1 Earth work excavation in all classes of soils except
hard rock requiring blasting and depositing on bank
with an initial leads and lifts and all other incidental
charges such as bailing out water, forming
protective bunds etc., complete for foundation as
per SS20B
707.10 Cum 81.00 / Cum 57275.00
2815541.00
Measurements
S.no Description of work No. Qty.
L B D
1 Earth work excavation in all classes of soils except hard rock requiring
blasting and depositing on bank with an initial leads and lifts and all other
incidental charges such as bailing out water, forming protective bunds etc.,
complete for foundation as per SS20B
2 Vibrated Cement Concrete of grade M15 Nominal Mix using 40mm ISS
size HBG metal including cost and conveyance of all materials to site
including cost of cement at site including cost of formwork, soft water,
labour charges for mixing, transporting, laying and curing concrete ,
working at depths , tools and plants and including all other incidental
charges etc; complete as per relevant standard specifications, for
Foundation of Drain
Ch 4280 - 5380 R 1 x 1 100.00 1.40 0.15 21.00
L bend at Ch 5380 R 1 x 1 16.00 1.40 0.15 3.36
Ch 5380 - 5600 R 1 x 1 220.00 1.40 0.15 46.20
Lead out drain R 1 x 1 45.00 1.40 0.15 9.45
Ch 5535 - 5600 L 1 x 1 65.00 1.40 0.15 13.65
Lead out drain L 1 x 1 35.00 1.40 0.15 7.35
101.01 Cum
(or) 101.01 Cum
Measurements
S.no Description of work No. Qty.
L B D
3 Vibrated Cement Concrete of grade M15 Nominal Mix using 20mm ISS
size HBG metal including cost and conveyance of all materials to site
including cost of cement at site including cost of formwork, soft water,
labour charges for mixing, transporting, laying and curing concrete ,
working at depths , tools and plants and including all other incidental
charges etc; complete as per relevant standard specifications, for Drain
Side Walls
Ch 4280 - 5380 R 1 x 2 100.00 0.30 0.90 54.00
L bend at Ch 5380 R 1 x 2 16.00 0.30 0.90 8.64
Ch 5380 - 5600 R 1 x 2 220.00 0.30 0.90 118.80
Lead out drain R 1 x 2 45.00 0.30 0.90 24.30
Ch 5535 - 5600 L 1 x 2 65.00 0.30 0.90 35.10
Lead out drain L 1 x 2 35.00 0.30 0.90 18.90
259.74 Cum
(or) 259.80 Cum
4 Vibrated Reinforced Cement Concrete M-25 Grade Design Mix using ISS size
hard granite broken graded metal including cost and conveyance of all materials
to site and cement at site but excluding cost and fabrication of steel, including
labour charges for mixing, transporting, laying, curing concrete, working at
heights, hire charges for tools and plants, including all other incidental chargeas,
etc., complete for Top SLAB.
5 Supply and Fabrication of S-415 steel required for all RCC items of works
involved in the schedule cost of steel at site fabrication, labour charges for
cleaning the rods straightening, cutting, bending, tying grills, including overlaping
to the required length wherever necessary and placing the reinforcement in
position as specified in the drawings, including cost of binding wire, provision of
spacer bars, cover blocks and all other incidental charges etc, complete, S-415
grade-1 MT.
Drain cover slab 1 x 1 481.00 0.01375 - 6.62 MT
360.00 / 259.80
Cost of Steel
Km 5/0 - 6/0
Km 5/0 - 6/0
CEMENT CONCRETE 1:2:4 M15 Nominal Mix Using 40mm metal Km 5/0 - 6/0
Cement Concrete 1:2:4 using 20mm HBG stone jelly for foundation including
watering whenever necessary and laid in layers not more than 15 cm thick
compacting complying with standard and as directed by the Departmental Officers
etc., complete.
CEMENT CONCRETE 1:2:4 M15 Nominal Mix Using 20mm metal Km 5/0 - 6/0
Cement Concrete M-25 Grade Design Mix using ISS size hard granite broken graded metal
including cost and conveyance of all materials to site and cement at site but excluding cost
and fabrication of steel, including labour charges for mixing, transporting, laying, curing
concrete, working at heights, hire charges for tools and plants, including all other incidental
chargeas, etc., complete for Top SLAB.
Vibrated Cement Concrete of grade M15 Nominal Mix using 40mm ISS size HBG
metal including cost and conveyance of all materials to site including cost of cement
at site including cost of formwork, soft water, labour charges for mixing,
transporting, laying and curing concrete , working at depths , tools and plants and
including all other incidental charges etc; complete as per relevant standard
specifications, for Foundations
Km 5/0 - 6/0
1.00 Cu.m CC 1:2:4 Mix 4951.97 Cu.m 4951.97
Water Charges for Curing
10.00 LS 10.00
concrete
All Tools and Plants 30.00 LS 30.00
4991.97
Vibrated Cement Concrete of grade M15 Nominal Mix using 20mm ISS size HBG
metal including cost and conveyance of all materials to site including cost of cement
at site including cost of formwork, soft water, labour charges for mixing,
transporting, laying and curing concrete , working at depths , tools and plants and
including all other incidental charges etc; complete as per relevant standard
specifications, for Drain Walls
Km 5/0 - 6/0
Km 5/0 - 6/0
1.00 Cu.m CC 1:1.5:3 Mix 6159.95 Cu.m 6159.95
Water Charges for Curing
10.00 LS 10.00
concrete
All Tools and Plants 30.00 LS 30.00
6199.95
Supply and Fabrication of S-415 steel required for all RCC items of works involved in the
schedule cost of steel at site fabrication, labour charges for cleaning the rods
straightening, cutting, bending, tying grills, including overlaping to the required
length wherever necessary and placing the reinforcement in position as specified in
the drawings, including cost of binding wire, provision of spacer bars, cover blocks
and all other incidental charges etc, complete, S-415 grade-1 MT.
TOTAL 73688.82
43.40
working Km 0.30
26.10
or
69.00
4.6
43.2 27 16.2
20.8
Construction of Drain at km 5/0 - 5/6 of Solakadu - Semmedu - Vilaram - Arapleswarar kovil - Semmedu Road including construction of Box culvert at
Km 5/4 - 2 Nos for side roads ( MD 690 )
Total
Length of Unit Wt.
Dia. In Spacing No. of Length of Total Weight
Sl.No Bar in of Bar Shape Description and Type of Bars
'mm in 'mm Bars Bar in 'Kg'
'mm' "kg/m'
in'mm'
2000+200
0+2000
Cover Slab main bar 12mm dia Anchor bar @ 150mm
1 12 mm Dia 150 7 1.10 7.70 0.893 6.88
c/c
2 10 mm Dia 125 10 1.00 10.00 0.62 6.2 cover Slab distributor bar 10mm dia @ 125 mm c/c
17.70
Total 13.08
13.734
or 13.75
Lead for Sand
###
Union Road Km 0/0-0/8 0.00 0.80 0.80
51.53
6.30
Sub Data I
Cost of MS sheets & angles
Weight of MS sheet 90x60cm x 10 Gauge
3.175 x 7850/1000 = 24.92 kg/squm
0.90x0.60x24.92 = 13.46 Kg/ No
Weight of MS angle size 25 x 25 x 3 mm
3.60 x 1.11 Kg/m = 3.996 (or) 4.00 Kg/No
13.46 Cost of MS sheets 90 x 60 cm, 10 Gauge 40.50 Kg 545.13
4.00 Cost of MS angle size 25 x 25 x 3 mm 40.50 Kg 162.00
LS 0.87
Total for each set (A) 708.00
Sub Data II
Cost of MS sheet & Angles and silver Oaks, Joists & Casurina for 10
m2
19.00 Cost of MS sheets & angles (Assuming for 40 uses) 708.00 Set 13452.00
Cost of single use 12217.95/40 13452.00 336.30
0.12 Silver oaks county wood joist 14847.00 1781.64
98.50 Casurina props 10cm to 13cm at 75cm c/c 24.00 2364.00
For 1 use Total 4145.64
Cost of single use 4145.64/5 829.13
Add Silver Oak Planks LS
829.13
MAIN DATA FOR CENTERING - 10 M2
1.00 Cost of M.S. sheet & Angles 336.30 1 use 336.30
1.00 Cost of silver Oak Joists and steel props 829.13 1 use 829.13
3.80 Carpenter I class 555.00 Each 2109.00
5.40 Mazdoor I Class 355.00 Each 1917.00
1.00 Fitter II Class. 467.00 Each 467.00
LS Add for cutting of MS Sheets and edges etc., LS 10.00
LS Add for cutting of MS Sheets and edges etc., LS 50.00
Total for 10 m2 5718.43
Rate for 1 m2 571.84
Rate for Shuttering
10.00 Centering Charges 571.84 m2 5718.43
98.5 / 5 Casurina Props 24.00 RM -472.80
0.30 Carpenter I class 555.00 Each -166.50
0.30 Mazdoor I Class 355.00 Each -106.50
Total for 10 m2 4972.63
Rate for 1 m2 497.26
NAME OF WORK : Construction of Drain at Km 40/8-41/4
Km 40/8-41/4
Cost per
Sl.No Description
Cum/MT Lead in Conveyan
Km ce charges
Total
Certified that the cement stockist at Sendamangalam which is shortest distance to site.
Assistant Divisional Engineer
Highways (C&M) Sendamangalam
Plains Metal 0 10 10 x 9.62
10 15 5 x 8.23
15
Hills 15 20 5 x 16.46
20 40 20 x 14.18
40 41 1 x 13.30
26
Plains Sand 0 10 10 x 9.62
10 20 10 x 8.23
20 40 20 x 7.09
40 46 6 x 6.65
46
Hills 46 80 34 x 13.30
80 80 0 x 11.16
34
Hills 12 20 8 x 10.30
20 40 20 x 8.86
40 46 6 x 7.64
34
swarar kovil - Semmedu Road
ads ( MD 690 )
Conveyance of Materials
Total
Plain Hills Total
60.20
10.30
70.50
82.40
177.20
45.84
375.94
305.44