0% found this document useful (0 votes)
597 views2 pages

Gate Installation Contract

This contract, made on June 3, 2022, between VEAM Metalworks and Mr. John Rey Sadio, outlines the fabrication and installation of a metal gate for a total cost of Php 90,000. The project includes specific tasks such as mobilization, installation, and application of primer paint, with a payment structure of 50% downpayment and 50% upon completion, and a duration of 10 days. The agreement is binding and can only be modified in writing with signatures from both parties.

Uploaded by

Melvin Ambrosio
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
597 views2 pages

Gate Installation Contract

This contract, made on June 3, 2022, between VEAM Metalworks and Mr. John Rey Sadio, outlines the fabrication and installation of a metal gate for a total cost of Php 90,000. The project includes specific tasks such as mobilization, installation, and application of primer paint, with a payment structure of 50% downpayment and 50% upon completion, and a duration of 10 days. The agreement is binding and can only be modified in writing with signatures from both parties.

Uploaded by

Melvin Ambrosio
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

VEAM Metalworks

646 Zamora St., Paliwas, Obando, Bulacan | 0936-7173319 / 0961-7828772

CONTRACT

This agreement is made on June 3, 2022

BETWEEN

1. VEAM Metalworks (First party)


2. Mr. John Rey Sadio (Second Party)

AGREEMENTS
In consideration of the mutual agreements and covenants contained herein for
the fabrication and installation of a metal gate, the first party and the second party agree
as follows:

1. Project Cost
Fabrication and installation of a metal gate with a total cost of Php
90,000.00

2. Scope of Work (First Party)


a. Fabrication of metal gate
b. Mobilization
c. Installation of metal gate
d. Application of primer paint
e. Demobilization

3. Materials
a. Specifications will be followed accordingly to the attached layout given by
the second party.

4. Payment Terms (Second Party)


a. 50% Downpayment
b. Remaining 50% upon completion

5. Project Duration
VEAM Metalworks
646 Zamora St., Paliwas, Obando, Bulacan | 0936-7173319 / 0961-7828772
a. Duration of 10 days

This contract and its agreements may not be modified in any manner unless in
writing and signed by both parties. This document hereto constitutes the entire
agreement between the parties. This contract shall be binding upon the parties and
shall be enforced under the laws of the Philippine Constitution.

Signed:

______________________________ _______________________________
Cecilia Palogan John Ray Sadio
VEAM Metalworks - Project Coordinator Client

______________________________
Melvin and Aileen Ambrosio
VEAM Metalworks - Owner

You might also like