Plant Owner
Plant Owner
0 MW AC Grid
Interactive Ground Mounted Solar Power Plant inclusive of Comprehensive
Operation & Maintenance (O&M) for 1 year
stamped upon it the designed hot and cold load which it is intended to support. Suitable scale
should also be provided to indicate load on support/hanger. Nameplates shall be as per best
practices of the industry.
All such plates, instruction plates, etc. must be bilingual with Hindi inscription first,
followed by English. Alternatively, two separate plates one with Hindi and the other with
English inscriptions may be provided.
All segregated phases of conductors or bus ducts, indoor or outdoor, should be provided
with coloured phase plates to clearly identify the phase of the system
8. DESIGN IMPROVEMENTS
The Owner or the Contractor may propose changes in the specification of the equipment or
quality thereof and if the parties agree upon any such changes the specification shall be
modified accordingly.
If any such agreed upon change is such that it affects the price and schedule of completion,
the parties should agree in writing as to the extent of any changing the price and/or schedule
of completion before the Contractor proceeds with the change. Following such agreement,
the provision thereof, should be deemed to have been amended accordingly.
9. TECHNICAL CO-ORDINATION MEETING
The Contractor should organize and attend fortnightly Progress Review Meetings with the
Owner during the period of Contract at mutually agreed venues for review of progress &
resolving technical clarifications, if any. The Contractor also need to attend such meetings
at his own cost and fully co-operate with such persons and agencies involved during the
discussions.
The Contractor must ensure availability of the concerned experts / consultants/ personnel
who are empowered to take necessary decisions during these meetings. The Contractor must
be equipped with necessary tools and facilities so that, if required, the drawings/documents
can be resubmitted after incorporating necessary changes and approved during the meeting
itself.
The Contractor should furnish Fortnightly Progress Report (FPR) to the Owner at most by
2nd and 16th of every month detailing out the progress achieved on all erection activities as
compared to the schedules. If the 2nd and 16th date of any month is holiday, the Contractor
shall ensure submission of MPR by the last working day before 2nd and 16th of that month.
This shall be supplemented by printed colour photographs and video in VCD/DVD
indicating various stages of erection and the progress of the work done at Site. The report
should also indicate the reasons for the variance between the scheduled and actual progress
and the action proposed for corrective measures, wherever necessary.
bench calibration, if required, and the re-installation of the said equipment after calibration
shall also be included as a part of the work under these specifications.
Defects prior to taking over
If at any time before the work is taken over, EIC shall:
c) Decide that any work done or materials used by the Contractor or any sub- Contractor is
defective or not in accordance with the contract, or that the works or any portion thereof, are
defective, or do not fulfil the requirements of contract (all such matters being hereinafter,
called ‘Defects’ in this Clause).
AND
d) As soon as reasonably practicable notice given to the Contractor in writing of the said
decision specifying particulars of the defects alleged to exist or to have occurred, then the
Contractor at his own expense and with all efforts shall make good the defects so specified.
In case the Contractor fails to do so, the Owner may take, at the cost and risk of the
Contractor, such steps as in all circumstances be reasonable to make good such defects. The
expenditure so incurred by the Owner will be recovered from the amount due to the
Contractor. The decision of the EIC with regard to the amount to be recovered from the
Contractor will be final and binding on the Contractor. As soon as the works have been
completed in accordance with the contract and have passed the tests on completion, the EIC
shall issue a certificate in which he shall certify the date on which the works have been so
completed and have passed the said tests and the Owner shall be deemed to have taken over
the works on the date so certified.
Defects after taking over
a) In order that the Contractor could obtain a completion certificate, he shall rectify any defect
arising from the defective materials supplied by the Contractor or workmanship or any act
or omission of the contract or that may have been noticed or developed after the works or
group of the works has been taken over, the period allowed for carrying out such works will
be normally 15 days. Normally it is expected that work will be completed within 15 Days.
However, in case of unforeseen /genuine delay EIC may take a call on this aspect whose
decision will be final. If any defect shall not be remedied within period stipulated above, the
Owner may proceed to do the work at Contractor’s risk and expense and deduct from the
final bill such amount as may be decided by the Owner.
b) If by reason of any default on the part of the Contractor, a completion certificate has not
been issued in respect of the works within one month after the date fixed by the Contractor
for the completion of the work, the Owner shall be at liberty to use the works or any portion
thereof in respect of which a completion certificate has not been issued , provided that the
works or the portion thereof so used as aforesaid shall be afforded reasonable opportunity
for completion of these works for the issue of completion certificate.
c) All the aforesaid safeguards /rights provided for the Owner shall not prejudice its other
rights/remedies elsewhere provided herein and/or under law.
13. ACCIDENT
Owner will not have any liability towards any loss or damage to the property or personnel
of the bidder deployed for discharging the work under this contract. In case any accident
occurs during the construction/ erection, operation & maintenance or other associated
activities undertaken by the Contractor thereby causing any minor or major or fatal injury to
his employees due to any reason, whatsoever, it shall be the responsibility of the Contractor
to promptly inform the same to the Owner and also to all the authorities envisaged under the
applicable laws.
14. CONFIDENTIALLITY
The Bidder will not engage any persons other than those who are authorized by Owner for
doing the work for the above contract. Any data recorded/taken from the plant will have
proprietary right of Owner. Contactor should not share any data recovered/taken from the
site with any other authority/consultant/personnel.
Bidder shall treat NIT documents and contents therein as private and confidential. If at any
time during bid preparation, bidder decides to decline the invitation to bid; all documents
must be immediately returned.
Note:
• Bidder (Contractor) shall not, without prior submission of his Bid to IPPL, make use
of any document or information except for purposes of performing the contract.
• Any document supplied to the bidder (Contractor) in relation to the contract other than
the Contract itself remain the property of IPPL and shall be returned (in all copies) to
IPPL on completion of Contractor’s performance under the Contract if so, required by
IPPL.
15. ORGANISATION CHART
The bidder shall furnish an organization chart for the proposed solar PV project with CV of
manpower employed. The person responsible for reporting to owner shall be indicated by
designation. Details of specialist manpower available with the company should be provided.
During the course of project execution, it will responsibility of contractor to take prior
approval of Owner for any change in organogram at any point of time.
E) GENERAL SYSTEMS
1. WEATHER MONITORING STATION:
As a part of weather monitoring station, Bidder shall provide following measuring
instruments with all necessary software & hardware required to integrate with Supervisory
Data Acquisition System so as to enable availability of data.
a) PYRANOMETER:
Bidder shall provide minimum two (02) numbers of pyranometers for measuring incident
global solar radiation. One of them shall be placed on horizontal surface and the other on
adjustable inclined plane. The specification for pyranometers shall be as follows:
Details Values
Spectral Response. 0.31 to 2.8 micron
Sensitivity Min 7 micro-volt/w/m2
Time response (95%): Max 15 s
Nonlinearity: ±0.5%
Temperature Response: ±2%
Tilt error: < ±0.5%.
Zero offset thermal Radiation: ±7 w/m2
Zero offset temperature change ±2 w/m2
Operating temperature range: 0 deg to +80 deg
Each instrument shall be supplied with necessary cables. Calibration certificate with
calibration traceability to World Radiation Reference (WRR) or World Radiation Centre
(WRC) shall be furnished along with the equipment. Bidder shall provide Instrument manual
in hard and soft form.
The Pyranometers shall be selected after conformance by Independent Chartered Electrical
Engineer for adherence to specifications laid out in the Tender Document. A duly certified
conformance certificate from Independent Chartered Electrical Engineer needs to be
submitted before placement of purchase order.
b) THERMOMETER:
Bidder shall provide minimum two thermometers (one for ambient temperature
measurement with shielding case and other for module back surface temperature
measurement). The thermometers shall be RTD / semiconductor type measuring instrument.
Ambient temperature measurement thermometer shall have a range of 0 to 60 degree C and
module back surface temperature sensor shall have range of 0 to 100-degree C. The
Instrument shall have valid calibration certificate.
Page 154 of 214
Signature of Bidder with Seal and date
PLANT OWNER Design, Engineering, Procurement, Construction (EPC) of 1.0 MW AC Grid
Interactive Ground Mounted Solar Power Plant inclusive of Comprehensive
Operation & Maintenance (O&M) for 1 year
Each Inverter
1 4 1 - 2
room
Control room 2 4 1 - 1
As per design
and statutory
Transformer requirement
5 - 2 8
yard for
transformer
bay area
Page 155 of 214
Signature of Bidder with Seal and date
PLANT OWNER Design, Engineering, Procurement, Construction (EPC) of 1.0 MW AC Grid
Interactive Ground Mounted Solar Power Plant inclusive of Comprehensive
Operation & Maintenance (O&M) for 1 year
o Checking of MC4 connectors (series and parallel wiring) for loose connections and
breakages if any to be replaced.
• Inverter Maintenance
o Filters at air inlet vents need to be cleaned fortnightly with warm soapy water and then
thoroughly dried before fitting back in the system.
o Regular checking of cabinet and heat sink fans to ensure smooth functioning.
o Monitoring of critical inverter parameters, checking of data log & event logs to identify
any abnormality beforehand and to take required preventive action.
o Regular checking of recording and display of all parameters and to take corrective
actions if required.
o To monitor weather station data on Data Acquisition System’s screen and to take
corrective actions in case of inaccuracy/non-recording of data.
Desiccant of sensor should be changed when it gets transparent. (It is most important for
faithful operation).
o Performance monitoring with focus on spring charging, tripping circuit, manual and
electrical operations.
• Transformer Maintenance:
o Monthly Maintenance
Checking of silica gel colour, oil level in breather cups, oil level of tank, and taking
corrective actions.
o Annual Maintenance
Inspection and cleaning of HT< termination box, marshalling box and cable sealing
boxes.
Checking of low oil level and Bucholz relay functioning through simulation.
• HT panel Maintenance:
o Monthly Maintenance
o Annual Maintenance
Measurement of insulation:
o Checking of fixtures, lamps and junction boxes, sealants and rectification as per
requirement including replacement of faulty lamps/ chokes and fixtures.
o Cable Meggering.
o Watering in earth pits in every quarter to ensure that earth resistance value doesn’t
exceed acceptable values as defined below.
Page 159 of 214
Signature of Bidder with Seal and date
PLANT OWNER Design, Engineering, Procurement, Construction (EPC) of 1.0 MW AC Grid
Interactive Ground Mounted Solar Power Plant inclusive of Comprehensive
Operation & Maintenance (O&M) for 1 year
Note: Preventive maintenance as detailed above are indicative, O&M vendor need to re-examine
preventive maintenance requirements as complete responsibility of equipment outage due to lack
of preventive maintenance will entirely rest upon O&M vendor.
ii) The contractor shall at his own expense provide all amenities to his workmen as per
applicable laws and rules.
iii) The Contractor shall deploy enough manpower at plant site to carryout work
instructions and preventive maintenance schedules as specified.
k) General cleaning and maintenance of control room, inverter room, array field and other plant
infrastructure.
l) The Contractor shall immediately report the accidents, if any, to the EIC & to all the concerned
authorities as per prevailing laws of the state.
m) Liaison with State Electricity utility so as to ensure optimum power production from the
project & revenue generation thereby protecting the interest of Owner. Contractor will be
responsible to settle monthly billing of wheeled energy with WBSEDCL.
n) The Contractor shall comply with the provision of all relevant Acts of Central or State
Governments including payment of Wages Act 1936, Minimum Wages Act 1948, Employer's
Liability Act 1938, Workmen's Compensation Act 1923, Industrial Dispute Act 1947, Maturity
Benefit Act 1961, Employees State Insurance Act 1948, Contract Labour (Regulations &
Abolishment) Act 1970 or any modification thereof or any other law relating whereto and rules
made there under from time to time.
o) Note: Above list of O&M activity is for guidance. Prior to initiation of O&M work,
Contractor need to submit detailed O&M schedule for approval of owner.
p) Power Evacuation Infrastructure:
Operation & maintenance of evacuation system up to the point of interconnection with
existing 6.6KV HT panel shall be the responsibility of the contractor. The maintenance and
repair work involve:
• Monthly inspection of complete evacuation system and submit report to Owner in
prescribed format as suggested by Owner. O&M technician during weekly inspection
has to sign register at Owner’s Solar Power plant as a proof of inspection.
• To undertake corrective action as per points highlighted in weekly inspection
report/recommendation of Owner’s representative.
• To undertake line inspection as per directions of IPPL representative in case of earth
fault/other fault in cable/system and to restore line by signing in registers/formats at
GSS.
• To undertake preventive & breakdown maintenance of Owner’s bay at GSS.
• Arrangement of Jeep/Tractor for material transportation and work force mobilization as
per the requirement in consultation with site officer.
• Identification of faults in 6.6 KV transmission cables, including arrangement of fault-
finding instruments.
• Repairing and jointing damaged cables with sleeve/straight-through joint arrangement,
or as specified in the relevant standards.
i) The Contractor shall submit detailed QAP within 15 days of the placement of Purchase
Orders for approval of Owner in accordance with the relevant standards and codes. The
Contractor shall ensure finalization of comprehensive QAP for all the equipments along with
Manufacturer before submission of QAPs for approval.
Quality assurance and inspection for civil works
Introduction
This part of the specification covers the sampling, testing and quality assurance requirement
(including construction tolerances and acceptance criteria) for all civil and structural works
covered in this specification.
This part of the technical specification shall be read in conjunction with other parts of the technical
specifications, general technical requirements & erection conditions of the contract which covers
common QA requirements. Wherever IS code or standards have been referred, they shall be the
latest revisions.
The rate for respective items of work or price shall include the cost for all works, activities,
equipment, instrument, personnel, material etc. whatsoever associated to comply with sampling,
testing and quality assurance requirement including construction tolerances and acceptance
criteria and as specified in subsequent clauses of this part of the technical specifications. The QA
and QC activities in all respects as specified in the technical specifications/ drawings / data sheets
/ quality plans / contract documents shall be carried out at no extra cost to the owner.
The contractor shall prepare detailed construction and erection methodology scheme which shall
be compatible to the requirements of the desired progress of work execution, quality measures,
prior approvals if any and the same shall be got approved by the Owner. If required, work
methodology may be revised/ reviewed at every stage of execution of work at site to suit the site
conditions by the contractor at no extra cost to the owner.
QA and QC manpower
The contractor shall nominate one overall QA coordinator for the contract detailing the name,
designation, contact details and address at the time of post bid discussions. All correspondence
related to Quality Assurance shall be addressed by the contractor’s QA coordinator to Owner.
Owner shall address all correspondence related to Quality issues to the contractor’s QA
coordinator. The contractor’s QA coordinator shall be responsible for co-ordination of Quality
activities between various divisions of the contractor and their sub-vendors on one hand & with
Owner on the other hand.
The contractor shall appoint a dedicated, experienced and competent QA&QC In-Charge at site,
preferably directly reporting to the Project Manager, supported as necessary by experienced
personnel, to ensure the effective implementation of the approved QAP. The contractor shall
finalize and submit a deployment schedule of QA&QC personnel along with their details to Owner
for approval/ acceptance and further shall ensure their availability well before the start of the
concern activity.
Page 164 of 214
Signature of Bidder with Seal and date
PLANT OWNER Design, Engineering, Procurement, Construction (EPC) of 1.0 MW AC Grid
Interactive Ground Mounted Solar Power Plant inclusive of Comprehensive
Operation & Maintenance (O&M) for 1 year
machines, plants testing facilities etc., and confirmation that the process control and manufacturing
of steel sections by re-rollers is the same as that of main steel producers, that billets for re-rolling
are sourced from main steel producers only shall be furnished with regards to re-roller.
Field Quality Plan
Well before the start of the work, the contractor shall prepare and submit the Field Quality Plans
(FQP) and obtain approval of Owner, which shall detail out for all the works, equipments, services,
quality practices and procedures etc. in line with the requirement of the technical specifications to
be followed by the contractor at site. This FQP shall cover for all the items / activities covered in
the contract / schedule of items required, right from material procurement to completion of the
work at site. Field Quality Plan shall cover following along with other details:
a) Civil work quality parameters.
b) Placement details of equipment on foundations, inside inverter room/control room.
c) Cable laying norms along with marker intervals & length of cable loop to be left.
d) Details of cable laying between modules to SMB, SMB to inverter, inverter to LTPDB,
LTPDB to transformer and for HT cable.
e) Procedure to be followed to maintain accuracy of alignment & level for module mounting
structure.
f) Number of equipment (total station, concrete mixtures, drilling machine, cube test machine
etc.) to be made available at site to ensure work completion as per schedule.
g) Any other procedure required to ensure quality work.
Material dispatch and receipt at site
After successful inspection of equipment/material by Owner/TPI, contractor can dispatch material
to site depending on adequate storage facility, availability of unloading manpower and other
factors. Following modalities to be complied for material dispatch and receipt at site:
a) Material Dispatch:
i) Contractor shall notify Owner of the date of each shipment from the works and expected
date of arrival at the site.
• For Indigenous materials - The shipping documents shall be sent to the Owner within 3
three days from the date of shipment.
• For imported materials – The shipping documents shall be sent to the Owner within 10
days from the date of shipment.
ii) Contractor will track the shipments and Owner shall be kept informed.
iii) Shipment status report from Contractor- weekly basis.
b) Material Receipt:
i) On arrival of the material at site, Contractor shall give written notice thereof to Owner to
inspect the materials, and shall keep in readiness for inspection, the materials, shipping
documents, relevant tests results, reports and certificates.
ii) CERTIFICATE OF VERIFICATION AND GOOD CONDITION jointly by Owner,
Contractor. Formats for the same to be developed by Contractor and to be approved from
Owner. Following needs to be ensured:
• Satisfaction that the material received is in conformity with the material requirements
of the Bill of Materials
• Tallying with description given in the shipping documents/packing list details
• Contractor’s invoices would be matched with respect to Serial numbers, tally sheets,
Condition of material received (Damaged, partly damaged) etc.
• Contractor would prepare Material Receipt Note for accepted materials (formats to be
developed by Contractor and approved by Owner). Material Receipt Note would be duly
verified and certified by Owner.
c) Record Keeping of Material:
i) Material Register (to be maintained by Contractor with each entry verified & checked by
the Owner’s representative): Two separate register as detailed below would be maintained.
• Register of Major items supplied by contractor as per the Purchase order (E.g. - PV
Modules, Inverter, Transformer, MMS, Cables etc.).
• Register of other materials such as Cement, Steel, Stone & aggregates, etc. with details
of the day to day receipt, issue, and stock (with brand name) of major items like steel,
cement supplied by contractor.
CHAPTER-5
(Annexure)
Annexure-01
CHECKLIST FOR BID SUBMISSION
Bidders are requested to duly fill in the following checklist. This checklist gives only certain
important items to facilitate the bidder to make sure that the necessary data / information as called
for in the Bid Document has been submitted by them along with their offer. This, however, does
not relieve the bidder of his responsibilities to make sure that his offer is otherwise complete in all
respects.
Please ensure compliance and tick (√) against following points:
S. Particulars Submitted
No.
1. Offer complete in all respects with pages in sequential order, original Bid
Document including drawings, Annexures, addendum(s) (if any)
i. Annexure-02: Covering Letter signed by the authorised signatory along with
Power of Attorney or any other proof of authority, in favour of the person who
has signed the tender (or a copy thereof duly attested by a Gazetted Officer)
ii. Annexure-03: Bidders General Information
iii. Annexure-04: Undertaking for non-engagement of child labour
iv. Annexure-05: Declaration about the relationship, if any, with IndianOil
Petronas Pvt Ltd director
v. Annexure-06: Performa of certificate for non-involvement of agent
vi. Annexure-07: Letter of Waiver of Conditions / Deviations
vii. Annexure-08: Bank guarantee, in case of EMD through BG
viii. Tender document along with Addendum/ Corrigendum/Amendment, if any,
issued for the tender duly stamped and signed on each page
ix. PV Syst report indicating the minimum generation and detailed loss diagram
2. Confirm that the Price Bid (in requisites formats strictly complying with the
requirements) has been duly filled in for each item &
3. Confirm that all forms are enclosed with the bid duly digital signed by
authorized person(s)
4. Confirm that the hard copy of EMD, has been sent to address mentioned in the
Tender document
Annexure-02
FORMAT OF THE COVERING LETTER
(On Company’s / Firm’s letterhead)
Date:
To,
IndianOil Petronas Pvt Ltd
LPG Import / Export Terminal
Kasberia, Purba MedinipurHaldia-721635
West Bengal
Dear Sir,
Subject: Design, Engineering, Procurement, Construction (EPC) inclusive of 1-Year
Comprehensive Operation & Maintenance (O&M) of 1.0 MW AC Grid Interactive
Ground Mounted Solar Power Plant
Please find enclosed our bid for “Design, Engineering, Procurement, Construction (EPC) inclusive
of 1-Year Comprehensive Operation & Maintenance (O&M) of 1.0 MW AC Grid Interactive
Ground Mounted Solar Power Plant” in response to Tender No. IPPL/ENN/PT-01/2024-25 issued
by M/s IndianOil Petronas Pvt. Ltd. (IPPL) on .04.2024.
We hereby confirm the following:
The bid for the subject tender is being submitted by _____________________ (Name of the
Bidder) who is the Bidder in accordance with the conditions stipulated in the Tender document.
We_____________________ (name of the Bidder), as the Bidder, would be responsible for
completion and performance of the anticipated Scope of Work.
We have examined in detail and have understood, and abide by, all the terms and conditions
stipulated in the Tender document issued by M/s IndianOil Petronas Pvt (IPPL) and in any
subsequent communication sent by IPPL. Our bid for the subject tender is consistent with all the
requirements of submission as stated in the Tender document or in any of the subsequent
communications from IPPL.
The information submitted in our bid for the subject tender is complete, and strictly as per the
requirements stipulated in the Tender document and is correct to the best of our knowledge and
understanding. We would be solely responsible for any errors or omissions in our bid for the
subject tender. If any information, document or declaration submitted in/with our bid for the
subject tender, is found to be incorrect at a later date, we indemnify IPPL against any loss due to
this and IPPL may take any action as deemed fit.
The Bidder designate Mr./Ms. ______________________________ (mention name, designation,
contact address, phone no. fax no. etc.), as our Authorized Signatory and Contact Person who is
authorized to perform all tasks including, but not limited to providing information, responding to
enquiries, entering into contractual commitments on behalf of the Applicant etc. in respect of our
bid for the subject tender.
Annexure-03
BIDDERS GENERAL INFORMATION
Contact Details
Country of Registration
Registered Office Address
Telephone Number
Fax Number
E-Mail Address
Contact Person Details
2 Name
Mobile Number
Designation
E-Mail ID
Power of Attorney for signing of Tender and Contact Details
3 Name
Title
Telephone Number
Fax Number
E-Mail Address
Address
The Bidder may use additional page to furnish details if the space provided in this form is
inadequate.
Page 171 of 214
Signature of Bidder with Seal and date
PLANT OWNER Design, Engineering, Procurement, Construction (EPC) of 1.0 MW AC Grid
Interactive Ground Mounted Solar Power Plant inclusive of Comprehensive
Operation & Maintenance (O&M) for 1 year
Annexure-04
UNDERTAKING FOR NON-ENGAGEMENT OF CHILD LABOUR
I/We hereby declare that:
a) We are committed to elimination of child labour in all its forms.
b) Neither we nor any of our nominated sub-contractor(s) are engaging Child Labour in any
of our work(s) in terms of the provisions of The Child Labour (Prohibition and
Regulation) Act, 1986 and other applicable laws.
c) We as well as our nominated sub-contractor(s) undertake to fully comply with provisions
of The Child Labour (Prohibition and Regulation) Act, 1986 and other applicable labour
laws, in case the work is awarded to us.
d) It is understood that if I/We, either before award or during execution of Contract, commit
a transgression through a violation of Article b/c above or in any other form, such as to
put my/our reliability or credibility in question, the Owner is entitled to disqualify us
from the Tender process or terminate the Contract, if already executed or exclude me/us
from future contract award processes. The imposition and duration of the exclusion will
be determined by the severity of transgression and determined by the Owner. Such
exclusion may be for a period of 1 year to 3 years as per the procedure prescribed in the
guidelines for holiday listing of the Owner.
e) I/We accept and undertake to respect and uphold the Owner’s absolute right to resort to
and impose such exclusion.
Annexure-05
DECLARATION ABOUT THE RELATIONSHIP, IF ANY, WITH INDIANOIL
PETRONAS DIRECTOR
For the purpose of Section 297/299 of the Companies Act, 1956, we certify that to the best of
my/our knowledge:
(i) I am not a relative of any Director of INDIANOIL PETRONAS.
(ii) We are not a firm in which a Director of INDIANOIL PETRONAS or his relative is a
partner;
(iii) I am not a partner in a firm in which a Director of INDIANOIL PETRONAS or his relative
is a partner;
(iv) We are not a private company in which a Director of INDIANOIL PETRONAS is a
Member or Director;
(v) We are not a company in which Directors of INDIANOIL PETRONAS hold more than
2 % of the paid-up share capital of our company or vice-versa.
1. MR. SATISH KUMAR VADUGURI Chairman
Annexure-06
This is to certify that we have not engaged / involved any Agent/ Representative/ BIDDER/
Retainer/ Associates who is not an employee of _ (name of your company) on
payment of any remuneration in India or abroad for this Project. Therefore, no agent’s/
Representative’s/ BIDDER’s/ Associate’s commission is payable in India or abroad against
this Contract.
Yours faithfully,
For
Annexure-07
Date
On company’s letterhead
TENDER NO.:
We M/s. ______________ hereby agree to fully comply with, abide by and accept without
variation, deviation or reservation all technical, commercial and other conditions whatsoever of
the Bidding documents and all Addendum / Corrigenda / Amendments issued by M/s. Indianoil
Petronas Pvt Ltd.,
We further hereby waive, withdraw and abandon any and all deviations, variations, objections
or reservations whatsoever hereto set out, given or indicated in our offer, clarifications,
correspondence, communications or otherwise with a view that the final price bid submitted may
be treated to confirm in all respects, with the terms and conditions of the said Bidding documents
including all Addendum / Corrigenda / amendments.
We further hereby confirm that the currencies of price in the price bid are as per the provisions
of the Bidding documents and there is no deviation to the provisions in the final price bid.
Annexure-08
FORM OF BANK GUARANTEE FOR EMD
BANK GUARANTEE FOR EMD/SECURITY DEPOSIT
BG NO._____________
DATED: ___________
To,
IndianOil Petronas Pvt Ltd
LPG Import / Export Terminal
Kasberia, Purba MedinipurHaldia-721635
West Bengal
Dear Sirs,
In consideration of IndianOil Petronas Pvt. Limited (hereinafter called “the company” which expression
shall include its successors and assigns), having awarded certain work for and relative to
________________________
i) This guarantee/undertaking shall be a continuing guarantee and shall remain valid and irrevocable
for all claims of the company upon the Bank made up to the midnight of ______________provided that
the Bank shall upon the written request of the company made upon the bank at any time within 6 (six)
Page 176 of 214
Signature of Bidder with Seal and date
PLANT OWNER Design, Engineering, Procurement, Construction (EPC) of 1.0 MW AC Grid
Interactive Ground Mounted Solar Power Plant inclusive of Comprehensive
Operation & Maintenance (O&M) for 1 year
months from the said date extend the validity of the Bank Guarantee by a further 6 (six) months so as to
enable claims to be made under this Guarantee by a further 6 (six) months from the said date with the
intent that the validity of this Guarantee shall automatically stand extended by a further 6 (six) months
upon such request by the company or the contractor on whom behalf the guarantee issued.
ii) The company shall have the fullest liberty without reference to the Bank and without affecting in
any way the liability of the Bank under this Guarantee/Undertaking, at any time and/or from time to time
to amend or vary the Contract and/or any of the terms and conditions thereof or relative to the said Initial
Security Deposit or to extend time for performance of the said Contract in whole or part or to postpone
for any time and/or from time to time any of the obligations of the Consultant and/or the powers or
remedies exercisable by the company against the Consultant and either to enforce or forbear from
enforcing any of the terms and conditions of or governing the said contract or the said Initial Security
Deposit or the securities available to the company or any of them and the Bank shall not be released from
its liability under these presents and the liability of the Bank hereunder shall remain in full force and
effect notwithstanding any exercise by the company of the liberty with reference to any or all the matters
aforesaid or by reason of time being given to the Consultant or any other forbearance, act or omission on
the part of the Consultant or of any indulgence by the company to the Consultants or of any other act,
matter or thing whatsoever which under the law relating to sureties or otherwise which could but for the
provision have the effect of releasing the Bank from its liability hereunder or any part thereof and the
Bank hereby specifically waives any and all contrary rights whatsoever.
iii) The obligations of the Bank to the company hereunder shall be as principal to principal and shall
be wholly independent of the contract and it shall not be necessary for the company to proceed against
the Consultant before proceeding against the Bank and the Guarantee/Undertaking herein contained shall
be enforceable against the Bank notwithstanding the existence of any other Guarantee/Undertaking or
security for any indebtedness of the Consultant to the company (including relative to the said Security
Deposit) and notwithstanding that any such undertaking or security shall at the time when claim is made
against the Bank or proceedings taken against the Bank hereunder, be outstanding or unrealized.
iv) The amount stated by the company in any demand, claim or notice made with reference to this
guarantee shall as between the Bank and the company for these presents be conclusive of the amount
payable by the bank to the company hereunder.
v) The liability of the Bank to the company under this Guarantee/Undertaking shall remain in full
force and effect notwithstanding the existence of any difference or dispute between the Consultant and
the company, the Consultant and the Bank and/or the Bank and the company or otherwise howsoever
touching or affecting these presents for the liability of the Consultant to the company, and notwithstanding
the existence of any instructions or purported instructions by the Consultant or any other person to the
Bank not to pay or for any cause withhold or defer payment to the company under these presents, with
the intent that notwithstanding the existence of such difference, dispute or instruction, the Bank shall be
and remain liable to make payment to the company in terms hereof.
vi) The Bank shall not revoke this undertaking during its currency except with the previous consent
of the company in writing and agrees that any change in the constitution of the Consultant or the Bank or
the company shall not discharge the Bank’s liability hereunder.
vii) Without prejudice to any other mode of service, a demand or claim or other communication may
be transmitted by fax, if transmitted by fax, the transmission shall be complete as soon as acknowledged
by bank.
(a) The Bank’s liability under this guarantee/undertaking shall not exceed
(b) This guarantee/undertaking shall remain in force upto _________and any extension(s)
thereof; and
(c ) The Bank shall be released and discharged from all liability under this
guarantee/undertaking unless a written claim or demand is issued to the Bank on or before
_____________or the date of expiry of any extension(s) thereof if this guarantee /
undertaking has been extended.
ix) The Bank doth hereby declare that Shri __________________(Name of the person signing on
behalf of the Bank) who is _____________________(his designation), is authorized to sign this
undertaking on behalf of the Bank and to bind the Bank hereby.
Yours faithfully,
Signature_________________
Dated: ________________
Annexure-09
1.2. Jt – Average solar irradiance (in W/m2) measured at the plane of modules during each 5-
minute interval by 1 no. Class-II integrating pyranometer installed
1.3. TM,t – Average temperature of modules (in °C) measured during each 5-minute interval by
thermometer installed at module back surface
1.4. GSTC – Standard irradiance i.e. 1000W/m2
1.5. γ – Absolute value of Temperature Coefficient (% per °C) for power output of the Solar
PV module
1.6. FT,t – Temperature correction factor
1.7. PN – Total installed PV capacity (Wp), where PN varies as below during the PGT/various
Yearly Performance Evaluation Tests as per the deration value of the Solar PV Modules
as specified in Clause 3.6 on Page-14 of Chapter-5:
1.8.
Value of PN
For PGT : P0 Total installed capacity of
Solar PV Modules (in Wp)
For Yearly Performance Evaluation Test during 1-Year 97.5% of P0
Inclusive O&M as per Part-I of Clause 3 of SCC : P1
For calculation purposes, when Jt < 200 W/m2, Ht shall be taken as zero, i.e. such
values of Ht shall be rejected (not considered in above summation).
3.2. Total Energy Generated from solar during PTP shall be calculated through the formula:
4320
E GEN = ∑ E GEN, t
t =1
For calculation purposes, when Jt < 200 W/m2, EGEN,t shall be taken as zero, i.e. such
values of EGEN,t shall be rejected (not considered in above summation).
3.3. The Performance Ratio during PTP shall be calculated through the formula:
EGEN
PR =
E Ref
There should be at least 1440 nos. of non-zero readings of Ht and EGEN,t considering the
above mentioned condition on availability of Jt. If the required numbers of readings are not
available, then the duration of PGT shall be extended beyond 15-days to have at least 1440
nos. of non-zero readings of Ht and EGEN,t.
3.4. In order to consider the Performance Guarantee Test positively passed, the following
condition must be satisfied:
PR ≥ 76%
In order to consider the Yearly Performance Evaluation Test positively passed, the following
condition must be satisfied:
Energy losses attributable to following events shall not be considered for performance guarantee
evaluation:
Annexure-10
LIST OF MANDATORY SPARES
Annexure-11
LIST OF APPROVED MAKES
S. Description of material Make
No.
Electrical Materials
Poly/Multi Crystalline Bhel/ Hanwha/ Risen/ Canadian Solar/ Tata Power
1
PV Module Solar/REC/ Adani Solar/Waare/EMMVEE/Axitec/ Phono
AC(Polycab/KEC/KEI/Gloster)/Ravin/DC(Lapp/Leoni/Siech
5 LT Cables
em)
6 String Monitoring Box(s) Trinity Touch/Statcon/CAPE/ABB/Hensel
7 Connectors Lumberg/Bizlink/Multi Contact/COYO/ phoenix /lapp
Fuse, MCB, MCCB,
8 ABB/Schneider/L&T/Mitsubishi/Bussman
Terminal Block, ELCB
HT/Inverter and Aux.
10 Schneider (Areva) /CG/ABB/ BHEL/Sungrow
Transformers/Switchgear
Remote Monitoring Webdyn/Solar-log/IPLON
11
System
Earthing material-
27 Mahavir, Amco Electrial & Engineering co.
Galvanised Steel
28 Cable Gland Comet, Dowels, Cable grip
HT Cable End
29 Raychem, 3M
Termination Kit
ABB, Birla Ericsson Optical ltd.,Finolex cables ltd,
30 Fibre Optic Cables-power Himachal furiristic comm. Ltd,Kabel Rheydt,Pirelli Cavi spa
Sterlite optical tech. [Link] cables limited,Vindhya
telelinks ltd.
CIVIL MATERIALS
25 Structural Steel Tata (Tiscon),Sail,Vizag Steel,Jindal Steel
26 Cement A.C.C,Ultratech,Larsen & Tourbo,Ambuja
27 Reinforcement Steel Tata (Tiscon),Sail,Vizag Steel,Jindal Steel,Panther,Srmb
500+Sr
Anti corrosive (epoxy
28 based) paint on Sika High Top-Armatec 108,Barcoat Ep,Fosroc Nitozinc
reinforcement bar Primer
Concrete bonding
29 admixture(Epoxy based) Cici Bond Epo,Sikadur-32 Lp,Fosroc Nitobond Ep Std.
for all RCC work
30 Synthetic Enamel Dulux Gloss,Luxol,Apcolite,Barger Butterfly
Annexure-12
(Executed in Rs 100 Stamp paper)
CONTRACT AGREEMENT FOR “____Name of the work________________” AT LPG
This agreement made this ……….. day of ………. Two Thousand ………. between IndianOil
Petronas Pvt Ltd, a Company incorporated under the Companies Act, 1956 and having its
Registered Office at INDIANOIL PETRONAS PRIVATE LIMITED, Acropolis 12th Floor, Unit
I & II, Premises No 1858/1, Rajdanga Main Road, Kolkata 70017. hereinafter called the
"Company" (which expression shall include its successors and assigns) on one party and M/s
_______________a Company incorporated under the Indian Companies Act 2013 and having
its Registered Office at _________________. Hereinafter called the "Contractor/s" (which
expression shall include his heirs, executors, administrators and assigns) on the other part,
whereas the contractor is desirous of Supply and erection of earthing system for field instruments
earthing
for the Company and WHEREAS the company has agreed to appoint the contractors upon the
terms and conditions hereinafter recorded NOW THIS AGREEMENT WITNESSED AND IT
1. The contractor will provide all the equipment and manpower required for carrying out
any of the work assigned to them as detailed in Rate Schedule attached mentioned in work order,
by the Company under this Contract by Location-in-charge or his down delegated authority at
LPG IMPORT / EXPORT TERMINAL, HALDIA,WEST BENGAL-721635
2. The Company shall pay to the contractor for the performance of the various works at the
rates specified in the Rate Schedule attached hereto. The rates finalized will be firm for the entire
contractual period and under all working conditions and the contractor will not be entitled to any
extra allowance during the currency of the contract, unilaterally.
3. The bills should be submitted as per the tender payment terms and condition
4. That the compliance of all Government rules and regulations regarding employment and
working conditions of personnel, including various statutory facilities shall be provided for by
the contractor. The contractors will be responsible for any fines for non-compliance of any such
rules.
5. The contractor expressly agrees to follow all the rules and regulations laid down in
Factories Act, Minimum Wages Act and other Legislation, in this regard. It is also agreed that
the contractor shall exclusively be liable for any breaches of any provisions of the said Acts or
like legislation and for any payment there under.
6. The contractor shall maintain all records as required under the Factories Act/Payment of
Wages Act/Workers Compensation Act/Employees State Insurance Act or any other Acts in
force from time to time. These records will be open for inspection by the Company's
representative/ concerned authorities as and when required.
17. This agreement shall remain in force effective till the completion of contract.
18. The Contractor shall comply with all statutory provisions relating to his trade/ business/
profession including his own employees or employees engaged by contractor and Company shall
not be responsible for his omission or commission. It is mandatory for the contractor to abide by
all the Safety, Health and Environment related norms as in force during the period of contract.
In case of violation of any of the above norms by the contractor, a penalty of Rs. 5000/- will be
imposed on per occasion basis.
a) Similarly, in case of violation of any of above norms resulting in any physical injury, a
penalty of 0.5% of the contract value per injury in addition to Rs. 5000/- as given above
will be imposed.
b) Similarly, in case of violation of any of above norms resulting in a case of fatal accident
within the LPG IMPORT / EXPORT TERMINAL, HALDIA,WEST BENGAL
premises, a penalty of 1% of the contract value (maximum of Rs. 10,00,000) per fatality
in addition to Rs. 5000/- as given above will be imposed. It is advised in the interest of
the contractor to take an appropriate insurance policy that can cater to the needs of such
incidents
c) All conditions lay down above and those covered in tender documents are also applicable.
[Link]:
All questions disputes and differences arising under or in relation to this Agreement shall be
referred to the sole arbitration of the CEO of the Company. If such CEO is unable or unwilling
to act as the sole arbitrator, the matter shall be referred to the sole arbitration of some other
officer of the Company by such CEO in his place, who is willing to act as such sole arbitrator.
It is known to the parties herein that the Arbitrator appointed hereunder is an employee of the
Company and may be Shareholder of the Company. The arbitrator to whom the matter is
originally referred, whether the CEO or office, as the case may be, on his being transferred or
vacating his officer or being unable to act, for any reason, the
CEO shall designate any other person to act as arbitrator in accordance with the terms of the
Agreement and such person shall be entitled to proceed with the reference from the stage at
which it was left by his predecessor. It is also the term of this Agreement that no person other
than the CEO or the person designated by the CEO as aforesaid shall act as arbitrator. The
award of the Arbitrator so appointed shall be final, conclusive and binding on all the parties
to the Agreement and provisions of the Arbitration & Conciliation Act 1996 or any statutory
modification or re-enactment thereof and the Rules made there under and for the time being
in force shall apply to the arbitration proceedings under this clause.
The parties hereby agree that the court in city of Haldia alone shall have jurisdiction to
entertain any application or any award/s made by the Sole Arbitrator or other proceedings in
respect of anything arising under this Agreement.
SIGNATURE …………………….
ON BEHALF OF IPPL
NAME ………………………….
DATE …………………………..
(Prop/Partner/Director)
SIGNATURE …………………………….
NAME OF FIRM……………………..
ADDRESS
NAME
DESIGNATION ………………………
SEAL…………………………..
Annexure-13
GLOSSARY OF TERMS:
A / Amp Ampere
AC Alternating Current
ACDB Alternating Current Distribution Board
ACSR Aluminium Conductor Steel Reinforced
WBSEDCL Tamil Nadu Generation and Distribution Corporation
ASTM American Society for Testing and Materials
BG Bank Guarantee
BIS Bureau of Indian Standards
BoQ Bill of Quantity
CAD Computer Aided Drafting
CCTV Closed Circuit Television
CEIG Chief Electrical Inspector to Government
CST Central Sales Tax
CT Current Transformer
CVT Capacitor Voltage Transformer
DC Direct Current
DG Diesel Generator
DSC Digital Signature Certificate
DWF Drawing Web Format
EIC Engineer In-Charge
EMD Earnest Money Deposit
EPC Engineering, Procurement and Construction
EWA Energy Wheeling Agreement
FGL Finished Ground Level
F.O. R Freight on Road
FY Financial Year
G.I. Galvanised Iron
GCC General Conditions of Contract
GHI Global Horizontal Irradiance
GSS Grid Sub-Station
GTP Guaranteed Technical Particulars
HRC High Rupturing Capacity
HT High Tension
IEC International Electrotechnical Commission
IEEE Institute of Electrical and Electronics Engineers
CEA Central Electrical Authority
IPPL Indianoil Petronas Pvt Ltd.,
IP Ingress Protection
Page 189 of 214
Signature of Bidder with Seal and date
PLANT OWNER Design, Engineering, Procurement, Construction (EPC) of 1.0 MW AC Grid
Interactive Ground Mounted Solar Power Plant inclusive of Comprehensive
Operation & Maintenance (O&M) for 1 year
IR Infra-Red
Isc Short Circuit Current
ISO International Organization for Standardization
ITB Instructions to Bidders
JV Joint Venture
km Kilo Metre
KV Kilo Volt
kVA Kilo Volt Ampere
kW Kilo Watt
kWh Kilo Watt Hour
kWp Kilo Watt Peak
LA Lightning Arrestor
LAN Local Area Network
LoA Letter of Award
LSTK Lumpsum Turnkey
LT Low Tension
LV Low Voltage
MCB Miniature Circuit Breaker
MCCB Moulded Case Circuit Breaker
MDR Major District Roads
MMS Module Mounting Structure
MNRE Ministry of New and Renewable Energy
MoU Memorandum of Understanding
MPPT Maximum Power Point Tracker
MS Mild Steel
MV Mega Volt
MVA Mega Volt Ampere
MW Mega Watt
MWh Mega Watt Hour
MWp Mega Watt Peak
NEFT National Electronics Funds Transfer
NH National Highway
NIT Notice Inviting Tender
NOC No Objection Certificate
O&M Operation and Maintenance
OFC Optical Fibre Cable
Owner Indian Oil Corporation Ltd.
PAN Permanent Account Number
PCU Power Conditioning Unit
Annexure-14
Annexure-15