0% found this document useful (0 votes)
191 views51 pages

Boreda Integrated Rural Development Project

Uploaded by

Tesfalem Nekere
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
191 views51 pages

Boreda Integrated Rural Development Project

Uploaded by

Tesfalem Nekere
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd

Boreda Integrated Rural Development

Project (BOIRDP)

Memo

To : Ato Tesfalidet G/Kidan, P/Manager - BOIRDP


From: Girma Gemeda, SLM Department Head - BOIRDP
Date: 15 /02/2023

Subject: - Farmer’s training proposal on natural resource


conservation & management

Farmer’s trainings on natural resource conservation and


management were planned under Sustainable Land
management department. Therefore, enclosed herewith,
please find the training proposal for the same, as per the plan
of operation for the first Quarter of the year 2023. The training
will be conducted for four consecutive days commence from February18,
2023 and Budget ref (Page 48, position 1.3.6)

I hereby request your approval to conduct the training as per


the scheduled.

With regards,

GG
Introduction
Boreda woreda is one of the woreda found in Gamo zone and most its topography of the
areas highly exposed to erosion which resulted in natural resource depletion due to various
reason, such as deforestation, over grazing, poor farming system, and depletion of water
resources are the major threatening factors. The impact of devastation of natural resources
affects the life of rural communities because of their heavy reliance on environmental
resources by affecting the productivity of other critical resources, such as crops, livestock,
and forest & water resources. Considering the above burning issues organizing training on
soil and water conservation management is found very crucial.
The purpose of the planned activity is to train participants about the natural degradation
cause and effects observed in the woreda and how to reclaim the degraded natural resources.
As a result this training is prepared to train 100 farmers, drawn from five (5) BOIRDP
operational kebeles/catchments.

Training methodology
For three consecutive days the training will undertake in the class room lecture on the topic,
group discussion and experience sharing among the participants and last day practical
exercise training will be carried out on the field at appropriate catchment identified.
1, Course Title
Farmers training on natural resource conservation and management
2, Venue: - The training will be given at Woreda Capital at appropriate place (Woreda hall/
school)
3, Duration: - The training is planned to be conducted for four consecutive days from
February 18-21,2023.
4, Objective of the trainings
- To provide participates the causes of natural resource degradation at
Boreda woreda.(create awareness for the farmers on NRM & effects)
- To build up the knowledge of participants (farmers) how to reclaim the
natural resource of the area.
- To equip the trainees on the techniques of soil and water conservation
measures (practical training on different structures).
5, Trainers: -Two trainer/ facilitator will be from Boreda woreda agricultural office. The
educational back grounds of the trainer are related to Natural resource management. The
MfM SLM department will be expected to assist the trainers in organizing and coordinating
the overall training program
6, Participants
The training participants will be selected from five (5) project identified catchments which
are: Dega Awussato, Kodo Muko, Damboo, Gorami Walqo and Chilibie kebeles are
identified for intervention for the year 2023 based on catchments approach. Accordingly, 100
farmers are drawn from these kebeles or catchments will be participated on this training.
7, Training methods and materials
Since the training is on natural resource conservation & management and its technical
realization, the training method to be used is participatory. Regarding the training language
local language (Gamugna) is intended to be used during the training sessions.
8. Budget break down

S/no Description Unit Quantity Unit No. of Total birr


Price/ birr days
A Per diem
Trainees Person 100 200 4 80,000.00

Trainer/Facilitator Person 02 450 4 3,600.00


Training coordinator person 01 1,000 2 2,000.00
Sub-Total 85,600.00
B Stationary
Exercise book No 102 25 2,550.00
Pen 102 15 1,530.00
Flip chart Roll 02 250 - 500.00

Art line marker Pkt 1 240 - 240.00


Sub-Total 4,820.00
C Tea & Coffee
Coffee Cup 103 7 4 2,884.00
Tea Cup 103 7 4 2,884.00
Water ½ litre 12 15 180.00
Sub-Total 5,948.00
Total 96,368.00

The total budget required to give this training is birr 96,368 (Ninety Six thousand Three
hundred Sixty Eight birr only). Budget ref (Page 48, position 1.3.6)
9, Detailed tentative time schedule and sessions of the program
to be covered

Day Time Topics presenters Tea break


 Registration
8:00 am-8:30am  Introduction and MFM -BRIRDP
8:30am - 8:45am Welcoming Speech P/Manager

 Major causes & effects of Agri office


8:45am-10:00am
Natural resource
18/02/2023

degradation
10:45am - 12:00am  Continued Agri office 10:30 - 10:45 Tea
 Group discussion on the Participants 12:00 -1:00
1:00Pm - 3:30Pm
topic Lunch
 Alternate solution for Agri office
3:30 - 3:45
3:45Pm - 4:00Pm natural resource
Coffee
degradation of the area
 Different structure
8:00 am- 12:00am construction to Maintain Agri office 10:30 - 10:45 Tea
19/02/2023

NRM.
 Agro forestry establishment Agri office 12:00 - 1:00
1:00pm - 3:00pm
& importance Lunch
 General discussion
3:00Pm - 4:00Pm Agri office 3:30 - 3:45 coffee

 Practical training in MFM- BoIRDP 4:00-4:15 Tea


8:00 am- 12:00am different SWC and &
importance Agri office
 Practical training in MFM- BoIRDP
different SWC &
Feb 20/2/2023

1:00pm - 3:00pm structure at Field Agri office


level

 Practical training in MFM- BOIRDP


different SWC & 3:00PM-3:15PM
3:00 Pm- 4:00Pm
structure at Field Agri office coffee
level Account
section
Day Time Topics presenters Tea break
4:00AM-4:15AM
Practical training in different MFM staff & Tea
SWC structure at Field level Agri office
8:30AM-2:00PM 3:00PM-3:15PM
coffee
Feb 21/2/2023

Closing ceremony & MFM


perdiem payment representative
3:00-3:30pm & Account
section

Boreda Integrated Rural


Development Project
(Boreda IRDP)

Memo

Date: 27/03/2023
To: Tesfalidet G/Kidan, Project Manager Boreda IRDP

From: Girma Gemeda SLM department head, Boreda IRDP

Subject: On- site farmers training proposal

As per action plan of 1st quarter year 2023, on- site farmers

training on natural resource conservation and management is

proposed for One day training which will be commenced March

31,2023.

Therefore, I kindly request your approval of enclosed two page

of proposal attached with this memo.


With regards,

GG

On-site Farmers training on natural resource conservation & management


Natural resource conservation and management intervention is one of the major
components considered under Boreda Integrated Rural Development Project. The existing
conservation practices in the area is very poor and highly land degradation observed in the
area. To aware the beneficiaries (Farmers) on major causes and effects of unwise
exploitation natural resource for ever growing demand for agricultural expansion and
grazing pressure of the area found very crucial. Hence, the department planned to offer On-
site training for hundred(100) farmers on major causes of natural resource degradation
and how to the beneficiaries conserve their farms in sustainably way in order to applied
appropriate conservation structures’. So, the department is proposed 100 farmers from
two kebeles (Dega Awusato (20) and Zufano (80) will participate on the training.
Topic of the training: -
Cause and effects natural resource degradation
Venue: -
The training will be given at Zufano kebele at selected site.
Time Table: -
The training will be planned to be conducted for 1 day, March 31,2023.
Objective of the trainings: -
-To provide participates the causes and effects of natural resource
degradation of the area.
-To build up the knowledge of participants how to reclaim the natural
resource of the area in sustainable way through applied appropriate
conservation structure.
-To create awareness for the communities on water shed management.
Facilitators: -
The trainer will be from Bored SLM department staff and Zufano kebele development agent.

Budget break down


Unit No. of
S/no Description Unit Quantity Price/ birr days Total birr

3 Tea & Coffee

Bread pcs 100 10 1 1,000.00

Tea Cup 100 7 1 700.00


Total 1,700.00

The total budget required to give this training is birr 1,700 (One thousand seven hundred
birr only) the budget is from SLM department.

Budget reference- Page 48


- 1.3.6
Detailed tentative time schedule and sessions of the program
to be covered
Time
Day Topics presenters Tea break
 Registration
 Introduction and MFM
Welcoming Speech JIRDP&
8:00 am-8:30am Jeldu
8:30am - 8:45am woreda
administrat
ion
04/02/2021

8:45am-10:30am  Major causes of Natural Agri office


resource degradation
10:45am -  Continued Agri office 10:30 - 10:45
12:00am Tea
 Shortcoming of natural Agri office
resource conservation 12:00 -1:00
1:00Pm - 2:30Pm
at jeldu woreda context Lunch

Group discussion & Participant 3:30 - 3:45


2:40Pm - 5:00Pm
presentation s Coffee
8:00 am- 4:00 10:30-10:45
pm Alternate solution for Agri office tea
natural resource 3:30 – 3:45
degradation of the area coffee
12:00- 1:00
lunch
Time
Day Topics presenters Tea break
 Closing remarks
05/02/ 4:00 pm– 5:00  Perdiem payments MFM- staff
2021 pm
3

Review meeting
Acquainted to regular monitoring of activities, weekly meeting will be organized with all
department heads to review the weekly achievements and plan for forthcoming weeks.
Program review meeting will be arranged on monthly basis with all technical staff to assess
the progress of planned activities. Similarly, quarterly internal evaluation meetings will be
organized every three months to critically examine the performance of the project. This
forum will be used to present the major constraints faced during implementation and
solutions sought to overcome those constraints. All field staff will be responsible to
produce daily field visit report for further review by departments, to arrange timely
supportive action and to promote smooth implementation of the project interventions.
Moreover, assessment will be carried out by the project and PCO management. PCO
management will oversee the progress and success of the implementation through review
of project progress reports, regular visits and field observations, discussion with key
stakeholders and target communities. The monitoring system is part of the project cycle in
learning and improvement processes of the project.

Subject: Proposal for review meeting


GK sustainable Livelihood Development Project commenced its development
intervention in 11 Kebele of the woreda since December 2015.Consecutive project
progress monitoring with different stakeholders were conducted so far. Now, we are
found on end of first phase and it has great important to trace project effectiveness,
efficiency, sustainability and Impacts. Hence, the project planned to conduct project
evaluation with woreda level sector offices on 01/11/2019 to 03/11/2019 for three
consecutive days.
Therefore, you kindly requested for the approval of budget birr 38,152.5(Thirty
Eight thousand one hundred fifty two and 50/100)
Therefore, Detail of the training proposal attached with this memo for your kind
approval.

With best Regards,

GG
To ensure sustainability of seedling production at private owned nursery level, the project
has encouraged and supporting two individual owned nurseries for seedling production
which serve for income source and for plantation. In the year, the project has supported two
individual owned nurseries to produce different tree species. Accordingly, in these two
private owned nurseries 35,390 different tree species (at kolu nursery = 25,140 and at Fello
nursery =10,250 seedlings) were produced in the year 2021. To strength these two private
owned nursery beneficiaries purchasing these produced tree seedling from the owner
beneficiaries are found very important.
Hence, I kindly request your approval to purchase the above mentioned amount of seedlings
that produced in both nurseries to distribute for project needy beneficiaries.
Boreda Integrated Rural Development
Project
(JIRDP)

Memo

Date:
27/03/2023
To: Tesfalidet G/Kidan, Project Manager JIRDP

From: Girma Gemeda SLM department head, JIRDP

Subject: Workshop on natural resource management

___________________________________________________________________________

Work shop on natural resource conservation & management was planned

under Sustainable Land management department. Therefore, enclosed

herewith, please find work shop for the same, as per the plan of operation for

the 1st quarter of the year 2021

I hereby request your approval to conduct the workshop as scheduled.

With regards,

GG
Farmers work shop on natural resource conservation & management
Natural resource conservation and management intervention is one of the major components
considered under Jeldu Integrated Rural Development Project. This workshop is along with the
activities planned Under SLM components.
The purpose of the planned activity is too aware the participants about unwise exploitation
natural resource for ever growing demand for agricultural expansion and grazing pressure of the
area, major causes of natural resource degradation and to reach an agreement with participants
about the reclamation of the degraded natural resource of Jeldu woreda. As a result this
workshop is prepared to participate 360 (farmers, Kebele managers & agricultural supervisors and
experts)
Course Title
Workshop on natural resource conservation and management
Venue
The workshop will be given at Jeldu woreda Meeting hall.
Time Table: - The workshop will be planned to be conducted for 1 day starting from February
11/2021.
Objective of the trainings
To provide participates the causes of natural resource degradation at jeldu
woreda.
To build up the knowledge of participants how to reclaim the natural resource
of the area.
To create awareness for the communities on water shed management.
Trainers
The trainer will be from Jeldu woreda agricultural and rural development office. The educational
back grounds of the trainer are related to Natural resource management. The MfM SLM
department will be expected to assist the trainers in organizing and coordinating the overall
workshop program.
Participants
The workshop participants are 325 farmers drawn from 27 PAS of jeldu wroreda and 35
participants from line office of jeldu woreda will be participated on this work shop.

Training methods and materials


Since the workshop is on natural resource conservation & management and its technical
realization, the workshop method to be used is partciparatory. Regarding training language afan
oromo language is intentional to be used during the workshop sessions.
Budget break down
Unit No. of
S/no Description Unit Quantity Price/ birr days Total birr

1 Per diem
Trainees( farmers) Person 325 100 2 65,000
Trainees ( line Person 35 250 2 17500
office)
Trainer Person 2 300 2 1200
3 Tea & Coffee

Coffee Cup 362 4 1 1448

Tea Cup 362 3 1 1086


Water 1/2Lit 12 7 1 84

Total 86,318

The total budget required to give this training is birr 86,318 (Eighty six thousand three hundred
eighteen birr only) the budget is from SLM department.

Budget reference- Page 71


- 1.3.6.3
Boreda Integrated Rural Development
Project
(Boreda IRDP)

Memo

To: Tesfalidet G/Kidan, Project Manager Boreda IRDP

From: Girma Gemeda SLM department head, Boreda IRDP


Date: 16/05/2023

Subject: On- site farmers training proposal

As per action plan of 2 nd quarter year 2023, on- site farmers

training on crop husbandry is proposed for One day on-site training

which will be commenced on May 17,2023.

Therefore, I kindly request your approval of enclosed one page of

proposal attached with this memo.

With regards,

GG
On-site Farmers training on crop husbandry agronomy practices
Most climate conditions of Boreda district is very suitable for the production of various vegetables
and fruits as well as coffee production. However, the farmers in the district use local varieties of
vegetables on small plot of land traditionally without proper agronomic practices under rain fed on
their homesteads and gain unsatisfactory production. Similarly, the farmers practices local varieties
of fruit, which is low productivity and disease resistances. In general the agronomy practices of the
area is very poor and need intervention to improve the situations. Accordingly, the project planned
to raise the awareness of the farmers through deliver proper training on improved way of production
and management methods.
So, the department is proposed to deliver on site training for 100 farmers who will be drawn from
two kebeles (Hatisa KAs (40) and Messa Buteza (60) will participate on the training.
Topic of the training: -
Create awareness on improved way of crop husbandry practices.
Venue: -
The training will be given at two selected appropriate project intervention sites (Hatisa & Messa
Buteza KA).
Time Table: -
The training will be planned to be conducted for 1 day, May 17,2023.
Objective of the trainings: -
-To create awareness for the farmers on improved way production of fruits,
vegetables and coffee seedlings.
-To produce vegetables, fruits and coffee seedlings in appropriate production
methods like proper spacing, pit preparation and planting techniques
Facilitators: -
The trainer will be from Boreda SLM department staff and project field development agents.
Budget break down
Unit No. of
S/no Description Unit Quantity Price/ birr days Total birr

3 Tea & Coffee

Bread pcs 100 10 1 1000.00

Coffee Cup 100 7 1 700.00


Total 1700.00
The total budget required to give this training is birr 1700.00 (One thousand seven hundred birr
only) the budget is from SLM department.

Budget reference- Page 45 and position1.1.8

Boreda Integrated Rural Development


Project
(Boreda IRDP)

Memo

To: Tesfalidet G/Kidan, Project Manager Boreda IRDP

From: Girma Gemeda SLM department head, Boreda IRDP


Date: 17/05/2023

Subject: On- site farmers training proposal

As per action plan of 2 nd quarter year 2023, on- site farmers

training in animal husbandry is proposed on-site training for one

day at two Kebele Administration sites which will be commenced on

May 17,2023.

Therefore, I kindly request your approval of enclosed two page of

proposal attached with this memo.

With regards,

GG
On-site Farmers training on Animal husbandry
The existing Livestock feed problem in the district (Boreda) is one of the animal husbandry
constraints that have paid attention by the project. The major problems observed in the area are
shortage of feed, poor genetic potential, diseases and management. More specifically, feed
deficiency coupled with poor genetic makeup of local breeds and prevalence of diseases as well as
poor management has contributed a lot for the reduction of productivity. In the project area,
shortage of animal feed and unwise use existing natural grazing system (free grazing) much
contributed for low productivity. To improve the situation, training the project targeted
beneficiaries in forage development and management as well as utilization practice found very
crucial. In addition, Breed improvement and management also include in the topics during
training undertaking.
1. Objectives of the training
To create the awareness of farmers on animal husbandry so as to improve the existing problems
of the area through project intervention.
2. Participants
It is expected that 150 farmers will be participated on-site trainings which will be drawn from
three Kebele Adminstration (Gambela (75) Chalibe & Danbo Anono (75)

Topic of the training: -


Create awareness of farmers on improved way of Animal husbandry practices.
Venue: -
The training will be given at two selected appropriate project intervention sites (Chalibe and
Gambela KAs).
Time Table: -
The training will be planned to be conducted for two different consecutive days which is June 14
and 15,2023 at mentioned selected sites.
Specific objective of the trainings: -
-To create awareness for the farmers on improved forage development and
management as well as utilization practices.
-Breed improvement and management.
Facilitators: -
The trainer will be from Boreda SLM department staff and project field development agents.

Budget break down


Unit No. of
S/no Description Unit Quantity Price/ birr days Total birr

3 Tea & Coffee

Bread pcs 150 10 1 1,500.00

Coffee Cup 150 7 1 1,050.00


Total 2,550.00

The total budget required to give this training is birr 2,550.00 (Two thousand Five hundred
Fifty birr only) the budget is from SLM department.

Budget reference- Page 46 and position1.2.5

On-site training scheduled program


S/no KA No of Date of Place of Remark
participanttraining training
deliver undertaking

1 Chalibe & Danbo


75 14June, 2023 Chalibe
Anono

2 Gambella 75 15June, 2023 Gambela

Total 150
Boreda Integrated Rural Development project
(Boreda IRDP)

Memo
To: Tesfalidet G/Kidan, Project Manager Boreda IRDP

From: Girma Gemeda SLM department head, Boreda IRDP


Date: 12/06/2023

Subject: On- site farmers training


proposal_________________________________

As per action plan of 2 nd quarter year 2023, on- site farmers

training in animal husbandry is proposed on-site training for one

day at two Kebele Administration sites which will be commenced on

June 14,2023.

Therefore, I kindly request your approval of enclosed two page of

proposal attached with this memo.


With regards,

GG

Boreda Integrated Rural Development project


(Boreda IRDP)

Memo
To: Tesfalidet G/Kidan, Project Manager Boreda IRDP

From: Girma Gemeda SLM department head, Boreda IRDP


Date: 26/05/2023

Subject: Off- site farmers training proposal

Dear Ato Tesfalidet,

As per action plan of 2nd quarter year 2023, off-site farmers training

in crop husbandry training proposed for four consecutive days at

two Kebele Administration sites (Zefine and Zefano) which will be

commenced on May 30, 2023.

Therefore, I kindly request your approval of enclosed two page of

proposal attached with this memo.


With regards,

GG

Farmers training proposal on vegetable and highland fruit


(apple) production & Management

Introduction
The climate conditions of the project areas that are very suitable for
the production of various vegetables and fruits as well as for coffee
plantation. Most Farmers in the project area use local varieties of
vegetables on small plot of land traditionally without proper agronomic
practices under rain fed on their homesteads and gain unsatisfactory
production. Similarly, the farmers practices local varieties of fruit,
which is low productivity and disease resistances. Taking these
problems in to consideration, the project has planned to promote high
yielding vegetable seed varieties and introduce highland fruit (grafted
apple seedlings) for residence at highland farmer’s and grafted
avocado and papaya seedlings plantation for middle highland and low
land farmers who have been taken appropriate training on improved
way of production and management methods. In addition, coffee
agronomy practices will include in the training topics. Accordingly, this
training is prepared to train 100 farmers from 11 kebele
administration will participate on vegetable and highland fruit
production and management for four consecutive days.
Course Title:-
Farmers training on crop husbandry.
Venue & Time table:-
The training will be conducted for four consecutive days from May 30,
2023—June2, 2023 at two project operational sites.
Venue:-
The training arranged at two project intervention sites which
appropriate for the farmers, for low land farmers are arranged at
Zefano KA and for highland and middle high land farmers arranged at
woreda capital (Zefine)
Objectives of the training:-
 To equip the farmers /trainees with better knowledge of improved way
of vegetables and highland fruit production and management.
 To introduce improved varieties of fruits (grafted apple and avocado,
papaya vegetables and coffee for the farmer’s so as to increase the
production and productivity.
 To enhance farmer’s knowledge on proper agronomy practices of
fruits, vegetables and coffee production.
 By using agroforestry system so as to maximize the production
 To create awareness of the community on agroforestry system in
order to address land scarcity.
Methodology of the training:-
For three consecutive days the trainees’ will attend theoretical training
in the class and last day practical training will be carried out on the
field. They exercise how to prepare pits and spacing standard for
apple, avocado, papaya and coffee seedlings plantation.

Component of the training;-

 Agroforestry establishment and its importance


 How and what to integrate different crops as agroforestry
components to increase production regarding to Boreda crop
pattern.
 Economic benefits from agroforestry components
 How to prepare pits for plantation of seedlings like grafted
avocado and apple, papaya, Enset and coffee seedling with
proper spacing.
 Major problems that hindered crop production of the woreda.

Trainers/Facilitators
Two trainers (2) are from Woreda agriculture and natural resource
office. The educational background and work experience of the
trainers are also pertinent to the training topic.
The overall training program is organized and coordinated by MFM-
Boreda IRDP SLM staff.
Participants: - It is expected that 100 farmers will participate on the
training and will be selected from 11 kebeles of the Woreda to
participate on training.

List of Kebele Administration will participate on the training as


follows;-
S/ Name of KA Qty Training place Remark
no
1 Zefano 15 Zefano
2 Awusato Abaya 15 “
3 Chalibe 14 Zefine town
4 Danbo Anono 4 “ “
5 Hatisa 4 “ “
6 Gambela 2
7 Dega Awusato 10 “ “
8 Koda Muko 15 “ “
9 Guramie walko 7 “ “
10 Messa Buteza 5 “ “
11 Goshe Zelie 9 “ “
Total 100

Budget Requirements, Perdiem and Other Cost

S/ Description Unit Quantit Rate/ Total Total cost


No y unit days
Day birr

1 Perdiem

1.1 Trainees Perso 100 200 4 80,000.00


n

1.2 Trainer “ 2 450 4 3,600.00


Sub total 83,600.00

2 Stationary

2.1 Exercise book No 100 25 2,500.00

2.2 Ball point pen (Bic) “ 100 15 1,500.00

2.3 Marker Pack 1 500 500.00

2.4 Fillip chart No 1 500 500.00

Sub total 5,000.00

3 Tea and coffee

Coffee Cup 102 7.0 4 2,856.00

3.1 Tea Cup 102 7.0 4 2,856.00

3.2 Bread No 102 10.0 4 4,080.00

3.3 High land water No 8 25 200.00

Sub total 9,992.00

Grand total 98,592.00

The total budget required to give this training is birr 98,592.00 (Ninety eight thousand five
hundred ninety two birr only) the budget is from SLM department.

Budget reference- Page 45 and position 1.1.8

Boreda Integrated Rural Development project


(Boreda IRDP)

Memo
To: Tesfalidet G/Kidan, Project Manager Boreda IRDP

From: Girma Gemeda SLM department head, Boreda IRDP


Date: 12/06/2023

Subject: On- site training of home- management

Dear Ato Tesfalidet,

As per Action plane of Boreda-IRDP year 2023, Human

Development department has planned to conduct for 40

beneficiaries’ on-site training in home management practices and

other related activities. The training has planned to be conducted

on-site training from June14, 2023 at Messa Buteza intervention

site. The planned budget reference for the activity indicated page

67 positions 5.4.1

Therefore, I kindly request your approval of enclosed two page of

proposal attached with this memo.

With regards,

GG

On-site training of home Management

1. Introduction

The environment hygiene of most rural houses is very poor, because of


poor partitioning and the culture of domestic animals and human
residing in the same house. Thus, partition of houses and installation of
improved stove is key activities to be continued during this period. In
addition, improving the general hygiene situation of the rural household
is one way of promoting better health for the community.
In order to improve personal and environmental hygiene home
management plays a great role. Accordingly, on-site training will be
provided for 40 women including their husbands as part of home
improvement and other related issues.

2. Objectives :-

The general objective of the training is to increase the community


general home management practices and other issues related to home
management and practical installation of improved efficient stove with
daily cooking.

The Specific objectives:-


 To aware the house of residence is separated from any animal or
separate animals from human residence at the same house.
 To give attention for separate kitchen from residential house
 To have practical on-site training for the household on improved
efficient stove with daily cooking stove.
 To aware the community on personal hygiene and
environmental sanitation

3. Method of discussion

The methodologies employed for the on-site training are;-

 General discussion on the issues of home management and their


problems
 Practical on-site training on installation of Gomizeye efficient stove
with daily cooking on the prepared bench.
 On empowering of women their role in the household.

4. Participants:-

It is expected that 40 women with their husbands will participate on the


training from two Kebeles (Messa Buteza & Goshe Zelle)

Facilitator: MFM SLM department organize and facilitating the training


with project field staff.

5. Budget breakdown for the training


S/no Description Quantity Unit price Total price
1 Coffee/Tea 40 7.0 280.00
2 Bread 40 10 400.00
Total 680.00
Boreda Integrated Rural Development
Project
(Boreda IRDP)

Memo

To: Tesfalidet G/Kidan, Project Manager Boreda IRDP

From: Girma Gemeda SLM department head, Boreda IRDP


Date: 13/10/2023

Subject: Framers field visit in the project intervention sites

As per action plan of the year 2023, farmers field visit in the

project intervention sites proposed at three development center

each for one day which will be commenced on October 17, 2023.

Therefore, I kindly request your approval of enclosed two page of

proposal attached with this memo.

With regards,

GG

Farmers field visit in the project intervention sites


In the year 2023, the project has implemented different activities through involvement of targeted
project beneficiaries. Most implemented activities are exemplar to others to sustain the activities
and assumed it create initiation for other farmers to engage in the intervention. Hence, farmers’ field
visit is found very important to transfer the best practices to other farmers. Meanwhile on the field,
the farmers evaluate the improved practices compared to the traditional working practices and also
discussion will be made regarding to the performance of the activities as well as challenges faced
during implementation. In general the farmers share their experience each other and enable to apply
these best practices on their farm/areas in the coming year.
So, the department is proposed 120 farmers for field visit who will be drawn from three Clusters
(Messa Buteza, Zefano and Dangle cluster) will participate on the field visit in order to sustain the
result obatain.

The Main objective of field visit:--


 To gain experience from farmers who have been performed best activities
 To transfer the best improved practices to other farmers
 To evaluate the practices on the field, challenge faced during implementation and share
the experience each other.
 To create wide adoption and scale up the participants in the project intervention and
benefit accordingly.
 Create awareness on improved agricultural technologies.
Venue: -
The field visit will be given at three selected appropriate project intervention sites (Zefano,
Chalibe & Messa Buteza KA).
Participants:-
S/No Name of KA No of participant Remark
1 Zefano cluster 40
2 Messa cluster 40
3 Dangale cluster 40
Total 120

Time Table: -
The field visit will be planned to be conducted for 1 day at each proposed sites, October 17, 18
and 20, 2023.

Facilitators: -
The project staff will be arranged field visit and facilitate all required materials to successful the
program.
Budget break down
Unit No. of
S/no Description Unit Quantity Price/ birr days Total birr

3 Tea & Coffee


Bread pcs 120 10 1 1,200.00

Coffee Cup 120 7 1 840.00


Total 2,040.00

The total budget required to give this training is birr 2,040.00 (Two thousand forty birr only) the
budget is from SLM department.

Budget reference- Page 48 and position1.3.6.2

Boreda Integrated Rural Development project


(Boreda IRDP)

Memo

To: Tesfalidet G/Kidan, Project Manager Boreda IRDP

From: Girma Gemeda SLM department head, Boreda IRDP


Date: 13/11/2023
Subject: Proposal on home economics management training for
women farmers

Dear Ato Tesfalidet,

Women farmers training on home economics management were

planned under Human development department. Hence, enclosed

herewith please find the training proposal for the same, as per the

plan of operation year 2023. The training will be conducted for

three consecutive days commence from November15, 2023. The

budget reference (page 67, position 5.4.1)

Therefore, I kindly request your approval of enclosed four page of

proposal attached with this memo.

With regards,

GG

Women farmers training proposal on home economics


Management

Introduction
Home economics is a subject through which many skill can be
developed in particularly the practical skills involved in planning,
cooking and serving food. Moreover, it inter-relationship between diet,
health, family, home and the choice and management of resource.
Realistic the above fact, it is found important to equip women farmers
with proper home management, food demonstration, environmental
sanitation and personal hygiene as well as family planning awareness.
In the project area, there are widely growing root crops particularly
sweet potato is the major one. However, the community habit of food
preparation from sweet potato not crossed traditional it remains only
cooking feeding type. It is important to improve the dietary status of
household family through create awareness about their nutritional
food value and preparation of balance diet from vegetables, fruits and
root crops for their families. So, the main aim of the training is how to
prepare different food value from sweet potato with combination of
other crops. Accordingly, this training is prepared to train 50 women
farmers from five kebele administrations will participate on the home
economics management training for three consecutive days. In
addition, the project social workers (3) will engage on the training let
the experience expand to other farmers during the on- site training
Course Title:-
Women farmers training on home economics management, food
preparation, and family planning.
Objectives of the training:-
 To equip women farmers how to prepare and cooking vegetables fruit
and root crops in order to improve the dietary status for their family.
 To enhance farmer’s (women) knowledge on nutritional value and
preparation of balance diet considering the food items available in the
project like root crops.
 Enable to improve their environmental and personal hygiene
 To create awareness of the women on different family planning
services in order to manage their family size.
Methodology of the training:-
For one and half days the trainees’ will attend theoretical training in
the class and for one and half days the trainees will participate on
practical training on sweet potato food demonstration. The trainees
will be classified into four groups in order handle and each trainee fully
involved on the practical on-site training.

Component of the training;-

 Theoretic training on home economics management


 Sweet potato food demonstration to prepare different food value.
 The use of improved stove and how to install the stove in the
farmer’s kitchen
 Home partition, environmental sanitation and personal hygiene
 Awareness creation on Family planning service and HIV/AIDS.

Venue: -
The training will be given at Woreda capital (Zefine) at appropriate
place.
Duration (Time Table): -
The training will be planned to be conducted for three consecutive
days which is From November 15-17, 2023.

Trainers/Facilitators
Three trainers (03) are from Woreda sector office. The educational
background and work experience of the trainers are also pertinent to
the training topic.
The overall training program is organized and coordinated by MFM-
Boreda IRDP SLM staff.
Participants: - It is expected that 50 women farmers will participate
on the training and will be selected from 5 kebeles of the Woreda to
participate on training.

List of Kebele Administration will participate on th e training as


follows;-
S/ Name of KA Qty Training place Remark
no
1 Danbo Anono 10 Zefine town
appropriate place
2 Chalibe 10 “ “ “
3 Hatisa 10 “ “ “
4 Gambella 10 “ “ “
5 Goshe Zelle 10 “ “ “
Total 50
Budget Requirements, Perdiem and Other Cost

S/ Description Unit Quant Rate/ Tot Total cost


No ity unit al
Day day
birr s

1 Perdiem

1.1 Trainees (women) Person 50 200 3 30,000.00

1.3 Trainer “ 3 450 3 4,050.00

Sub total 34,050.00

2 Different food items for


practical training

2.1 Different food items LS 11,645.00

Sub total 11,645.00

3 Tea and coffee

Coffee Cup 54 7.0 3 1,134.00

3.1 Tea Cup 54 7.0 3 1,134.00

3.2 Bread No 56 10.0 3 1,680.00

3.3 High land water 1liter No 2 25 3 150.00


container

Sub total 4,098.00

Grand total 49,793.00

The total budget required to give this training is birr 49,793.00 (Forty nine thousand seven
hundred ninety three birr only) the budget is from HD department.

Budget reference- Page 67 and position 5.4.1


Food items required for sweet potato food demonstration into
different food value preparation:-

S/ Item Unit Qty Unit Total Remark


no price price
1 Maize flour Kg 16 60 960.00
2 Flour for bread “ 10 120 1,200.00
3 Rice “ 5 150 750.00
4 Macaroni “ 5 120 600.00
5 Lentil “ 2 200 400.00
6 Edible oil Lit 5 240 1,200.00
7 Hot pepper kg 1 400 400.00
8 Salt “ 1 60 60.00
9 Onion “ 10 120 1,200.00
10 Garlic “ 1 200 200.00
11 Sweet potato “ 25 40 1,000.00
12 Cabbage Bundl 1 70 70.00
e
13 Haricot bean kg 5 75 375.00
14 Cassava flour “ 10 75 750.00
15 Enset product “ 25 60 1,500.00
(kocho)
16 Tomato “ 4 60 240.00
17 Charcoal 2 250 500.00
Sack
18 Firewood Bundl 2 120 240.00
e
Total 11,645.0
0
Boreda Integrated Rural Development project

(Boreda IRDP)

Memo

To: Tesfalidet G/Kidan, Project Manager Boreda IRDP

From: Girma Gemeda SLM department head, Boreda IRDP


Date: 20/11/2023
Subject: Proposal of Field workers on job training

Dear Ato Tesfalidet,

As per the action plan of year 2023, field workers on job training
has planned under HD department. Hence, the project has
proposed learn on site overall project activities implementation
status with project development agents and government
development agents at Boreda IRDP project office for three
consecutive days commencing from November 21, 2023. The total
budget required for training is estimated birr 28,511 (Twenty eight
thousand five hundred eleven birr only).
Therefore, Detail of the program proposal attached with this memo
for your kind approval.

With Regards,

GG
1. Objective;-

The experience share each other on site is very crucial at least


once in a year to monitor & evaluate whether the implementation
of projects is in the right track or not (plan verse achievement).
Moreover, problems encountered, way of improve poor quality
activities, solutions taken for improvement and directions set for
future implementation.
1.1 Specific objectives;-
 To evaluate the status of plan verse achievement at each
development center
 To share experience from each other and learn from best
practices have been done.
 To set direction of improvement for the activities of poor quality
implementation and activities which indicated under
achievement and way of challenges overcome.
2. Methodology: -

For two consecutive days field observation and evaluation should


be done on spot at each development center and discussion
should be undertaken at office level on the status of plan verse
achievement at their development center, problem encountered
and solution have been taken.
3. Duration of review meeting:-

The proposed experience share each other will be conducted for 3


consecutive days from November 21 to 23, 2023
4. Participants:-
The total participants will be eighteen (18) project staff (four
development agents, three social workers and eleven Government
development agents) will be participated on proposed program.
5. Facilitator:-
The project management jointly with technical staffs will handle the
training program.
6. Venue:-
Project office/ Woreda hall

7. Budget: -
Details of budget needed to conducting experience share each
other is available at the tables below

8. Perdiem and Other Cost


S/ Description Unit Quant Rate/ Tota Total
No ity unit l cost
Day days
birr
1 Perdiem
1.1 -MFM Development agents Perso 4 1,000 2 8,000.0
-MFM Social works n 3 1,000 2 0
“ 6,000.0
0
1.2 Government development “ 11 350 3 11,550.
agents 00
Sub total 25,550
2 Tea and coffee
2.1 Tea Cup 21 7.0 3 441.00
Coffee “ 21 10.0 3 630.00
Bread “ 21 10.0 3 630.00
2.3 High land water No 21 20 3 1,260.0
0
Sub total 2,961.0
0
Grand total 28,511.
00
Boreda Integrated Rural Development
project

(Boreda IRDP)

Memo

To: Tesfalidet G/Kidan, Project Manager Boreda IRDP

From: Girma Gemeda SLM department head, Boreda IRDP


Date: 15/12/2023
Subject: Proposal of training youth on poultry rearing techniques,
production and management

Dear Ato Tesfalidet,

As per the project change strategy Pullet provision for household


level shift to youths who have been organized in group on small
scale poultry rearing techniques and management for the purpose
of job creation resulted in generate income for themselves. Hence,
offer intensive training for the youths in poultry production and
management found very crucial. Accordingly, this training is
prepared to train 10 youth who have been organized in group and
two development agents who have been working at youth selected
sites also will participant on the training to share their experience,
follow up and strength the youths in order to sustain the activity.
The training will be conducted for six consecutive days commence

from December19, 2023. The budget reference (page 46, position

1.2.5)

Therefore, I kindly request your approval of enclosed two page of

proposal attached with this memo.

With Regards,

GG

Youths training proposal on poultry rearing technique,


production and management

1. Introduction

Unemployment rate one of the current main challenges faced


particularly youths who have been completed their higher education is
rare to get job opportunity. To reduce the unemployment rate of youths,
the project has planned to share the government burden to address the
problem as much as possible by working toward young people by
encouraging them to assess all alternative opportunities. Agribusiness,
one of the activity the project targeted on youths who are volunteering
to organize themselves in associations and groups to become
entrepreneurs. Hence, at two project intervention sites (Zefano & Goshe
Zelle KA) two youths group which consist five members each are
organized on small scale poultry production and management through
woreda livestock and marketing agency jointly with the project.
Accordingly, the project has prepared intensive training to equip the
youths on poultry rearing techniques, production and management for
five consecutive days.

2. Objective;-
To create job opportunity for youth who have been completed
their higher education in order to generate income for
themselves
 To enable the youth entrepreneur and make initiation/explainer
for the rest youths to engage on alternatives activities.
To create awareness of youths to enable entrepreneurs and
create suitable working environment for the youths
The main objective of the training poultry rearing, where young
individuals can actively engage in chicken management,
feeding, and healthcare.
3. Methodology: -
For three consecutive days theoretical training will be undertaken in the
class and the remaining two consecutive days the train will take part in
practical training and share experience from other similarly youths who
have been participated on small scale poultry rearing found at Arba
Minich area.
Duration of the training:-
The proposed training will be conducted for five consecutive days from
December 19 to 24, 2023 and extra one day perdiem considered for the
train to and fro to their sites.
4. Participants:-
The total participants will be twelve (12) which are, 10 youths and two
project development agents who follow up the activity and give
technical support for organized youth groups until the activity sustain .
5. Facilitator:-
One expert from Boreda woreda Livestock and marketing agency as
facilitator of the training and one expert from Arba Minich small- scale
poultry farm coordinator.

6. Venue:- Zefine town and / Zefine secondary school

7. Budget: -
Details of budget needed to conduct the training is available at the
tables below

8. Perdiem and Other Cost

S/ Description Unit Quant Rate/ Tota Total


No ity unit l cost
Day days
birr
Perdiem
1 Youth Perso 10 200 5 10,000.
n 00
2 Development agent “ 2 1,000 4 8,000.0
0
3 Trainer- from woreda “ 1 450 4 1,800.0
Trainer - from Arba Minchi “ 1 700 1 0
700.00
Sub total 20,500.
00
2 Tea and coffee
2.1 Tea Cup 14 7.0 5 490.00
Coffee “ 14 10.0 5 700.00
Bread “ 28 10.0 5 1,400.0
0
Lunch dish 10 100.0 2 2,000.0
0
2.2 High land water No 14 20 2 560.00
Sub total 5,150.0
0
Grand total 25,650.
00

The total budget required to give this training is birr 25,650.00 (Twenty Five thousand Six
hundred Fifty birr only) the budget is from SLM department.

Budget reference- Page 46 and position 1.2.5

Boreda Integrated Rural Development


Project (BOIRDP)
Memo

To : Ato Tesfalidet G/Kidan, P/Manager - BOIRDP


From: Girma Gemeda, SLM Department Head - BOIRDP
Date: 15 /12/2023

Subject: - Farmers training proposal on forage development &


management

Farmer’s trainings on forage development and management were


planned under Sustainable Land management department.
Therefore, enclosed herewith, please find the training proposal for
the same, as per the plan of operation for the year 2023. The training
will be conducted for three consecutive days commence from December 25,
2023 and Budget ref (Page 46, position 1.2.5)

I hereby request your approval to conduct the training as per the


scheduled.

With regards,

GG
Farmers training proposal on backyard forage development.

1. Introduction

Farmers in the project areas feed their cattle poor forage species in
both quantity and quality that resulted in low production and
productivity because of lack of access and awareness. Hence, the
project considering this problem, and has planned to deliver proper
training for the farmers in order to develop improved forage both in
quantity and quality.
Therefore, introducing and promotion of different forage
development strategies for the farmers is found to be very
essential. .
2. Objectives: -
 Enable the farmers to produce improved forage at appropriate
forage development strategies
 To generate significant income from the sector.
 To increase animal production & productivity
 To create awareness of farmers on forage development in order
to produce sufficient forage species to feed their animals

3. Training components:
 Methods of forage development strategies
 Introduce different improved forage species
 Methods of feeding system and utilization
 Improved forage production and management

4. Training Methodology: -

The training will be arranged at two appropriate sites (Zefano, and


Chalibe cluster) and it involves both classroom training and field
practices at site. In this respect class room education will be under
taken for two (2) days and last day practical exercise will be carried
out at Zefano and Chalibe.
5. Duration of training

The proposed training will be conducted for 3 consecutive days


from December 25 to 27, 2023. Before training schedule
(24/12/2023), the trainers should available on the training sites to
arrange the training and make preparation and additional one day
perdiem will consider.
6. Participants
It is expected that 80 farmers will be participated from project-
targeted areas from 09 Kebele Administration like under Zefano
cluster which are: Zefano, Awusato Abaya, Zonga Wacha, kacha
kalayo and under Chalibe cluster which are include: Chalibe,
Danbo Anono, Gambella, Hatisa and Goshe Zelle).

6. Trainers:-
Two guests will be invited from Woreda government Livestock
development office (Boreda) and the project Boreda will take part
as a coordinator.
Venue: Zefano & Chalibe sub- town

7. Budget: -
Details of budget needed for conducting the proposed training is
available at the tables below

8. Perdiem and Other Cost


S/No Distribution Unit Quantity Rate/ Total Total cost
unit Day days
birr
1 Perdiem
1.1 Trainees Perso 80 200 3 48,000.00
n
1.2 Trainer “ 2 450 4 3,600.00
Sub total 51,600.00
2 Stationary
2.1 Note book No 82
2.2 Pen (Bic) “ 82 23 1,886.00
2.3 Marker Pcs 6 20 120.00
2.4 Fillip chart No 2 337 674.00
Sub total 2,680.00
3 Tea and coffee
3.1 Coffee Cup 83 10.0 3 2,490.00
3.2 Tea “ 83 7.0 3 1,743.00
3.2 Bread No 166 10.0 3 4,980.00
3.3 High land water No 8 20 3 480.00
(1lit)
Sub total 9,693.00
Grand total 63,973.00
The total budget required to give this training is birr 63,973.00 (Sixty three thousand Nine
Hundred Seventy three birr only) the budget is from SLM department.

Budget reference- Page 46 and position 1.2.5

Boreda Integrated Rural Development


project

(Boreda IRDP)

Memo

To: Tesfalidet G/Kidan, Project Manager Boreda IRDP

From: Girma Gemeda SLM department head, Boreda IRDP


Date: 15/12/2023
Subject: Proposal of training youth on poultry rearing techniques,
production and management

Dear Ato Tesfalidet,

As per the project change strategy Pullet provision for household


level shift to youths who have been organized in group on small
scale poultry rearing techniques and management for the purpose
of job creation resulted in generate income for themselves. Hence,
offer intensive training for the youths in poultry production and
management found very crucial. Accordingly, this training is
prepared to train 10 youth who have been organized in group and
two development agents who have been working at youth selected
sites also will participant on the training to share their experience,
follow up and strength the youths in order to sustain the activity.
The training will be conducted for six consecutive days commence

from December19, 2023. The budget reference (page 46, position

1.2.5)
Therefore, I kindly request your approval of enclosed two page of

proposal attached with this memo.

With Regards,

GG

Boreda Integrated Rural Development


Project
(JIRDP)

Memo

Date:
25/01/2024
To: Tesfalidet G/Kidan, Project Manager JIRDP

From: Girma Gemeda SLM department head, JIRDP

Subject: Workshop on natural resource management

Work shop on natural resource conservation & management was planned

under Sustainable Land management department. Therefore, enclosed

herewith, please find work shop for the same, as per the plan of operation for

the 1st quarter of the year 2021

I hereby request your approval to conduct the workshop as scheduled.


With regards,

GG

Farmers work shop on natural resource conservation & management


Natural resource conservation and management intervention is one of the major components
considered under Jeldu Integrated Rural Development Project. This workshop is along with the
activities planned Under SLM components.
The purpose of the planned activity is too aware the participants about unwise exploitation
natural resource for ever growing demand for agricultural expansion and grazing pressure of the
area, major causes of natural resource degradation and to reach an agreement with participants
about the reclamation of the degraded natural resource of Jeldu woreda. As a result this
workshop is prepared to participate 360 (farmers, Kebele managers & agricultural supervisors and
experts)
Course Title
Workshop on natural resource conservation and management
Venue
The workshop will be given at Boreda woreda Meeting hall.
Time Table: - The workshop will be planned to be conducted for 1 day starting from January
29/2024.
Objective of the trainings
To provide participates the causes of natural resource degradation at Boreda
woreda.
To build up the knowledge of participants how to reclaim the natural resource
of the area.
To create awareness for the communities on water shed management.
Trainers
The Facilitator will be from Boreda woreda agricultural and rural development office. The
educational back grounds of the trainer are related to Natural resource management. The MfM
SLM department will be expected to assist the facilitator/trainers in organizing and coordinating
the overall workshop program.
Participants
The workshop participants are 325 farmers drawn from 27 PAS of jeldu wroreda and 35
participants from line office of jeldu woreda will be participated on this work shop.

Training methods and materials


Since the workshop is on natural resource conservation & management and its technical
realization, the workshop method to be used is partciparatory. Regarding training language afan
oromo language is intentional to be used during the workshop sessions.
Budget break down
Unit No. of
S/no Description Unit Quantity Price/ days Total birr
birr
1 Per diem
-Trainees( Kebele chairperson) Person 31 200 2 12,400.00
-Trainees ( Kebele Manager) Person 28 350 2 19,600.00
-Trainees (Woreda line office and “ 43 350 2 30,100.00
government DAs’
-project DAs’ and Social workers “ 7 1,000 2 14,000.00
Trainer/Facilitator Person 2 450 2 1,800.00
3 Tea & Coffee

Coffee Cup 362 4 1 1448

Tea Cup 362 3 1 1086


Water 1/2Lit 12 7 1 84

Total 86,318
The total budget required to give this training is birr 86,318 (Eighty six thousand three hundred
eighteen birr only) the budget is from SLM department.

Budget reference- Page 71