Rfi & RPT Riser Clamp 1rc

Uploaded by

izzatamirr94
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Topics covered

  • Straightness,
  • Technical Reports,
  • Engineering,
  • Revision Control,
  • Contractor's Representative,
  • Engineering Drawings,
  • RFI,
  • Safety Standards,
  • Regulatory Compliance,
  • Quality Assurance
0% found this document useful (0 votes)
32 views3 pages

Rfi & RPT Riser Clamp 1rc

Uploaded by

izzatamirr94
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Topics covered

  • Straightness,
  • Technical Reports,
  • Engineering,
  • Revision Control,
  • Contractor's Representative,
  • Engineering Drawings,
  • RFI,
  • Safety Standards,
  • Regulatory Compliance,
  • Quality Assurance

REQUEST FOR INSPECTION QR CODE

(INTERNAL)

PROJECT : PROVISION OF ENGINEERING, PROCUREMENT, RFI NO : BIN-MEB-STR-RFI-FU-RSR-J00105

CONSTRUCTION & COMMISSIONING OF BINDU A


(TOPSIDE & JACKET) - PACKAGE 1

TO : EXXONMOBIL DATE : 18/6/2024

FROM : MUHIBBAH ENGINEERING (M) BHD(12737-K)


INSPECTION :
ITEM TO BE INSPECTED

STRUCTURAL PIPING OTHERS(SPECIFY) :


1ST INSPECTION 2ND INSPECTION 3RD INSPECTION OTHERS(SPECIFY):

THE FOLLOWING WORK IS READY FOR INSPECTION:

MATERIAL RECEIVING DIMENSION


MATERIAL VERIFICATION INSPECTION RELEASE NOTE
FITUP PAINTING/COATING
VISUAL OTHERS (SPECIFY):
NON-DESTRUCTIVE TEST (NDT)

NOTES:
*REFER REPORT: BIN-MEB-STR-RPT-FU-RSR-J0015

Joint: 1A 1B 1C 2A 2B 2C 3A 3B 3C 4A

4B 4C 5A 5B 5C 6A 6B 6C 7A 7B

88-N-45-GA037-002-NDE-SHT 1 OF 1
LOCATION : WORKSHOP 1 DRAWING NO :
REV0
DATE : 18/6/2024 TIME : 09.00AM
REQUESTED BY:

CONTRACTOR'S REPRESENTATIVE
IZZAT AMIR
NAME : IZZAT AMIR
DATE : 18/6/2024

INSPECTION RESULT :
INSPECTION (RESULT) ACCEPTED REJECTED RESCHEDULED

REMARKS :

INSPECTED BY:
SIGN:

NAME:

DATE:

Form No . MEB-QCR-GEN-001, Rev0


FIT-UP INSPECTION REPORT
QR CODE
(STRUCTURAL) INTERNAL

PROJECT : PROVISION OF ENGINEERING, PROCUREMENT, REPORT NO : BIN-MEB-STR-RPT-FU-RSR-J0015


CONSTRUCTION & COMMISSIONING OF BINDU A
(TOPSIDE & JACKET) - PACKAGE 1 DRAWING NO : 88-N-45-GA037-002-NDE-SHT 1 OF 1 REV0

CONTRACT NO. : A4025810 DATE : 18.06.2024


PAGE NO. : 1 OF 2

DESCRIPTION : SUBSTRUCTURE RISER AND RISER CLAMP DETAILS TYPE-1 AT EL(+)4.500


ROOT STRAIGHTNESS / EDGE
S/NO. JOINT NO. PIECE NO MVR Report No. STATUS REMARKS
GAP ALIGNMENT PREPARATION
1RC-1-1 BIN-MEB-STR-RPT-MVR-RSR-J0020
1RC-1-6 BIN-MEB-STR-RPT-MVR-RSR-J0008
1 001 ACC ACC F ACC
1RC-1-14 BIN-MEB-STR-RPT-MVR-RSR-J0008
1RC-1-17 BIN-MEB-STR-RPT-MVR-RSR-J0009
1RC-1-2 BIN-MEB-STR-RPT-MVR-RSR-J0020
2 002 1RC-1-5 BIN-MEB-STR-RPT-MVR-RSR-J0008 ACC ACC F ACC
1RC-1-16 BIN-MEB-STR-RPT-MVR-RSR-J0003
1RC-1-1 BIN-MEB-STR-RPT-MVR-RSR-J0020
1RC-1-3 BIN-MEB-STR-RPT-MVR-RSR-J0008
3 003 ACC ACC F ACC
1RC-1-13 BIN-MEB-STR-RPT-MVR-RSR-J0008
1RC-1-17 BIN-MEB-STR-RPT-MVR-RSR-J0009
1RC-1-2 BIN-MEB-STR-RPT-MVR-RSR-J0020
4 004 1RC-1-4 BIN-MEB-STR-RPT-MVR-RSR-J0008 ACC ACC F ACC
1RC-1-16 BIN-MEB-STR-RPT-MVR-RSR-J0003
1RC-1-1 BIN-MEB-STR-RPT-MVR-RSR-J0020
5 005 1RC-1-6 BIN-MEB-STR-RPT-MVR-RSR-J0008 ACC ACC F ACC
1RC-1-16 BIN-MEB-STR-RPT-MVR-RSR-J0003
1RC-1-2 BIN-MEB-STR-RPT-MVR-RSR-J0020
6 006 1RC-1-5 BIN-MEB-STR-RPT-MVR-RSR-J0008 ACC ACC F ACC
1RC-1-16 BIN-MEB-STR-RPT-MVR-RSR-J0003
1RC-1-1 BIN-MEB-STR-RPT-MVR-RSR-J0020
7 007 1RC-1-3 BIN-MEB-STR-RPT-MVR-RSR-J0008 ACC ACC F ACC
1RC-1-10 BIN-MEB-STR-RPT-MVR-RSR-J0008
1RC-1-2 BIN-MEB-STR-RPT-MVR-RSR-J0020
8 008 1RC-1-4 BIN-MEB-STR-RPT-MVR-RSR-J0008 ACC ACC F ACC
1RC-1-12 BIN-MEB-STR-RPT-MVR-RSR-J0008
1RC-1-1 BIN-MEB-STR-RPT-MVR-RSR-J0020
1RC-1-3 BIN-MEB-STR-RPT-MVR-RSR-J0008
9 009 ACC ACC F ACC
1RC-1-6 BIN-MEB-STR-RPT-MVR-RSR-J0008
1RC-1-7 BIN-MEB-STR-RPT-MVR-RSR-J0008
1RC-1-2 BIN-MEB-STR-RPT-MVR-RSR-J0020
1RC-1-4 BIN-MEB-STR-RPT-MVR-RSR-J0008
10 010 ACC ACC F ACC
1RC-1-5 BIN-MEB-STR-RPT-MVR-RSR-J0008
1RC-1-8 BIN-MEB-STR-RPT-MVR-RSR-J0008
1RC-1-1 BIN-MEB-STR-RPT-MVR-RSR-J0020
11 017 1RC-1-6 BIN-MEB-STR-RPT-MVR-RSR-J0008 ACC ACC F ACC
1RC-1-16 BIN-MEB-STR-RPT-MVR-RSR-J0003
1RC-1-2 BIN-MEB-STR-RPT-MVR-RSR-J0020
12 018 1RC-1-5 BIN-MEB-STR-RPT-MVR-RSR-J0008 ACC ACC F ACC
1RC-1-16 BIN-MEB-STR-RPT-MVR-RSR-J0003
1RC-1-2 BIN-MEB-STR-RPT-MVR-RSR-J0020
13 019 1RC-1-4 BIN-MEB-STR-RPT-MVR-RSR-J0008 ACC ACC F ACC
1RC-1-16 BIN-MEB-STR-RPT-MVR-RSR-J0003
NOTE:

SB : SINGLE BEVEL DB : DOUBLE BEVEL SQ : SQUARE


SV : SINGLE VEE DV : DOUBLE VEE F : FILLET

REQUESTED BY: INSPECTED BY:


SIGN: SIGN:
IZZAT AMIR

DATE: 18/6/2024 DATE:

(MEB PRODUCTION QC INSPECTOR) (MEB QC INSPECTOR)

Form No. MEB-QCR-STR-003, Rev0


FIT-UP INSPECTION REPORT
QR CODE
(STRUCTURAL) INTERNAL

PROJECT : PROVISION OF ENGINEERING, PROCUREMENT, REPORT NO : BIN-MEB-STR-RPT-FU-RSR-J0015


CONSTRUCTION & COMMISSIONING OF BINDU A
(TOPSIDE & JACKET) - PACKAGE 1 DRAWING NO : 88-N-45-GA037-002-NDE-SHT 1 OF 1 REV0

CONTRACT NO. : A4025810 DATE : 18.06.2024


PAGE NO. : 2 OF 2

DESCRIPTION : SUBSTRUCTURE RISER AND RISER CLAMP DETAILS TYPE-1 AT EL(+)4.500


ROOT STRAIGHTNESS / EDGE
S/NO. JOINT NO. PIECE NO MVR Report No. STATUS REMARKS
GAP ALIGNMENT PREPARATION
1RC-1-1 BIN-MEB-STR-RPT-MVR-RSR-J0020
14 020 1RC-1-3 BIN-MEB-STR-RPT-MVR-RSR-J0008 ACC ACC F ACC
1RC-1-16 BIN-MEB-STR-RPT-MVR-RSR-J0003
1RC-1-1 BIN-MEB-STR-RPT-MVR-RSR-J0020
15 021 1RC-1-6 BIN-MEB-STR-RPT-MVR-RSR-J0008 ACC ACC F ACC
1RC-1-16 BIN-MEB-STR-RPT-MVR-RSR-J0003
1RC-1-2 BIN-MEB-STR-RPT-MVR-RSR-J0020
16 022 1RC-1-5 BIN-MEB-STR-RPT-MVR-RSR-J0008 ACC ACC F ACC
1RC-1-16 BIN-MEB-STR-RPT-MVR-RSR-J0003
1RC-1-1 BIN-MEB-STR-RPT-MVR-RSR-J0020
17 023 1RC-1-3 BIN-MEB-STR-RPT-MVR-RSR-J0008 ACC ACC F ACC
1RC-1-9 BIN-MEB-STR-RPT-MVR-RSR-J0008
1RC-1-2 BIN-MEB-STR-RPT-MVR-RSR-J0020
18 024 1RC-1-4 BIN-MEB-STR-RPT-MVR-RSR-J0008 ACC ACC F ACC
1RC-1-12 BIN-MEB-STR-RPT-MVR-RSR-J0008

NOTE:

SB : SINGLE BEVEL DB : DOUBLE BEVEL SQ : SQUARE


SV : SINGLE VEE DV : DOUBLE VEE F : FILLET

REQUESTED BY: INSPECTED BY:


SIGN: SIGN:
IZZAT AMIR

DATE: 18/6/2024 DATE:

(MEB PRODUCTION QC INSPECTOR) (MEB QC INSPECTOR)

Form No. MEB-QCR-STR-003, Rev0