V-Drain Details
V-Drain Details
IES S
A R A RIE
EV EV
O P OP
SL SL
C UT CU T
500mm min
300mm min
FINAL LAYERS REF . 311 STEEL MESH CONTINUOUS FINAL LAYERS REF . 311 STEEL MESH CONTINUOUS
OVER CONSTRUCTION JOINTS. OVER CONSTRUCTION JOINTS.
REINFORCING TO OVERLAP BY 400mm REINFORCING TO OVERLAP BY 400mm
POSITION OF SUBSOIL DRAIN (IF ANY) POSITION OF SUBSOIL DRAIN (IF ANY)
CH1+200 CH 3+300
CONCRETE SIDE DRAIN CONCRETE SIDE DRAIN
W
IES
107
R
2000
E VA
FINAL LAYERS 50 50 RECOMPACT DISURBED SOIL TO
OP
STEEL FLOATED FINISH 95% MOD AASHTO DENSITY.
T SL
CU
300
500mm min
CONCRETE 25 MPa SABS 952 / SANS 952.
CONCRETE V DRAIN IN
AREAS WITH VEHICLE TRAFFIC
CH 9+180 - CH 9+200
CONCRETE SIDE DRAIN
01
DATE
JUNE 2024
DESCRIPTION
DESIGNED DRAWN
Roads Directorate
Tel: +266 22 326 892/3/4 Fax : +266 22 311 242 TITLE Rev.
CHECKED CHECKED Cell: +266 5885 0418 MAFUBE E-mail : mafube@leo.co.ls OPEN DRAIN CROSS SECTIONS PLAN No. MF-MSM-A7-012
0 20 40 60 80 100 ORIGINAL
DATE
SHEET 1 OF 1 01