STX OIC Plan Tasks 4 OCT 11 CDT Senerth & CDT Seibert

Purpose: The purpose of this OIC plan is to clearly state the tasks of the STX OIC as well as the S3 as they pertain to the FTX, and to outline a plan of action to complete all necessary tasks NLT Thursday 6 OCT 11.

Tasks: Compile and example STX Lane walker book. (Lane 7) Inform and instruct ALL Lane Walkers on the proper way to compile a STX Lane walker book. Direct phone contact to each Lane Walker informing them of due date (6 OCT 11) Email sent through Emergency Contact list clearly outlining pieces to be contained within each Lane walker book, as well as suggestions on obtaining pieces All lanes from Fall 10 are photo copied, so 6 lanes need not be changed. Organize a RECON to Stones Ranch on Friday 7 OCT 11 S3 will coordinate with LTC Aube NLT 5 OCT 11 Clarify Trans Organize time to leave UCONN (Tentative 1230) Participating Cadre National Guard cooperation Hours on ground Contact all those needed on the RECON via phone NLT 4 OCT 11 to compile a list of those available to attend.

All lane walkers S3 (Senerth) STX OIC (Seibert) Class instructors and assistants (per CDT Rogers guidance) Begin compiling TOC lane book Contents: ALL Documents for each lane (Literal copies of each Lane walker book) MSIV Contact roster Cadre Contact roster STX Lane LDP roster Should give a clear representation of which MSIII is on what lane during what rotation. Squad Assignments Spreadsheet defining which MSIII is assigned as Squad Leader or Team Leader(s) on each STX lane. This is all predetermined. FTX Company leadership (in order to determine whether the garrison squad leadership is upholding leadership qualities even during STX) CRMW for each lane, and for holistic STX Operation (using the website that LTC Flarhety described to us in class.

Plan of Action:

4 OCT 11 NLT 2100: Send a copy of this OIC Sheet to CDT Palmer for further guidance. Create memorandum to send to Lane Walkers so there is no question on what needs to be contained in the Lane Book. (Remember: 6 lanes will use most of the pieces

created last year) 1) Lane Concept Page A general explanation of how the lane will operate. Explains the purpose and course of action during the lane. Also this sheet will include the OPFOR purpose and intent, as well as any safety considerations that may occur during the lane. 2) Execution Page This page first states the distance and direction that the cadets will travel, and names the objective that they will approach. This page must also include a step-by-step course of action that cadets are EXPECTED to maintain throughout the lane. This will include statements such as Once the squad approaches the objective they will then... 3) Map of Lane This will be an aerial drawing of the lane. Make sure to include the distance and direction, and all important terrain features. In this drawing utilize a Key or Legend to depict the Start point, objective, buildings, Skookums, etc. 4) OPORD This will be a full 5 paragraph operations order. 5) STX Road to War page This is a faux description of the enemy in the area, and the cultural aspects cadets need to be aware of while conducting operations in Atropia. This should be the same in every lane walker book. 6) STX Time line Overall time line for the STX Operation, designed in an H+ manner. This will be a time line for ONE lane, not the entire day of STX. This time line will give an EXPECTED outline for time hacks that the MSIII squad leader should follow, as well as definitive hard times for such movements as issuing the OPORD, beginning the AAR and moving to the next lane. 7) LDP Roster For STX lanes 8) SQD Assignments This will include which cadets are assigned to each squad. This WILL include MSIIIs, MSIIs, and MSIs. (Cadet Caless needs to be referenced for final number of those attending FTX) Once the final roster of those in attendance of FTX is received, the MSIIs and MSIs can be filled into the existing squads MSIIIs have already been placed in. 9) Lane Smart Cards This sheet will be a spreadsheet where each row contains information for each STX lane. In the vertical columns, the following information will need to be stated for each lane:

1. Start grid 2. End grid 3. Azmuth 4. Distance 5. ICOM Channel 6. OPFOR Rounds 7. OPFOR Equipment 8. Lane # 9. Type of lane (MTC, Ambust, RECON, etc) 10) Evaluation Smart Card This spreadsheet will show which MSIIIs are on what lane at what time, and what position they will hold, as well as which MSIV will be evaluating them. 11) Squad Rotation Smart Card Outlines which squad will be on which lane during which rotation. 12) OPFOR Roster Which MSIV (and MSIs) will be OPFOR on which lane 13) FTX Company leadership LDP 14) Composite Risk Management worksheet