King Edward Memorial Park Foreshore

King Edward Memorial Park Foreshore


Location plan
Introduction

Construction

Phase one construction plan


Diversion only required when internal site road in use

Construction

Phase two construction plan


Diversion only required when internal site road in use Maximum extent of construction site for phase 2 Site hoarding Cofferdam Controlled (day time) crossing open unless required by construction activities Piling rig Local authority boundary Site support/welfare Excavated material storage and processing Maintenance workshop and storage Construction support Internal site road Crane Barge Site access Existing Thames Path Thames Path diversion

Phase three construction plan


Diversion only required when internal site road in use Maximum extent of construction site for phase 3 Site hoarding Cofferdam Controlled (day time) crossing open unless required by construction activities Local authority boundary Site support/welfare Excavated material storage and processing Construction support Internal site road Site access Drop shaft Option for contractor to transport materials using barges Existing Thames Path Thames Path diversion

Draft limit of land to be acquired or used

Ca

et ble Stre
North East Storm Relief CSO

Proposed tunnel route centreline Local authority boundary Existing sewer Existing CSO

Maximum extent of construction site for phase 1 Site hoarding Cofferdam

Controlled (day time) crossing open unless required by construction activities

Local authority boundary Site support/welfare Internal site road Site access

y The Highwa

Glamis Road

King Edward Memorial Park

TOWER HAMLETS Free Trade Wharf


Jack up barge servicing piling operations Barge TOWER HAMLETS

Existing Thames Path Thames Path diversion

Shadwell Basin

SOUTHWARK

Cranes

SOUTHWARK

Drop shaft

TOWER HAMLETS

SOUTHWARK N

TOWER HAMLETS

SOUTHWARK N

N
Figure 1A: King Edward Memorial Park Foreshore location plan

Figure 2C: Illustrative phase 1 construction plan

Figure 2D: Illustrative phase 2 construction plan

Figure 2E: Illustrative phase 3 construction plan

Layout of the site showing landscape advance works


Relocated multipurpose sports area
3

King Edward Memorial Park Foreshore


Memorial Park benches permanently relocated in line with Memorial Thames Path diverted around construction site hoarding
13

Future use
14

Future use
Related documents: Design Electrical and control kiosk against existing brick wall

Layout of the site once construction works complete


Football pitch access Relocated childrens play area Memorial Park benches relocated on line with Memorial

15

Relocated bandstand

The Highway

The Highway

Artists impression of the site after the works are completed

Glamis Road

Glamis Road

Bowling green Football pitch

Proposed construction site

Proposed construction site

Tennis courts New North East Storm Relief CSO outlet

Figure 3B: Artists impression of the site after the works are completed

King Edward Memorial Park Foreshore


27

Controlled (daytime) crossing of construction access route open unless required by construction activities

Aerial view of the completed works


Thames Path widened and improved. Provides maintenance access to shaft

N Thames Path remains open during construction Minor reconfiguration of tennis courts Relocated childrens play area Paving and landscaping improvements to area around Rotherhithe Tunnel ventilation shaft Advanced tree planting to improve Memorial Avenue
Bike stands New gated entrance to park and Thames path Activity/ fitness zone Seating area Ventilation columns

N Grassed area around relocated bandstand

Figure 3C: Layout of the site showing landscape advance works

Figure 3D: Layout of site once construction works complete

28

29

Figure 3E: Aerial view of the completed works

30