REM Manufacturing T.Codes Guide

This document outlines the process and T-Codes for repetitive manufacturing (REM) in SAP. It provides a step-by-step process including: [1] Creating the material master, bill of materials, work centers, routings, and production versions; [2] Generating production orders and transferring to demand; [3] Creating a product cost collector; [4] Running MRP and backflushing costs. The detailed T-Codes for REM setup and cost estimation are also listed.

Uploaded by

tirupathi rao
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
93 views2 pages

REM Manufacturing T.Codes Guide

This document outlines the process and T-Codes for repetitive manufacturing (REM) in SAP. It provides a step-by-step process including: [1] Creating the material master, bill of materials, work centers, routings, and production versions; [2] Generating production orders and transferring to demand; [3] Creating a product cost collector; [4] Running MRP and backflushing costs. The detailed T-Codes for REM setup and cost estimation are also listed.

Uploaded by

tirupathi rao
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

REM Process T.

Codes

Repetative manufacturing is period based planning and not based on


orders. Normally same products will be manufactured over longer period of
time..products will not change frequently. Confirmation is from backflushing and
settlement is through from product cost collector for the period. Confirmaton will
be without ref to planned orders. Planned orders are sufficient to carry out shop
floor activity. In master data production versions and cost collector is must where
this is not mandatory in discreate.

You do these steps for rem production:

mm01 : Material Master


- MRP - 4 view you click rem

cs01 : Create Bom

cr01 : Create Work Center

ca21 : Create Rate Routing

mm02 : Prodn Version

md61 : Create PIR

mc74 : Transfer PIR to Demand

kkf6n : Create Product Cost Collector

mb1c : Create Stock

md02 : MRP run

mfbf : Rem Back Flush

The detailed sequence of T.Codes for REM including Std cost estimate.

Material master - MM01

BOM - CS01

Price Planning - KP26

Work Center - CR01

Rate Routing - CA21

Material Master Change, enter production version - MM02 (MRP 4 View)


REM Process T.Codes

Product Cost Collector - KKF6N

Costing - CK40N

Backflushing - MFBF