You are on page 1of 2

Qchem/RLOC JOB SAFETY

Furnace Radiant Coils Replacement


Document No : FLQ-QCHEM-JSA-001 Rev 0
Date:

Activity (and main steps): Preparation works, Blinding, Opening coil man ways, Coil cutting replacement, Coil welding on top and bottom(support leg welding), Final Box up, Deblinding and removal of tools and equipment. ACTIVITY/ TASK Potential Hazard Effect
Hazard description & effects Who & what might be harmed

Risk Evaluation
conse quenc e prob abilit y Risk Rati ng

Control Measures
Control measures and or/ Recovery measures

Residual Risk
conse quenc e Prob abilit y Risk Ratin g

For blinding.***

Use of tool kit box for proper storage on a platform. User to inspect the tools for any defective material prior to the job. Use of hand gloves and proper PPEs Full body safety harness with double lanyard to be used while dismantling the handrails and for all jobs performed on the incomplete platform Working people and nearby 1 B M Use of proper dust mask and proper eye protection Store all removed insulation in appropriate bags. Blinding location to be verified with the approved LOTO and blind list by the blind tags with operator and lead worker should show the blind location to the work crew and to be present while the crew opening the flange. Revalidate blinding and LOTO list with crew during shift changeover. Hand wont be used as a tools/holder Hammer and spanner tie with rope during the hammering 1 A L

B. Blinding 1. Removal of insulation surround the flanges Flying insulation materials during blinding and de blinding,

2. Unbolting the flange using hammer wrench. And insulation of proper blind

Blinding wrong location/ missing energy sources Falling tools Pinch point

Working people

Consequences: 1, 2, 3 (From Low to High); L.M.H (From Low to High) MQSE 9-41-13A_ Rev0_05.03.09

Probability: A, B, C (From Low to High) Page: 1 of 5

Risk rating:

Qchem/RLOC JOB SAFETY

Furnace Radiant Coils Replacement


Document No : FLQ-QCHEM-JSA-001 Rev 0
Date:

Activity (and main steps): Preparation works, Blinding, Opening coil man ways, Coil cutting replacement, Coil welding on top and bottom(support leg welding), Final Box up, Deblinding and removal of tools and equipment. ACTIVITY/ TASK Potential Hazard Effect
Hazard description & effects Who & what might be harmed

Risk Evaluation
conse quenc e prob abilit y Risk Rati ng

Control Measures
Control measures and or/ Recovery measures

Residual Risk
conse quenc e Prob abilit y Risk Ratin g

Hazard Specific Additional PPE: Goggles Face Shield Welding glass Chemical Suit Disposable Coveralls Thermal Radiation Suit (Aluminized Suit) Dust Mask Respirator Air Line (Supplied Air) SCBA Half Face Full Face Other PPE or Equipment

Cartridge Type_ _ _ _ _ _ _ _ _

Consequences: 1, 2, 3 (From Low to High); L.M.H (From Low to High) MQSE 9-41-13A_ Rev0_05.03.09

Probability: A, B, C (From Low to High) Page: 2 of 5

Risk rating: