---------------TECHBRO ENGINEERING SOLUTIONS PVT LTD ---------------
www.techbrosolutions.net
Name: S. Karthigai Priyanga
Designation: Civil & Structural Engineering
Total years of Experience: 3.5
Relevant Experience
PROFILE SUMMARY
Specializing in the design and analysis of steel structures, including pipe racks ,platform, walkway
supports and technical building. Proficient in using STAAD.Pro, IDEA StatiCa, RAM Connection, and
Hilti Profits for design calculations. Experienced in collaborating with stakeholders, ensuring quality
through reviews, and delivering projects on time. Familiar with key design codes (American,
European, Indian) and skilled in Tekla and Navis works for seamless multidisciplinary project
coordination.
EDUCATION
Year Qualification Institution %/CGPA
Bachelor of Mepco Schlenk
Engineering-CIVIL Engineering
2017 –2021 93%
College, Sivakasi.
Noble Matric
2013 HSC School, 94.4%
Virudhunagar.
SOFTWARE KNOWN
● Staad.pro
● Ram connection
● Idea statica
● MS Excel
● Auto CAD
● E tabs(basic)
● Revit (basic)
---------------TECHBRO ENGINEERING SOLUTIONS PVT LTD ---------------
www.techbrosolutions.net
EXPERIENCE SUMMARY
Duration Company Name Designation
July 2021 – present Techbro engineering Civil & structural
solutions engineer
WORK EXPERIENCE
PROJECT: SHELL FUEL STATION, TRICHY
CLIENT: SHELL INDIA MARKET PVT. LTD.
Proficient in AutoCAD and STAAD.Pro for drafting and structural design.
Analyzed and designed canopy, Shell Select store, and equipment supports.
Modeled steel and concrete structures for canopy and building design.
Applied Indian codes and standards for structural design.
PROJECT: INTEGRATED SOLID WASTE MANAGEMENT (ISWM),
BANGALORE
CLIENT: NEXUS NOVUS
Drafted reinforcement details for settling, sludge, and mixing tanks.
Utilized AutoCAD and STAAD.Pro for structural modeling and design.
PROJECT: HYD-111, HYDERABAD
CLIENT: AECOM
Designed secondary structures, including wall panels, axial fans, and bus duct
supports.
Used IDEA-Statica and Excel for simple connection designs.
Prepared and submitted design calculation reports to the client.
Knowledgeable in Indian codes and standards.
PROJECT: BIJAR DRI PLANT-FURNACE, IRAN
CLIENT: DRI TECH
Analyzed and designed furnace steel structures supporting the top gas scrubber, shaft
furnace, and cooling gas scrubber using STAAD.Pro.
Planned steel member arrangements and provided foundation load data for
substructure design.
Designed base plates using IDEA-Statica and adhered to Iranian codes and standards.
PROJECT: DRI PLANT-DS UNIT, SOHAR, OMAN
CLIENT: DRI TECH
Analyzed and designed desulphurization plant structure supporting three vessels using
STAAD.Pro.
---------------TECHBRO ENGINEERING SOLUTIONS PVT LTD ---------------
www.techbrosolutions.net
Prepared wind load and load combination calculations.
Designed connections and base plates using RAM connection and coordinated with
detailers for detailed drawings.
Followed American and UBC codes and standards.
PROJECT: PIPERACK – ABU DHABI, UAE
CLIENT: KANOO ENERGY
Analyzed and designed pipe rack steel structure for boiler feedwater and saturated
steam lines.
Provided foundation load data for substructure design and coordinated with detailers
for connection design and base plates.
Submitted design calculation reports for loading and connections.
Knowledgeable in American codes and standards.
PROJECT: CMRL-OPERATING CONTROL CENTER BUILDING
CLIENT: CHENNAI METRO RAIL LIMITED
Supported primary loading calculations and prepared wind load and load combination
calculations as per design basis report.
Applied Indian codes and standards for structural design.
PROJECT: HOT HP SEPARATOR (1520-D-005) REPLACEMENT AT RRW
CLIENT: ALNASR
Designed structural support for the replacement of the Hot HP Separator, ensuring
compliance with project specifications and safety standards.
PROJECT: FGD SYSTEM PACKAGE FOR GADARWARA SUPER THERMAL
POWER PROJECT STAGE – I (2 X 800 MW)
CLIENT: ISGEC HEAVY ENGINEERING LIMITED
Performed structural analysis using STAAD.Pro under various load conditions and
seismic events for the FGD system.
PROJECT: 22 TPD CBG PLANT_H2S SCRUBBER
CLIENT: ECOFINITY SOLUTIONS PVT. LTD.
Designed and analyzed the H2S scrubber system for a 22 TPD Compressed Biogas
(CBG) plant.
Collaborated with the process engineering team to align structural and operational
requirements.
PROJECT: DRI FURNACE - STEEL PLANT
CLIENT: ENTER ENGINEERING
Analyzed and designed furnace steel structure supporting the top gas scrubber, shaft
furnace, and cooling gas scrubber.
---------------TECHBRO ENGINEERING SOLUTIONS PVT LTD ---------------
www.techbrosolutions.net
Coordinated with stakeholders to ensure accurate and efficient designs.
Conducted self-reviews and peer reviews to maintain high standards of
documentation.
Delivered quality designs on time and ensured up-to-date project documentation.
PROJECT: REFRIGERATION SYSTEM AND FEEDSTOCK PURIFICATION
CLIENT: THYSSENKRUPP
Led the design and structural analysis of refrigeration and feedstock purification
systems.
Ensured all components could withstand load and performed detailed design
calculations according to Indian codes.
PERSONAL DETAILS
Languages Known: English, Tamil
Certifications: -