscellaneous Details etc. of all permanent structures, along with detailed calculations and other associated details for submission to the Clients for obtaining necessary approvals. All necessary revision, alteration and modification to the designs and drawings as may be required shall be carried out by SPA-INDUS IV diligently for obtaining approval of DMRC, and thereon till eventual completion of works is accomplished, SPA-INDUS JV shall be sespousible for approval of all technical notes, design notes, alternative proposals, drawings etc, from the clients /client’s consultants! proof consultants within the specified time. ©. Apart from having to prepare drawings at intermittent stage, SPA-INDUS JVshall provide YFC with six (6 hard copies or as required by DMRC of approved drawings e 4. SPA-INDUS JV shall be obligated to review! modify and cert the Project Quality Control and Quality Assurance manual, to be submitted to clients /client’s consultants for their final acceptance. e, SPA-INDUS JV shall treat this contract and all submission and documents thereof as private and confidential. You shall not provide any consultaney services/ reveal any data / information to any of our competitors / other agencies, without our knowledge or prior consent, Should at any time during the project execution be there any default or breach of contract by you on this account, YFC shall take the matter seriously and thereon reserves the right to terminate this contract and claim for recovery of damages incurred to us on this account. f. Inorder not to impede the work on your account SPA-INDUS JV shall depute full time their engineering representative(s) for all technical discussions with client/client’s engineer, as and when requested by the client, for getting necessary approval of all technical notes, design notes, alternative proposals, drawing etc. g. Detailed Engineering for the temporary works such as form work, casting yard specialised equipment’s etc. are excluded trom the scope of this work order. However, SPA-INDUS JV shall review and validate the design of temporary structures. h, SPA-INDUS JV shall prepare and issue anpropit meataseioy of of construction of enecosent poresont » LS permanent elements as applicable at all such construction stage loadings and other ‘temporary works conditions, However, SPA-INDUS JV will not be responsible for the detailed construction methodology/ method statement for submission to DMRC. SPA-INDUS JV shall prepare complete final design notes, technical notes and as- built drawing (6 Copies) or as required by DMRC, and shall submit the same to clients for final acceptance. In terms of carrying out designs and preparation of drawings and approval thereof, any changes in execution drawings and design calculation, if necessitated on account of site conditions, will be duly conveyed by YFC to SPA-INDUS JV tor necessary incorporation, modification and getting fresh approval from the client. During the finalization of designs and drawings, and also during site execution, if any additions or alterations are suggested by client/client’s consultant, and if such alterations are having financial implications. YFC shall expect these specific situations io be broughi io their notive by SPA-INDUS JV immediately in writing. To that extent SPA-INDUS JV shall all the time be doing their best endeavours to inform YFC about all potential variations having financial implications and receivable additionally from DMRC. or deference any dispute arising out of this contract that cannot be amicably settled between YECL and SPA within 30 days of either party issuing written request for such amicable settlement shall be finally settled under the rules of India Arbitration and conciliation Act, 1996 by appointing mutually selected sole arbitrator in a further 30 days period. Failing that a sole arbitrator shall be appointed by the Managing Director YEC. The arbitration shall take place in Delhi/Gurgaon, and the resulting award shall be final and binding on the parties. Thanking You Accepted by for YFC Projects Pvt. Ltd. for M/s. Shrish Patel & Associates Consultants Pvt Ltd And Indus Consultrans Pvt Ltd (SAP-INDUS JV) Authorised Signatory onedule 4 fegmend (14052 Ranenuge 2 Tenden Soarhbes [ 5 6|6 Total Project Fee 6,82,00,000.00 Ta per schedula of Payment ‘Breakup Head ‘ Aproval from | Aproval from Sno. DESCRIPTION OF ITEMS PAYABLE UNIT kup Heed) Submision of ome | APrval rv Payable Amount [Sub schedule At’ (GENERAL) 34,10,000| 5.00% ‘Sub Head % 1 [Subrission ad ppronofdsgn Programe ene ‘ome monn saat Project 2 |submison and approval of preliminary Design etre Projet 0.00% ‘000% 6.92900 3 |submeson and approval of DentveDesgn ene Projet sa 52.00% 25.00% 25.00% 1023,00 4 Peet and approval of Design Basis Report entire 20.00% 0.00% 25.00% 25.00% 6,82,000] [Stier and aproval Goctstrica riproive rept fe um awa mon oon sano lente Project [Submission and approval of aigment AD Dom S00% 50% 75.00% aaron] a TOTAL 70.00% 3410000 — vm | *Btakup Hood] steianintcFC ena [Avoratiam accoM] ENE. | On cumplaton ot | onconpitions So. DESCRIPTION OF TEMS PAYABLE Wise icDesgn TorGEC Oring | OMRCSFC | “Srctreaate | Srusow ste Sub achedulo A2 Vaduc, Elevated amps Elovatod siding line at ‘Sangam Vihar, Vaiduct for lajpat nagar to saket G line, Cross overs } and Scissors & Special Spans as shown in GAD, TENDER DRAWING ramon) hie ANDI OR SPECIFIED IN THE EMPLOYER'S REQUIREMENT) Sub Heads 1 Pite Perle Gop 700% DO 00% To | ste T0000 2 [Pile Caps Per Pile Cap 15.00% 50.00% 25.00% 20.00% 5.00% 14,25,300, 3 Pe Per Ber 70.00% 2.00% 500% 700% 7,5)200 4 Pir Cape, ash barr & Shear Keyl dlopre Per Ber 5.0% 3.00% 500% 200%, 375,100 U-Grde? FGderindudng evessng, gruing eal o 5 | octet tena a Pec 5.00% 50.0% 250% 2.0% 475400 © [Steel Spane’Special spans Per spen 20.00% B0o% 25.00% 20.00% 75,00,400. he NEE © Design of Sphorical bearing and seismic restainere fc] 7 lopal snes Per span 5.00% so.00% 25.00% 20.00% __ |Load Testing of spans as pax nope of work Per span 2.00% 50.00% 25.00% 20.00% '¢ [Elevated ramp - Foundation o GL. complete Rint 5.00% 50.00% 25.00% 2.00% 10 [Elevated ramp - GL. to, Rang complete Rint 5.00% 50.00% 25.00% 20.00% 11 [Elevated ramp = Track lab complete Rt 3.00% 50.00% 25.00% 20.00% 12 [Submission of asbul drawings 5.00% 50.00% | 25.00% 20.00% TOTAL 00.00% [sub schedule A3 Integrated viaduct with 6 lane flyover, Ramp on Both] ‘side for Flyover, 2 lne approach from BRT corridor to Fly over as ‘showm in GAD, TENDER DRAWING ANDI OR SPECIFIED IN THE SPR 8 reo EMPLOYER'S REQUIREMENT) ‘Sub Heads 1_ [Fondation 2__|Inoase of Pile Foundation 3 [Ping Par Pe Group 20.00% 50.0086 25.00% 20.00% 4 [Pie Caps Per Pile Cap 15.00% 50.0096 25.00% 20.00% 5 [Pies Per Pier 12.00% 50,008 25.00% 20.00% 6__|Pre Caps, crash baer & Shear Keys) stoners Per Pier 5.00% 50,0086 25.00% 20.00% UGirder! LGider induding sessing, grouting ote. all as 7 leanolte fo Non Stedrd span of Per span 20.00% 50.00% 25.00% 200% © |Sieet Spane/Special spans Per span 70.00% 50.0086 25.00% 2.00% [Psion of Spherical bearing and seni restanes fo oy asa, com 50.00% 25.0% a special spans 10 [Load Testing of spans as per scope of work Per gran 300% BO.00H 00% 200% “11___| Approval of Reinforced Earth Rint 5.00% 50.00% 25.00% 20.00% 12__|Suamission of as-built drawings Rint 5.00% 50.0086 25.00% 20.00% 1 TOTAL 00.00% © ‘AS. [6 Lano Undorpass at Saket-G 373600000] 9.00% 185.1_[Foundation 75.1.4 | wallShorng with Stel Stustre RW 20.00% 00% 25.00% 200% 500% 12,27,600 75.12 [General Arrengment drawings um 15.00% 00% 25.00% 20.00% 500% 9,20,700 'A5.13 [Detalles of Closed box sootion of Uderpass Per oar 35.00% 0.0% 25.00% 20.00% 500% 21.48,300 ‘85:14 [Detalles of Trough section at Aporoaches Per arn 25.00% D.0% 25.00% 20.00% 500% 15,34,500 185.15 _ |Submission of ee bul drawings Per qn 500% 0.00% 00% 20.00% 500% 3,08,900| otal 00.00% 50.00% 25.00% 20.00% 500% 336,000] ‘R52 _[2.Lane Undorpass at Ambedkar Nogar 79.92,000.00| 6.00% [52 |Foundaton 7852.1 _|[D wallShotng with Steel Stusture Ri 20.00% OE 00% 20.00% 500% 3,18,400 ‘852.2 [General Arrangment drawings Gun 150% 50.00% 25.00% 20.00% 500% 6,19,000 ‘8523 [Delle of Cloed box socion of Underpass Per eqn 35.00% DO 25.00% 20.00% 500% 14,32,200 ‘85.24 [Detalles of Trough section at Aporoeches Per smn 25.00% 0.00% 25.00% 20.00% 500% 10,25,000 ‘552.5 _ [Submission of ee-bul drawings Per am 500% 50.00% 25.00% 20.00% 500% 2.04600 Total 00.00% 50.00% 25.00% 20.00% 5.00% 49 92,000 Total ASAS2 702,30, 000 \7- On completion of defect ability period of contract with DMRC. 410,000] 5.00% 34,10,000 otal 682,00,000 | 100.00% 82,00,000 [Proparation of Alignment GAD of flyover and [Metro viaduct including viacuct within station. ‘AB _|Interface with alignment prepared by the Rs. 4,00,000] Lumsum [contractor of the adjoining portion of viaduct! Inyover [Submission of Horizontal and verlical profile as par Iopo submitted by YFC and alignment GAD issued 1 Jovem at tender Stage complying Employers 60.00% 40% oor 18% come Requirements 2; /peeeporeta the road widening! Trafic 40.00% 45% 20% 15% 40,000 management plans as per OMRC requirement 700,000 Total value of Workorder 6,83,00,000 os) |Ambedkar Nagar Por station 4.00% 0.00% 25.00% 20.00% 5.00% 4,386,480 6) [Set G Saen Per ation 400% 500% 250% 20.00% 500% 435480 Total : “600% 50.00% 25.00% 70.00% 50% 7.36800 Concourse Level: Al works as dataled in the Tender pacrg_ [20a and x epcied in ho Employers Requrement . Wats between Concourse lve and plat lve ircluing| iv wre for ite, ecaaore ed tioanes) [Senger her Son Per sialon 0% so 260% 20 Sie 350 2) [ehargur Staton ar aon 500i 000% 250% 200% 50% 5.45800 o)__[Amboskar Napar ar ain 500% 0.00% 250% 200% 5.00% 45600 [sake Staion er aon ati sant 250% 20.00% 5 3.72960 [Total 22.00% 50.00% 25.00% 20.00% 5.00% 24,00,840) Paton jve Al works a dtaled inthe Tender ravings rats [2M sotiodn he Enplyers Requronent, Cl wot . on ove pata lov nlacing fring of Bolts, isa for PEB roof struture.) a]__[Sengem var Statin er aon 400% 0% 5 200% So aa5m00 6) [Kanpur Staion Pec station 00% 000% 25.00% 200% 5.00% 5.45600 @)__[Ambodar Nagar Per ation 50% 0.00% 25 00% Z000% 6.00% 3.45600 4) [Sekt G Saion er taton 00% 000% 25.00% 2000% 5.00% 2.72980 [Total 22.00% 50.00% 25.00%. 20.00% 5.00% 24,00,840) "M1 _ [Submision ofa bul ranings Z a) [Sangam vihar Station Per station 4.25% 000% 25.00% 20.00% 5.00% 1,386,400) 8) angur taon Pec etalon 1.25% 0008 75.00% 20.00% 6.00% 1.36.00 2) |Ambedkar Noqar_ Per station 1.25% 50.00% 25.00% 20.00% 5.00%. 1,36,400 ) [Saket G Station Per staion 125% 50.00% 25.00% 20.00% 6.00% 1,36,400| Hota Bo 00% 750% 20.0% 500% 545600 TOTAL 100.0% 4,09,12,000) Sib schedule AS- 6 lane Underpaes a sketG and 2 lane under poss rom MB Road to BRT corridor including Ramps on both des as thom n Tender rating, GAD, sope work n Employer ‘soa00) 15.00% 3H | Requirements. hy © repens ‘Sub Heads t aa ‘ol Q A orb Nagar Persaion 100% aoa 25.0% woe | st 320} d) |Saket G Station Per station 4.00% 50.00% 25.00% 20.00% 5.00% 436,480 Total 15.00% 50.00% 25.00% 20.00% 500% 76.36.00] Concourse Level: Al wos as detaied in the Tender ‘ncaa. |Svings and / © pected in the Employes Rexurment I Works beeen Congoiee level and plato fv inclu iv werk for its, ecaelere and ticases) @)__ [Sangam var Staion Ber afon 700% wo 7500% 7% | 500% a0] 6) Mhangur Staion Per aon 500% 000% 25 00% 700% | 500% 45600 e) [Ambedkar Nagar Per saton 506 =D 25.00% 70.00% | 500% 54560] @) [Set staen Per aon 6.00% a0 0% 76.00% 700% | 500% 372,80] [Total 22.00% 50.00% 25.00% 20.00% 5.00% 24,00,640 Platorm level: Al works as dete nthe Tender cranings| aaig. [Pesos th Employes Rogitenen. Ci wees } an tove paleo level incutng Sig of Bos, ins et or PEB cot srutre) a) [Sangam var Staion Per afon 200% aaa ec mae | 600% 23580} b) |Khanpur Station Per station 5.00%. 50.00% 25.00% 20.00% 5.00% 5.45.60) o)__ [Ambedkar Nooar Per aon 500% 000% 26.00% 7.00% | 500% 54560] d) |Seket G Station Per station 8.00% 50.00% 26.00% 20.00% 5.00% 872,930] [Total 22.00% 50.00% 25.00% 20.00% 5.00% 24,00,640 718 _ |Submission of asl ranings A a) |Sangam vihar Station Per station 50.00% 25.00% 20.00% 5.00% 1,36,490) 6) hang Sabon Pex aon S00 25.00% 2.00% | 500% 1.3640 OC] [Ambedkar Nagar Per station. 50.00% 25.00% 20.00% 5.00% 136,400] d) [Sate Saen Per aon sO 260% 7.00% | 500% 1.36.40 otal 50.00% 25.00% | 20.00% 500% Sag00 i TOTAL 1,09,12,090) [Sub schedule AS- 6 lane Underpass at saket G and 2 lane under pass tom WB Road to BRT coridor including Ramps on both ses Jehown in Tender drawing, GAD, scope of work n Employer ee P| Requirements. by ©) ) rae Ss Sub Heads a ee i ws ‘Sub Schedule A4 (STATIONS) -For 4 stations i Khanpur, Ambedkar Nagar and Saket G (Interchange Integrated - All ‘Sangam Vihar, ‘works as detailed in the Tender drawings and / or specified in the f,09,12,000 iene mloers Rue sub et 7a onion FeLi Trews dio aA ig ga Sa Feigao | a am ome | ae | — som Dia Sn Pogue | 5006 Ea zat [zane [sane 2 ants e Farge fie | S06 sae 250% | are] som [sa Sen Pergupotlo [506 0 zane | amos | sane |Total 19.00% 50.00% 25.00% 20.00% 5.00% FERRPAIES a ga ar Sa fe pete | a am in | “mom | a 3 ra lan Fe sioce [2208 En zaa%e | “aa | som o |Ambedker Nagar Per_pile Cap. 250% 50.00% 25.00% 20.00% 5.00% i fsa Sen Pe sisce [420 00h ‘sti [none | aa [Total 12.00% 50.00% 25.00% 20.00% 5.00% cna Lt At ws nen Tete oi tz |mal cuted nw Emin’ Pent He cu Sadao Oncoesia 3) [bana var Staten Foran ae Sea], so samme | moun | 500% 9 [ape San Parana SoS) sone zo | am | som 2 trae Peaanate So) 5 aor er 2 remaanite card : @ (saa csain inate SOP 0m a ea ii a on | aR sa Sakae, ht & xa (Gnd tl sts fame lol) wos eo ald no Ted Sons steno Eel Reno 7 ingen San Snes | 0 am a | i Wise San Feaen [4098 ea ‘sane | a

You might also like