Efficiency Improvement at Dahanu Thermal Power Station-A Success Story
Efficiency Improvement at Dahanu Thermal Power Station-A Success Story
●
Performance Monitoring
●
Performance Review
●
Data Management and control
●
Sustainability improvement Initiatives
●
Use of Renewable Energy Resources
●
Employees Involvement & Team Work
●
Effectiveness in Reliability & Energy Efficiency Improvement
Company Profile
Infrastructure
Generation
EPC
Transmission
Distribution
Trading
Confidential Slide 3
DTPS at a Glance
Commercial Operation
Confidential Slide 4
DTPS Milestones
EnMS
1998 Quality Management System ISO 9001 BS EN 16001:2009
1999 Environment Mangement System ISO 14001 ISO 50001:2011
RBNQA
2000 RAMCO ERP Package implementation
2001 ISO upgradation SAP ECC
ISO 27000
2002 Optic Ground wire (OPGW) & Backbone data highway
SA 8000
2003 SAP & Employee self service implementation
6 Sigma-II
2004 British Safety Council Audit KM, OHSAS
6 Sigma-I
Mercer, CII 2006 Occupational Health and Safety Assessment
2005 Benchmarking in CII
Studies OHSAS 18001
BSC
2005 Six Sigma Drive I SAP & 2006 Knowledge Management
2005 HR Mercer study ESS
OPGW 2006 Six Sigma Drive II
ISO
Upgrade 2007 Social Accountability SA 8000
Confidential Slide 5
System Approach
ISO 14001:2004
Safe
Reliable Sustainable
Efficient Economical Clean
O
M C
P R
O O
T E
N N
I V
I T
M I
T R
I E
O O
S W
R L
E
Confidential Slide 7
Monitoring for Sustenance
Divisional
AOP
Departmental
Objectives &
Targets
Deviation
Yes FIR on respective Department Corrective / Preventi
ve Actions
Departmental Sc
ore Cards based
on Yearly O&T
Confidential Slide 8
Objectives Of Monitoring System
Confidential Slide 9
Monitoring Facilities At DTPS
●
Departmental websites
●
All departments
X-force
Machine
IMS , ISMS, SA, EnMs, 6 Sigma(Customize
● Digital
Interface (HMI) Logbooks
●
Various Standards on site Formats)
●
BIS standards
●
ISO standards
On line library Intranet website
●
Onlineinformation
EMS
Department wise
●
Legal (Acts, Notifications and Legal
updates)
Confidential Slide 10
Performance Monitoring
Performance
Monitoring
Testing Of
Individual All
Energy
Auxiliary Equipment
Boiler & Auditing Of Tripping &
Power Before &
Turbine All Area As Event
Side Losses Consumptio After
Per CEA Analysis.
n By Online Overhaul &
Guideline
EMS Estimation
Of Gain
Confidential Slide 11
Performance Review
Performance
?
Departmental
Monthly Review
Daily
Monthly OfReview
Meeting
Overall
With All
Departmental
Plant
Operation
Meeting Plant
Team
Performance
Review
MeetingMembers
Team Meeting
Confidential Slide 13
Sustainability Improvement Initiatives
Coal Management
Overhaul Strategy
Maintenance Philosophy
Planned Maintenance
Coal Management
Coal Auxiliary Power Heat Rate
% Kcal/kwh
Blended coal
8.25 2290
Wash + Imported
Confidential Slide 15
Coal Management - Benefits
Reduction in
●
Coal moisture
●
Coal consumption
●
ASH generation
●
Wear and tear
●
Auxiliary power
●
Boiler tube leakages
Confidential Slide 16
Overhauling Strategy -Rolling Plan
Boiler 2 years
HT Motors - 4 years
Confidential Slide 17
Overhauling Strategy -Rolling Plan Benefits
Confidential Slide 18
Reduction in Overhaul time
●
Modular conceptualization
●
HP module
●
Short shutdown opportunities
●
Overhauling of redundant auxiliaries
●
Standardized procedure for turbine cooling
●
De-coupling of Generator,
Confidential Slide 19
Reduction in Overhaul time
●
New technology - Induction heaters,
Quick erect type aluminum boiler
scaffolding, LFET etc.
●
Extra bigger size manhole for boiler
●
Project management software
●
Round the clock working – 2 shifts
Confidential Slide 20
Reduction in Overhaul time
Overhaul Days
18
45
1999-2000 2009-2010
Confidential Slide 23
Arresting Duct Leakages in Opportunity
Air Ducts
Confidential Slide 24
Condenser Vacuum Improvement
Condenser Vacuum Improvement Helium Leak Detection Test
Confidential Slide 25
Efficiency Based Maintenance
Energy deviation concept
Defects which affects the efficiency, auxiliary power are given top priority
e.g. HP heaters, Condenser, Duct rectification, APH Seals rectification, Mill
Performance 26
Confidential Slide 26
of
Major Initiatives
HP module replacement
BFP cartridge replacement
Coal mill liners replacement
APH basket replacement
Installation of CEP VFD
Reduction in startup time
Reduction in oil consumption
Reduction in DM make-up
Smart soot blower operations
Daily Energy Deviation Monitoring
HP module replacement
HP module Replacement
2010 2006
1980
1955
Unit-1 Unit-2
Before After
Confidential Slide 29
BFP cartridge replacement
Confidential Slide 30
Replacement of liners by Hi-Crome Liner
Mill Liner
Coal Mill
Confidential Slide 31
APH basket replacement
Unit-1 Unit-2
Before After
Confidential Slide 32
VFD Installation at CEP
Energy
Total 12 Nos. Of VFD Are Installed In Different Saving
Application 622 Kw
Confidential Slide 33
Reduction In Warm Start Up Time
12.44
12
11.2 11.5 11.52
10.3 10.29
10.11
10 10.05
9.4
8.58 8.37
8
7.26 7.38 Target 7 hrs
6.7
6.23 6.32 6.22 6.27
6 Mar-06 5.07
5.49 5.43
4.78
4 4.27 5.08
3.57 4.6
10.08 Hrs 5.53 Hrs
2
Before Project After Project
0
35
Confidential Slide of
Reduction In Start up time - Benefits
Reduction in Start-up time 4.55 hrs
Direct Benefits
Per Warm Start-up
Reduction in Oil consumption 16 kl
Indirect Benefits:
Reduction in
●
Auxiliary power consumption
●
DM water consumption
●
Customer dis-satisfaction
Confidential Slide 36
Reduction In Oil consumption
Confidential Slide 37
Reduction In Oil consumption
20
10
0
39496 39512 39572 39678 39802 39810 40034 40491 40597 40706 40739 40762 40785
Confidential Slide 38
DM makeup reduction
Optimization of Soot
Blowers operation
Confidential Slide 40
Installation of Magna Drive Coupling
Magna Drive Coupling - Couplings transmits torque from
Savings Investments
(Rs. Lacs) (Rs. Lacs)
0.01 3.5
41
Confidential Slide of
Daily Energy Deviation Report
Operating Value:
Base
theValue:
Operational
It includes Control:
Maintenance
Effect Control:
Of It IsQuality
Coal
It Includes Decided Based
Variation, On
This
control
includes
Condenser Average
Vacuum
Un-optimized Value of 1 Year Data
Condition,
Detail Analysis
Other Of Problems
Seasonal
Operation Effects.
Deviation,
Solution In Terms
Operators OfRunNew Alternative
Valve /Have To
Damper Equipment
Passing, In This
Average Power Technology
Standardized
PreventiveOperating Range.
Maintenance Due,
Consumption Repairor Replacement.
Set Points At Various Parameters
Rate As On Date
Confidential Slide 42
Monthly Building Energy Deviation Report
Confidential Slide 44
Employees Involvement
&
Team Work
Employees Involvement
Conductance ‘3L’ Life learning Program O&M Conference for group companies
With BEE
46
Confidential Slide of
Employees Involvement & Team Work
47
Confidential Slide of
Improvement plans implemented
Confidential Slide 48
Six Sigma Initiatives
Over 15 O&M related six sigma projects are implemented
Example
Reduction in start-up time
Reduction in Heat rate losses
Auxiliary Power reduction
Reduction in Overhaul time
100% auto loops controls
Condenser vacuum improvement
Reliability improvement of cooling water pumps
49
Confidential Slide of
Simulator
Technical Training center at DTPS has facility of 250 MW simulator
GET training
Refresher course
50
Confidential Slide of
Effectiveness in Reliability & Efficiency Improvement
Confidential Slide 51
Benefits
Confidential Slide 52
Conclusion
Confidential Slide 53
Confidential Slide 54
Thank You
Confidential Slide
NC raising in SAP system:
Confidential Slide 56
Corrective action against NC raised:
Confidential Slide 57
58
Confidential Slide of
59
Confidential Slide of
60
Confidential Slide of
Confidential Slide 61
Confidential Slide 62
Heat Rate Monitoring
Kcal/Kwh
Confidential Slide 63
Heat Rate Reporting
Deviation Analysis Report (Daily) Monthly Performance Test Report
Summary
Environment Parameters
Confidential Slide 64
APC Monitoring
Kwh
Confidential Slide 65
Online Energy Monitoring System
ELAN ELAN
VIEW SERVER
LAN
Continual Improvement
ELAN
RS485
Total 161 New Energy
VIEW RS485
Single Login
Meters Installed (HT)
Confidential Slide 66
Area wise focus for Energy Conservation
AHP
CHP
Compressors
HT Aux – 90%
LT Aux – 10%
DEA
ECO
SEA WATER
CONDENSER
CREEK
BFP CWP
9 mw 5.04 mw
CEP
0.625 mw
APH
4.70 mw
ES
2.7 mw P
FD Fan
ID Fan 3.5 mw
Coal Mill PA Fan 1.45 mw
67
Confidential Slide of
Energy Auditing
Confidential Slide 68
Plant Reliability
Confidential Slide 69
Pre-Outage & Post-Outage Survey
Chronic
ESP efficiency
Problems
TestIdentification
Performance Related Observations
Calculation Of Benefits From Overhaul
Chronic
ESP efficiency
Problems
TestIdentification
Confidential Slide 70
Improvement plan 18.1 format in SAP:
Confidential Slide 71