GeoUtilityPresentation
AEG:AnIntegratedSolution
AEG 2010
TeamBackground
AdvancedEnergyGroup(AEG):
Geothermal/solarthermalassessment,engineering,design Experienceinworkingwithmunicipal/countyprocesses Arrayofotherrenewableenergyalternativesavailable Widearrayofpublic/privatefinancingoptions Management/ReportingforGrants,TaxCredits&otherSubsidies Training/workforcedevelopmentcapabilities Communications,evaluation,reportingabilities
AEG 2010
AdaptiveRenewableEnergySolutions
Goal:Reducecurrentenergyusebeforeaddingnewenergysources GroundsourceGeothermalisthefoundation
Supplementedbyothersolutionsascalledfor(Weatherization,LEDlighting)
Solarthermal(almostalwaysagoodcompaniontoGeothermal) Otherdesiredenergysolutionsthenneedtoprovidefarlesspower
Photovoltaicsolar Windenergy AlternativeFuelGeneratorsand/orFuelCells
totakekeybuildingsOffGrid,inemergencies,orwhenotherwisenecessary
Highestoverallperformance,efficiency
Energyefficiencyratingof500% 600%(EPA),comparedtomostefficient conventionalheatingandcooling
AEG 2010 Hardin Geothermal 2010
What We Do!
Wecoolandheatasplantsdoit,byputtingroots downintotheearth
SolarEnergystoredintheearthsmantle,createsanearconstant51 temperature. Usingaclosedloopsystem,heatexchangers(piping)bringup51 waterfromtheearth. UsingHeatPumps,51 waterismuchlesscostlyforproducingsummerACthan70100 air. AndisalsolesscostlytouseasthebaseforwinterHeatthan 1050 air. Onceused,theearthloop returnsthewatertoberechargedagainat51.
AEG 2010 Hardin Geothermal 2010
AEG 2010
Geothermal vs.Conventional
Geothermal (Underground)
AEG 2010
Conventional (UsableSquareFootage)
Hardin Geothermal 2010
What is NoLongerNeeded
CONVENTIONALMECHANICALSYSTEMS
Cooling Towers
AEG 2010 Hardin Geothermal 2010
CONVENTIONALMECHANICALSYSTEMS
BoilerPlant
Chiller Plant
AEG 2010
Drilling Drilling
Boreholesaredrilledtocreatethewellfield
AEG 2010
TheInstallation
InstallationProcessandHowitAllWorks
AEG 2010
CostEfficiency
AEG 2010
2008OakridgeNationalLabReportforDOE
Giventheneedtoreininournationsenergy consumptionandcarbonemissions,whileatthe sametimestimulatingoureconomyoutofitsmost seriousdownturnsincetheGreatDepression,the authorrecommendsthatfederalpolicymakers seriouslyconsideraggressivelydeploying GeothermalHeatPumpsnationwide,with programscommencingassoonaspossible.
AEG 2010
3 SignificantBenefitswithAEGandHardin
1.ConcentrationonDistrictwideGeoUtilitysystems:
Harnessestremendouseconomiesofscale, Createsjobsandcommunitywealth, Makesfinancingagainstfutureenergysavingspossibleona muchbroaderscale,withlowerinterest
2.Hardinspatentedgeothermaltechnologydevelopments thatreducedrillingcosts(andtime)by4560%
Withotherpatentedenergy/costsavingtechnologiesaswell.
3.Hardinhasmanymoreyearsofdistrictwideexperience thanothers;startedwithcollegecampuswidesystems
AEG 2010 Hardin Geothermal 2010
1. GeoThermalUtilities&DistrictwideSystems: ASampleDistrictGeothermalSystem
This is the district-wide geothermal installation at Ball State University, the largest US Geothermal installation. The geo-fields and bore holes need not be near the buildings being served.
AEG 2010
SolarThermalAidsGeothermalfor DistrictHeating
AEG 2010
2. TheBiggestHardinTechnologyDifference
TheBiSec 3.2HeatExchanger
CutstheCostofDrillingandInstallingtheGeothermalfield4560%
ConventionalUBendPipe Hardin BiSec HeatExchanger
*GreyRepresentsGrout;theLightBlueistheWaterintheHeatExchangepiping.*
Thethinnertheannulargroutspace,themoreefficientheattransfer
AEG 2010 Hardin Geothermal 2010
BoreholeThermalResistanceofDifferentHeatExchangerDesigns
AEG 2010
TheHardinBiSec Advantage
FewerBores,SmallerFootprint,LowerCost
AEG 2010
NewHRX(TriSec)4.5 HeatExchanger
ScientificallydesignedbyHardinandUniv. ofTennessee,thenewHRXhasseveral advantagesovertheBiSec. Waterheldundergroundlonger,more completelyexchangesheatwiththeearth. Kidneyshapedlobescreateevenmore circumferenceforheatexchange. UnitissimplywiderthantheBiSec, allowingfewerfeetofExchangertoserve theproject. Result:thesizeofthegeofieldisreduced byatleast60%overUBend.
AEG 2010
AdditionalHardinTechnologicalAdvantages
WaterPlus canuseacitysdomesticwatersupplytoaid thegeothermalfield,withfarlesscost. Hardincanuselocalwaterfeatures(lakes,rivers)toeven furtherreducethecostofgeothermalfields. HardinisnowpatentingnewdevelopmentsinHeat Exchangers,DrillingandInstallationTechnologies. LocalHeatExchangermanufacturingsavestransportation costs,nearlyallothersaremanufacturedinChina.
AEG 2010 Hardin Geothermal 2010
3. HardinGeothermalInstallations
Crosswinds Community LaFontaineCadillac/BPG Crossroads ofMichigan A3COfficeBuilding WayneStateUniversity LawrenceInst.ofTech. St.JosephsHospital MurrayStateCollege LaurelIslandTownship St.MarysMedical Center EisenhowerMedical Center GoldenGate Casino
AEG 2010
Detroit,MI Highland,MI Detroit,MI AnnArbor,MI Detroit,MI Southfield,MI SuperiorTwp,MI Tishomingo,OK LaurelIsland,GA NewYork,NY ElCentro,CA LasVegas,NV
Hardin Geothermal 2010
LocalCaseStudy#1: LawrenceTechnologicalUniversity
ThenewStudentServices buildingdemonstrates geothermalatwork.
(88)300FTbores Noboiler,furnace orgasmeter
AEG 2010
AEG 2010
LocalCaseStudy#3:UniversityofToledo IndoorPracticeFacility
MostadvancedmultiusefacilityofitskindinUS 90,400SF ROIunder3years Providesheating& coolingwithsame equipment 42bores,300feet deepunderthe arena spacewas acriticalissue Geothermalcreatedenoughextraroomforwomanssoccer UTnowplanningcampuswide(3campus)system
AEG 2010 Hardin Geothermal 2010
WhatIsAGeoUtility?
Acitycanlevyutilitypaymentsfromitsresidencesorbusinesses Itformsautilitydistrict usinggeothermal/solarthermal
Alongwithotheralternativeenergyaddons
FinancingpaysforcompleteinstallationAGAINSTFUTUREENERGY
SAVINGS
AEG 2010 Hardin Geothermal 2010
SavingsPayBackGeoUtilityFinancing
Residentsandbusinessesgeta6070%reducedbill fromtheirregularutilitycompany,andabillfrom theGeoutilitycoveringthefinancechargesfor:
Installingtheoverallgeothermalinfrastructure Individualhookupsforhomes,businessesorother buildings Operatingfees(asmalldevelopmentfeecanbeadded)
HowtheGeoUtilityWorks
TheGeoutilityprovidesservice,maintenance,billing,etc.
Individualcities/entitiesmaywanttoplaygreaterorlesserrole.
Allorpart ofgeosysteminstallationcostcanbefinanced.
Includingthegeofieldinfrastructureandhome/buildinginstallation.
AEG 2010
NewPropertyTaxes/NewCommunityWealth
UsingWyandottes$20MillionPhase1Projectastheexample $9Millionisthecostofhomeandbuildinghookup $11Millionisthecostofthegeothermalfieldandpumps TheGeoFieldisautilityplant:
Itsunderground,usingpublicrightsofway Andspreadoutaroundthecity
AEG 2010
GeoThermal &GeoUtilityBenefits
Naturalgasusevastlyreduced Electricpowerconsumptionadvantages:
Totalpowerconsumptionisreduced(especiallyinsummer) Loadfactorsmorecloselymatchwhatcanbeprovidedbyrenewableproduction
Farlessequipmentneeded,nocoolingtowersorboilers
Createmoreusablespaceinabuildingbyeliminatingcurrentequipment
Current&PlannedGeoUtilityDistricts
ACTIVELYINTERESTEDMUNICIPALITIES/DISTRICTS/COUNTIES: Wyandotte LOI,signed,PPAgoingtoCityCouncil,now Southfield LOI,signed ClintonTwp LOI,PPAbeingnegotiated Pontiac LOIsigned HighlandPark LOISigned AnnArbor LOI,PPAbeingnegotiated Toledo/LucasCounty(OH) LOISigned,PortAuthorityplanningproject Sandusky(OH) LOISigned,PPAinprogress Saginaw LOISigned,NonProfitDevelopment WoodhavenSchools Contracted MeetingwithDetroit CityCouncilGreenTaskForceon14plannedprojects. WithDetroitPublicSchoolsonnewconstructionandrenovation. WithMt.Clements,HarrisonTwp,Warren,Farmington,RoyalOak,Ferndale, NoviandDearborn;andOaklandandLucasCountiesforcountycampuses.
Hardin Geothermal 2010
AEG 2010
ToledoLucasCountyPortAuthorityReceives $15MillionDOEGrantforEnergyRetrofits
NeighborhoodFundingResourcesassistedtheTLCPAin planningforandobtaininga$15milliongrantfromtheDOE. ItwillbeusedwithinitsNorthwestOhioBondFundto:
Leverageover$60Millioninprojectfinancing. Alongwithothermatchingfundsandfinancingallowit&Toledoto establishanAdvancedEnergyUtilityDistrict(AEU)withintheCityof Toledotoimplement$200Millioninwidescaleuseofenergy efficiency,alternativeenergypracticesandsolutionsinresidential, commercial,governmentalandindustrialfacilities. Almost2/3rdsofthiswillbeforaDistrictwideGeothermalprogram.
TheAEUwillbeginwithintheCityofToledoandwillbe expandedtoothercitiesandtownshipswithinLucasCounty.
Ultimately,willincludeall28countiesthatarepartoftheTPAs financingjurisdictioninNorthwestOhio. BecauseofToledosproximitytoMichigan,theprojectisdesignedto benefitbusinesses&citizensofbothstates.
AEG Hardin Geothermal 2010
AGeoUtility:Wyandotte(Phase1):Creating CommunityWealthinaNewFinancialEra
$20MillionPhase1Includes:
220UnitnewCondoComplex HistoricBuilding(Museum)District CityRecreationCenter&IceRinks HighRiseBank/OfficeBuilding CommercialArea/SurroundingHomes 47NSP3financedHomeRehabs $450,000innewannualtaxassessment 110goodjobs(60entrylevel);training localHVACcontractors,electricians, plumbersanddrillersingeoinstallation
ForWyandottesUtilityCo.it: Evensoutsummer/winterpeaks,letting
itcloseitsold,inefficientpeakplants.
SchoolGeoUtility: WoodhavenSchoolCampus
Thisisfundedbyschoolfinances,but canbefinanced,againstfutureenergy savings.Itincludes: HighSchoolBuilding(250KSF)
MiddleSchoolBuilding(130KSF) AdministrativeBuilding(20KSF) Total500KSFsystemwillcost$800K.
AGeoUtility:Pontiac
LOIsigned:$15Millionproject FirsttargetedLoop,butpaybacktooslow Alternatives:
CityHall,Police&FireDepts. Library&DistrictCourt SchoolAdmin.Building LighthouseNeighborhood:UnityPark
AEG 2010
CityofHighlandPark
LetterofIntent(LOI)signedfor$15Millionproject. AreastillbeingdeterminedwithHPDEVCO Financingnotyetidentified MaybeginwithMcGregorLibrary/CityHall;canbe financedbyRecoveryZoneorQualifiedEnergy ConservationBonds Include2commercialdistrictsand3neighborhoods InitialPhase1willcreate75Jobs(60%entrylevel) Willreduceutilityuseby60%lutilitybillsby2030%; 5060%whenfinancingispaidoff Willadd$300Kinnewpropertyassessments
AEG 2010
DetroitProjectsUnderDiscussion
Cobo Hall(withSDG) NewPortAuthorityTerminal Kronk Village(Emman.Steward) GardenViewEstates(HUD) EastVillageHistoricDistrict WhittierApartmentComplex WurlitzerBuildingonBroadway OldChannel56bldg.
forMosaicYouthTheatre
FinancingSolutions
PotentialUseofFederalRecoveryZoneBonds:
EconomicDevelopmentBondscanbeusedforpublicbuildings;PNC Bankandtax staffworkingwithAEGtoassesspossibleGeoutilityuses FacilityBondscanbeusedforpublicprivatepartnershipsforgeoutilities PensionFundscanbeapproached Combinationofoptions,ifappropriate Oakland,Lucascounties;citiesofToledo; AnnArborconsideringRZBuse
OtherOptions:
QualifiedConservationBonds FederalTaxCode6320Financing DOELoanGuarantees PrivateFinancing Leasing AdvancedTaxCreditSales EECBGFundsorOtherStateorFederalFunds BrownfieldTaxCreditscouldapplytoallinstallationsinCoreCity
AEG 2010 Hardin Geothermal 2010
NewCenturyCareerCenter(NC3)
Strategy
Eachinitial$20MillionProject creates110newjobs 800jobswillbecreatedin Michigan,justwiththeworknowin theplanningstage. NC3Programisbasedoncreating pathwaysforindividualcareer development,inthefieldsbelow.
Curriculum/PathwayAreas
GeothermalFieldInstallation
FromDiggingtoCrewChief DrillingTeams/InstallGeofields GroundSourceHeatExchanger HeaderAssemblyInstallation ManifoldSystemInstallation
Construction
Inspections&Assessments ResidentialEnergyEfficiency Installations ElectricalandPlumbing PlenumandDuctwork OnDemandHotWaterSystems Weatherization
MechanicalEquipment
GroundSourceHeat Pumps RadiantHeatingSystems SolarThermalInstallation HybridSolar/WindSystem Installation LED(alternative)lighting
Maintenance
Ongoing Metering New Installations
AEG 2010
ADDITIONAL CASESTUDIES
AEG 2010
GaltHouseEast(Hotel)Louisville,KY
$272,700ayear
AEG 2010
GreatRiverMedicalCenter
Wechoseageoexchangesystemforits flexibility. SteveLeavitt,Directorof Development.Medicalfacilitieswillchange substantiallyoveralifetimeandthenice thingaboutthegeothermalheatpump systemistheabilitytojusttieintotheloop andaddadditionalcapacitywhereitis needed. Engineersestimatedtheoperatingcostsof $.25persq.ft.peryearvs.conventional costof$.55. Todaytheysave31%onenergycostsvs. othersimilarsizedfacilities.
AEG 2010
MurrayStateCollege
Verticalboreswereinitially installedtosupportalibrary; combinationofexpansionand retrofit. Firstinstalledasprivatelyowned utility;expandedcampuswide overtime Finally,theUniversityuseda bondtopurchaseandcomplete expansionofthesystem.
Utilitysavingsexceed60%forheatingandcooling.
AEG 2010 Hardin Geothermal 2010
AEG 2010
THANKYOU
ForFurtherInformationContact: