Kind & Company (Builders) Limited Bridge House 530 High Road Leytonstone London E11 3EQ Tel: 020 8539 6923 Fax: 020 8558 7566 Email: mail@kind-build.com www.kind-build.com
At
Health & Safety Consultants Richardson-Hill Limited 23 Springfield Road North Chingford London E4 7DJ Tel: 020 8524 8396 Fax: 020 8524 8446 E-mail: michaelowen3@aol.com Website: www.richardson-hill.co.uk
Health & Safety Executive London Division Rose Court Southwark Bridge London SE1 9HS Tel: 020 75562100 Fax: 020 75562102 RIDDOR Tel: 0845 3009923
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 1 of 72
Content 1.0
1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8
2.0
2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10 2.11 2.12 2.13 2.14 2.15 2.16 2.17 2.18
Management of Work
Management Structure Responsibilities and Duties of Management Health & Safety goals for the Project Arrangements for monitoring and reviewing Health & Safety performance Liaison between parties on site Consultation with the workforce The exchange of design information between the Client, Designer, CDM Co-ordinator and the Contractors Handling design change during the Project The selection and control of Sub-Contractors The exchange of Health & Safety information between Contractors Site security Site Induction Site Safety Training Welfare facilities and First Aid The reporting and investigating of accidents and incidents, including near misses The production and approval of Risk Assessments and written Systems of Work Site Rules, including drugs and alcohol policy Fire & emergency procedures
3.0
3.1
3.2 3.3 3.4 3.5 3.6 3.7 3.8 3.9 3.10 3.11 3.12 3.13 3.14 3.15 3.16 3.17 3.18 3.19 3.20 3.21 3.22 3.23
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 2 of 72
4.0
4.1 4.2 4.3 4.4
5.0
5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8 5.9 5.10 5.11 5.12 5.13 5.14 5.15 5.16 5.17
Appendices
F10 (rev 04.07) Notification of construction projects Project Risk Assessments and Control Measures Contractors Method Statements / Risk Assessments / COSHH Assessments etc. Site Safety Induction Guidance & Register Operatives Training Records & Certificates of Competence Site Set Up Plan Works Programme Company Site Rules Health & Safety File contents Contract Document Register Pre-Construction Information Site Investigation Report Asbestos Survey Report Underground Utilities Survey Site Delivery traffic Management Statement Environmental Policy Fire Risk Assessment
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 3 of 72
1.0
The Site The proposed location is Churchfield Primary School, Latymer Road, Enfield, Middlesex N9 9PL. The school was originally built in the mid 1970s and was designed as separate infant and junior schools. It was amalgamated in the 1980s to form a single primary school and has grown by accretion and provision of temporary classrooms to its current size. The site is located off Latymer Road with a single narrow access shared by pedestrians and vehicles. It is bordered on the north and east boundaries by private residential property, to the west by a recreation ground and to the south by Salmons Brook. The actual site boundaries are indicated on the contract drawings and these are to be secured by the Principal Contractor and maintained as secure throughout the course of the contract. It is anticipated that access for the second stage of the works (new extension and eco classroom) will be via the private access way between 123 and 125 Latymer Road, subject to terms and conditions to be agreed between LBE and the owners. Surrounding Land Use Adjacent buildings are residential housing and will remain in occupation and use throughout the works. All Contractors vehicles must be parked to avoid obstruction at all times. Loading and offloading of materials must take place within the Principal Contractors designated site area. The works The works comprise the consolidation of pupil numbers on the site to 3 form entry, i.e. increasing from 574 to 630 pupils (Reception to Year 6). Six classes are currently housed in three double temporary (mobile) classrooms. The intention is to provide six new classrooms plus additional teaching and non teaching space. The works will provide approximately 1280m2 of new build accommodation together with some remodelling and modernisation, additional hard play area and car parking. The scheme proposes a two storey extension to the north west of the main school building and linked to it as Contract 2 and a new standalone building as an eco classroom. Contract 1 (by others) requires the extension of the main school reception and relocation of the admin offices from Easter to the end of the summer break 2011. There is expected to be some overlap between Contracts 1 and 2.
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 4 of 72
1.1
Introduction
Kind & Company (Builders) Limited, as the Principal Contractor for this project has formulated this Construction Phase Plan in accordance with the Construction (Design & Management) Regulations 2007 and the Managing Health & Safety in Construction Approved Code of Practices 2007, to enable the Company and others associated with the project to improve planning and arrangements of the health and safety requirements for the project. This Plan is required to be developed sufficiently in advance of the works by the Companys Management Team and others associated with the project. 1.2 Photo Gallery taken by Tony Rickard during Site Wide Survey carried out on 19 July 2011
3. New access to be formed into school from proposed site access road
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 5 of 72
1.3
General Programme (Refer to Appendix 5.7) Contract 2: Section 1 replace boiler, form new access road and site set up. Start on site: 25.07.2011, complete: 28.08.2011 (extended to 30 Sept 2011) Section 2 demolish one temporary double classroom and construct new two storey extension. Start on site: 25.07.2011, complete: 20.07.2012 Section 3 demolish two temporary double classrooms and construct new single storey eco classroom building and associated external works, including reconfiguring car parking spaces. Start on site: 23.07.2012, complete: 14.12.2012
1.3.1 Site working times The permitted hours during which works may be carried on site are:
Not before 8.00am or after 5.00pm Monday to Friday. At no time on Saturdays (without permission from LBE), Sundays or Bank Holidays.
Noisy operations are limited to between 9.00am and 4.00pm Monday to Friday.
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 6 of 72
1.4
Project Directory Design Team Client Contact: Niranjali Amarasinghe- Education Building Development Officer London Borough of Enfield Asset Management Unit Education Childrens Services and Leisure PO Box 51 Civic Centre Enfield Middlesex EN1 3XB Tel: E-mail: 020 8379 3068 Niranjali.Amarasinghe@enfield.gov.uk
Client Advisors: London Borough of Enfield Architectural Services Civic Centre Enfield Middlesex EN1 3AX Contact: E-mail: Tel: Mobile: Contact: E-mail: Tel: Contact: E-mail: Tel: Contact Email: Tel: Contact: Email: Tel: Fax: Chris Nasah Programme Manager chris.nasah@enfield.gov.uk 020 8379 6771 07828 472 147 / 07903 969 397 John Wilkinson Principal Architect (Acting) john.wilkinson@enfield.gov.uk 020 8379 6828 Barry Skelton Contracts and Policy Manager barry.skelton@enfield.gov.uk 020 8379 6833 Pat Lyne -Electrical Engineer pat.lyne@enfield.gov.uk 020 8379 6772 Tamer Asim Principal Services Engineer tamer.asim@enfield.gov.uk 020 8379 6710 020 8379 6850
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 7 of 72
CDM Co-ordinator Frankham Consultancy Group Limited Irene House Five Arches Business Estate Maidstone Road Foots Cray Sidcup Kent DA14 5AE Tel: Fax: Contact: E-mail: 020 8309 7777 020 8309 7890 Steve Hickford steve.hickford@frankham.com
Architect / Lead Consultant Bryant Harvey Partnership Architects Nicholas House River Front Enfield Middlesex EN1 3TF Tel: Fax: Contact: Email: Mobile: Contact: Email: Contact: Email: 0208 367 8000 0208 363 3608 John Harvey Partner in charge jrh@bhpp.co.uk 07932 625042 Rettah Holland Project Architect rh@bhpp.co.uk mark Skehill ms@bhpp.co.uk
Quantity Surveyor Potter Raper Partnership Julco House 26-28 Great Portland Street London W1W 8QT Tel: 020 7436 5005 Fax: 020 7436 5115 Contact: Email: David Maskell joe.parker@prp.gb.com
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 8 of 72
Building Services Engineer Pinnacle Consulting Engineers Highways House 37 Broadwater Road Welwyn Garden City Hertfordshire AL7 3AX Tel: Fax: 01707 385300 01707 385321
Structural Engineer Conisbee and Associates 15 Offord Street London N1 1DH Tel: Mobile: Contact: E-mail: 020 7697 7232 07968 856514 Alan Dunsmore, Principal Structural Engineer alan.dunsmore@conisbee.co.uk
Specialist Consultant (Traffic Statement) JMP Consultants Ltd 8th Floor 3 Harbour Exchange Square London E14 9GE Tel: Tel: Fax: Contact: Email: 020 7536 8007 (Direct) 020 7536 8040 020 7005 0462 Stephen Evans Stephen.evans@jmp.co.uk
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 9 of 72
Tel: Mob:
Corporate H&S: Robert Shortis Corporate H&S Officer Safety Advisor Planning: Robert Lancaster
Tel: E-mail:
Tel: E-mail:
Tel: E-mail:
Health and Safety Executive Local HSE office: London Division Rose Court Southwark Bridge LONDON SE1 9HS Tel: 020 7556 2100 Fax: 020 7556 2102 The Health and Safety Executive RIDDOR incident reporting centre contact number is 0845 300 9923. Incident Contact Centre Caerphilly Business Park Caerphilly CF83 3GG Websites: www.riddor.gov.uk or www.hse.gov.uk E-mail: riddor@natbrit.com
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 10 of 72
School Contacts Churchfield Primary School Latymer Road Enfield Middlesex N9 9PL Tel: Fax: Contact: 020 8807 2458 020 8807 5830 Andrea Nutter Executive Head Teacher Adrian Hall - Head Teacher Anthony Cooks Site Manager churchfield.office@churchfield.enfield.sch.uk
E-mail:
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 11 of 72
1.5
Survey and Reports available in Contract Documents: Appendix 5.13 Site Investigation Report (Report Reference GL14194) Appendix 5.14. Asbestos Survey Report Appendix 5.15. Underground Utilities Survey 1.6 Extent of existing records See Section 1.5. 1.6.2 Local Authority Records with regard to Planning Controls and Building Regulations.
1.7 Plans which are relevant for Health & Safety 1.7.1 CDM Co-ordinator Preconstruction Information prepared by Frankham Consultancy Group. Reference 223946. Refer to Appendix 5.11
Report
1.8 Information about existing structures See Section 1.5. 2.0 Management of Work 2.1 Management structure Refer to Kind & Company (Builders) Limited Health & Safety Policy, Rev. March 2010 2007, Part 1 for Management structure. Director in Charge of Health and Safety: Mr T. J. Pegrum Project Manager: Mr. T. J. Rickard Site Manager: Mr Tba Safety Consultant: Richardson Hill Ltd Designated Safety Advisor: TBA Tel No: 0208 539 6923 Tel No: 0208 539 6923 Tel No: Tba Tel No: 020 8524 8396 Tel No: Tba
2.2 Responsibilities and Duties of Management Kind & Company (Builders) Limited will maintain the duties and responsibilities as the Principal Contractor for the duration of the works. The Project Manager will be overall responsible for health and safety for this contract (refer to the Company Health & Safety Policy, Part 1). Specialist Package Contractors will be appointed who will be responsible for complying with all Health & Safety requirements related to their works, including adequate supervision. At no time will the site be operational without competent supervision.
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 12 of 72
2.3 Health & Safety goals for the Project To prevent, insofar as is reasonably practicable, risks and any unplanned events that results in injury, ill health to people, or damage to property, plant materials, or the environment or a loss of business opportunity and to complete the project on time and within budget. 2.4 Arrangements for monitoring and reviewing Health & Safety performance The Project Management Team plan to carry out regular Health & Safety monitoring to ensure that Health & Safety standards are of an acceptable level throughout the duration of the project. Kind & Company (Builders) Limited have arranged initially for fortnightly monitoring of the works to be carried out by their Health & Safety Advisor to ensure compliance with Statutory Legislation, Approved Codes of Practice and Safe Systems of Work. If safety standards are not being met satisfactorily, the safety monitoring and Safety Inspections will be increased to assist where improvements may be necessary. Kind & Company (Builders) Limited require any specialist Package or Trade Contractors to carry out their own monitoring and reviewing of Health & Safety on site and report to Kind & Company (Builders) Limiteds Project Manager as soon as possible after each review / inspection. Health & Safety will be reviewed by all persons associated with the project during Site Progress Meetings.
2.5 Liaison between parties on site Sufficient liaison with the Client and the Clients Project Team will be held with Contractors prior to the Contract starting and throughout the duration of the project. Regular liaison and meetings will be held with all parties involved as circumstances dictate. Safety issues are planned to be discussed during monthly Progress Meetings. 2.6 Consultation with the workforce Kind & Company (Builders) Limited Project Manager will ensure provisions are in place and maintained for consultation with the workforce throughout the duration of the project. Management will liaise with workforce representatives and the workforce generally on a regular basis to ensure that any Health & Safety issues raised will be considered so that Health & Safety can be developed and improved where necessary. In addition, Kind & Company (Builders) Limited will maintain pro-active open channels of communication with the workforce, via formal or informal meetings, written communications or by Management having general discussions with the workforce. 2.7 The exchange of design information between the Client, Designer, CDM Co-ordinator and Contractors The Contract Administrator will ensure that the exchange and circulation of information in relation to design changes occurs as required and that records are updated accordingly. The media for exchange of information will be agreed in advance with all parties on the project. The Contract Administrator will ensure that significant design information regarding the project is incorporated into the Health & Safety File.
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 13 of 72
2.8 Handling design changes during the Project Design changes agreed by the Project Team are to be co-ordinated by the Contract Administrator. Any risks involved in design change are to be evaluated by the Project Team and suitable control measures relayed to the workforce in advance of the work. 2.9 The selection and control of Sub-Contractors Package Contractors and Trade Contractors engaged by Kind & Company (Builders) Limited will be subject to investigation and vetting procedures instituted by Management. Only competent and suitably resourced Contractors will be engaged on the project. The Vetting Form required to be completed by Contractors is contained in the Company Health & Safety Policy, Part 3. The Project Management Team will adequately induct, supervise and monitor Contractors Health & Safety performances to ensure compliance with all appropriate Health & Safety Standards and arrangements. Non-conformance by Contractors will be thoroughly investigated and additional control measures will be implemented to prevent reoccurrence.
2.10 The exchange of Health & Safety information between Contractors The exchange of information between Contractors on this project will be via the Project Manager. 2.11 Site Security Hoarding, access gates and signage is to be maintained throughout the duration of the project by Site Management and the workforce. No Unauthorised Persons Beyond This Point, Danger Keep Out signs are to be displayed around the perimeter of the site for the duration of the project. All Site Personnel will be required to comply with Kind & Company (Builders) Limited security arrangements for the project as outlined below:Access to the project site will be strictly controlled by Site Management. All Site Personnel, Contractors and Visitors will be required to report to Site Management upon arrival and on departure from site. Sub-Contractors are to supply Kind & Company (Builders) Limited with names, addresses and dates of birth of all persons who will be required to work on site. Sub-Contractors are to advise Kind & Company (Builders) Limited in advance of any changes of site operatives due to sickness or absenteeism etc., and will supply this information before persons commence work. All site personnel are to co-operate with security arrangements by informing Site Management of any suspicious persons or occurrences that they witness.
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 14 of 72
2.12 Site Induction All personnel required to work on site must receive Site Safety Induction prior to being allowed to work on site. Kind & Company (Builders) Limited Site Management will provide Site Safety Induction to Contractors and main groups of workers. A register of persons receiving Site Safety Induction will be kept on site. Contractors are to ensure that all their Site Personnel have received Company Induction. If Site Personnel miss Kind & Company (Builders) Limited Induction courses, the Contractors Management Team will be responsible for ensuring they give Site Safety Induction to the minimum standard of Kind & Company (Builders) Limited Health & Safety Policy and provide proof to Kind & Company (Builders) Limited Site Management that Induction has taken place. Site Safety Induction is to follow the minimum format laid out in Kind & Company (Builders) Limited Health & Safety Policy, Part 3. 2.13 Site Safety Training Site personnel will be required to demonstrate both Health & Safety and Trade competence prior to attending Site Induction. Copies of Site Personnels competency Training Certificates must be provided to Kind & Company (Builders) Limited Site Management Team, which will be kept on site in the Site Safety File which will be available for inspection. Proof of Training will include, but is not limited to: Health First Aid Fire Safety Manual handling HAVS COSHH / PPE General Trade Competency CSCS Safety Awareness Working at Height Plant & Equipment Dumpers Excavators Scaffolding Mobile crane operations High reach forklift Banksmen / Slingers Abrasive Wheels Specialist equipment
Kind & Company (Builders) Limiteds Designated Site Safety Advisor and Site Management will perform Safety Tool Box Talks to remind Site Personnel of general safety arrangements. Contractors will be required to give regular Safety Tool Box Talks to their own workforce. Proof of Tool Box Talks given is to be submitted to Kind & Company (Builders) Limited Site Management in the form of Tool Box Talk Registers which will be kept in the Site Safety file which will be available for inspection.
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 15 of 72
2.14 Welfare facilities and First Aid Kind & Company (Builders) Limited will set-up all main site welfare facilities in accordance with the Site Set Up Plan. This will include the following:2.14.1 A toilet and hand basin will be provided. Paper hand towels and soap will also be provided for general use. These facilities will be maintained by Kind & Company (Builders) Limited. All site personnel are required to keep the facilities in clean order after use. 2.14.2 A canteen facility will be provided by Kind & Company (Builders) Limited, which will include the following:Seating (chairs with backs - no benches) for a minimum of 20 persons should be provided or a managed system to stagger rest breaks must be put in place; A sink connected to the sewer and freshwater supply; Hot running water; Electricity supply; The facility for heating food and water; Refrigerator; Flip top bin; Basic supply of cutlery and crockery; Impervious flooring and worktops; Heater; Health & Safety Notice Board. The canteen facility will be arranged to be cleaned on a regular basis by Kind & Company (Builders) Limited. All Site Personnel are required to keep these facilities in clean order after use, particularly with regard to food hygiene, keeping surfaces and cutlery clean and disposing of waste food. 2.14.3 All Contractors will be required to carry out a PPE Assessment for their own Site Personnel and provide all appropriate personal protective equipment to their workforce. The standard issue to all Site Personnel is required to be provided by the Contractors to their own workforce, which is as follows:Safety helmets; Safety footwear; Fluorescent tops, i.e., Jackets, T-shirts, Vests, etc. Contractors are to ensure their Site Personnel wear the standard issue PPE at all times whilst on site, except where it may be designated a safe area by Kind & Company (Builders) Limited Site Management, such as the canteen and the site office.
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 16 of 72
2.14.4 A drying room and changing facilities will be provided by Kind & Company (Builders) Limited in the compound area. These facilities will consist of the following:A bench; Wall hooks; Heater. These facilities will be maintained by Kind & Company (Builders) Limited i.e. regularly cleaned to prevent a build-up of discarded PPE and Contractors should advise their workforce of this procedure so that personal belongings will not be lost. Kind & Company (Builders) Limited will not be responsible for the security of personal belongings and advise that Contractors should make their own arrangements for their workforces valuables during the working day. All site personnel are required to keep the facilities in clean order after use. 2.14.5 Kind & Company (Builders) Limited will ensure that an adequate number of First Aiders are provided for the duration of the works including appropriate First Aid Kit. The First Aid Kit will be located in the Site Managers office. Contractors are required to carry out their own First Aid Risk Assessment for the type of works they will be involved in on site and ensure they have sufficient First Aid provisions where required for their own specific needs. 2.14.6 Shared welfare arrangements are to be agreed in writing with all Contractors and a record kept on site available for inspection. Any additional welfare required by Contractors for their workforce must be fully expressed and agreed with Kind & Company (Builders) Limited Project Team in advance of working on site.
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 17 of 72
2.14.7 Emergency Services: Dial 999 In Event of Emergency Nearest A&E Hospitals Whipps Cross University Hospital and NHS Trust Whipps Cross Road London E11 1NR Tel: 020 8539 5522 Distance approximately 4.6 miles Alternatively DIAL 999 Nearest Police Enfield Police Station (open 24 hours) 41 Baker Street Enfield EN1 3EU Tel: 0300 123 1212 enfieldenquiries@met.police.uk Email: Alternatively DIAL 999 to report a crime in progress only Non-urgent response minor crime can also be reported via the Internet on www.online.police.uk
Fire Enfield Fire Station 99 Church Street Edmonton London N9 9AA Tel: 0208 555 1200 ext 53252 (local Fire Safety Office) Email: enfieldgroup@london-fire.gov.uk In emergency contact the Fire Brigade by dialling 999 and give the name and address of the site. Do not replace the receiver until the address has been read back to you. Local Authority London Borough of Enfield Civic Centre Silver Street Enfield EN1 3XY Tel: Fax: E-mail: 020 8379 1000 020 8379 4453 buildingcontrol@richmond.gov.uk
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 18 of 72
Services Gas: Southern Gas Networks 0800 111 999 (24 hour emergency freephone) www.scotiagasnetworks.co.uk Water: Thames
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 19 of 72
2.15
The reporting and investigating of accidents and incidents, including near misses
Kind & Company (Builders) Limited operates a comprehensive incident reporting and investigation system as part of their Health & Safety Management System. All accidents, incidents and near misses, irrespective of their origin or result, are required to be reported to Kind & Company (Builders) Limited Site Management as soon as possible, who in turn will report to the Companys Designated Safety Advisor for further advice. If any accidents occur, they are to be logged in the Site Accident Record Book / Form. All accidents will be investigated by Kind & Company (Builders) Limited Site Management and those considered significant, including RIDDOR reportable will be further investigated by Senior Management with the assistance of the Companys independent Health & Safety Consultants, Richardson-Hill Limited. RIDDOR is to be fully complied with and Contractors are required to provide a copy of any RIDDOR reportable reports to Kind & Company (Builders) Limited Senior Management and a copy is required to be kept in the Site Safety File. Health and Safety Executive Local HSE office: London Division Rose Court Southwark Bridge LONDON SE1 9HS Tel: 020 7556 2100 Fax: 020 7556 2102 The Health and Safety Executive RIDDOR incident reporting centre contact number is 0845 300 9923. Incident Contact Centre Caerphilly Business Park Caerphilly CF83 3GG Websites: www.riddor.gov.uk or www.hse.gov.uk E-mail: riddor@natbrit.com
Near miss reports / investigations are to be copied to the Kind & Company (Builders) Limited Site Management who will keep a copy in the Site Safety File and arrange further investigation where necessary by Kind & Company (Builders) Limited Safety Advisors. Further guidance to be complied with in relation to accidents, incidents and near misses are contained in Kind & Company (Builders) Limited Health & Safety Policy, Parts 2 & 3.
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 20 of 72
2.16 The production and approval of Risk Assessments and written Systems of work The Design Team for the project have produced Risk Assessments and control measures to be considered to minimise risks and hazards for this project. These documents have been considered by Kind & Company (Builders) Limited Project Management Team in the planning of the project. Kind & Company (Builders) Limited Project Management Team members have undertaken a Project Specific Risk Assessment exercise and have produced Action Required Method Statements for the main safety controls for the project. This document is included in the Appendices section 5.2 of this Construction Phase Plan. Contractors are to carefully consider the Design Team and the Project Management Teams Risk Assessments and control measures in advance of works to ensure the control measures are suitable and can be accommodated by the Contractors works on site. Any areas of concern or conflict with regard to Health & Safety must be communicated to Kind & Company (Builders) Limited Project Management Team for further consideration and any necessary additional safety measures. Further specific detailed Risk Assessments and Safe Method of Work Statements are to be carried out by Contractors where necessary and agreed with Kind & Company (Builders) Limited Project Management Team, prior to commencement of Contractors operations on site. This should be carried out with sufficient time for arrangements to be agreed and accommodated. Contractors Risk Assessments and Safe Method of Work Statements are to be supplied to the Site Management Team, copies of which will be kept in the Site Safety File, available for reference purposes and inspection. E.g: Work on an occupied school site/premises. Demolition works. Access and egress to/from local estate roads. Maintaining means of escape at all times. Protection of school children, school staff, visitors, pedestrians, local residents and private property. Prevention of damage to Highway Authority assets (e.g. footways, carriageways and highways infrastructure, etc. Tracing for hidden or buried existing services within the confines of the project works. Works creating dust, noise and vibration. Work at height. Lifting operations. Manual handling. Construction traffic movements. Lifting operations. Asbestos Removal Any hot works Gas works Electrical supply works, disconnections and reinstatements; Movement and use of plant, equipment and materials; Working at height and use of access equipment;
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 21 of 72
These will be examined and approved by Kind & Company (Builders) Limited Project Team prior to work being allowed to commence. Sub-Contractors will be required to provide evidence that the contents of such documents have been conveyed to their operatives prior to such activities commencing. Site Management for the project are to ensure that site personnel are made aware of all necessary safety precautions in connection with their work prior to commencement of such activities. All necessary information will be conveyed to the workforce and a record kept. 2.17 Site rules, including drugs and alcohol policy Kind & Company (Builders) Limited General Safety Precautions and Site Rules will be complied with. These arrangements must be conveyed during Site Induction to all Site Personnel involved in the project. Kind & Company (Builders) Limited Site Management and Contractors supervision will monitor compliance with these and other arrangements specified in Kind & Company (Builders) Limited Health & Safety Policy, the Contractors Policy, Site Risk Assessments and Safe Method of Work Statements on a continuous basis throughout the duration of the project.
2.17.1 General Safety Precautions and Site Rules: REFER TO APPENDIX 5.8 All Site Personnel to sign in and out of the site and make their presence known on site to Management and wear ID Badges Standard PPE, safety footwear, safety helmets and fluorescent tops will be worn at all times. A reasonable dress code shall be followed No contact with the school, school children or staff is permitted at any time General public safety to be maintained at all times. All temporary electrics are to be 110 Volt supply and to conform to the HSE publication HS(G) 141 'Electrical Safety on Construction Sites'. Use the right tools for the job. Plant and equipment to be kept in good order and not misused. Report any safety defects to Site Management. No smoking, no naked flames in areas at risk from fire and explosions. Check the working environment for hazards before working. Ensure instructions are fully understood before working. Maintain personal hygiene and look after welfare facilities provided. Be aware of others safety - do not create hazards. Always take precautions to prevent materials and tools etc., from falling. Ensure that debris does not accumulate unsafely. Do not obstruct accessways unsafely. Do not carry loads that cannot be managed comfortably to prevent the risk of injury. Report all accidents and dangerous occurrences immediately to Site Management. The consumption of, or being under the influence of alcohol is not permitted on site. No gambling allowed on site. No radios allowed on site.
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 22 of 72
No burning of rubbish on site. A Permit to Work System is required for Confined Spaces, Work on or adjacent to Live Electrical Services, Hot Works, Hazardous Materials, Asbestos Removal, Use of Disc Cutters, Work at Height involving the use of fall arrest equipment, Excavations Smoking in designated area only The use of illegal drugs is not permitted on site. No on site parking is permitted. Parking is restricted to surrounding roads. Violent or abusive behaviour is not permitted on site. Waste: Remove rubbish, debris, surplus material regularly and keep the site and Works clean and tidy. You are responsible for removal of your waste/packages to skips. Any potential hazards, incidents or accidents must be reported to the Site Agent immediately. Storage of LPG canisters or cylinders: remove from site daily or store to comply with the Codes of Practice for the keeping of LPG in cylinders and similar containers. All local speed limits shall be strictly complied with. Anyone who does not understand their responsibilities regarding Health and Safety must discuss this with the Site Agent, Kind & Co will provide any assistance required which will include offering subcontractors and subcontract operatives the guidance of Kind & Cos Safety Consultant.
2.18 Fire & Emergency Procedures An appropriate outlined Fire & Emergency Plan has been formulated and included in the Risk Assessment / Action Required Method Statement contained in Appendices section 5.2 of this Construction Phase Plan. This outlined Plan will be developed by the Kind & Company (Builders) Limited Site Management Team and Contractors as works progress, where appropriate. Site Personnel will be informed of fire precautions during Site Safety Induction prior to them commencing work on site. Site Management will monitor the escape routes to ensure they remain free from any unsafe obstructions. Escape routes will not be permitted to be used for work activities or storage areas. The site will be a designated No Smoking area. Temporary signage will be displayed where necessary with regard to Fire Points and emergency evacuation routes / exits etc. Temporary fire points will be provided by Kind & Company (Builders) Limited for this project. The fire points will be located at strategic positions on the site and are to comprise of 9 litre water and CO2 fire extinguishers as a minimum. All potential hot works will be carried out under the strict control of Hot Works Permits issued and managed by Kind & Company (Builders) Limited Site Management.
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 23 of 72
Kind & Company (Builders) Limited have contained in their Health & Safety Policy, a general Fire Policy and Fire Policy Checklist which must be conformed to where appropriate by all Site Personnel. Contractors are to appoint competent members of their workforce in writing as Fire Wardens to assist in the maintenance of fire precautions and to report any defects to Kind & Company (Builders) Limited Site Management Team.
3.0
3.1 Delivery and removal of materials, waste and work equipment etc., taking into account any risks to the general public, neighbours and site personnel, traffic routes and segregation of vehicles and pedestrians REFER TO APPENDX 5.15 Site Delivery Traffic Management Statement There will be no on site parking. streets. Parking will be on main road and surrounding
It is important that site activities and deliveries, etc., do not put the general public, neighbours and site pedestrians at risk. Site personnel are to comply with all Local Authority requirements, The Road Traffic Act for the roads, in particular with regard to parking and any speed restrictions. Existing vehicular, pedestrian access routes and rights of way are to be safely maintained throughout the duration of the project.
3.2 Dealing with services, water, gas, electricity, including overhead power lines and temporary services Kind & Company (Builders) Limited will arrange to have all of the live gas and electric services isolated in the public highway (for buildings to be demolished) prior to any demolition of building works commence. To the existing building to be refurbished the electricity supply will be downgraded to 110v using transformers. Refer to section 1.5 for existing survey records. Contractors are to study this information in advance of their works. Work on existing site services will be carried out under a Permit to Work. Where circuits are disconnected at power source, provisions will be in place to ensure the following:a) b) c) That there will be no possibility of accidental re-connection. Identification and warnings against re-connection are displayed. Records of Permits are to be kept on site throughout the contract.
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 24 of 72
Contractors are to exercise extreme caution with the testing and subsequent reinstatement of any service supplies, in particular electric and gas. The Project Team will ensure they obtain as installed drawings clearly showing the routes of all hidden services. Live high voltage wiring and gas services necessary to be left live will be identified in all areas that could be affected by the works as live. Live services in the vicinity of the works must be adequately safeguarded and protected from damage. Wiring disconnected will be identified in all areas as dead. Electrically powered tools and equipment are required to be 110v or battery operated wherever possible. Any specialised equipment that requires a higher voltage will only be permitted if there is no alternative and after an application has been made in writing and agreed by the Project Team. This type of equipment will have power cable runs kept as short as possible and suitably protected from potential damage and will be connected to Residual Circuit Devices (RCDs) Only competent and approved Engineers working to current standards and industry guidance will be allowed to carry out work on gas and electrical systems. Gas and electrical works will be appropriately tested and certificated. Contractors are to provide Test Certificates and data information to Kind & Company (Builders) Limited Site Management Team who will retain copies on site in the Site Safety File. Refer to Project Specific Risk Assessment contained in the Appendices Section 5.2. 3.3 Accommodating adjacent land use
The proposed location is Churchfield Primary School, Latymer Road, Enfield, Middlesex, N9 9PL The school was originally built in the mid 1970s and was designed as separate infant and junior schools. It was amalgamated in the 1980s to form a single primary school and has grown by accretion and provision of temporary classrooms to its current size. The site is located off Latymer Road with a single narrow access shared by pedestrians and vehicles. It is bordered on the north and east boundaries by private residential property, to the west by a recreation ground and to the south by Salmons Brook. The actual site boundaries are indicated on the contract drawings and these are to be secured by the Principal Contractor and maintained as secure throughout the course of the contract. It is anticipated that access for the second stage of the works (new extension and eco classroom) will be via the private access way between 123 and 125 Latymer Road, subject to terms and conditions to be agreed between LBE and the owners.
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 25 of 72
Surrounding Land Use Adjacent buildings are residential housing and will remain in occupation and use throughout the works. All Contractors vehicles must be parked to avoid obstruction at all times. Loading and offloading of materials must take place within the Principal Contractors designated site area. The Contractor must ensure that clear access to the adjoining parts of the school site and buildings are maintained and suitably segregated from the works and vehicles movements at all times, and school users are not impeded by Contractors vehicles, materials and/or plant. All public and private highways and access points must be kept free of obstructions during the works. The perimeter of the site has a combination of existing timber fencing, brick walling and trees bordering neighbouring residential properties. All site personnel will be required to work diligently to safeguard neighbours and their visitors, as well as their properties, giving consideration with special regard to safe access and egress, protection of services and environmental issues, such as dust and noise. (Refer to Project Specific Risk Assessment contained in the Appendices Section 5.2 and 5.16 Environmental Policy) 3.4 Stability of construction whilst carrying out construction work, including temporary structures and existing unstable structures The Package Contractors and other Contractors are to fully consider the stability of the existing building to be refurbished while demolition, refurbishment and the new structure is being built including access equipment such as scaffolding and plant etc. The Designers of the new structure are to take full account of ensuring the stability of permanent structure. Any alteration or process / conditions which could affect the stability of such structures are to be fully considered and communicated to Kind & Company (Builders) Limited Project Team. Appropriate safety information regarding stability must be calculated and detailed. This information must be available on site in the Site Safety File. 3.5 Preventing falls Working at height will be planned in line with The Work At Height Regulations 2005. Wherever possible, working at height will be eliminated or minimised. 3.5.1 Preventing persons from falling It is anticipated that the main risk from falling will be in connection with high level works, i.e:Falling into excavations; Working on erecting, maintaining and dismantling scaffolding; Working from scaffolding; Work in connection with constructing floors on the new structure; Edge protection on floor edges and stairwells, etc;
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 26 of 72
Climbing and descending access ladders; Working with lifting appliances; Working on roofs; Works on staircases; Tripping and slipping; Working from the back of lorries. Working at height and the potential of falling will be continuously assessed by the Project Team and Contractors. Risk Assessments / Safe Method of Work Statements are to be formulated and appropriate provisions provided prior to starting work where it could be possible for persons to fall. Sufficient measures are to taken to prevent persons from falling at all times. Site personnel working at height are required to work from the most suitably safe and adequate access equipment (such as scaffold, podium steps or similar fitted with guardrails) in order to minimise risks Risk Assessment and Method Statement Induction is required to be conveyed to persons required to work at height prior to allowing them to work. Only competent persons will be allowed to work at height. Working at height is required to be supervised by a competent person to ensure that all safety controls are in place to prevent falls. Safety Tool Box Talks will be given by Kind & Company (Builders) Limited Site Management and Contractors Management to persons working at height. This is required to be carried out regularly throughout the project to site personnel of the risks associated with working at height. Working at height areas will be required to be inspected by Contractors before each shift by Contactors competent persons prior to allowing works to continue. 3.5.2 Preventing Materials and Equipment etc., from falling The working area will be sufficiently fenced or cordoned-off to prevent any persons from venturing into areas where there could be a risk of materials, etc., from falling. Provisions will be put in place to prevent materials and equipment etc., falling from height, such as:Monaflex / debris netting and brickguards; Sandwiching plastic sheeting within double boarding of the 1st lift; Scaffold fans. Materials and equipment which could be caught by the wind will be adequately secured. Materials such as plywood, scaffold boards, etc., will be laid down flat to prevent them from being blown over by the wind, or knocked over accidentally. 3.5.3 The Use of Ladders Ladders will only be permitted if there is no other reasonably practicable alternative. Persons who are required to use ladders and step-ladders will need to demonstrate their competence and a checking procedure is required to be in place to ensure that ladders are safe and suitable prior to use by a competent person.
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 27 of 72
3.5.4 Erecting, maintaining & dismantling scaffolding Scaffolding is required to be erected in accordance with current Industry Codes of Practice, Manufacturers / Suppliers specifications and relevant Regulations to ensure suitability and stability. Scaffolders are to submit evidence of their competency prior to carrying out scaffold works. The scaffolding works will supervised by an advanced Scaffolder and overseen by the Site Management Team. Copies of Handover Certificates will be provided to the Site Management Team prior to the scaffolding being used, copies of which are required to be kept on site for the duration of the project. Risk Assessments and Safe Method of Work Statements for scaffolding works will be required prior to scaffolding works being carried out on site. Scaffold inspections will be carried out by a competent person on a weekly basis and after any alterations or bad weather conditions. Records of inspections will be made and kept on site utilising the appropriate inspection report forms. Contractors supplying their own scaffolding, which includes tower and system scaffolds, must make arrangements for a competent person to carry out the legally required inspections. Copies of Inspection Reports are to be submitted weekly to Kind & Company (Builders) Limited Site Management Team. It is envisaged that scaffolds will be required for the following tasks:To gain access to building elevations; To store small quantities of building equipment and materials; To provide protection to accessways and working areas around the site; Access in stairwells; To prevent the need for ladders when working internally on high ceilings etc; For Surveys and Inspections, etc. 3.6 Work with or nearby fragile materials All appropriate precautions will be required to be taken by Contractors and Site Personnel when working near fragile materials, such as:Glass; Temporary decking; Plasterboarded ceilings.
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 28 of 72
3.7
Lifting operations will be carried out in accordance with The Lifting Operations and Lifting Equipment Regulations 1998 (LOLER) and The Work At Height Regulations 2005. Contractors works must be fully considered within the Safe Working Load capacity of any mobile crane or other lifting appliances that may need to be utilised on site.
Competent persons must be appointed to supervise and manage lifting operations. Only competent persons are allowed to be involved in lifting operations. Details of operators who have received training and are authorised to use lifting equipment are to be included in a Lifting Plan, along with the safe operating systems and precautions. Safety Tool Box Talks are to be given to persons working at height regularly throughout the project to remind them of the risks associated with working at high levels with regard to the potential of materials etc., falling onto persons below and neighbouring properties. Proof of thorough examination, testing and inspecting records are required to be retained on site in the Site Safety File. Refer to Project Specific Risk Assessment contained in the Appendices Section 5.2 and Manufacturers / Suppliers Specifications. Refer to Kind & Company (Builders) Limited Company Health & Safety Policy Procedures, Part 2. 3.8 The maintenance of plant and equipment All plant and equipment to be used on site is required to be selected for its suitability and safety. All plant and equipment supplied to site must comply with current Legislation. Appropriate Test Certificates and maintenance records are required for plant and equipment prior to them being used on site. Appropriate and regular checks are required to be made by Contractors for plant and equipment to ensure it is properly used and maintained. Plant and equipment operators will be competent and have competency certification where required, i.e. C.I.T.B. All electrical tools will be either battery operated or 110v supply and will be PAT tested as appropriate. Competency Certificates and Test Certificates for equipment will be kept on site in the Site Safety File. All defective plant or equipment will be taken out of use, isolated, clearly marked Out of Order and removed from site or suitably repaired as soon as possible.
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 29 of 72
Particular attention will be given to the possible hazards associated with using the following plant:Electrical equipment Angle grinders Compressed air equipment Ladders Mixers Vibration and noise from plant or hand held tools Any lifting equipment and lifting gear Scaffolding
All plant & equipment, whether provided by Kind & Company (Builders) Limited or its Contractors will be properly maintained and inspected on a regular basis and according to the regime established by the Kind & Company (Builders) Limited Health & Safety Management System, PUWER & LOLER. Refer to Project Specific Risk Assessment contained in the Appendices Section 5.2 and Manufacturers / Suppliers Specifications.
3.9 Work on excavations and work where ground conditions are poor Not anticipated on this project 3.10 Work on wells, underground earthworks and tunnels Not anticipated on this project.
3.11 Work on or near water where there is a risk of drowning Not Applicable
3.13 Work in a caisson or compressed air working Not applicable to this project. 3.14 Work involving explosives Not applicable to this project.
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 30 of 72
3.15 Storage of materials (particularly hazardous materials) and work equipment Package Contractors and Contractors / Sub-Contractors are to store their general materials and equipment in the designated storage area on site. See Appendix 5.6 Site Set Up Plan. Hazardous storage must be agreed with Kind & Company (Builders) Limited Site Manager prior to them delivered to site. Storage requirements are to be planned to minimise associated risks such as:Unsafe obstructions; Overloading; Stability; Unnecessary handling; Difficulties in slinging and lifting. Special consideration must be given to potentially hazardous substances such as:Explosive gases LPG and Acetylene; Fuel for plant; Highly flammable substances such as solvents and paints; Combustible waste such as timber and packaging. Contractors are required to provide Site Management with Manufacturers Data Sheet information, COSHH Assessments and detail their storage arrangements for the substances of special consideration. 3.16 The removal of asbestos Refer to Type 3 Asbestos Survey Report carried out by Tersus on 13 December 2008; reference L802/NPS1/1. Refer to the Method of Analysis and Conclusion contained in Appendix 2 of the report. Refer to Appendix 5.12
3.17 Dealing with contaminated land Refer to Site Investigation Report; Report reference No.C11584. 3.18 Manual handling Contractors are required to minimise manual handling wherever possible. Any essential manual handling is required to be restricted to weights and material sizes capable of being handled safely. Where materials are required to be manually handled, weights are required to be restricted to 20kg or less and distances for carrying manually, minimised. Equipment is to be provided to minimise the need for manual handling. Persons required to carry out manual handling are to be suitably fit, trained and competent. 3.19 The use of hazardous substances, particularly where there is a need for health monitoring The use of hazardous substances is required to be kept to the minimum. All potentially hazardous substances to be used on this project are to be subject to a COSHH Assessment and such assessment information along with risk reduction and control measures are to be conveyed to site personnel prior to use. A complete list of all potentially hazardous materials / substances / operations and waste etc., for the project is to be accompanied by COSHH Assessments, Manufacturers Data Sheets
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 31 of 72
and Method Statements to ensure appropriate control measures will be in place. This information is to be submitted to Kind & Company (Builders) Limited Project Team in advance of being brought onto the site and used, etc. Note: The provision of Manufacturers Data Sheets will not substitute for Employers COSHH Assessments. The following list of substances, which is not exhaustive, have been considered as having the potential of being hazardous and Contractors are therefore required to consider this list and any other potentially hazardous substance carefully and provide all necessary safety measures to protect the workforce and others on this project:Materials requiring particular precautions with work on existing buildings Any asbestos containing materials, including rainwater goods, cowls, board, spray applied materials, coatings, cement based sheet products, floor tiles, bituminous materials/adhesives. Insulation to pipes and lagging, ropes and seals, etc. Existing painted surfaces containing lead. Lead sheet materials (e.g. flashing). Lead pipes. Lead sash window counter-weights. Brick/cement/concrete and general dusts. Existing plaster boards. Existing insulation (e.g. glassfibre and/or Rockwool). Existing areas of damp/mould (mould spores). Lath and plaster materials (particularly those containing animal hair as a constituent of the plaster mix). Biological materials and detritus deposits remaining foul and surface water pumping stations, manholes, catch-pits, chambers, drainage pipes, disused plumbing fixtures, etc. Glass and glazing.
In addition, the following materials may present health hazards and where used in the works the Contractor should obtain the relevant Manufacturers Safety Data Sheet (MSDS), ensure suitable and sufficient COSHH assessments are carried out and the contents made known to all persons involved in the works who may be exposed to risks associated with the use of the products. Any cementitious materials, screeds, fillers, mortars and concrete,etc. Plaster and lime powders, dusts and mixes. Any solvent based adhesives. Spray applied paints and adhesives. Insulation fibres (e.g. Rockwool). Solvent based paints/finishes. Epoxy type resins and compounds. Pastes and fluxes associated with hot works/soldering, including fumes given off by hot work processes. Sealants. Wood dusts and fibres (particularly MDF).
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 32 of 72
All safety measures necessary to safeguard the workforce and others must be complied with, including the provision for appropriate training, instruction, supervision, health monitoring and where required, PPE Assessments and record keeping. Contractors are to provide Kind & Company (Builders) Limited Project Team with appropriate information regarding potentially hazardous substances which were not eliminated which have residual risks for the purpose of inclusion into the project Safety File. 3.20 Reducing noise and vibration Noise and vibration is required to be eliminated wherever possible, or kept as low as reasonably practicable throughout the duration of the project. Where the operational risk levels illustrated within The Control of Noise At Work Regulations 2005 could be exceeded, the precautions set out to eliminate or reduce noise levels are to be implemented. Details of maximum exposure times are to be conveyed to the relevant Site Personnel and strictly adhered to. Records of required monitoring should be kept on site in the Safety File, available for inspection. Works generating noise and vibration are to be carried out at times considered reasonable for a residential and commercial area and as may be specified by the Local Authority with regard to noise and by the Project Teams Engineer with regard to limitations on vibration. Contractors are required to give consideration to nearby neighbours and keep the Kind & Company (Builders) Limited Site Manager informed in advance of potentially noisy operations which cannot be avoided, to ensure that suitable measures are taken to suppress noise. Note: This means, in most cases, noise suppression techniques will be expected, or alternative solutions are to be employed. Noisy operations which cannot be avoided are to be planned to be carried out during periods of the day to minimise inconvenience to neighbours. Every consideration should be given not to start any potentially noisy operation before 8.30am or after 5.30pm during weekdays, with a quiet time between the hours of 1.00pm to 2.00pm. No noisy operation should be planned to be carried out during weekends, bearing in mind that no work is permitted after 1.00pm on Saturdays. The main activities which are anticipated could involve the potential of high noise levels to neighbours or Site Personnel, which will need to be accounted for and suitable control measures put in place if it is not possible to eliminate, are as follows:Plant operations, excavators, generators and compressors; Power tool operations, breakers, hammer drills, angle grinders, Hilti fixings, etc; Hand tool operations, hammers; Scaffold works; Loading skips; Lorry deliveries. The main activities which are anticipated could involve the potential of substantial vibration to structures or to Site Personnel which will need to be accounted for and suitable control measures put in place if it is not possible to eliminate, are as follows:Plant operations and excavators;
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 33 of 72
Power tool operations, breakers, hammer drills, angle grinders, Hilti fixings, circular saws, jigsaws, chop saws, etc; Hand tool operations, hammering, chiselling; Loading skips; Lorry deliveries. 3.21 Work with ionising radiation Not anticipated to be an issue on this project.
3.22 Exposure to UV radiation (from sunlight) Contractors are required to advise all their personnel who are required to work on site of the potential health problems associated with UV radiation. Site Personnel will be required to wear suitable clothing at all times when exposed to sunlight. Skin exposed to sunlight should be protected with suitable UV protection sun cream, which Contractors should ensure is available to be used by their Site Personnel. Contractors should monitor these protective measures and ensure that their Site Personnel are safeguarded. 3.23 Hot Works All hot works will be subject to a Hot Works Permit. These will detail all important safety issues to safeguard against fire, such as the person(s) undertaking the task and the type of fire extinguisher(s) that must be present during the task, etc. All hot works will cease one hour before the end of the working shift and the person who carried out the hot works will remain in the vicinity checking regularly to ensure that no fires will occur. Hot works are to be signed-off by the person who carried out the hot works and the competent supervising person. Records of Hot Works Permits are to be kept on site available for inspection. 4.0 The Health & Safety File 4.1 Layout and format Kind & Company (Builders) Limited Project Team will ensure that the layout and format for the Health & Safety File conforms to the CDM 2007 Code of Practice. Contractors are required to provide all appropriate Health & Safety information to Kind & Company (Builders) Limited Project Team that will be needed to allow future construction work, including cleaning, maintenance, alteration, refurbishment and demolition to be carried out safely. This information should alert those carrying out such works to risks so that it helps them decide how to work safely. 4.1.1 Contractors are to provide accurate information wherever possible in advance of their works and on an on-going basis with completion of accurate information no later than 7 days after their works are complete on site. 4.1.2 Designers and Contractors are required to inform the CDM Co-ordinator in advance, in writing, of the information that will be prepared and handed over for the Safety File, specifically for this project. 4.2 Arrangements for collecting and gathering information The arrangements for collecting information for the Health & Safety File from the Designers and Contractors, etc., are to be agreed with Kind & Company (Builders) Limited Project Team. The Project Team will arrange with the CDM Co-ordinator
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 34 of 72
appropriate arrangements to monitor and review the status of information and provide assistance in amending or adding information as the project progresses. 4.2.1 Contractors are required to compile all appropriate information to Kind & Company (Builders) Limited Project Teams Contract Administrator for inclusion in the Health & Safety File. 4.2.2 The CDM Health & Safety File is planned to be submitted to the CDM Coordinator at the end of the project. 4.2.3 The Health & Safety File will be located with Kind & Company (Builders) Limited head office. 4.2.4 The content of the Health & Safety File must contain the following information which Contractors must submit where it relates to their works:The Health & Safety File The Contents of the Health & Safety File: The purpose of the Health and Safety File is to provide information needed to allow future construction work, including cleaning, maintenance, alterations, refurbishment and demolition to be carried out safely. All members of the project team are to provide relevant information to the CDM Coordinator for inclusion in the Health and Safety File. This information should include: a) a brief description of the work carried out; b) any residual hazards which remain and how they have been dealt with (e.g. surveys or other information concerning asbestos; contaminated land; water bearing strata; buried services etc); c) key structural principles (e.g., bracing, sources of substantial stored energy including pre and post-tensioned members) and safe working loads for floors and roofs, particularly where these may preclude placing scaffolding or heavy machinery there; d) hazardous materials used (e.g. lead paint; pesticides; special coatings which should not be burnt off etc); e) information regarding the removal or dismantling of installed plant and equipment (eg any special arrangements for lifting, order or other special instructions for dismantling etc); f) Health and safety information about equipment provided for cleaning or maintaining the structure; g) The nature, location and markings of significant services, including underground cables; gas supply equipment; fire-fighting services etc;
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 35 of 72
h) Information and as-built drawings of the structure, its plant and equipment (e.g., the means of safe access to and from service voids, fire doors and compartmentalisation etc). The file does not need to include things that will be of no help when planning future Construction work, for example: a) The pre-construction information, or construction phase health and safety plan; b) Construction phase risk assessments, written systems of work and COSHH assessments; c) Details about the normal operation of the completed structure; d) Construction phase accident statistics; e) Details of all the contractors and designers involved in the project (though it may be useful to include details of the Principal Contractor and CDM Coordinator); f) Contractual documents; g) Information about structures, or parts of structures, that have been demolished unless there are any implications for remaining or future structures, e.g., voids; h) Information contained in other documents, but relevant cross-references should be included. 4.2.4.1 Refer to the CDM Code of Practice with regard to further Safety File Information details.
4.3 Storage of information Kind & Company (Builders) Limited standard method of information storage is to use modern information technology where this is practicable. Contractors should submit information to the Contract Administrator via e-mail wherever possible, in Microsoft Word, Excel or PDF format. If this is not possible, hard copies can be sent by post, but Designers and Contractors must retain copies until the Contract Administrator has confirmed receipt. 4.4 Handing over information at the end of the Project to the Client Kind & Company (Builders) Limited Project Team will hand over the Health & Safety File to the CDM Co-ordinator.
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 36 of 72
5.0 5.1
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 37 of 72
5.2
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 38 of 72
July 2011
July 2011
CONTRACTORS
IMPROBABLE
EMPLOYEES
PROBABLE
POSSIBLE
YOUNG PERSONS
VISITORS
REMOTE
PUBLIC
Ref
High
2 3
Med Med
High
High
High
High
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 39 of 72
HAZARDS IDENTIFIED
PUBLIC
Ref
9 10
High
Med
11
High
12
High
13 14
High High
15
High
16
Med
17
Med
18
High
19 20 21
High High
Med
22
Med
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 40 of 72
LIKELY/ FORESEEABLE
CONTRACTORS
IMPROBABLE
EMPLOYEES
PROBABLE
POSSIBLE
YOUNG PERSONS
VISITORS
REMOTE
PUBLIC
Ref
24 25 26 27 28
High
Med
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 41 of 72
OF
COMPLETED
Ensure that the entrances to be used by site personnel are clearly marked up. A basic pedestrian plan has been included in Section 7 below which will be adhered to and developed where necessary to safeguard pedestrians etc., when loading and unloading vehicles and when transporting plant etc., across the pavement, ensuring that appropriate signs, barriers and personnel are deployed. Ensure that difficult lorry manoeuvres in the road leading to the site and in tight areas on the site are assisted by competent banksmen wearing fluorescent garments and that safe distances are maintained by personnel for lorry manoeuvres. Ensure that the premises entrances are kept free at all times from any unsafe obstructions.
Site Manager & Contractors Site Manager, Contractors & Site Personnel
Low Low
Site Manager, Contractors & Site Personnel Site Manager, Contractors & Site Personnel Site Manager, Contractors & Site Personnel Site Personnel Site Manager & Contractors Site Manager & Contractors
Low
Low
Security. Refer to Security Contractors arrangements and any security device handbooks.
Ensure that the sites doors, windows, gates, etc., are locked / secured during lunch breaks away from site and at the end of the working day. The premises will be sufficiently secured at night where openings have been made in fencing and hoarding etc. Site Personnel are to make their presence known to the Site Manager when on site and leaving the site. Ensure Danger Keep Out - No Unauthorised Persons signs are displayed on the hoarding / fencing.
Low
Low Low
Accessways.
Ensure that accessways are demarcated clearly and are not unsafely obstructed by works/operations and that storage does not cause an obstruction. Accessways will also be kept in good condition, well illuminated during hours of darkness, firm and without surface trips and slipping hazards. Accessways around working areas, due to the location of the works, must be kept clear of any unsafe obstructions. Give regular Tool Box Talks to the works personnel with regard to keeping accessways free from unsafe obstructions. Any obstruction of accessways will be removed immediately. Investigate the reasons obstructions occurred and eliminate the problem at source where possible or provide additional provisions to prevent obstruction problems from reoccurring.
Low
Site Manager, Contractors & Site Personnel Site Manager & Contractors Site Manager & Contractors
Low
Low Low
Ensure that lorries/vans are not overloaded and materials and equipment do not overhang the vehicle. Ensure that the loads are secure and weight is distributed safely in accordance with the design capabilities of the vehicle. Check that vehicles are in good safe order and tidy before setting off. Road and pavement surfaces will be protected from damage so that they remain in a good safe condition for pedestrians, site personnel and visitors. Ensure when loading and unloading vehicles that there is sufficient room around the vehicle to prevent cross contamination of risks with other persons, in particular ensure that accessways and working areas are not unsafely obstructed. A pedestrian plan will consider protective measures to pedestrians and other road users when loading and unloading heavy and awkward items (Refer to Section 7 below). Personnel working from the back of lorries constitutes working at height. Wherever possible, personnel will not climb up onto lorries and if they do need to, provisions will be in place to protect them from falling.
When loading lorries/vans Lorry/van Drivers, Personnel assisting On-going Lorry/van Drivers Lorry/van Drivers, Site Manager & Contractors Lorry/van Drivers, Site Manager & Contractors
Low
Low Low
Low
Med
Low
RESIDUAL RISKS
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 42 of 72
When utilising lorry Hyabs, personnel assisting or persons in the vicinity of the operation, must wear safety helmets and safety footwear, etc. Only competent persons will be involved in lifting operations. Loading and unloading lorries will be carried out in designated areas only as agreed with Site Management.
Site Manager, Contractors, Hyab Operator & Site Personnel Site Manager, Contractors & Site Personnel
Med
Med
Competent persons must plan working at height. Wherever possible, risks and hazards must be eliminated. Where risks and hazards remain, all necessary control measures must be provided. Working at height operations must always be supervised by a competent person. All persons required to work at height must be competent this will include all scaffolding works, working from the scaffolding, working on the roof, lifting operations, working on the staircases and transporting materials to and from high level areas, etc. Scaffolding calculations will be required. Scaffolding will be designed by a competent Engineer, erected by competent Scaffolders and will be inspected on a weekly basis or after alteration or any bad weather conditions by a competent person. A copy of an Inspection Report for the scaffolding and any lifting appliance must be kept on site for inspection purposes. Persons working at high levels must not put themselves at risk from falling, or put persons who may be in the vicinity at risk from falling materials or equipment. Where there is the potential for persons to fall, there must be adequate prevention protection in place. There will also be adequate protection to prevent materials and debris etc., from falling. Ensure that Safe Method of Work arrangements are in place and communicated to persons who will be carrying out high level works. Ensure adequate safe access to high level works is provided. Refrain from using ladders if there are safer alternatives.
Med
Low
Low
Low
Site Manager & Contractors Site Manager & Contractors Before work starts. Contracts Manager, Site Manager & Contractors
Low
Low
Ladders. The Work At Height Regulations 2005. HSE Guidance Safe Use of Ladders and Stepladders.
Wherever possible, ladders will be substituted for safer access equipment, such as podiums and scaffolds, etc. Working off ladders constitutes working at height, therefore competent persons will be required to plan and supervise this type of work. Ladders will be considered as access equipment only wherever possible. If persons have to use ladders as access or to work from, the ladder must be adequately secured in place at the correct angle. Wherever possible both hands should be free for adequate hand-hold, otherwise provisions such as a safety belt / fall arrest system will be utilized to prevent persons from falling off the ladder when their hands are occupied. In addition, persons using ladders should not overstretch. Carrying materials up and down ladders increases the risk of falling and therefore will be avoided wherever possible so that both hands can be used for adequate hand-hold. Small tools and materials could be clipped to tool belts etc., to keep hands free providing they do not hinder or obstruct the climb or descent from a ladder. The correct type of ladder should be used dependent upon the circumstances. The ladder will be strong enough and durable so they withstand being easily damaged. Note: Lightweight ladders have the advantage of being easily carried and manoeuvred, but the disadvantage is that they are susceptible to damage.
Med
6 cont
Any person required to use a ladder in connection with their work will be trained in the safe use of the type of ladder and any associated equipment to safeguard them from the risk of falling. Note: Persons using heavy and long ladders will require manual handling training. All persons working from ladders must be medically fit and must not suffer from medical conditions such as black-outs and dizziness. All ladders used must be in good order. They will be checked regularly to ensure they are kept in good order.
Before work starts. Contracts Manager, Site Manager & Contractors Before operatives start work on site. Contracts Manager, Site Manager & Contractors Before operatives start work on site. Contracts Manager, Site Manager & Contractors
Site Manager, Contractors & Site Personnel
Low
Med
Med
Low
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 43 of 72
Med
Before the contract starts. Contracts Manager, Site Manager & Contractors
Low
Low Low
To aid safe lifting, loads to be lifted wherever possible should have the load weight clearly marked-up and provisions for safe lifting will be provided, i.e., securely palleted, fitted with lifting eyes or other safe provisions for attaching lifting gear. Competent Certificated Operatives to be used. arrangements before commencement of work. Check
Contracts Manager, Site Manager & Contractors Contracts Manager, Site Manager & Contractors Contracts Manager, Site Manager & Contractors Before electrical work starts. Contracts Manager, Site Manager & Contractors
Low
Low
General arrangements covered in the Company Health & Safety Policy. 9 Electrical risks installations & works. to M & E drawings. The Electricity Regulations 1989. The Electricity Regulations 1988. At for Refer Work Supply
PPE Assessments are required to be carried out for persons involved or affected by lifting operations.
Low
A competent person must plan, supervise, test and inspect all electrical works and installations. Arrangements to be checked, i.e., service drawings. Detailed Safe Method of Work Statement required for working safely with electrical systems. Competent qualified Electricians (ECA or CEE) to be engaged on electrical systems in excess of 110v. Check qualifications of personnel. Carry out works in accordance with the Electrical Permit to Work.
Low
The Low Voltage Electrical Equipment (Safety) Regulations 1989. The IEE Wiring Regulation (Code of Practice) 16th Edition.
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 44 of 72
Low
10
Manual Handling. Refer to Manual Handling Regulations and Code of Practice. HSE Guidance.
Plan the project to minimise manual handling and provide lifting aids wherever possible.
Contracts Manager, Site Manager & Contractors Site Manager & Contractors Site Manager & Contractors Site Manager & Contractors Site Manager & Contractors
Low
Ensure that personnel who have to carry out manual handling operations are suitably fit and appropriately trained and instructed. Ensure personnel carrying out manual handling are aware of the weights involved. Carry out Manual Handling Assessments. Where loads are in excess of 20kg and there are no suitable lifting aids that can be utilised safely, team lifting may be necessary. All persons involved in team lifting will need to be coached with regard to the additional techniques necessary for safe team lifting. Ensure that personnel involved in manual handling have received training on good manual handling techniques. PPE Assessments are required to be carried out for persons involved in manual handling.
Low
Low
Low Med
Low
Low
11
Using power tools, machines and plant. Refer to Manufacturers guidance. The Provision and Use of Work Equipment Regulations 1998, The Workplace (Health, Safety & Welfare) Regulations 1992, The Management of Health & Safety At Work Regulations 1999, The Control of Noise At Work Regulations 2005. Approved Code of Practices for the Safe Use of Woodworking Machines. HSE Guidance Notes. British Federation. Woodworking
Operators of power tools, machines and plant must be competent and suitably trained and instructed on their safe use and general safety awareness with regard to how this equipment could affect others safety. Check that operatives using power tools, machines and plant are competent.
Low
Ensure that power tools, machines and plant are in good order before issue and use. All guards must be in place and equipment which generates dust should be of the design to suppress dust or have dust collection devices fitted. The Method of Work when using power tools etc., must be fully considered to minimise dust, noise and dangers from moving parts or fragments flying-off of material being worked on.
Low
Ensure power tools, machines and plant are properly maintained and a record kept of servicing and repairs. Ensure the correct power tools, machines and plant are used for the job. Equipment that has been designed properly for a job will minimise the risks and hazards, but there will always be a need to take into account the environment where equipment is used and how that may affect the operator or others in the vicinity. Machines and plant being maintained or repaired must be safely isolated, locked-off where there could be a possible risk of entrapment or electrical hazards, etc. This will be carried out under a Permit to Work. To minimise the risks of electrical shock when using electrically powered tools, battery powered tools will be used wherever possible or 110v. Battery powered tools additionally eliminate trailing lead hazards. Inspection and PAT testing of portable appliances, keeping maintenance records and manufacturers data sheet information.
Low
11 cont
British Standards BS6854. General arrangements covered in the Company Health & Safety Policy.
Low
Low
Low
Low
PPE Assessments are required to be carried out for persons using power tools, machines and plant.
Low
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 45 of 72
Demolition work must be planned and supervised by a competent person. Check the competency of all personnel who are required to carry out this work.
Senior Management & Foreman Management Foreman, Safety Consultants Senior Management, Structural Engineers, Safety Consultant & Foreman Managers & Foreman
Low
Low
If structural elements of a building / structure are affected, detailed arrangements should be designed by a Structural Engineer.
Low
PPE Assessments are required to be carried out for persons carrying out demolition / dismantling and strip out works.
Low
Low
14
Careful consideration will be given to operations to ensure that all environmental issues are complied with and that there is the least amount of effect on the environment. Competent persons will carry out Surveys to ascertain whether there are any environmental hazards such as hazardous materials or hazardous contaminations. If environmental hazards are present, competent persons will carry out an Assessment and plan and supervise the works. All persons will be informed of hazards and control measures in the form of Induction and Tool Box Talks, etc.
Low
Low
Low
15
to
Substances Health
Assessments will be carried out for substances that will be used on the project which could be hazardous to health.
Low
COSHH Assessments will be conveyed to persons who are using or come into contact with potentially hazardous substances / processes and that adequate instruction and safeguards are put in place to prevent ill health and hazards. Any potentially hazardous substances will be substituted for safer substances wherever possible.
Low
Senior Management, Site Manager & Contractors On-going. Site Manager & Contractors
Low
16
Housekeeping.
Personnel will be made aware of the importance of the arrangements for housekeeping during Inductions and Safety Tool Box Talks. Personnel will be allocated duties to ensure that welfare facilities are kept clean and arrangements will be planned for sufficient removal of waste from site. All persons will be informed of housekeeping arrangements in the form of Induction and Tool Box Talks, etc.
Low
Low
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 46 of 72
Low
Contracts Manager, Site Manager & Contractors On-going. Contracts Manager, Site Manager & Contractors Site Manager & Contractors Site Manager & Contractors Site Manager & Contractors Site Manager & Contractors Contracts Manager & Safety Consultant Site Manager & Contractors
Low
Low
Low
Low
Low Low
Low
Low
Low
Med Low
Low
Low
Site Personnel Site Manager & Contractors Site Manager & Contractors Site Manager & Contractors
Low Low
Low
Low
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 47 of 72
Low
Contracts Manager, Site Manager & Contractors Site Manager, Contractors & Site Personnel
Low
Low
Gas cylinder storage must comply Manufacturers/Suppliers recommendations. cylinders in use are kept on site.
fully Ensure
with only
Site Manager & Contractors Contracts Manager, Site Manager & Contractors
Before personnel start work. Site Manager & Contractors
Low
Gas appliances will be operated and used in accordance with Manufacturers Guidelines.
Low
21
Biological hazards.
Site personnel will be adequately instructed on biological hazards with regard to risks related to vermin, food hygiene, sharps, etc.
Low
Food preparation and eating areas will be kept hygienically clean and adequate washing facilities made available to personnel. PPE Assessments will be required to be carried out for persons involved in working in the vicinity where biological hazards could be present. 22 Stacking and storage of materials and components. Detailed arrangements for the safe storage and stacking of materials etc., to be made. Personnel will be made aware of the stacking and storage arrangements for site operations. 23 Asbestos. General arrangements covered in the Company Safety Policy Safety Procedures. Refer to Regulations The Asbestos Any works that involves affecting Asbestos Installations must be carried out fully in compliance with The Asbestos Regulations and Local Authority requirements. Particular consideration should be given when working on older properties built prior to the early 70s.
Low Low
Low
Med
HSE Guidance Notes For detailed arrangements with regards to this subject, consult with company Safety Consultants 24 Lone Workers. Lone workers will not be subjected to high risk activities or environments such as working in dangerous structures, working at height and working in confined spaces without other suitable persons being present. Not anticipated for this project. A detailed Method Statement from Contractors will be required with particular regard to protecting persons from falling and excavation support systems. Not anticipated on this project.
Contracts Manager, Site Manager & Contractors Contracts Manager, Site Manager & Contractors
Med
25 26
Underpinning. Excavations.
Low
27
Piling.
Low
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 48 of 72
Explanatory notes for the level of risk: High: Any risk factors which are given this evaluation should be given priority to resolve or to minimize to a lower category of risk using necessary controls. Medium: This risk evaluation is secondary to the higher risk factors, but nevertheless must be resolved to a lower category risk using necessary controls. Low: A low risk evaluation does not mean safe it means the risks have been reduced to the practicable minimum. It will be necessary to ensure all appropriate control measures are in place.
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 49 of 72
July 2011
July 2011
Activity / situation Sect 1. Boiler replacement, forming new access road and site set up. Sect 2. Demolish one temporary double classroom and construct new two storey Extension. Sect 3. Demolish two storey double classrooms and construct new single storey eco building and associated external works, including reconfiguring car parking spaces. classroom
CONTRACTORS
IMPROBABLE
EMPLOYEES
PROBABLE
POSSIBLE
YOUNG PERSONS
VISITORS
REMOTE
PUBLIC
Ref
Med
High
Med
Loading & unloading lorries / vans. Site materials congesting vehicle access.
High
Wheel washing using a jet wash. Hazards associated with high water pressures, flying objects, being crushed by vehicles, slipping and tripping, getting wet and dirty, preventing ice in cold weather. Maintaining and cleaning the roadway / right of way. Hazards associated with mud, slipping and tripping, getting wet and dirty, preventing ice in cold weather.
High
Med
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 50 of 72
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
RESIDUAL RISKS
EXISTING CONTROLS & CONTROL MEASURES SAFE METHOD OF WORK INFORMATION STATEMENT PROCEDURES
The current condition of the roadway. Survey the roadway to determine its structure.
Site Agent & Surveyor Site Agent & Surveyor Senior Management Site Agent and Site Personnel Before the contract starts. Contracts Manager & Site Agent
Low
Survey the roadway for existing services to determine precautionary measures and future connection issues. Roadway access. Refer to Local Authority requirements. Highway Code. Install separate site pedestrian access from vehicle access.
Low
Low
A basic pedestrian plan has been included below which will be adhered to and developed where necessary to safeguard site personnel and visitors from transport entering and leaving site. Pedestrian Plan arrangements to be followed regarding precautionary measures to protect the general public, neighbours and occupiers, etc, as follows:Determine the safest locations within the site to load and unload lorries and prepare in advance of deliveries so that vehicles will not obstruct the public right of way and can pull in off the road immediately. Determine the safe locations to store the materials on site. Check the requirements of the Local Authority with regard to permission and Licences. Ensure that the road is kept clear at all times. Ensure that the roadway and public right of way is kept in good safe condition. Display Caution Site Entrance signs for deliveries. Display Pedestrian Entrance signs indicating pedestrian site entrance at the access point to the site. Where lifting and hyab lorry operations etc., are to be carried out, ensure there are sufficient banksmen deployed to assist. Site Personnel, including delivery drivers are to be made aware of the importance and the arrangements for keeping the roadway / public right of way and the highway free from hazards before any works start and during Induction which may have an effect on the general public. This Pedestrian Plan will be reviewed and developed to ensure that pedestrian safety is maintained at all times. Ensure Danger Keep Out - No Unauthorised Persons signs are displayed on the hoarding / fencing. Ensure that accessways are demarcated clearly and are not unsafely obstructed by works/operations and that storage does not cause an obstruction. Accessways will also be kept in good condition, well illuminated during hours of darkness, firm and without surface trips and slipping hazards. Vehicle & plant movement on site. Minimise the need for site vehicle and plant manoeuvres to prevent the build-up of mud. The use of mobile cranes would minimise the use for site vehicle manoeuvres. Site vehicles and plant will be restricted to clean hard-standing areas on site wherever possible to prevent the need for wheel washing. Only essential vehicles are to be allowed on site. This will also minimise the possibility of mud etc., being transported onto the public highway and right of way. Ensure that difficult lorry manoeuvres are assisted by competent banksmen wearing fluorescent garments and that safe distances are maintained by personnel for lorry manoeuvres. Ensure that transport does not reverse out of the site. Accessways around working areas, due to the location of the works, must be kept clear of any unsafe obstructions.
Low
Low
Site Agent
Low
Site Agent & Site Personnel Site Agent & Site Personnel Site Agent &Site Personnel Site Agent &Site Personnel Site Agent & Site Personnel
COMPLETED
Low Low
Low
Low Low
RESIDUAL RISKS
EXISTING CONTROLS & CONTROL MEASURES SAFE METHOD OF WORK INFORMATION STATEMENT PROCEDURES
Page 51 of 72
Give regular Tool Box Talks to the works personnel with regard to keeping accessways free from unsafe obstructions and arrangements for safeguarding the general public who may wish to use the right of way. Any obstruction of accessways will be removed immediately. Investigate the reasons obstructions occurred and eliminate the problem at source where possible or provide additional provisions to prevent obstruction problems from reoccurring.
Site Agent
Low
Site Agent
Low
Loading and unloading lorries / vans. Refer to the Lorry Manufacturers Handbook.
Ensure that lorries/vans are not overloaded and materials and equipment do not overhang the vehicle. Ensure that the loads are secure and weight is distributed safely in accordance with the design capabilities of the vehicle. To minimise the impact on the road, loading and unloading of lorries and vans etc, will be contained within the site boundaries in designated areas. Check that vehicles are in good safe order and tidy before setting off. Ensure when loading and unloading vehicles that there is sufficient room around the vehicle to prevent cross contamination of risks with other persons, in particular ensure that accessways and working areas are not unsafely obstructed.
Low
Lorry/van Drivers & Site Agent On-going Lorry/van Drivers Lorry/van Drivers & Site Agent
Low
Low Low
Persons operating this equipment must be trained and competent. The area set aside for jet washing will be required to be concrete based with suitable drainage. The wheel washing area must not obstruct vehicle and plant access. For safety reasons the wheel washing area gradient must only be slight so that lorries can park securely without the risk of rolling or creeping occurring. This is important, particularly if it is necessary to work close to the wheels of vehicles. Persons carrying out wheel washing must wear protective wet weather gear, goggles and gloves. Vehicles being jet washed must be turned off and the handbrake applied. If necessary, wheels should be chocked. The wheel washing operatives must check with the lorry drivers that these arrangements have been met prior to starting work. The jet washing operatives are required to keep the jet washing area clean and ensure that the drains are functioning correctly. Jet washing should not be carried out where temperatures are expected to be below freezing point. As a general precaution during the winter months, excess water and mud should be cleared away on a regular basis to prevent slippery ground conditions.
Site Agent Site Agent Site Agent Site Agent, Jet Washing Operative & Lorry Drivers Site Agent Jet Washing Operative & Lorry Drivers Jet Washing Operative Site Agent & Jet Washing Operative
Low Low
Low Low
the
The roadway is to be kept clean from any residue mud / dirt by an operative assigned to this duty. During the winter months severe weather can be expected, particularly with regard to wet and freezing conditions. A quantity of salt and sand should be available to maintain the main access free from ice and snow.
Low Low
Explanatory notes for the level of risk: High: Any risk factors which are given this evaluation should be given priority to resolve or to minimize to a lower category of risk using necessary controls. Medium: This risk evaluation is secondary to the higher risk factors, but nevertheless must be resolved to a lower category risk using necessary controls. Low: A low risk evaluation does not mean safe it means the risks have been reduced to the practicable minimum. It will be necessary to ensure all appropriate control measures are in place.
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 52 of 72
Initial Site set up / Traffic Vulnerable Persons Asbestos Mechanical / Electrical Demolition Works Piling Groundworks & Concrete Frame
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 53 of 72
5.3
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 54 of 72
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 55 of 72
Guidance Note: Site Induction is to include specific Site Safety Rules based upon the Company Health & Safety Policy, the Construction Phase Plan (where applicable), the Risk Assessment and Safe Method of Work Statement for the job and for the Sub-Contractor where applicable, the Fire Plan, COSHH information and any other relevant information which will safeguard site personnel and others who could be affected by site operations. A copy of this Induction Register should be filed on site.
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 56 of 72
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 57 of 72
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 58 of 72
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 59 of 72
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 60 of 72
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 61 of 72
THE HEALTH AND SAFETY FILE The Principal Contractor shall comply with his duties under the Construction (Design and Management) Regulations 2007 and obligations set out in the contract documents to ensure that the CDM Co-ordinator receives all the information required to complete the Health and Safety File within four weeks of the issue of the Certificate of Practical Completion by the Architect/Lead Consultant. The Client requires a four ring binder containing originals or good copies of all documents as detailed plus a CD of the same. The contents of the CD shall be pdf, Word or Excel file format with any scanned documents separately identified. A CD with the entire contents of the Health and Safety File/Operating and Maintenance Manuals as a single document will be unacceptable. Operation and Maintenance Manuals must be available before the building is handed over to the Client. The information compiled by the Principal Contractor for the Health and Safety File needs to include any items that will assist anyone carrying out construction work, maintenance to the structure after completion of the current project and/or demolition of the structure at the end of its life and may include some of all of the following:Model Contents of the Health and Safety File
o Commencement and completion dates o A brief description of the work carried out. o Names and addresses of sub-contractors and suppliers and the relevant work packages undertaken. o General details of the construction methods and materials used. o Key structural principles (for example, bracing, sources of substantial stored energy - including pre- or post-tensioned members) and safe working loads for floors and roofs, particularly where these may preclude placing scaffolding or heavy machinery there. o Any residual hazards which remain and how they have been dealt with (for example surveys or other information concerning asbestos, contaminated land, water bearing strata, buried services, etc). o Hazardous materials used (for example lead paint, pesticides, special coatings which should not be burnt off, etc). o Information regarding the removal or dismantling of installed plant and equipment (for example any special arrangements for lifting, order or other special instructions for dismantling, etc).
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 62 of 72
o Health and safety information about equipment provided for cleaning or maintaining the structure. o Details of the structures internal equipment and maintenance facilities. o Manuals produced by specialist sub-contractors and suppliers which outline operating and maintenance procedures and schedules for plant and equipment installed as part of the structure. o The nature, location and markings of significant utilities services, including underground cables, gas supply equipment, fire-fighting services, etc. and details of any new or existing incoming services. o Record or and as-built drawings of the structure, its plant and equipment (for example, the means of safe access to and from service voids, fire doors and compartmentalisation, etc.) produced throughout the construction process along with the related design criteria. o Inspection, installation and test certificates and commissioning test results. o The CDM Co-ordinator may ask for permission to audit this material and system at any time during the construction phase and such permission is not to be unreasonably withheld. o On larger and more complex projects, this information is to be forwarded to the CDM Co-ordinator on completion of the work stages or elements.
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 63 of 72
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 64 of 72
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 65 of 72
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 66 of 72
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 67 of 72
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 68 of 72
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 69 of 72
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 70 of 72
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 71 of 72
Kind & Company (Builders) Limited, Bridge House, 530 High Road, Leytonstone, London E11 3EQ.
Page 72 of 72