DAILY NIGHT WORK CHECKLIST
Project Name STATE BANK PMC MACC
TAWDWAL TOWER
CSC KAFD-TWADWAL Contractor HESCO
TOWER (9th) FLOOR
Date 04/02/2024 Manpower 20
General Requirements
Sr.No Description Yes No N/A Comments
Night Work Permit Approved by all stakeholders.
01 MACC/PMC/ CSC. And available at site
02 All on going Activities mentioned in Approved
Night work Permit
03 First aider ratio is maintained as per MACC
requirements 1:50
04 Contractor Safety Coverage are provided.
05 Safety officer Ratio Maintained as per DGCL
requirements 1:50
06 Contractor Safety Coverage are provided.
07 Emergency response team/arrangements are
provided on site
08 Dedicated ambulance and Paramedic available
at site
09 Are the main access and egress ways area lighted,
are of good standard and free of materials?
10 Are there adequate welfare facilities available,
i.e., toilet, rest shelter, water?
11 Are emergency procedures, i.e., evacuation &
emergency numbers, discussed with workers on
first night of work in the first tool-box-talk,
before work commences?
12 Are the work areas properly marked for night
work i.e, excavations barricaded with flashing
lights?
13 Are all points of exit, pedestrian pathways, and
muster points shall be clearly illuminated and
marked?
14 Are the sufficient number of tower lights and
flood lights provided at the work location?
15 Is there an adequate lighting in work areas of at
least 85lux? Test result be attached for all work
areas.
16 Are there traffic controllers/flagmen at size
with lighted batons at the work site?
17 Are the traffic cone with reflective tape
provided to identify and isolate heavy
equipment/parking operating area?
18 Are everyone at night shift using high-
visibility safety vest?
19 Is there an adequate supervision available
at all time during the work at night?
20 is stand by electrician available?
21 Are the workers wearing reflective vest or
coverall with reflective bond?
Contractor HSE Representative Name and Contractor HSE Representative Name and
Signature Signature