Repetitive manufacturing REM
Period base planning and not based on orders
Products will be manufactured over longer period of time
Products will no changes frequently
Confirmation is from backflushing
Settlement is trough from product cost collector
Planned orders are sufficient to carry out shoop floor activity
Master Data
Material master (MM01)
BOM (CS01)
Work Center (CR01)
Rate Rounting (CA21)
Product Version (C223)
REM Profile (OSP2)
Material Cost estimate (CK11N)
Release (CK24)
Premilinary costing for the product cost collector (KKF6N)
REM Profile (OSP2)
Process Flow
Demand Management
MRP RUN
Planned Order
REM Confirmation
Movement types
MTS
Goods receipt 131
Goods issue 261
MTS / MTO
SAME
MRP1,MRP2, MRP4
SAME
SAME
SAME
SAME
SAME
SAME
SAME
SAME
SAME
MD04 Check Requirements/Stock
MIGO - Goods receipt Mov 501 or MB1B mov 501
MD61 - Create planned independent Requirements for finish material
MD02 - Single item, Multi-Level MRP - Create planned order SAME
Check in MD04 SAME
MFBF - REM Confirmation SAME
MTO MB51
571E
572E
MTO
DIFERENT
MRP3 - Strategy group, Avaliability check
VA01 - Create sales order for finish product
Check in the MD04 the sale order
MIGO - Goods receipt Mov 501 and put the sale order in where, MMBE CHECK