WBS Template

WBS Estimate Revision History


Date Version No Change Description Change done by Reviewed by Approved by

HCLT Confidential

1 of 2

PLCT004_2.4

WBS Template

Effort Estimation Sheet WBS Method


Project Name Project Code Date Estimation Done by Reviewed By Phase Brief description about Project

Project Details
Life cycle Phases (Tick all Relevant Ones) Requirements Module Testing CR Expectations Reusability expectations Other Details (please explain other details in full) Stable Customer Projects HCL Projects System Analysis Specification Integration User documentation Minor Use of Reuse Components: Design Maintenance Coding All Major New Development

Effort Estimation Details


Activities / Components Effort (Hrs) Remarks

Project Management Planning & Scheduling Quality Control Weekly meetings Project Management Review Module / Sub-system I SRS HLD ERS DD (Detailed Design) Coding Testing 1.1 Basis of Estimation <Describe the estimation basis here which includes, productivity, task wise efforts, work product size etc. While estimating the SBR needs to be referred. Give details of the reference project/sub-systems that are considered during this estimation. Give details about the Reusability expectations taken into consideration while arriving at the effort estimation> 1.2 Assumptions <List down all the assumptions that are made in the effort estimation process. The assumptions may include information on dependency on development environment, dependency on reused software, etc.>

1.3 Estimation Related Risks <List down any Risks associated with the estimation process. For example, when estimation is being carried out for a new technology area with no prior data> 1.4 Contingency <Mention the contingency effort as % of the overall effort> 1.5 Summary
Description Project Effort Contingency TOTAL Effort Effort (person weeks / person months)