North East Storm Relief CSO
Proposed tunnel route centreline Local authority boundary Existing sewer Existing CSO
Local authority boundary Site support/welfare Internal site road Site access
y The Highwa
Glamis Road
Shadwell Basin
SOUTHWARK
Cranes
SOUTHWARK
Drop shaft
TOWER HAMLETS
SOUTHWARK N
TOWER HAMLETS
SOUTHWARK N
N
Figure 1A: King Edward Memorial Park Foreshore location plan
Future use
14
Future use
Related documents: Design Electrical and control kiosk against existing brick wall
15
Relocated bandstand
The Highway
The Highway
Glamis Road
Glamis Road
Figure 3B: Artists impression of the site after the works are completed
Controlled (daytime) crossing of construction access route open unless required by construction activities
N Thames Path remains open during construction Minor reconfiguration of tennis courts Relocated childrens play area Paving and landscaping improvements to area around Rotherhithe Tunnel ventilation shaft Advanced tree planting to improve Memorial Avenue
Bike stands New gated entrance to park and Thames path Activity/ fitness zone Seating area Ventilation columns
28
29
30
www.thamestunnelconsultation.co.uk