Solar Inspection Report

Uploaded by

janglerushikesh4
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

Rooftop Solar Inspection

Form
Inspection Date:_________________

Name of Division______________ Name of Sub-Division:__________________


Connection Type: 1P / 3P Solar Application ID:___________________
National Portal Ref. No:_______________________

Details of Consumer
Particulars Observation
Consumer Number
Name of Consumer
Address of Consumer
MSEDCL Existing Sanction & Connected Load In kW
DTC Code

Solar System Equipment & Capacity Details


Particulars of Inverter & Modules Observation
Solar Grid Tie Inverter Make
PV Inverter Capacity in kW
PV Inveter Serial Number
PV Module Make
No's Module Installed & Capacity of each Module No's ( Wp)
Type of Module DCR/ Non DCR
Modules are approved in ALAMM List
The Solar Roof Top Capacity in DC ( Watt )
Whether AC capacity less than equal to Sanctioned load

SLD
Particulars YES NO Note
Single Line Schematic Diagrams in respect of its system
facility Submited

All Equipment installed as per specifications duly signed by


the licensed electrical contractor/ Solar PV installer 
Inverter, Module Mounting structure, AC & DC DB with
Components DC Cable(s) AC Cable(s) Lightning Arrestor
Earthing System
Particulars YES NO Note
Separate Earthing provided ACDB Earthing 
Separate Earthing provided For DCDB & Solar Panel 
Structure
Separate Earthing provided for LA Earthing 
All Metallic body Parts Earthed 

Protection Switchgears
Particulars YES NO Note
DC Fuses or MCB Provided in DCDB 
Surge Protection Device Installed in both Side ACDB & 
DCDB
MCB Provided before AC Load Side in ACDB 
Separate Lightning Arrestor installed for system 
1. Whether switch has visible for verification 
2. Whether switch clearly indicate Open/Close Position
3. Whether switch has facility of locking in openPosition
Islanding is working after disconnect AC Supply 

Net Metering System Details


Particulars Observation
Net meter Installed in Grid System at the
time of Joint Inspection
Net Meter is Tested at MSEDCL If (Yes) Testing Date & Seal
No
Meter Make
Meter Serial No
Meter Capacity
Location meter easily assessable for meter reading
Whether Net Meter connection properly found

Generation Meter Details


Particulars Observation
Generation meter Installed in Grid System at the
time of Joint Inspection
Generation Meter is Tested at MSEDCL If Yes Testing Date
& Seal No
Meter Make
Meter Serial No
Meter Capacity
Location meter easily assessable for meter reading
Whether Generation Meter connection properly found
Overall Observation
Particulars YES No Observation
Whether System is working Properly 
Islanding of Solar System working Satisfactory 
The Above inspected Solar System with 
associated equipment & Metering System can be
taken into system (Yes/No)
Any Remarks Discrepancies to be attended by consumer 
for to be complied

Is PV Panels are DCR, if Yes

Sr. PV Panel Serial No. Wp Sr. PV Panel Serial No. Wp


No No.
.
1 16
2 17
3 18
4 19
5 20
6 21
7 22
8 23
9 24
10 25
11 26
12 27
13 28
14 29
15 30

Dy. EE/ Add. EE MSEDCL AEQC Consumer Vendor


Verified Verified Verified Verified with Seal