PMEGP Financial Assistance Application
PMEGP Financial Assistance Application
I certify that all information furnished by me is true; and that I and any of my dependent have not
borrowed any money under subsidy linked scheme from any Central / State Government or bank for
establishing any such project
Place:
Date: Signature of the Applicant
For Official Use only: (Rejected / to be placed before District Task force Committee)
Reason (if Rejected):
4 Qualification
Academic Technical
Graduate M Tech Polymer Engineering
Manu-
Whether the Service
6
project (mark √)
facturing √ Unit
Unit
8 Name of the project / business activity proposed :
KOLEKAR ENGINEERS
Legal Status:
BUILDING DETAILS
Particulars Area Rate/[Link] Amount in Rs.
WORKSHOP 2500 500.00 1250000.00
OFFICE 250 800.00 200000.00
Washroom 50 1000.00 50000.00
0.00
0.00
0.00
0.00
MACHINERY DETAILS
Particulars Qty. Rate Amount in Rs.
12" lathe machine 1 250000.00 250000.00
Drilling macine 1" radial 1 100000.00 100000.00
Welding machine Electrical 400Amp 1 50000.00 50000.00 Mal
Welding machine Elctronic 200 amp 1 25000.00 25000.00
Slotting machine 1 50000.00 50000.00
Plastic Extrusion machine 1 750000.00 750000.00 KVI
Plastics Mixers 2 100000.00 200000.00
Grinders 2 75000.00 150000.00 DIC
Agglomerator 2 100000.00 200000.00
Other machines, hand grinder, cutter etc 10 5000.00 50000.00
0.00 Rur
0.00
Total 1825000.00 No
f. Contingency/Others/Miscellaneous 50000.00
DETAILS OF SALES Ow
Rate/ Qantity Amount in Rs.
Particulars of Products
Unit
Plastics Extrusion Machine 700000 5 3500000.00
Plastics Mixers 75000 15 1125000.00
Grinders 70000 15 1050000.00
Agglomerator 125000 10 1250000.00
Granule cutters 35000 20 700000.00
Agricultural machines 40000 50 2000000.00
0.00
Total 9625000.00
RAW MATERIALS
Particulars Unit Rate/Unit Reqd. Unit Amount In Rs.
Metal Sheets 2mm to 15 mm 8000 55.00 8000 440000.00
MS angles 1" to 4 " 8000 40.00 8000 320000.00
EN 24, EN41 Pipes and BAR 10000 120.00 10000 1200000.00
Lathe machine tools 500 100.00 500 50000.00
Grinding wheels etc 500 35.00 500 17500.00
Welding Rod packets 500 300.00 500 150000.00
Electrical Motors 1 hp to 40 hp 30 25000.00 30 750000.00
Gearboxes helical 120 CD to 225 CD 20 70000.00 20 1400000.00
Other miscellenius 5 40000.00 5 200000.00
Total . 4527500.00
WAGES
No. of Wages Per Month Amount in Rs.
Particulars
Worker Total Month 12
Turner 2 10000.00 240000.00
Welder 1 10000.00 120000.00
Helper 3 8000.00 288000.00
machine Operator 1 10000.00 120000.00
0.00
0.00
0.00
Total 7 768000.00
SALARY DETAILS
No. of Wages Per Month Amount in Rs.
Particulars
Staff Total Month 12
Manager 1 12000.00 144000.00
Supervisor 1 8000.00 96000.00
Sales Executive 1 12000.00 144000.00
Office Boy 1 6000.00 72000.00
Accountant 1 7000.00 84000.00
Total 5 540000.00
Stock in process 20
Finished goods 20
Receivable by 10
POWER ESTIMATE
Power Requirement 25
Depreciation
On Building 5.00%
On Machinery 10.00%
INTRODUCTION
The proposed project is for establishment of an industrial unit for manufacture of Plastics
processing machines such as Extruder, mixer, agglomerator, Grinder etc as well as
Agricultural machine. Now a dasy processing machines fo plastics is fast groving industry.
There are very few manufacturer in this field and there is market throughout india as well as in
abroad. There are lot opportunities to export these machines in developing countries. The
manufacturing of proposed products involve various manufacturing processes like cutting of
steel sections, fabrication, welding, drilling, turning making sub assemblies, fitting & final
assembly etc where steel sections & other
parts/components like tynes, springs & fasteners be out sourced & purchased as per
own design & specifications. The manufacturing also involves inspections at various stages till
they are finally assembled & packed as per their Quality assurance standards/plans.
The plan will conceive and developed by this individual, with the intent to apply his extensive
experience, education and contacts in the industry to building a successful profitable corporation.
PROJECT AT A GLANCE - TOP SHEET
1 Name of the Entreprenuer ANIL DHONDIRAM KOLEKAR
8 Debt Service :
Coverage Ratio
10 Project : 0 Months
Implementation
Period
12 Employment : 12
13 Power Requirement : 25
14 Major Raw materials : Metal Sheets 2mm to 15 mm ,MS angles 1" to 4 ",EN 24, EN41 Pipes and
The proposed project is for establishment of an industrial unit for manufacture of Plastics processing
machines such as Extruder, mixer, agglomerator, Grinder etc as well as Agricultural machine. Now a dasy
processing machines fo plastics is fast groving industry. There are very few manufacturer in this field and
there is market throughout india as well as in abroad. There are lot opportunities to export these
machines in developing countries. The manufacturing of proposed products involve various
manufacturing processes like cutting of steel sections, fabrication, welding, drilling, turning making sub
assemblies, fitting & final assembly etc where steel sections & other
parts/components like tynes, springs & fasteners be out sourced & purchased as per
own design & specifications. The manufacturing also involves inspections at various stages till they are
finally assembled & packed as per their Quality assurance standards/plans.
Er. Anil D. Kolekar who is the proposed director of the operating entity. Mr. Anil holds bachelor degree in
B. Tech chemical (Plastics) & Master Degree in M. Tech Polymer Engineering from world’s reputed
institute, ICT (formerly UDCT) Mumbai. He has total 4 years of experience after graduation out of which
he has worked as a research engineer in Mumbai India & 2 years as a process research engineer in KSA
for American company. After gaining experince abroad has gained experience in operation &
maintenance of Plastics processing machineries.
The plan will conceive and developed by this individual, with the intent to apply his extensive experience,
education and contacts in the industry to building a successful profitable corporation.
3 COST OF PROJECT
A. Fixed Capital Investment
a. Land : 5000 Own
Margin Money Subsidy received will be kept in term deposit as per norms of
CMEGP in the name of Beneficiary for three years in the financing branch.
3.2 STATEMENT SHOWING THE REPAYMENT OF TERM LOAN & WORKING CAPITAL :
TERM LOAN
Interest @
Year Opening Balance Installment Closing Balance
10.50%
1st 3150000 0 3150000 330750
2nd 3150000 630000 2520000 330750
3rd 2520000 630000 1890000 264600
4th 1890000 630000 1260000 198450
5th 1260000 630000 630000 132300
6th 630000 630000 0 66150
7th 0 0 0 0
8th 0 0 0 0
WORKING CAPITAL
Interest @
Year Opening Balance Installment Closing Balance
10.50%
1st 1349442 0 1349442 141691
2nd 1349442 269888 1079554 141691
3rd 1079554 269888 809665 113353
4th 809665 269888 539777 85015
5th 539777 269888 269888 56677
6th 269888 269888 0 28338
7th 0 0 0 0
8th 0 0 0 0
5 Rawmaterials :
Particulars Unit Rate/unit [Link] Amount in Rs.
Metal Sheets 2mm to 15 mm 8000 55.00 8000 440000.00
MS angles 1" to 4 " 8000 40.00 8000 320000.00
EN 24, EN41 Pipes and BAR 10000 120.00 10000 1200000.00
Lathe machine tools 500 100.00 500 50000.00
Grinding wheels etc 500 35.00 500 17500.00
Welding Rod packets 500 300.00 500 150000.00
Electrical Motors 1 hp to 40 hp 30 25000.00 30 750000.00
Gearboxes helical 120 CD to 225 20 70000.00 20 1400000.00
Other miscellenius 5 40000.00 5 200000.00
Total 4527500.00
5.1 Wages :
No. of Wages Amount in Rs.
Particulars Worker Per Month (Per Annum)
Turner 2 10000.00 240000.00
Welder 1 10000.00 120000.00
Helper 3 8000.00 288000.00
machine Operator 1 10000.00 120000.00
0 0 0.00 0.00
0 0 0.00 0.00
0 0 0.00 0.00
Total 7 768000.00
6 Administrative Expenses :
6.1 Salary
Manager 1 12000.00 144000.00
Supervisor 1 8000.00 96000.00
Sales Executive 1 12000.00 144000.00
1 6000.00 72000.00
1 7000.00 84000.00
Total 5 540000.00
Manufacturing Expenses
Raw Material 4527500.00
Wages 768000.00
Repair & Maintenance 96250.00
Power & Fuel 481250.00
Other Overhead Expenses 19250.00
Affix latest
attested
Photograph
District : Miraj
Pin: 416406 State: #REF!
Phone #REF!
E-Mail #REF!
8.1 How the activity was financed so far : ( To be filled up in case of existining unit Only )
*Source of Funds Security Rate of Repayment per Present O/s Amount of Default
Interest Month ( Rs. in '000 ) (if any)
9 Project Details for Proposed New Unit : Copy of detailed project report is enclosed.
a Expansion / Mordenisation :
9.1 Capacity (Furnish the details of Installed capacity & production : (No. in Units/ Qty. in Kg./Volume in liter per annum)
Capacity is arrived at on the basis of Days working on shift basis
Product & Present Installed Maximum Prod. Proposed Installed Maximum Prod.
By-product if any Capacity Achieved Capacity of 1st Year envisaged
70.00% 4382075
Administrative Manpower
Accounting personnel
Ancillary Building
Storage
9.9 Plant and Machinery Existing (Value in Rs.) Proposed (Value in Rs.)
Indigenous 1825000.00
Imported
Total 0.00
9.11 Utilities (Furnish details on requirement, availability, adequacy, qualitative aspects etc..)
Particulars of Utilities Contracted Load Connected Load Further requirement
in HP/KW/W in HP/KW/W in HP/KW/W
Power
Water
Fuel
Others (Specify)
9.12 Environment Aspect of the Project :
J Provision for
1. Buildings 0.00
2. Plant & Machinery 0.00
3. Other Fixed Assets 0.00
B Reserves 0.00
F Subsidy
Central Government 1249845.00 1249845.00
State Government 0.00
14 Projected Cash flow Statement : Projected Cash flow Statement given in the
Detailed Project Report.
3. Occupation :
4. Details of movable & immovable
properties owned by him /her/other
family members
18 Government Consents :
(Give deatails of various licenses / consents required to be obtained from various authorities for the proposed project)
19 DECLARATION
I / We hereby declare that the information given herein before and the statements and other
papers enclosed are, to the best of our knowledge and belief, true and correct in all particulars
Prepared By:
#REF!
District Industries Center
#REF!
#REF!
#REF! State: #REF!
e-Mail:
Ph. No.: Fax: