Continuous Beam: SS3B2-1 to S3B5-2-500X1000 (Code of Practice : Eurocode 2 - 2004)


4/25/2024 3:34:37 PM C01

Input Tables
fck (MPa) 32

fy (MPa) 500

fyv (MPa) 500

% Redistribution 0
(O)ptimised or (D)ownward redistribution D
Top Cover :Reinforcement centre (mm) 75

Bottom Cover :Reinforcement centre (mm) 75

Dead load factor 1.35


Live load factor 1.5
Concrete density (kN/m3) 25

% of live load considered as permament 25


Ø (Creep coefficient) 2
Ecs (Shrinkage strain) 300E-6
cot (Θ) - Eurocode Shear 2.5

Bw D Bf-top Hf-top Bf-bottom Hf-bottom Y-offset Web Flange


Section number (mm) (mm) (mm) (mm) (mm) (mm) (mm) offset offset

1 500 1000

Span Section Section Section


number length (m) number left number right

1 9 1 1
2 9 1 1

Support Code Column below Code Column above Code


number C,F F,P F,P
D (mm) B (mm) H (m) D (mm) B (mm) H (m)

Load W-left W-right a b P a M a Load


Case Span (kN/m) (kN/m) (m) (m) (kN) (m) (kNm) (m) Description

D 1 60 60
L 1 30 30

D 2 60 60
L 2 30 30

Span M left M right


number kNm kNm
Job Number Sheet
Job Title
Client
Your details here
Calcs by Checked by Date

Deflection, Shear, Moment and Steel diagrams. Span 1

Elastic Deflections (Alternate spans loaded) Def max = 3.949mm @ 4.00m


.500

1.00

1.50

2.00

2.50

3.00

3.50

4.00

4.50

5.00

5.50

6.00

6.50

7.00

7.50

8.00

8.50

9.00
1.00

2.00

3.00

4.00

Long-term Deflections (All spans loaded - using required reinforcement) Def max = 18.13mm @ 3.80m
.500

1.00

1.50

2.00

2.50

3.00

3.50

4.00

4.50

5.00

5.50

6.00

6.50

7.00

7.50

8.00

8.50

9.00
2.00
4.00
6.00
8.00
10.0
12.0
14.0
16.0
18.0

SHEAR: X-X V max = -803.7kN @ 9.00m

400
200
.500

1.00

1.50

2.00

2.50

3.00

3.50

4.00

4.50

5.00

5.50

6.00

6.50

7.00

7.50

8.00

8.50

9.00
-200
-400
-600
-800

MOMENTS: X-X M max = -1447kNm @ 9.00m


-1500

-1000

-500
.500

1.00

1.50

2.00

2.50

3.00

3.50

4.00

4.50

5.00

5.50

6.00

6.50

7.00

7.50

8.00

8.50

9.00

500

Shear Reinforcement: X-X Asv max = .7303mm²/mm @ 8.00m


.700
.600
.500
.400
.300
.200
.100
.500

1.00

1.50

2.00

2.50

3.00

3.50

4.00

4.50

5.00

5.50

6.00

6.50

7.00

7.50

8.00

8.50

9.00

Bending Reinforcement: X-X As max = -3939mm2 @ 9.00m


-4000

-3000

-2000

-1000
.500

1.00

1.50

2.00

2.50

3.00

3.50

4.00

4.50

5.00

5.50

6.00

6.50

7.00

7.50

8.00

8.50

9.00

1000
Job Number Sheet
Job Title
Client
Your details here
Calcs by Checked by Date

Deflection, Shear, Moment and Steel diagrams. Span 2

Elastic Deflections (Alternate spans loaded) Def max = 3.949mm @ 14.0m


9.50

10.0

10.5

11.0

11.5

12.0

12.5

13.0

13.5

14.0

14.5

15.0

15.5

16.0

16.5

17.0

17.5

18.0
1.00

2.00

3.00

4.00

Long-term Deflections (All spans loaded - using required reinforcement) Def max = 18.13mm @ 14.2m
9.50

10.0

10.5

11.0

11.5

12.0

12.5

13.0

13.5

14.0

14.5

15.0

15.5

16.0

16.5

17.0

17.5

18.0
2.00
4.00
6.00
8.00
10.0
12.0
14.0
16.0
18.0

SHEAR: X-X V max = -803.7kN @ 9.00m


800
600
400
200
9.50

10.0

10.5

11.0

11.5

12.0

12.5

13.0

13.5

14.0

14.5

15.0

15.5

16.0

16.5

17.0

17.5

18.0
-200
-400
-600
-800

MOMENTS: X-X M max = -1447kNm @ 9.00m


-1500

-1000

-500
9.50

10.0

10.5

11.0

11.5

12.0

12.5

13.0

13.5

14.0

14.5

15.0

15.5

16.0

16.5

17.0

17.5

18.0

500

Shear Reinforcement: X-X Asv max = .7303mm²/mm @ 9.00m


.700
.600
.500
.400
.300
.200
.100
9.50

10.0

10.5

11.0

11.5

12.0

12.5

13.0

13.5

14.0

14.5

15.0

15.5

16.0

16.5

17.0

17.5

18.0

Bending Reinforcement: X-X As max = -3939mm2 @ 9.00m


-4000

-3000

-2000

-1000
9.50

10.0

10.5

11.0

11.5

12.0

12.5

13.0

13.5

14.0

14.5

15.0

15.5

16.0

16.5

17.0

17.5

18.0

1000

You might also like