Abstract for RA-1
Name Of Contractor :- Alphas projects
S.NO Description of Work BOQ Billed Qty Billed Amount Remarks
UNIT QTY RATE Amount Previous This Bill Cumm. Previous Bill This Bill Cummulative Bill
Bill Qty Qty Bill Qty
1 P/C 1'X9" beam for resting pipe material on it. (Material + Labour Rate) Rft 50.00 ₹ 320.00 ₹ 16,000.00 38.54 38.54 ₹ - ₹ 12,332.80 ₹ 12,332.80
2 PCC below Beam - 2" thk PCC Sqm 50.00 ₹ 290.00 ₹ 14,500.00 44.52 44.52 ₹ - ₹ 12,910.80 ₹ 12,910.80
3 Labour Engaged for Beam breaking , fixing , excavation of trench NOS 100.00 ₹ 850.00 ₹ 85,000.00 30.00 30.00 ₹ - ₹ 25,500.00 ₹ 25,500.00
Qty May be increase and Decrease as per Site
Total ₹ 115,500.00 ₹ - ₹ 50,743.60 ₹ 50,743.60
Add Gst @ 18 % ₹ 20,790.00 ₹ - ₹ 9,133.85 ₹ 9,133.85
Grand Total I/c Gst ₹ 136,290.00 ₹ - ₹ 59,877.45 ₹ 59,877.45
Page 1 of 1 Abstract