0% found this document useful (0 votes)
359 views50 pages

Company Profile PT BMJ

Company presentation for offshore project

Uploaded by

Welly Cholil
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
359 views50 pages

Company Profile PT BMJ

Company presentation for offshore project

Uploaded by

Welly Cholil
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

BURLIEV GROUP

PT Burliev Maritama Jaya


General Contractor, Fabrication and Engineering

PT Karya Bahrindo Cipta


Human Rersouces Supplier ([Link] Ri Nomor 146 Tahun 2017

9/21/2021 1
About Us

9/21/2021 2
BURLIEV GROUP
Burliev Group consist of PT Burliev Maritama Jaya and PT
Karya Bahrindo Cipta. Before, PT Burliev Maritama Jaya was
established in 2008 for handling the General Contractor,
fabrication and engineering. As effect of expansion and
specialization the company (PT Burliev Maritama Jaya), in
2014 PT Karya Bahrindo Cipta was formed as Human
Resources Supplier.

PT Burliev Maritama Jaya


General Contractor, Fabrication and Engineering

Our Services ranges general supplier for oil and gas industry
stuffs, Blasting and painting, pipe line and steel structure.

PT Karya Bahrindo Cipta


Human Resources Supplier ([Link] RI Nomor 146 Tahun
2017)

Is Human Resources Supplier for recruitment and placement


formal and informal skilled worker. It can be placement to
hospital, household, industry, etc..

9/21/202 3
1
BURLIEV GROUP
Established and located in Batam Island, Indonesia.
The presence in strategic location enable us to provide to
our worldwide clients a reliable and efficient services in
the global offshore and onshore works of oil and gas
industry.

BMJ, provide services to our customers such as steel


structure/fabrication, blasting painting, out fitting erection
and installation, pipe spool fabrication, pipe installation,
pre-commissioning, hydrotest and general supplier stuffs
for oil and gas construction.

KBC specialty is the high quality service in providing “the


right personnel on the right job” in order to help our
clients achieve optimum proficiency in performance and
productivity. We furnish well experienced professionals
both local or expatriates to fulfill our client need and
satisfaction. If you are experiencing temporary manpower
shortage or require additional personnel for an oncoming
commitment project, please call us and check our charge
rates.

9/21/202 4
1
BURLIEV GROUP
COMPANY VISION
●To be the preferred provider of oil and gas construction
services for the global offshore and onshore project
activities

●To build the trust for our clients and customer to


generate profitable growth for the benefit of each other
through our service.

COMPANY MISSION
● To fill and deliver the specialty of our services to the
client and customer's needs, on time and every time

●To remain and committed to upgrade the quality of our


services and performance, establishing us as one of the
leading professionalism, integrity, honestly and fairness to
handle the job by placing the right person to right job.

● To do with realistic cost, efficient and best quality for all


jobs to deliver product with Hight quality and best services

9/21/2021 5
Our Services

9/21/2021 6
PT Burliev Maritama Jaya
OUR CLIENTS :
1. KVR Industry Service AS
2. PROSAFE PRODUCTION SERVICES Pté Ltd
3. PT. SAIPEM INDONESIA
4. PT. SAIPEM INDONESIA KARIMUN BRANCH
5. PT. SAIPEM SINGAPORE PTE LTD
6. SAPURA ACERGY SDN BHD
7. SLC SAIPEM LEIGHTON CONSORTIUM
8. PT Mc DERMOTT INDONESIA

Welding jobs:
1. SMAW Welders (down hill or up hill)
2. SMAW/GTAW 6G – 6GR
3. FCAW 6G – 6GR
4. Titanium Welder, CuNi, Stainless Steel Welder
5. SAW Welder
6. Maintenance Welder
7. Repair Welder
8. Fitter
9. Welding Engineer
10. Welding Inspector

9/21/2021 7
PT Karya Bahrindo Cipta
Other available personnel's to purpose as follow :
15. Store Keeper
Marine Non Marine 16. Document Controller Construction
1. Insulator 1. Ultrasonic Testing Operation 17. Painter Civil 1. Excavator Operator
2. Oiler 2. Magnetic Particle Testing 18. Steel Carpenter 2. Bulldozer Operator
3. Electrician 3. Superintendent-All Disciplines 19. Wood Carpenter 3. Wheel Loader Operator
4. Steward 4. Supervisor-All Disciplines 20. Coating Inspector 4. Crane Operator
5. Chief Engineering 5. Foreman-All Disciplines 21. QA/ QC Engineer 5. Dump Truck Driver
6. Deck Hand/ AB 6. Instrument Technician 22. QC Site 6. Quarry Personnel
7. Tug Skipper 7. HSE 23. Yard Safety
8. Cook 8. Crane Operator 24. Construction Manager
9. Welder 9. Painter Blaster 25. IT Support
10 Fabricator 10. Mechanic 26. Construction Engineer
11. Electrician 27. Logistic Coordinator
12. Scaffolder 28. Pipe Fitter
13. Rigger 29. Fitter Structure
14. Helper

9/21/2021 8
PT Karya Bahrindo Cipta
Other available personnel's to purpose as follow :

1. Nurse
2. Industry Employee
3. Driver
4. Office Staff
5. Chef
6. Garmens
7. Oil and Gas Industry personnels
8. Oil Tanker personnels

9/21/2021 9
Why Us ?

9/21/2021 10
BURLIEV GROUP
PT Karya Bahrindo Cipta
FLEXIBILITY AND EFFICIENCY OF LABOR
Increase or decrease the size of your workforce to
match your workload, no more costly and
unnecessary over staffing, no more worries being
over or understaffed, we take the strain.

AVAILABILITY OF LABOR
On receipt of a confirmation order from the client, we
will contact and select the personnel from our large
and comprehensive database. We are usually able to
fill most of requirements for temporary personnel
within 24 to 48 hours should this urgency be necessary.

NO HIDDEN COST
Employer national insurance, holiday pay, overtime
rates, travel costs, lodging allowance all of this cost
just in our fully inclusive charge rates ( Unless otherwise agreed ).

NO COST FOR DISMISSALS OR REDUDANCY EASY INVOICING


Temporary workers working for PT Karya Bahrindo Cipta Using the formula ( WORK HOUR x Rate of Charge ) = Sum
are legally entitled to one hour notice instead Paid
one week or month's notice of a permanently
employed worker. This Ideal for unplanned
ca9n/c2e1l/l2a0ti2o1nor unscheduled shortages. 11
Our Certification

9/21/2021 12
PT Burliev Maritama Jaya
ISO 9001 : 2008 Certificate

9/21/2021 13
PT Burliev Maritama Jaya
MLC Certificate

9/21/2021 14
PT Burliev Maritama Jaya
IMCA Certificate

9/21/2021 15
PT Karya Bahrindo Cipta
KEMENKERTRANS No. 146 Tahun 2017

9/21/2021 16
IZIN USAHA JASA KONSTRUKSI BESERTA LAMPIRANNYA
NOMOR INDUK BERUSAHA (NIB) : 1211000652035

9/21/2021 17
IZIN USAHA JASA KONSTRUKSI BESERTA LAMPIRANNYA
NOMOR INDUK BERUSAHA (NIB) : 1211000652035

9/21/2021 18
PT Karya Bahrindo Cipta
ISO 9001 : 2015 Certificate

9/21/2021 19
Our Expertise

9/21/2021 20
BURLIEV GROUP

PT Karya Bahrindo Cipta is experienced in


recruitment, administration, supervision, and personnel
liaison. With our comprehensive database
management system we are able to find and provide
you our best personnel to fit in your project needs.

OUR COMPANY EXPERIENCED IN:


1. Human resource specialist
2. Personnel selection and assessment
3. BOSIET arrangement
4. Personnel mobilization and Demobilization
5. VISA application
6. Travel Arrangement

OUR VALUE ADDED POINTS:


√ Integrity : We built our business start by trust and honesty, and we make it to become an attitude for our staff
√ Commitment : Our commitment to providing our client with high quality services, professional, on time and best rates
√ Teamwork : We work as one team with our client in order to comply our commitment and keep our integrity
√ Customer Focus : We always focus on how to satisfy our client objectives or needs. To us, your success is our target

9/21/2021 21
Contact Us
PT Burliev Maritama Jaya
General Contractors, Fabrication and Engineering

PT Karya Bahrindo Cipta


Human Resources Supplier ([Link] RI Nomor 146 Tahun 2017)

Office:
Komp. Ruko Kintamani Tel. +62 778 473417/18
Block C/15 Batam Centre Fax +62 778 473419
Batam 29421 – Batam Island Mobile +62 811 700 3101
Indonesia Email :
lia@[Link]
burliev@[Link]
kbc@[Link]
9/21/2021 22
Gallery
CLIENT : PT. SAIPEM KARIMUN BRANCH
PROJECT NAME : AL - IRAQ

9/21/2021 23
Fabrication Yard Lay Out

9/21/2021 24
Gallery
CLIENT : PT. SAIPEM KARIMUN BRANCH
PROJECT NAME : AL - IRAQ

9/21/2021 25
Gallery
CLIENT : PT. SAIPEM KARIMUN BRANCH
PROJECT NAME : AL - IRAQ

9/21/2021 26
Gallery
CLIENT : PT. SAIPEM KARIMUN BRANCH
PROJECT NAME : AL - IRAQ

9/21/2021 27
Gallery
CLIENT : PT. SAIPEM KARIMUN BRANCH
PROJECT NAME : DECK GORGON, PHONTON GORGON, CASTORO (8 AND 10)

9/21/2021 28
Gallery
CLIENT : PT. SAIPEM KARIMUN BRANCH
PROJECT NAME : DECK GORGON, PHONTON GORGON, CASTORO (8 AND 10)

9/21/2021 29
Gallery
CLIENT : PT. SAIPEM KARIMUN BRANCH
PROJECT NAME : DECK GORGON, PHONTON GORGON, CASTORO (8 AND 10)

9/21/2021 30
Gallery
CLIENT : PT. SAIPEM KARIMUN BRANCH
PROJECT NAME : JACKET GORGON

9/21/2021 31
Gallery
CLIENT : PT. SAIPEM KARIMUN BRANCH
PROJECT NAME : BASE S 45 MADEIRA

9/21/2021 32
Gallery
CLIENT : SAPURA ACERGY
PROJECT NAME : NEW CONTINGENCY STINGER

9/21/2021 33
Gallery
CLIENT : PT. SAIPEM KARIMUN BRANCH
PROJECT NAME : AL WASIT

9/21/2021 34
Gallery
CLIENT : PT. SAIPEM KARIMUN BRANCH
PROJECT NAME : AL WASIT

9/21/2021 35
Gallery
CLIENT : PT. SAIPEM KARIMUN BRANCH
PROJECT NAME : AL WASIT

9/21/2021 36
Gallery
CLIENT : SAIPEM LEIGHTON CONSORTIUM-LAMPUNG
PROJECT NAME : GORGON

9/21/2021 37
Gallery
CLIENT : SAIPEM LEIGHTON CONSORTIUM-LAMPUNG
PROJECT NAME : GORGON

9/21/2021 38
Gallery
CLIENT : SAIPEM LEIGHTON CONSORTIUM-LAMPUNG
PROJECT NAME : GORGON

9/21/2021 39
Gallery
CLIENT : SAIPEM LEIGHTON CONSORTIUM-LAMPUNG
PROJECT NAME : GORGON

9/21/2021 40
Gallery
CLIENT : PT. SAIPEM KARIMUN BRANCH
PROJECT NAME : SAIPEM FDS 2 NASSAU

9/21/2021 41
Gallery
CLIENT : PT. SAIPEM
PROJECT NAME : BP TORTUE GTA HUB PROJECT / SAIPEM

9/21/2021 42
Gallery
CLIENT : PT. SAIPEM
PROJECT NAME : BP TORTUE GTA HUB PROJECT / SAIPEM

9/21/2021 43
Histogram
TOTAL OF MANPOWER SUPPLIED FOR PROJECTS ANNUALY

800 800

700 Manpower Required, 6M70anpower Required, 682 700

600 Manpower Required, 569 600

[Link] total required by project


No. of total Manpower

500 500

400 400

670 682
300 300
569 Manpower Required, 244

200 200

244
100 100
Manpower Required, 3M0anpower Required, 3M1anpower Required, 31
30 31 31
0 0
2008 2009 2010 2011 2012 2013 2014
Year Total Manpower
Manpower Required

9/21/2021 44
45
2011
2008
2009
2010

2012
2013
2014

Coating Inspector
Wood Carpenter
Steel Carpenter
Painter Civil
Document Controller
Store Keeper
Helper
Rigger
Scaffolder
Histogram

Electrician
Mechanic
Blaster

Job Positions
Painter
Operator Crane
HSE
Instrument Tehnician
Mechanical Fitter
Fitter Piping
Supllied Manpower chart

Fitter Structure
Fitter
by Job position

Welder
Foreman - all disciplines
Supervisor - all
disciplines
Superintendent - all
disciplines
Magnetic Particle
Testing
Ultrasonic Testing
Operation

9/21/2021
Welding Inspector

60
200

180

160

140

120

100

80

40

20

0
no. of personnel
Histogram
Combined Histogram Burliev

Annualy
Year Total Manpower Manpower Required
2008 30 30
2009 31 31
2010 31 31
2011 569 569
2012 670 670
2013 682 682

2014 244 244

Trade Histogram Burliev


Position 2008 2009 2010 2011 2012 2013 2014
W elding Inspector 0 0 0 6 8 115 20
Ultrasonic Testing Operation 0 0 0 2 2 4 0
Magnetic Particle Testing 0 0 0 2 2 4 0
Superintendent - all disciplines 0 0 0 4 4 5 2
Supervisor - all disciplines 0 0 0 6 12 7 3
Foreman - all disciplines 0 0 0 12 13 25 5
Welder 30 8 8 120 124 190 31
Fitter 0 8 8 10 15 15 8
Fitter Structure 0 0 0 40 40 20 7
Fitter Piping 0 0 0 40 40 25 9
Mechanical Fitter 0 0 0 20 22 15 6
Instrument Tehnician 0 0 0 15 10 7 0
HSE 0 0 0 2 8 8 3
Operator Crane 0 0 0 3 9 10 0
Painter 0 0 0 60 95 65 36
Blaster 0 0 0 60 80 54 29
Mechanic 0 0 0 5 6 5 2
Electrician 0 0 0 7 7 5 4
Scaffolder 0 7 7 40 44 30 15
Rigger 0 8 8 0 0 10 20
Helper 0 0 0 80 84 35 32
Store Keeper 0 0 0 4 4 8 4
Document Controller 0 0 0 1 1 0 1
Painter Civil 0 0 0 10 10 7 0
Steel Carpenter 0 0 0 10 10 4 0
W ood Carpenter 0 0 0 10 10 4 0

Coating Inspector 0 0 0 0 10 5 7
9/21/2021 Total 30 31 31 569 670 682 244
46
Previous experiences
No Clients Description Location Project Name Year Present

Welders, piping fitters, scaffolders, FPSO ESPOIR EVOIRIEN –


1 Prosafe Production Pte Ltd P. 183 ESPOIR Upgrading Project April 2009 - October 2010
riggers Offshore – Abdjian – West Africa

Suriya B WQT-SKY 3 Program


2 PT Saipem Indonesia Welders GTAW qualified Thailand Offshore - Castoro Otto Jan 2011 - 26 Jul 2011
Castoro Otto

3 PT Saipem Indonesia Installation of Thai Project S45 - Gajha preparation S45-Gajha Preparation Feb 2011 - May 2011

Sandblasting & painting job for SKY Sandblasting & Painting Job For
4 PT Saipem Indonesia SIKB - Karimun Yard Feb 2011 - March 2012
include consumables and equipment's SKY

Welders Qualified (Certified) for SPCM Supply Of Welder Service to SPCM


5 PT Saipem Indonesia SIKB - Karimun Yard July 2011 - Aug 2011
PRJS Support PRJS Support

Bandar Lampung – Hanjung


6 Saipem Leighton Consortium Blasting and Painting Gorgon Project July 2011 - Aug 2011
Yard

LNG Jetty & Marine Structure, Jacket,


Bandar Lampung – Hanjung
7 Saipem Leighton Consortium pipe spool fabrication, pipe Gorgon Project Oct 2011 – Feb 2014
Yard
instatalation#Pre-comissioning

General Inspector / Welding Inspector General Inspector to Supervise


8 Sapura Acergy Sdn Bhd Profab - Batam July 2011 - January 2013
CSWIP 3.1 Fabrication of Stinger at Batam

9/21/2021 47
Previous experiences
No Clients Description Location Project Name Year Present

HSE Supt, HSE officer, Superintendent,


Service Manpower (S. LTD
9 PT Saipem Indonesia Welding Foreman, Fitter Foreman, SIKB - Karimun Yard 20 July - 22 Aug 2011
Kirinskoye Norman Oceanic)
welder, steel fitter, helper

10 PT Saipem Indonesia Welding Inspector For Yongnam - Gorgon Project Gorgon PRJ Karimun Yard SKY 3 08 Aug - Oct 2011

Manpowers Supply for Saipem Karimun Manpowers Supply for Karimun


11 PT Saipem Indonesia SIKB - Karimun Yard Oct 2011 - April 2012
Yard Yard

Supply Welding Inspector for Gorgon


12 PT Saipem Indonesia Profab - Batam Gorgon PRJ Karimun Yard SKY 3 Jul 2011 - Dec 2011
Project

Supply Manpower For Motorman &


S45 Bien Dong - Mc Dermott
13 PT Saipem Indonesia Supply motoroman - electrician Electrician For SPCM Project 1 sept 2011 - 15 sept 2011
Vietnam Project
Support

Gorgon Project - Bandar


14 Saipem Leighthon Consurtium Blasting, painting Bandar Lampung – Hanjung Yard Mei 2012 – Feb 2014
Lampung

Bandar Lampung - Gorgon Coating Inspector For Gorgon


15 Saipem Leighthon Consurtium Coating Inspector Mei 2012 – Mei 2014
Project Project

16 PT Saipem Indonesia Steel Structure/fabrication and erection SIKB - Karimun Yard SIKB - Karimun Yard Sept 2012 - July 2013

17 PT Saipem Indonesia Welder Repair Semac 1 - Vietnam Bien Dong Project SEMAC 1 Jan 2012 - May 2013

9/21/2021 48
Previous experiences
No Clients Description Location Project Name Year Present

Supply welders
SMAW 6 GR
18 PT Mc Dermott Indonesia SMAW/GTAW Mc Dermott – Yard BATAM NFPS,NFE, Tyra Project September 2019 – Present
SMAW/FCAW
FCAW SS

Cable Tray, Standalone support


19 PT BATAMEC BATAM Batamec Yard – Tanjung Uncang BP TORTUE – GTA HUB PROJECT JUNE 2021 - PRESENT
(E&I,safety, etc) Fender Frame

9/21/2021 49
Organization Chart

9/21/2021 50

You might also like