Echnical Offer

This technical proposal outlines PACT Engineering's design and supply of a water treatment plant utilizing reverse osmosis technology for Serage Construction & Oilfield Service at the Abu Attifel Field in Libya. The project aims to produce cooling tower make-up water and drinking water, with specific requirements for water quality and treatment processes. PACT Engineering emphasizes its expertise in water and wastewater treatment, offering comprehensive operation and maintenance services to ensure optimal plant performance.

Uploaded by

Mora
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
82 views44 pages

Echnical Offer

This technical proposal outlines PACT Engineering's design and supply of a water treatment plant utilizing reverse osmosis technology for Serage Construction & Oilfield Service at the Abu Attifel Field in Libya. The project aims to produce cooling tower make-up water and drinking water, with specific requirements for water quality and treatment processes. PACT Engineering emphasizes its expertise in water and wastewater treatment, offering comprehensive operation and maintenance services to ensure optimal plant performance.

Uploaded by

Mora
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd

INDUSTRIAL AND MUNICIPAL WATER AND

WASTEWATER TREATMENT

TECHNICAL PROPOSAL
WATER TREATMENT PLANT
REVERSE OSMOSIS TECHNOLOGY

Prepared For: Serage Construction & Oilfield Service

RFQ Ref: UTC-999-ABU-22


Project Name: Provision of new Water Treatment Plants Project at Abu Attifel Field

End User M/s Mellitah Oil & Gas B.V. (Libyan Branch)
Location: Libya
INDUSTRIAL AND MUNICIPAL WATER AND WASTEWATER
TREATMENT

Pact Ref. : 231216


Date : 1st May 2024

M/s Serage Construction & Oilfield Service

Attention : Mohamed Mukhtar - Managing Director


Subject : Technical Proposal for Design and Supply of Water Treatment Plant

Dear Sir,

Thank you for considering PACT Engineering in this Tender.

Please find attached our competitive technical proposal in line with received Tender documents.
We hope it meets your expectations in technical aspects of the project.

Should you need any further clarification please feel free to contact us any time.

For and on Behalf of


PACT ENGINEERING FZC

Table of Contents
SECTION 1 : PACT INTRODUCTION......................................................................................................................4
1.1. OUR AREAS OF EXPERTISE:.......................................................................................................................5

PACT REF: 231216 PLANT: WATER TREATMENT PLANT LOCATION: LIBYA DATE: 01/05/2024
Page 2 of 44
INDUSTRIAL AND MUNICIPAL WATER AND WASTEWATER
TREATMENT

WATER TREATMENT.........................................................................................................................................5
WASTEWATER TREATMENT.............................................................................................................................6
1.2. OUR SERVICES:.........................................................................................................................................7
PACT OPERATION & MAINTENANCE SERVICES................................................................................................7
PACT O&M TEAM PLANT MONITORING...........................................................................................................8
SPARE PARTS SERVICE......................................................................................................................................8
CHEMICALS SERVICE........................................................................................................................................8
SECTION 2 : IMPORTANT NOTES..........................................................................................................................9
SECTION 3 : DESIGN BASIS..................................................................................................................................10
SECTION 4 : SCOPE MATRIX................................................................................................................................12
4.1. NGL PLANT.............................................................................................................................................12
4.2. OIL CENTER............................................................................................................................................15
4.3. COMMON..............................................................................................................................................19
4.4. SITE SURVEY...........................................................................................................................................20
4.5. DESIGN AND ENGINEERING...................................................................................................................21
SECTION 5 : SCOPE OF SUPPLY..........................................................................................................................24
5.1. SCOPE OF SUPPLY FOR PACKAGE-A, NGL PLANT: (2 X 50% OR 2 DUTY).................................................24
5.2. SCOPE OF SUPPLY FOR PACKAGE-B, OIL CENTER: (2 X 50% OR 2 DUTY)................................................30
SECTION 6 : EQUIPMENT MAKES AND ORIGIN...................................................................................................37
SECTION 7 : LIST OF TERMINATION / TIE-IN POINTS..........................................................................................38
7.1. TIE-IN POINTS FOR NGL PLANT (PACKAGE-A):........................................................................................38
7.2. TIE-IN POINTS FOR OIL CENTER (PACKAGE-B):.......................................................................................39
SECTION 8 : POWER CONSUMPTION..................................................................................................................40
8.1. PRELIMINARY POWER CONSUMPTION FOR NGL PLANT (PACKAGE-A):.................................................40
8.2. PRELIMINARY POWER CONSUMPTION FOR OIL CENTER (PACKAGE-B):................................................41
SECTION 9 : CHEMICALS CONSUMPTION...........................................................................................................42
9.1. PRELIMINARY ONE (1) YEAR CHEMICAL CONSUMPTION FOR NGL PLANT (PACKAGE-A):......................42
9.2. PRELIMINARY ONE (1) YEAR CHEMICAL CONSUMPTION FOR OIL CENTER (PACKAGE-B):.....................42
SECTION 10 : SPARE PARTS..................................................................................................................................43
10.1. SPARE PARTS FOR START – UP & COMMISSIONING...............................................................................43
10.2. RECOMMENDED SPARE LIST FOR 2 YEARS OPERATION.........................................................................43

SECTION 1 : PACT INTRODUCTION

We take this pleasure introducing PACT® Team, an integrated solution provider


specialized in Water and Wastewater Treatment applications. We provide feasible
solutions in line with proper control cost of plant and operation for expected products
quality.

PACT REF: 231216 PLANT: WATER TREATMENT PLANT LOCATION: LIBYA DATE: 01/05/2024
Page 3 of 44
INDUSTRIAL AND MUNICIPAL WATER AND WASTEWATER
TREATMENT

“Demonstrated Water-Wise”
Custom Built Operator Friendly Plants, Engineering to Latest
Technology,
Designed for Durability, Mineral Upkeep & Lowest Capital Outlay

PACT® and its affiliates are operating through their offices in USA, Europe & Middle East.
The offices are providing wide range of services of integrating R&N to estimation and
design; detail engineering and souring; production and fabrication of to be pre-assembled
units; site erection and operation by PACT® team for its plants and even other existing
plants. Modern fabrication facilities housing for Profile Cutting Machines, Welding TIG, MIG,
CO2, Lathe, Milling Machine, Hydraulic Iron Worker, Portable certified 7T crane. With the
state-of-the-art facilities for fabrication and machining, PACT has become recognized
leading fabricator of Water Treatment Plants in UAE.

We ensure complete customer satisfaction with its in-house physical testing facilities and
a dedicated HSE & Quality Control team prior to dispatch the system to site in presence of
client and /or its third party nominated inspector.

The fabrication methods, procedures and processes comply with the highest standards,
governed by international norms prevailing in this sector of business. We also ensure
complete safety of operating personnel and an environmentally friendly operation.

PACT® has built a successful compendium at large municipal and industrial application
but not limited to, Water treatment technology using Ultra filtration, Reverse Osmosis, and
Ion-Exchange and Wastewater Treatment technology such as extended aeration,
Activated Sludge, MBR, MBBR, SBR, Liquid and Gas Chlorination Dosing system, UV,
Ozonation, and Membrane Separation.

We have bounded ourselves to establish and maintain fruitful relation with our clients in
governmental and private section.

We have served wide range of industries such as Fine Chemical; Petrochemical,


Pharmaceutical, steel and semiconductor, Car and Car-Parts, Food & beverage throughout
known names such as Bechtel, Chevron, PepsiCo, Bayer, Shell, Krupp, Coca Cola, GE, BP,
Apple, Rolls-Royce and many others. You can trust that we can be your

Solutions provider: Re-using the Wastewater &


Keeping the Freshwater hereafter.
1.1. OUR AREAS OF EXPERTISE:
WATER TREATMENT
 Removing Suspended Solids

PACT REF: 231216 PLANT: WATER TREATMENT PLANT LOCATION: LIBYA DATE: 01/05/2024
Page 4 of 44
INDUSTRIAL AND MUNICIPAL WATER AND WASTEWATER
TREATMENT

Conventional
 Screening
 Clarification
 Filtration (Gravity & Pressurised)

Advanced
Ultra-Filtration

 Softening
 Nano filtration
 Ion exchanger

 Desalination
 Nano filtration
 Reverse Osmosis
o Brackish water, Sea Water, brine
recovery, Treated Sewage or treated
wastewater.
o Single pass, two pass and three pass
for arsenic removal.
o Pre-assembled:
 Containerised
 Skid mounted.
 Multi skids or containers

 Condensate polishing

 Cooling tower
 Filtration
 Blow-down recovery

 Demineralization

PACT REF: 231216 PLANT: WATER TREATMENT PLANT LOCATION: LIBYA DATE: 01/05/2024
Page 5 of 44
INDUSTRIAL AND MUNICIPAL WATER AND WASTEWATER
TREATMENT

Conventional
 Double bed ion exchanger.
 Mixed bed Ion exchanger.
 Double bed followed by mixed bed (for
brackish water)
 Single pass or two pass R/O with Mixed
bed R/O
 (For seawater and or high brackish)
Advanced
 R/O followed by EDI system

WASTEWATER TREATMENT
 Sewage
Treatment
 MBBR
 MBR
 SBR
 SAF
 Extended aeration

 Industrial wastewater
 Advanced Oxidation
process – Ozone,
Fenton’s reagent
 Oil removal
packages- API, CPI,
DAF, Coalescence
filters
 Electro coagulation
 Odour control
system

PACT REF: 231216 PLANT: WATER TREATMENT PLANT LOCATION: LIBYA DATE: 01/05/2024
Page 6 of 44
INDUSTRIAL AND MUNICIPAL WATER AND WASTEWATER
TREATMENT

1.2. OUR SERVICES:

PACT OPERATION & MAINTENANCE SERVICES

In order to complete PACT® services, we have developed through the years a highly trained team of engineers,
technicians and operators who are capable of commissioning, start-up & operation & maintenance to the
clients. The same team are responsible and liable to provide after-sales services. PACT® has a long track record
of successful operation and maintenance management of water and Wastewater treatment plants around the
world. PACT also offers the same services for plants that are supplied by others, ensuring optimized plant
operation that delivers high quality products at a lower operational cost.

PACT® Engineering O&M department manage and maintain full plant responsibility through a dedicated team of
qualified and experienced personnel that offer:

 Site inspection, generating status reports.


 Detailed study & design review
 Operation and maintenance instructions
 Optimization proposal of existing systems
 Laboratory, jar tests and pilot services
 Training at site and at PACT facility

PACT® Costumer care division would be responsible to follow up its client to provide addition all other services
mention above the following:

1. Spare parts
2. Chemical consumable
3. Other consumable (Such as Membranes & Filters)

PACT REF: 231216 PLANT: WATER TREATMENT PLANT LOCATION: LIBYA DATE: 01/05/2024
Page 7 of 44
INDUSTRIAL AND MUNICIPAL WATER AND WASTEWATER
TREATMENT

PACT O&M TEAM PLANT MONITORING

 24/7 control, operation, and maintenance service of the plant.


 Identifying and reporting any abnormal conditions by continuously inspecting and monitoring the
equipment process parameters related to overall infrastructure performance.
 Providing monthly and annual system performance of the plant.
 Preparing planned preventive maintenance schedules, methods and procedures and implementing
health and safety action plans.
 Supply of chemicals, consumables, spare parts, portable instruments and special tools for operation and
maintenance
 Performing regular cleaning including periodical removal & transportation of sludge, foreign debris,
screenings, and other waste products for disposal in accordance with the local standard regulations.
 Carrying out necessary laboratory analyses to monitor the influent characteristics and support
management of the effluent parameters.

SPARE PARTS SERVICE

PACT® maintains a large inventory of spare parts on the major components of its systems for prompt delivery.
For those parts that are not in the inventory, PACT has a priority agreement with its suppliers to deliver such
items at a moment’s notice.

CHEMICALS SERVICE

PACT® O&M department offers a full range of tested chemicals required for smooth operation of water and
wastewater treatment plants. The type and dosage of chemicals to be used are determined after thorough
testing of the water or wastewater being treated.

PACT REF: 231216 PLANT: WATER TREATMENT PLANT LOCATION: LIBYA DATE: 01/05/2024
Page 8 of 44
INDUSTRIAL AND MUNICIPAL WATER AND WASTEWATER
TREATMENT

SECTION 2 : IMPORTANT NOTES

1. This project is for producing 2 x 50 m 3/hr (2400 m3/day) Cooling tower make-up water with expected Electrical
Conductivity < 300 µS/cm for NGL plant (package-A) and 2 x 75 m3/hr (3600 m3/day) Drinking water with
expected TDS < 200 ppm for Oil Center (Package-B).
2. Source of Raw Water is from borewell with TDS 3236 ppm at NGL plant and 3386 ppm at Oil Center.
3. PACT has considered a single pass RO system with Multimedia filtration (automatic), Activated Carbon Filter
(automatic) & micron filtration as pretreatment with necessary chemical dosing units for both the packages.
4. The proposed RO system has been designed at a 75% recovery basis for both the packages.
5. PACT has considered the following equipment:
 Filter feed Tank
 Filter Feed Pumps
 Chemical Dosing Systems: Pre-Chlorination
 Multimedia Filters (Automatic Operation)
 Activated Carbon Filters in series (Automatic Operation)
 Air Scouring Blowers for Multimedia Filters
 Filter Backwash pumps
 Filtered Water Tank (offline tank)
 Chemical Dosing Systems: Antiscalant, and SMBS dosing system
 Micron Cartridge Filters
 High Pressure Pump
 RO Pressure Vessels & SWRO Membranes
 RO Flushing & CIP System
 RO product water transfer pumps
 Waste Water collection tank
 Waste Water Transfer pumps
 Chemical Dosing Systems: pH adjustment & post-Chlorine dosing system
 Related Instruments, Valves, piping, fittings & cabling.

6. The RO system has been designed with raw water temperature of 15-35°C.
7. All high-pressure piping material in RO feed will be SS316 & RO reject will be Duplex SS.
8. low-pressure piping material will be as follows:
 Upstream of MMF: UPVC
 MMF frontal & Downstream of MMF: CPVC
 Backwash waste line: Transparent PVC tubing
 Air Scouring: CS
 Chemical Dosing line: CPVC

9. PACT offer considered MCP panel (Form 2: IP 54) with simplex PLC & HMI.
10. The cable from MCP to each motor, instrument, and valve will be unarmored.
11. We have considered an unclassified safe area for both the new RO plants and accordingly designed the
Instruments, Motors, Actuators, panel & other electrical equipment etc.
12. Proposed country of origin is as per Section 6: Equipment Makes and Origin.

PACT REF: 231216 PLANT: WATER TREATMENT PLANT LOCATION: LIBYA DATE: 01/05/2024
Page 9 of 44
INDUSTRIAL AND MUNICIPAL WATER AND WASTEWATER
TREATMENT

SECTION 3 : DESIGN BASIS

PACKAGE-A: NGL PLANT AT COOLING WATER TREATMENT & COOLING


TOWER – UNIT 313 FOR COOLING WATER PURPOSE
Raw water source : Borewell
Raw water flow rate : 66.67 m3/hr
RO permeate flow rate : 50 m3/hr
RO system recovery : 75%
Quantity : 2 x 50% or 2 Duty

RAW WATER PARAMETERS FOR PACKAGE-A:


PARAMETERS UNITS RESULTS
pH - 7.4
Conductivity µS/cm 5057
Salinity as NaCl mg/L 2240
Chloride as Cl mg/L 1359
Sodium as Na mg/L 881
Total Hardness as CaCO3 mg/L 1370
Calcium as Ca mg/L 312
Magnesium as Mg mg/L 143
BOD (Max.) ** mg/L 10
Carbonates as CO3 mg/L Traces
Bicarbonate as HCO3 mg/L 281
Sulphate as SO4 mg/L 840
Nitrates as NO3 mg/L 0.008
Nitrites as NO2 mg/L 0.035
Reactive Silica as SiO2 mg/L 1.227
Ammonium as NH4 mg/L 1.39
Total Suspended Solids (TSS) mg/L 7.6
Total Dissolved Solids (TDS) mg/L 3236
Turbidity FTU 6
Chemicals mg/L 0.25*
Dissolved Iron as Fe mg/L 0.45

PRODUCT WATER QUALITY FOR PACKAGE-A:


PARAMETERS UNIT AVERAGE OUTLET VALUES
pH - 7.0
Electrical Conductivity µS/cm < 300
Reactive Silica as SiO2 mg/L < 3.0
Total Organic Compound (TOC) mg/L < 0.2
Iron as Fe mg/L < 0.3

Design Notes:
 *We presumed that the chemical in the raw water is nothing but residual chlorine.
 ** As the source of water is deep borewell, the BOD presence expected to be very less, so we considered <10ppm instead of 60ppm.
 The design is based on the influent characteristics mentioned in the raw water parameters for each package. Maximum ±5% fluctuation can be
accepted. Any variations of more than ±5% will impact the performance of the system and may have commercial implications to resolve the
issues.
 Product quality may fluctuate ±5% from the values provided in product water table based on actual site operation conditions and raw water
quality variations within the said limits.
 Temperature of raw water 15-35°C.
 Oil & Grease, TOC, COD and heavy metals should be NIL in the feed water.

PACKAGE-B: A/100 OIL CENTER AT AUXILIARY PLANT – SYSTEM 530 FOR

PACT REF: 231216 PLANT: WATER TREATMENT PLANT LOCATION: LIBYA DATE: 01/05/2024
Page 10 of 44
INDUSTRIAL AND MUNICIPAL WATER AND WASTEWATER
TREATMENT
DRINKING WATER PURPOSE
Raw water source : Shat-al Arab River
Raw water flow rate : 100 m3/hr
RO permeate flow rate : 75 m3/hr
RO system recovery : 75%
Quantity : 2 x 50% or 2 Duty

RAW WATER PARAMETERS FOR PACKAGE-B:


PARAMETERS UNITS RESULTS
pH - 7.16 – 7.35
Conductivity µS/cm 5290
Salinity as NaCl mg/L 2138
Chloride as Cl mg/L 1453
Sodium as Na mg/L 856
Total Hardness as CaCO3 mg/L 1370
Calcium as Ca mg/L 292
Magnesium as Mg mg/L 156
BOD (Max.) ** mg/L 10
Carbonates as CO3 mg/L Traces
Bicarbonate as HCO3 mg/L 220
Sulphate as SO4 mg/L 940
Nitrates as NO3 mg/L 1.7
Nitrites as NO2 mg/L 0.003
Reactive Silica as SiO2 mg/L 0.364
Ammonium as NH4 mg/L 0.87
Total Suspended Solids (TSS) mg/L 2.25
Total Dissolved Solids (TDS) mg/L 3386
Turbidity FTU 0.004
Chemicals mg/L 0.2*
Dissolved Iron as Fe mg/L 0.018

Design Notes:
 *We presumed that the chemical in the raw water is nothing but residual chlorine.
 ** As the source of water is deep borewell, the BOD presence expected to be very less, so we considered <10ppm instead of
60ppm.
 The design is based on the influent characteristics mentioned in the raw water parameters for each package. Maximum ±5%
fluctuation can be accepted. Any variations of more than ±5% will impact the performance of the system and may have
commercial implications to resolve the issues.
 Product quality may fluctuate ±5% from the values provided in product water table based on actual site operation conditions
and raw water quality variations within the said limits.
 Temperature of raw water 15-35°C.
 Oil & Grease, TOC, COD and heavy metals should be NIL in the feed water.

PRODUCT WATER QUALITY FOR PACKAGE-B:

PARAMETERS UNIT AVERAGE OUTLET VALUES


Total Dissolved Solids (TDS) mg/L < 200

AVAILABLE ELECTRICAL POWER ON SITE: 400 ± 5% V/3ph/50 Hz

PACT REF: 231216 PLANT: WATER TREATMENT PLANT LOCATION: LIBYA DATE: 01/05/2024
Page 11 of 44
INDUSTRIAL AND MUNICIPAL WATER AND WASTEWATER
TREATMENT

SECTION 4 : SCOPE MATRIX

4.1. NGL PLANT


SN DESCRIPTION PACT CONTRACTOR REMARKS
1 NGL PLANT
DESIGN & SUPPLY OF FULLY AUTOMATIC 2 X 50 M3/HR
1.1
NEW RO WATER TREATMENT PLANT
Filter Feed pumps - 4 nos. (1 duty + 1 standby for each
train)
- Pump with Motor
- Suction Valve
1.1.1
- Discharge Valve
ü
- Discharge NRV
- Discharge Pressure Gauge
- Suction Discharge Piping (Maximum 2 meters)
Pre-Chlorination (NaOCl) dosing system - 1 set (common
for both the trains)
1.1.2 - Dosing Tank - 1 no ü
- Dosing Pumps - 2 nos (1 duty + 1 Standby)
- Low level switch for Dosing Tank
Multimedia filters (MMF) - 2 Nos (1 for each train)
- Pressure Vessel (CS Epoxy Coated)
- First fill Multigraded Sand Media
1.1.3
- Pneumatic Isolation Valves
ü
- Frontal Piping
- Instruments as mentioned in the technical offer
Activated carbon Filter (ACF) - 4 nos. (2 in series for each
train)
- Pressure Vessel (CS Epoxy Coated)
1.1.4 - First fill Activated Carbon & Sand Media ü
- Pneumatic Isolation Valves
- Frontal Piping
- Instruments as mentioned in the technical offer
Filtered water Storage Tank - 1 no (common for both the
trains)
- Overflow / Drain piping
1.1.5
- Manual Drain Valve
ü
- Manual Outlet valve
- Inlet/Outlet Piping
Filter Backwash Pumps for MMF & ACF - 2 nos (1 duty + 1
standby), common for both the trains
- Pump with Motor
- Suction Valve
1.1.6
- Discharge Valve
ü
- Discharge NRV
- Discharge Pressure Gauge
- Suction Discharge Piping (Maximum 2 meters)
Air Scouring Blower for Multimedia Filters - 2 nos (1 duty
+ 1 standby), common for both the trains
- Blower with Motor
1.1.7
- Discharge NRV
ü
- Discharge Pressure Gauge
- Discharge Piping
1.1.8 RO Feed pumps - 3 nos. (1 duty for each train + 1 ü
common standby)

PACT REF: 231216 PLANT: WATER TREATMENT PLANT LOCATION: LIBYA DATE: 01/05/2024
Page 12 of 44
INDUSTRIAL AND MUNICIPAL WATER AND WASTEWATER
TREATMENT
- Pump with Motor
- Suction Valve
- Discharge Valve
- Discharge NRV
- Discharge Pressure Gauge
- Suction Discharge Piping
De-Chlorination (SMBS) dosing system - 1 set
- Dosing Tank - 1 no (Common for both the trains)
- Dosing Pumps - 3 nos (1 duty for each train+ 1 common
1.1.9
Standby)
ü
- Dosing Tank Mixer with motor
- Low level switch for Dosing Tank
Antiscalant dosing system - 1 set
- Dosing Tank - 1 no (Common for both the trains)
1.1.1
0
- Dosing Pumps - 3 nos (1 duty for each train+ 1 common ü
Standby)
- Low level switch for Dosing Tank
1.1.1
1
Static Mixer for RO Feed - 2 nos (1 for each train) ü
Cartridge Filter for RO feed - 2 sets (1 for each train)
- CF housing
1.1.1 - Filter Elements
2 - Isolation & Drain Valves
ü
- Inlet/outlet Pressure Gauge
- Inlet/ Outlet Piping
1.1.1 Pneumatic actuated Isolation Valve - 2 nos (1 for each
3 Train)
ü
1.1.1
4
Pneumatic actuated Dump Valve - 2 nos (1 for each Train) ü
RO High Pressure pumps - 2 nos. (1 duty for each train)
- Pump with Motor
1.1.1
5
- Variable Frequency Drive ü
- Discharge Pressure Gauge
- Suction Discharge Piping
1.1.1
6
RO Pressure Vessels - 2 lots (1 for each train) ü
1.1.1
7
RO Membranes - 2 lots (1 for each train) ü
RO Product Water Storage Tank - 1 no (common for both
the trains)
1.1.1 - Overflow / Drain piping
8 - Manual Drain Valve
ü
- Manual Outlet valve
- Inlet/Outlet Piping
RO Product Water Transfer Pumps- 2 nos (1 duty + 1
standby), common for both the trains
- Pump with Motor
1.1.1 - Suction Valve
9 - Discharge Valve
ü
- Discharge NRV
- Discharge Pressure Gauge
- Suction Discharge Piping (Maximum 2 meters)
RO CIP System - 1 set (common for both the trains)
1.1.2 - CIP tank with electrical heater - 1 no
0 - CIP pumps - 1 no
ü
- CIP Cartridge Filter - 1 no
1.1.2 RO Flushing System - 1 set (common for both the trains) ü
1 - Flushing tank - 1 no

PACT REF: 231216 PLANT: WATER TREATMENT PLANT LOCATION: LIBYA DATE: 01/05/2024
Page 13 of 44
INDUSTRIAL AND MUNICIPAL WATER AND WASTEWATER
TREATMENT
- Flushing pumps - 1 no
Post pH (NaOH) Adjustment Dosing System - 1 set
(common for both the trains)
1.1.2 - Dosing Tank - 1 no
2 - Dosing Pumps - 2 nos (1 duty + 1Standby)
ü
- Dosing Tank Mixer with motor
- Low level switch for Dosing Tank
Post-Chlorination (NaOCl) dosing system - 1 set (common
for both the trains)
1.1.2
3
- Dosing Tank - 1 no ü
- Dosing Pumps - 2 nos (1 duty + 1 Standby)
- Low level switch for Dosing Tank
1.1.2
4
Pipes & fittings within the Skid boundary limit ü
1.1.2
5
Instrumentation as mentioned in the technical offer ü
1.1.2
6
Electrical & control system for new RO plant ü
Skid works for:
- Multimedia Filter Frontal piping
- Activated Carbon Filter Frontal piping
1.1.2
7
- RO system ü
- RO CIP & Flushing system
- Dosing systems
- Control Panel
1.1.2 The concentrated reject waste water of the RO plant to
8 be diverted to theupgraded disposal system.
ü
Construct and install new building which shall include:
- Control room as building specification. as per spec.
- Small kitchen with its axillaries. as per spec.
- Small office with its axillaries. as per spec.
1.1.2
9
- Suitable storage room for storing membrane and ü
others. as per spec.
- Supply all necessary appliance and axillaries. as per
spec.
- Any civil work such roads and its requirements
1.1.3 The existing fence around the plant location may need to
0 be move a little further to accommodate for the road.
ü
The nearby fence of the plant location may need to be
1.1.3
1
moving outward Installation of new fence. To be verified ü
during the bidder site visit
Construction location of a new building for the new RO
1.1.3
2
Plant to be in the west of ü
the existing Nitrogen plant in the NGL plant.
The Contractor is required to check the proposed location
1.1.3
3
to be suitable for the ü
requirement of the building.
Upgrading the waste disposal. drain and sewage systems
in the new building,
which include:
- Disposal/collection pit
1.1.3 - Piping system
4 - Septic tank: for 10 people
ü
- Transfer pump
- Remote pit disposal pit
- Drain system of NGL
- Any other civil work may needed
1.1.3 Replace the existing damaged power transformer of 350 ü

PACT REF: 231216 PLANT: WATER TREATMENT PLANT LOCATION: LIBYA DATE: 01/05/2024
Page 14 of 44
INDUSTRIAL AND MUNICIPAL WATER AND WASTEWATER
TREATMENT
kVA to accommodated
5
the new load of The New RO plant .
1.1.3 The existing transformer is fed by power cable of cross
6 section is 3 core x 50mm2.
ü
The Operation of the plant should be controlled and
1.1.3
7
monitored by SCADA ü
system and connected to the existing NGL DCS system.
1.1.3 A complete analysis of raw water from all assigned water
8 wells
ü
PACT scope includes
dosing systems
required for RO plant
Provide chemical dosing system: as mentioned in our
- Handling facilities, technical offer:
- Tank, - Pre Chlorination
1.1.3 dosing system
8
- Piping, ü - SMBS dosing system
- Pumps, - Antiscalant Dosing
- Injection system System
- Follow HSE safety and environmental issues - Post Chlorination
dosing system
- Post pH correction
dosing system
1.1.3
9
Two (2) years operational spare parts ü
1.1.4
0
One (1) year Chemical supply ü
Essential Portable measuring meters such as:
- conductivity & TDS
1.1.4
1
- pH ü
- Chlorine
- SDI test kits
The building should also include (split unit) air
1.1.4 conditioned storage room for
2 storing the membranes and other room for the operator
ü
needs.
Piping works:
1.1.4 - From Raw Water Tank to New RO plant
3 - From New RO plant to Product Water Tank
ü
- From New RO plant to Wastewater pit
Prepare all drawings, P&IDs, PFDs, datasheets, and
operation & maintenance
1.1.4 manuals for the new plant as well as the piping
4 arrangement and isometric drawings for the new plant
ü ü
connections and all these shall be in according to MOG
procedure

4.2. OIL CENTER


[Link] CONTRACTO
DESCRIPTION PACT REMARKS
. R
2 OIL CENTER
DESIGN & SUPPLY OF FULLY AUTOMATIC 2 X 75 M3/HR
2.1
NEW RO WATER TREATMENT PLANT
2.1.1 Filter Feed pumps - 4 nos. (1 duty + 1 standby for each ü
train)
- Pump with Motor
- Suction Valve
- Discharge Valve
- Discharge NRV
- Discharge Pressure Gauge

PACT REF: 231216 PLANT: WATER TREATMENT PLANT LOCATION: LIBYA DATE: 01/05/2024
Page 15 of 44
INDUSTRIAL AND MUNICIPAL WATER AND WASTEWATER
TREATMENT
- Suction Discharge Piping (Maximum 2 meters)
Pre-Chlorination (NaOCl) dosing system - 1 set (common for
both the trains)
2.1.2 - Dosing Tank - 1 no ü
- Dosing Pumps - 2 nos (1 duty + 1 Standby)
- Low level switch for Dosing Tank
Multimedia filters (MMF) - 2 Nos (1 for each train)
- Pressure Vessel (CS Epoxy Coated)
- First fill Multigraded Sand Media
2.1.3
- Pneumatic Isolation Valves
ü
- Frontal Piping
- Instruments as mentioned in the technical offer
Activated carbon Filter (ACF) - 4 nos. (2 in series for each
train)
- Pressure Vessel (CS Epoxy Coated)
2.1.4 - First fill Activated Carbon & Sand Media ü
- Pneumatic Isolation Valves
- Frontal Piping
- Instruments as mentioned in the technical offer
Filtered water Storage Tank - 1 no (common for both the
trains)
- Overflow / Drain piping
2.1.5
- Manual Drain Valve
ü
- Manual Outlet valve
- Inlet/Outlet Piping
Filter Backwash Pumps for MMF & ACF - 2 nos. (1 duty + 1
standby), common for both the trains
- Pump with Motor
- Suction Valve
2.1.6
- Discharge Valve
ü
- Discharge NRV
- Discharge Pressure Gauge
- Suction Discharge Piping (Maximum 2 meters)
Air Scouring Blower for Multimedia Filters - 2 nos (1 duty +
1 standby), common for both the trains
- Blower with Motor
2.1.7
- Discharge NRV
ü
- Discharge Pressure Gauge
- Discharge Piping
RO Feed pumps - 3 nos. (1 duty for each train + 1 common
standby)
- Pump with Motor
- Suction Valve
2.1.8
- Discharge Valve
ü
- Discharge NRV
- Discharge Pressure Gauge
- Suction Discharge Piping
De-Chlorination (SMBS) dosing system - 1 set
- Dosing Tank - 1 no (Common for both the trains)
- Dosing Pumps - 3 nos. (1 duty for each train+ 1 common
2.1.9
Standby)
ü
- Dosing Tank Mixer with motor
- Low level switch for Dosing Tank
Antiscalant dosing system - 1 set
- Dosing Tank - 1 no (Common for both the trains)
2.1.10 - Dosing Pumps - 3 nos. (1 duty for each train+ 1 common ü
Standby)
- Low level switch for Dosing Tank

PACT REF: 231216 PLANT: WATER TREATMENT PLANT LOCATION: LIBYA DATE: 01/05/2024
Page 16 of 44
INDUSTRIAL AND MUNICIPAL WATER AND WASTEWATER
TREATMENT

2.1.11 Static Mixer for RO Feed - 2 nos (1 for each train) ü


Cartridge Filter for RO feed - 2 sets (1 for each train)
- CF housing
- Filter Elements
2.1.12
- Isolation & Drain Valves
ü
- Inlet/outlet Pressure Gauge
- Inlet/ Outlet Piping
Pneumatic actuated Isolation Valve - 2 nos. (1 for each
2.1.13
Train)
ü
2.1.14 Pneumatic actuated Dump Valve - 2 nos. (1 for each Train) ü
RO High Pressure pumps - 2 nos. (1 duty for each train)
- Pump with Motor
2.1.15 - Variable Frequency Drive ü
- Discharge Pressure Gauge
- Suction Discharge Piping
2.1.16 RO Pressure Vessels - 2 lots (1 for each train) ü
2.1.17 RO Membranes - 2 lots (1 for each train) ü
RO Product Water Storage Tank - 1 no (common for both
the trains)
- Overflow / Drain piping
2.1.18
- Manual Drain Valve
ü
- Manual Outlet valve
- Inlet/Outlet Piping
RO Product Water Transfer Pumps- 2 nos (1 duty + 1
standby), common for both the trains
- Pump with Motor
- Suction Valve
2.1.19
- Discharge Valve
ü
- Discharge NRV
- Discharge Pressure Gauge
- Suction Discharge Piping (Maximum 2 meters)
RO CIP System - 1 set (common for both the trains)
- CIP tank with electrical heater - 1 no
2.1.20
- CIP pumps - 1 no
ü
- CIP Cartridge Filter - 1 no
RO Flushing System - 1 set (common for both the trains)
2.1.21 - Flushing tank - 1 no ü
- Flushing pumps - 1 no
Post pH (NaOH) Adjustment Dosing System - 1 set
(common for both the trains)
- Dosing Tank - 1 no
2.1.22
- Dosing Pumps - 2 nos (1 duty + 1Standby)
ü
- Dosing Tank Mixer with motor
- Low level switch for Dosing Tank
Post-Chlorination (NaOCl) dosing system - 1 set (common
for both the trains)
2.1.23 - Dosing Tank - 1 no ü
- Dosing Pumps - 2 nos (1 duty + 1 Standby)
- Low level switch for Dosing Tank
2.1.24 Pipes & fittings within the Skid boundary limit ü
2.1.25 Instrumentation as mentioned in the technical offer ü
2.1.26 Electrical & control system for new RO plant ü
2.1.27 Skid works for: ü
- Multimedia Filter Frontal piping
- Activated Carbon Filter Frontal piping
- RO system

PACT REF: 231216 PLANT: WATER TREATMENT PLANT LOCATION: LIBYA DATE: 01/05/2024
Page 17 of 44
INDUSTRIAL AND MUNICIPAL WATER AND WASTEWATER
TREATMENT
- RO CIP & Flushing system
- Dosing systems
- Control Panel
Construction of a new building for the new RO Plant able to
2.1.28 accommodate: - the RO plant equipments - control room - ü
offices - & utility room(s).
Raw water supply:
- Raw water Supply Tank ( WT- 1 , 3,4,5 ) outlet connection
- Contractor to provide connection and valve.
2.1.29 - Size must be confirmed during site visit ü
- For any interface, Contractor must provide activities,
material, instrument. piping, mechanical means control,
monitoring and safety issues
Treated Water Reception:
- Treated water receiver tank (WT- 1 , 3,4,5)
- Contractor to provide connection and valve
2.1.30 - Size must be confirmed during site visit ü
- For any interface, Contractor must provide activities,
material, instrument. piping, mechanical means control,
monitoring and safety issues
Rebuild /revamp the existing damaged office building which
include:
2.1.31 - offices ü
- kitchen
- and toilet
Upgrading the waste disposal, drain and sewage systems in
the new building,
which include:
- Disposal/collection pit
2.1.32 - Piping system ü
- Septic tank: for 10 people
- Transfer pump
- Remote pit disposal pit
- Any other civil work may needed
Upgrade/new the current sewage to be to accommodate
2.1.33 the of the operators control room. Contractor shall ü
consider it in the ITT package, under package B Item 4 . 1 0.
PACT scope includes
dosing systems
required for RO plant
Provide chemical dosing system: as mentioned in our
technical offer:
- Handling facilities, - Pre Chlorination
- Tank, dosing system
2.1.34 - Piping, ü - SMBS dosing
- Pumps, system
- Antiscalant Dosing
- Injection system System
- Follow HSE safety and environmental issues - Post Chlorination
dosing system
- Post pH correction
dosing system
Replace the existing damaged power transformer of 800
2.1.35 kVA to accommodated ü
the new load of The New RO plant .
The existing transformer is fed by power cable of cross
2.1.36
section is 3 core x 50mm2.
ü
The chlorination dosing system should be installed at the
distribution network after the Auto Clave pressurized tanks
2.1.37
not before to ensure proper water sterilization. Also,
ü
should be equipped with Auto Flush and Auto Cl P system.

PACT REF: 231216 PLANT: WATER TREATMENT PLANT LOCATION: LIBYA DATE: 01/05/2024
Page 18 of 44
INDUSTRIAL AND MUNICIPAL WATER AND WASTEWATER
TREATMENT
Flacon 135 o r equivalent is an anti-scale chemical or other
suitable chemical to
2.1.38
proposed by the contractor to prevent scale development
ü
in the RO membranes
Essential Portable measuring meters such as:
- conductivity & TDS
2.1.39 - pH ü
- Chlorine
- SDI test kits
2.1.40 Two (2) years operational spare parts ü
2.1.41 One (1) year Chemical supply ü
The Operation of the plant should be controlled and
2.1.42 monitored by SCADA ü
system.
Piping works:
- From Raw Water Tank to New RO plant
2.1.43
- From New RO plant to Product Water Tank
ü
- From New RO plant to Wastewater pit
Prepare all d rawings, P&IDs, PFDs, datasheets, and
operation & maintenance manuals for the new plant as
2.1.44 well as the piping arrangement and isometric drawings for ü ü
the new plant connections and all these shall be in
according to MOG procedure

4.3. COMMON
CONTRACTO
SN DESCRIPTION PACT REMARKS
R
3 COMMON FOR BOTH THE PACKAGES
3.1 The main activities in both plant locations
3.1.1 Site Survey (before & after awarding the Contract). ü
PACT scope includes
Design & Engineering
for the installation of
both RO Water
Design and Engineering is required for the installation of Treatment Plant.
both of RO Water treatment Plants including their power Power Transformer &
3.1.2 transformers & Construction of their buildings. and all the ü ü their building
piping works required to connect the new plants with the construction, and
piping works from
treated water tanks and to disposal systems. new plants to treated
water tanks and
disposal systems is by
contractor.
At Oil Center, the contractor shall upgrade the wastewater
3.1.3 system in order to handle the new quantities of the ü
wastewater
Construction of the RO plants on the Site, at oil center and
3.1.4
at NGL plant as set forth in scope.
ü
Project Facilities as specified in scope and in conformity
3.1.5
with the Specifications and Standards .
ü ü
3.1.6 Procurement/ Supply, Inspection, Factory testing and ü ü PACT scope includes
Procurement/
Acceptance of both RO
Supply, Inspection,
Water treatment plants including power transformers & all Factory testing and
the required equipment & materials. Acceptance of both
RO Water treatment
plants.
Power Transformer &
all the required
equipmet &

PACT REF: 231216 PLANT: WATER TREATMENT PLANT LOCATION: LIBYA DATE: 01/05/2024
Page 19 of 44
INDUSTRIAL AND MUNICIPAL WATER AND WASTEWATER
TREATMENT
materials by
contractor.
Transportation, Insurance, loading and unloading of
3.1.7
material at MOG site/ stores.
ü
Shipment and transfer all the equipment from vendors to
3.1.8
the site location
ü
3.1.9 EIA, Topography survey & site preparation. ü
3.1.1 All works (Civil, Structural, Mechanical/Piping,
0 Instrumentation, Electrical and Control, etc).
ü ü
3.1.1
1
Construction of buildings for new RO Plants. ü
Rectification of any damage (if any) occurred during
3.1.1
2
transportation/ unloading observed on receipt of material ü
at site.
3.1.1 Compliance of Checklist points during FAT, Site, stores (if
3 any)
ü ü
3.1.1 Installation, testing, commissioning & startup of the new
4 power transformers & new treatment plants.
ü
The Contractor is fully responsible to review, check and
correct (if needed) all the data mentioned and given in the
Scope of Work technical package and must take
3.1.1
5
inconsideration that any data in this package as preliminary ü
information and not to be taken as basic data where the
contractor must collect all data needed during the site
survey activities for the detailed engineering phase.
Any errors or omissions in this SOW shall not absolve the
3.1.1 Contractors I Vendor from the responsibility of designing
6 and providing complete and fully functional equipment as
ü ü
described in this document.
The design and manufacturing of the treatment plants shall
be in accordance to all specifications, drawings, procedures,
3.1.1
7
standards and other documents attached ü ü
hereto and with the best modern practice & relevant
international Specifications.
EPIC Contractor shall prepare an overall project schedule
covering all aspects of the EPIC phase. It shall incorporate
activities and milestones representing realistic period for
3.1.1 equipment and material delivery and contract
8 development. It shall show reasonable lead time for MOG
ü ü
and Third Parties authorizations and approvals in parallel to
main project activities so that the overall project schedule is
not delayed.

4.4. SITE SURVEY


CONTRACTO
SN DESCRIPTION PACT REMARKS
R
SITE SURVEY, DATA ACQUISITION AND VALIDATION
4
BEFORE SUBMITTING THE TECHNICAL & COMMERCIAL PROPOSALS
Described below are the Contractor's headlines responsibilities
related to the works to be executed in the Site Survey, engineering,
4.1 procurement, supply, manpower, tools, equipment, materials,
installation, construction, commissioning & startup for the
completion of this Project:
Bidders shall conduct a detailed site survey and investigation with the
4.1. Water treatment specialist before submitting their Offers for the
1 verification of all requirements (Space, building, Waste, Electrical
ü
power supply, piping works, HSEQ, etc) for the new RO Plants @ NGL

PACT REF: 231216 PLANT: WATER TREATMENT PLANT LOCATION: LIBYA DATE: 01/05/2024
Page 20 of 44
INDUSTRIAL AND MUNICIPAL WATER AND WASTEWATER
TREATMENT
Plant & N1 00 Oil Centre auxiliary plant and in order to fully acquaint
with the site conditions, facilities and existing systems and also to
Collect water samples to characterize the water feed specification &
take all necessary data & measurements required to present their
offers. Any omission or deletion or skip-over during this site survey by
the CONTRACTOR shall not be acceptable as a basis for claiming
variation order in the future.
4.1. All Technical & Commercial proposals have to be submitted by the
2 Bidders based on the site survey findings & this SOW.
ü ü
Detailed site survey report has to be submitted by the bidders after
site survey to
inform the Company that all the requirements in the Company SOW
4.1. are right or if bidders discover in their site survey some discrepancy
3 or shortages in the Company SOW then must have to inform the
ü
Company then on approval all Commercial proposal has to be
submitted. Site survey report must contain all the information
collected from the site.
During this site survey, bidders shall also check the availability of
4.1. electrical Power for the new RO Plants in both NGL & N1 00 Plant. In
4 addition, check the required type of buildings to be constructed for
ü
the new RO Plant.
4.2 AFTER AWARDING THE CONTRACT
Selected Contractor for this project must conduct detailed Site Survey
of the field before starting the engineering activities in order to get
4.2. the entire information & for collecting the water samples required in
1 order to complete this Project.
ü
CONTRACTOR shall be responsible to collect all the data, documents,
and measurements (in the absence of any).

4.5. DESIGN AND ENGINEERING


CONTRACTO
SN DESCRIPTION PACT REMARKS
R
5 DESIGN AND ENGINEERING
5.1 SCOPE FOR DESIGN AND ENGINEERING
Contractor shall perform detailed engineering & design , calculations,
prepare all drawings, P&IDs, Isometric, data sheets, specifications,
standards, procedures, studies, bills of materials & quantities,
5.1.1
operations and maintenance manuals, etc. required to support the
ü ü
procurement, fabrication. Installation/construction, commissioning
and Start-up of the both RO Plants & buildings.
The Contractor shall also be responsible for carrying out any residual
basic engineering necessary for proceeding with detailed engineering
5.1.2 like equipment/instrument sizing, utility consumption, specifying ü ü
derived data in process data sheets, type and material selection of
instruments/ equipment wherever required.
The CONTRACTOR is required to execute the engineering activities
5.1.3
which may include but not limited to the following:
ü ü
Compilation of all data/ information furnished in the bid package and
5.1.4
additionally collected/ generated by the Contractor.
ü ü
Preparation of Project deliverables list covering all the Project
5.1.5
activities
ü ü
Preparation of Project schedule (Gantt chart) showing expected time
5.1.6
each activities and expected deliverables.
ü ü
Conduct a field study; review/update the survey data including
5.1.7 collection of samples & additional data I surveys (if required) etc. ü
during detailed engineering phase.

PACT REF: 231216 PLANT: WATER TREATMENT PLANT LOCATION: LIBYA DATE: 01/05/2024
Page 21 of 44
INDUSTRIAL AND MUNICIPAL WATER AND WASTEWATER
TREATMENT
Prepare & Issue all related documents and drawings (calculation
5.1.8
reports, simulations, 30 layouts, studies . . . etc).
ü ü
Perform analysis and calculations (civil, structural, process, piping
hydraulic) mechanical, electrical & Instrumentation) required for the
new plants . buildings & power transformers . Analysis, calculation
5.1.9
and design criteria shall be submitted in a professional manner as
ü ü
standard practices format complete with all relevant information,
data, references and others.
5.1.10 Calculations for the membranes design. ü
Perform Topographic survey & soil investigation & then preparation
of detailed reports after conducting Site topographic survey & soil
5.1.11
investigation & should contained data, layouts and plans (i.e.
ü
elevation level, contour, coordinates, and others)
Preparation of Civil works plans and layouts (i.e. drainage, trench,
5.1.12
roads, pavement, and others)
ü
5.1.13 Site development plan preparation. ü
Environmental impact assessment study report preparation after
5.1.14
performing EIA.
ü
Preparation of Architectural layouts and plans (i.e. building
5.1.15 perspective, floor plans, equipment plans, elevations, sections, ceiling ü
plans, schedule of building fixtures, doors, windows and others).
Structural plans and layouts Preparation (i.e. concrete foundation
plans, wall and roof framing plan, structural details, schedule of
5.1.16
structural materials, crane
ü
structural layout and details).
Mechanical works plans and layouts (i.e. HVAC . fire fighting
5.1.17 prevention system, ü
plumbing, water layout, relevant details )
Conduct all piping works required to connect the new plant to the
5.1.18
treated water and from the raw water tank
ü
Electrical plans and layouts preparation (i.e. lighting, power, relevant
5.1.19
details )
ü
Design and engineering of a complete electrical I instrumentation and
control works including provision of power supply for the new RO
5.1.20
Plants & buildings and install level switches in the existing treated and
ü ü
raw tanks.
Cabling and necessary electrical equipment and elements for Reverse
5.1.21 Osmosis water treatment plant ending of process control ü ü
automation, instrumentation, monitoring control room.
Prepare the electrical documents of design and engineering for
drawings, ,(a) P&ID, (b) all electrical power ,(c) cable "sizing &
5.1.22 routes", (d) protection systems, (e) control systems, (f) operating, (g) ü ü
preventive maintenance and maintenance procedures. All will be
supplied as soft/hard copy documents.
Instrumentation and automation interface with existing Control
Systems services shall include all engineering, design, procurement,
and installation requirements of field instrumentation as well as
5.1.23
modifications on DCS control and monitoring systems, ESD
ü
"emergency shutdown system", note that Fire & Gas protection
systems already existing and in operation.
Electrical calculations and studies shall include, but not be limited to,
the electrical load summary, Short circuit (three phase and earth
5.1.24 fault), Equipment sizing, Cable sizing, Illumi nation level, Lightning ü
protection, Earthing study, Indoor lighting system report, Outdoor
lighting system report, AC-DC load diagrams, Electrical balance.
5.1.25 Other drawings preparation required by the Company. ü
5.1.26 Layout plan in the erection and removal of scaffolding. ü
5.1.27 Layout plan in the erection and removal of barricades or shoring for ü

PACT REF: 231216 PLANT: WATER TREATMENT PLANT LOCATION: LIBYA DATE: 01/05/2024
Page 22 of 44
INDUSTRIAL AND MUNICIPAL WATER AND WASTEWATER
TREATMENT
the protection of the facility users.
Preparation of civil & piping drawings, PFDs, PIDs and piping
5.1.28
isometrics.
ü ü
5.1.29 Prepare construction methodology and procedures. ü
Prepare a breakdown lists and bill of materials specifying all the
5.1.30 technical specifications of the materials required to build the ü ü
structures & installation of new RO Plants.
Design analysis and calculation of the new system based on required
5.1.31
capacity and production of the plant requirements.
ü ü
Design analysis and calculation of the new system that suitably link
5.1.32
with the existing layout of the equipment connection.
ü ü
5.1.33 Stress Analysis using Caesar-II software. ü ü
Prepare equipment plan and layouts that comply with system
5.1.34 specifications and requirements that suit and coincide to the new ü ü
building structures.
5.1.35 Fixing details of the equipment into the new buildings. ü ü
5.1.36 Connection details between existing layouts to new system layout. ü
5.1.53
7
Indicate electrical, instrument and control system required. ü ü
5.1.38 HAZOP study and report / resolution. ü ü
Preparation of design documents, procedures, training documents,
5.1.39 manuals, ü ü
drawings etc.
Material requisitions and specifications for Contractor supplied
5.1.40
Materials and Equipment
ü ü
Contractor shall perform any activities within the battery limits and
any interface requirements between the MOG and the contractor
5.1.41
within the battery limits. such interface requirements: electrical,
ü
mechanical, piping and control, monitoring for the process
The preparation and submission for COMPANY'S APPROVAL, Design
5.1.42
andEngineering Practice and Procedures.
ü ü
Timely prepare and submit for COMPANY Approval design and
engineering Practices and Procedures covering design and
engineering;

a. Contractor shall Coordinate with all regulatory bodies and


agencies,
whenever and wherever applicable and ensure compliance with
Certifying Authority requirements. In addition shall provide all
necessary documentations, complying with COMPANY'S
requirements for documentation; Documentation shall be provided in
hard & soft copies (PDF & native files) in CO-ROMs. All Prepared
5.1.43
documents have to submit to the Company for Review & Approval.
ü ü
Fully automatic/Manual RO equipment (vendor list) shall be approved
by the Company. All drawings/methodology shall be subject to review
and approval by the Company. The construction shall be carried out
based on the Approved for Construction (AFC) drawings.

b. Contractor shall use the latest Engineering software during the


engineering phase such as for Process design Hysys/Pipesys, for
structural calculation and analysis shall be STAAD Pro, for the
preparation of working drawings shall be AutoCAD & for the stress
analysis shall be Caesar II etc.
The Contractor's scope requires all activities required for completion
5.1.44 of the Work with the satisfaction of the Company including any ü ü
necessary activities not specifically identified herein.

PACT REF: 231216 PLANT: WATER TREATMENT PLANT LOCATION: LIBYA DATE: 01/05/2024
Page 23 of 44
INDUSTRIAL AND MUNICIPAL WATER AND WASTEWATER
TREATMENT

All Works shall be performed in accordance with the relevant


International Codes & Standards & considered as a part of scope.
5.1.45 Unless Company has specifically referred to a particular revision, ü ü
Contractor shall use the latest revision. All the specifications shall be
submitted to the Company for review & approval.
The Contractor shall be responsible for identifying, from the
5.1.46 specifications enclosed, the Codes and Standards (including their ü ü
revisions and/or issue dates) applicable to the Design and Supply.

SECTION 5 : SCOPE OF SUPPLY

5.1. SCOPE OF SUPPLY FOR PACKAGE-A, NGL PLANT: (2


X 50% OR 2 DUTY)
QUANTIT
SN EQUIPMENT REMARKS
Y
1. RAW WATER TANK
1.1.
Raw Water Tank -- (Existing By Client)

2. PRE-TREATMENT SYSTEM
Filter Feed Tank (Common for both the
trains):
2.1. Capacity: 25.0 m3
1.0 1 duty
Retention: 10 mins
MOC: GRP
Type: Horizontal Cylindrical
Filter Feed Pump:
Capacity: 71.0 m3/h @ 5.0 bar
2.2. Type: Centrifugal pump
4.0 1 duty + 1 standby for each train
MOC: CI body / SS impeller
Design: ISO 5199
Motor: 18.5kW, IP55, Class 5
2.3. Pre-Chlorination (Hypo) Dosing System 1.0 set Pump: 1 Duty + 1 standby
(Common for both the trains): Tank: 1 Duty
Dosing pump:
Capacity: 0-3 lph @ 6 bar
MOC: PVC head PTFE diaphragm
Operation (on/off): Automatic
Stroke adjustment: Manual
Dosing tank:
Capacity: 100 lit

PACT REF: 231216 PLANT: WATER TREATMENT PLANT LOCATION: LIBYA DATE: 01/05/2024
Page 24 of 44
INDUSTRIAL AND MUNICIPAL WATER AND WASTEWATER
TREATMENT

QUANTIT
SN EQUIPMENT REMARKS
Y
MOC: PE/GRP
Type: vertical Cylindrical
Multimedia Filters (MMF):
Flow rate: 71.0 m3/hr
Dimension: 2800mm Dia. x 1500mm HOS
MOC: Carbon steel
Internal coating: Epoxy paint
External coating: Epoxy paint
Operating pressure: 5 bar
Design Pressure: 7.5 bar
2.4. U-Stamp: not considered.
2.0 2 duty (1 for each train)
Design Standard: ASME Sec VIII Div-1
Inlet piping: UPVC
Face piping: CPVC
Backwash drain line: Transparent PVC tube
Valves:
 Operation: Automatic,
 Actuator: Double acting Pneumatic
Actuated
 MOC: CPVC
Activated Carbon Filters (ACF):
Flow rate: 71.0 m3/hr
Dimension: 2400mm Dia. x 1500mm HOS
MOC: Carbon Steel
Internal coating: Epoxy paint
External coating: Epoxy paint
Operating pressure: 4 – 5 bar
Design Pressure: 7.5 bar
2.5. U-Stamp: not considered.
4.0 4 duty (2 nos. in series for each train)
Design Standard: ASME Sec VIII Div-1
Face piping: CPVC
Inlet/Outlet Piping: CPVC
Backwash drain line: Transparent PVC tube
Valves:
 Operation: Automatic,
 Actuator: Double acting Pneumatic
Actuated
 MOC: CPVC
Filtered Water Tank (Common for both the
trains):
Capacity: 50.0 m3
2.6.
Retention: backwash volume of one MMF or 1.0 1 duty
ACF + 10 mins RO Feed volume
MOC: GRP
Type: Horizontal Cylindrical
2.7. Backwash Pump for MMF & ACF (common 2.0 1 duty + 1 standby
for both the trains):
Capacity: 155.0 m3/h @ 2.0 bar
Type: Centrifugal pump
MOC: CI body / SS impeller
Design: ISO 5199

PACT REF: 231216 PLANT: WATER TREATMENT PLANT LOCATION: LIBYA DATE: 01/05/2024
Page 25 of 44
INDUSTRIAL AND MUNICIPAL WATER AND WASTEWATER
TREATMENT

QUANTIT
SN EQUIPMENT REMARKS
Y
Motor: 15kW, IP55, Class 5
Air Scouring Blower for MMF (common for
both the trains):
2.8. 250 Nm3/hr @ 0.35 bar
2.0 1 duty + 1 standby
Type: Side channel / Positive Displacement
MOC: Aluminum alloy/Cast Iron
Motor: 5.5kW, IP55, Class 5
3. BWRO SYSTEM
RO Feed Pumps:
Capacity: 67.0 m3/h @ 3.0 bar
3.1. Type: Centrifugal pump 2 Duty (1 for each train) + 1 common
3.0
MOC: SS316 body & Impeller standby
Design: ISO 5199
Motor: 11kW, IP55, Class 5
SMBS Dosing System (Common for both the
trains):
Dosing pump:
Capacity: 0-8 lph @ 6 bar
MOC: PVC head PTFE diaphragm
Pump: 1 Duty + 1 standby
3.2. Operation (on/off): Automatic
1.0 set Tank: 1 Duty
Stroke adjustment: Automatic
Mixer: 1 Duty
Dosing tank:
Capacity: 200 lit
MOC: PE/GRP,
Type: vertical Cylindrical
Mixer: SS316
Antiscalant Dosing System (Common for
both the trains):
Dosing pump:
Capacity: 0-8 lph @ 6 bar
MOC: PVC head PTFE diaphragm
3.3. Pump: 1 Duty + 1 standby
Operation (on/off): Automatic 1.0 set
Tank: 1 Duty
Stroke adjustment: Manual
Dosing tank:
Capacity: 200 lit
MOC: PE/GRP,
Type: vertical Cylindrical
Acid Dosing System (Common for both the
trains):
Dosing pump:
Capacity: 0-10 lph @ 6 bar
MOC: PVC head PTFE diaphragm
3.4. Pump: 1 Duty + 1 standby
Operation (on/off): Automatic 1.0 set
Tank: 1 Duty
Stroke adjustment: Automatic
Dosing tank:
Capacity: 300 lit
MOC: PE/GRP,
Type: vertical Cylindrical
3.5. Static Mixer:
1.0 1 duty (on common RO feed header)
Size: DN 150

PACT REF: 231216 PLANT: WATER TREATMENT PLANT LOCATION: LIBYA DATE: 01/05/2024
Page 26 of 44
INDUSTRIAL AND MUNICIPAL WATER AND WASTEWATER
TREATMENT

QUANTIT
SN EQUIPMENT REMARKS
Y
Cartridge Filter:
Capacity: 67 m3/hr
3.6.
Operating pressure: 3 – 4 bar 2.0 2 duty (1 for each train)
MOC: PP cartridge, PVC/FRP housing
5-micron filtration
Isolation Valve:
3.7. MOC: CPVC
2.0 2 duty (1 for each train)
Type: Butterfly, PN 10
Actuation: Pneumatic
Dump Valve:
3.8. MOC: CPVC
1.0 1 duty (on common feed header)
Type: Butterfly, PN 10
Actuation: Pneumatic
High Pressure Pump with VFD:
Capacity: 67.0 m3/hr @ 20.0 bar
3.9. Type: Vertical Multistage
2.0 1 duty for each train
MOC: SS316 body & Impeller
Design: ISO 5199
Motor: 55kW, IP55, Class 5
RO Pressure Vessels:
Size: 8” dia. x 7 element long
3.10. Pressure rating: 450 psi
18.0 9 duty for each train
Arrey: 6:3
Type: Side port
MOC: FRP
RO Membranes:
Size: 8” dia. x 40” length
3.11. Type: Spiral wound, Brackish Water
126.0 63 duty for each train
MOC: Polyamide
Area: 400 ft2 per element
Salt Rejection: 99.8%
3.12.
Product Water Tank -- (Existing By Client)
RO Product Transfer Pumps:
Capacity: 100.0 m3/h @ 3.0 bar
3.13. Type: Centrifugal pump
2.0 1 duty + 1 standby
MOC: SS316 body & Impeller
Design: ISO 5199
Motor: 18.5kW, IP55, Class 5
Waste Disposal Collection Tank (Common
for both the trains):
3.14. Capacity: 15.0 m3
1.0 1 duty
Retention: 20 mins
MOC: GRP
Type: Horizontal Cylindrical
Waste Water Transfer Pumps:
Capacity: 45.0 m3/h @ 4.0 bar
1.1. Type: Centrifugal pump
2.0 1 duty + 1 standby
MOC: Duplex SS
Design: ISO 5199
Motor: 11kW, IP55, Class 5

PACT REF: 231216 PLANT: WATER TREATMENT PLANT LOCATION: LIBYA DATE: 01/05/2024
Page 27 of 44
INDUSTRIAL AND MUNICIPAL WATER AND WASTEWATER
TREATMENT

QUANTIT
SN EQUIPMENT REMARKS
Y
2. POST TREATMENT SYSTEM
Post pH (NaOH) Adjustment Dosing System:
Dosing pump:
Capacity: 0-10 lph @ 4 bar
MOC: PVC head PTFE diaphragm
(Common for both the trains)
Operation (on/off): Automatic
Pump: 1 Duty + 1 standby
2.1. Stroke adjustment: Automatic 1.0 set
Tank: 1 Duty
Dosing tank:
Mixer: 1 Duty
Capacity: 300 lit
MOC: PE/GRP,
Type: vertical Cylindrical
Mixer: SS316
Post-Chlorination (Hypo) Dosing System:
Dosing pump:
Capacity: 0-3 lph @ 4 bar
MOC: PVC head PTFE diaphragm
(Common for both the trains)
Operation (on/off): Automatic
2.2. 1.0 set Pump: 1 Duty + 1 standby
Stroke adjustment: Automatic
Tank: 1 Duty
Dosing tank:
Capacity: 100 lit
MOC: PE/GRP
Type: vertical Cylindrical
3. RO CIP SYSTEM (COMMON FOR BOTH THE TRAINS)
RO CIP Tank:
Capacity: 2.5 m3
Tank: 1 duty
3.1. MOC: PE/GRP 1.0
Heater: 1 duty
Type: Horizontal Cylindrical
Electrical Heater: Provided
RO CIP Pump:
Capacity: 54 m3/hr @ 4.0 bar
Type: Centrifugal, end suction,
3.2. 1.0 1 duty
MOC: SS 316
Design: ISO 5199
Motor: 15 kW, IP55, Class 5
Cartridge Filter for RO CIP:
Capacity: 54 m3/hr
3.3. Operating pressure: 4-5 bar 1.0 1 duty
MOC: PP cartridge, PVC/FRP housing
5-micron filtration
4. RO FLUSHING SYSTEM (COMMON FOR BOTH THE TRAINS)
RO Flushing Tank:
Capacity: 4.0 m3
4.1. 1.0 1 duty
MOC: PE/GRP
Type: Horizontal Cylindrical
4.2. RO Flushing Pump: 1.0 1 duty
Capacity: 27 m3/hr @ 2.0 bar
Type: Centrifugal, end suction,
MOC: SS 316

PACT REF: 231216 PLANT: WATER TREATMENT PLANT LOCATION: LIBYA DATE: 01/05/2024
Page 28 of 44
INDUSTRIAL AND MUNICIPAL WATER AND WASTEWATER
TREATMENT

QUANTIT
SN EQUIPMENT REMARKS
Y
Design: ISO 5199
Motor: 5.5 kW, IP55, Class 5
5. VALVES
High Pressure Valves: Lot
5.1. MOC: Duplex SS
Pressure ratings: PN 25
Low Pressure Valves: Lot
5.2. MOC: CPVC
Pressure ratings: PN 10
6. PIPE & FITTINGS
High Pressure Pipe & Fittings:
MOC:
6.1. RO Feed: SS316L Lot
RO Reject: Duplex SS
Pressure ratings: SCH 40
Low Pressure Pipe & Fittings:
MOC:
Upstream of MMF: UPVC
Downstream of MMF: CPVC
RO Permeate: SS316L
6.2. Lot
Backwash drain line: Transparent PVC tubing
Air Scouring: CS
Chemical Dosing line: CPVC
Pressure ratings: SCH80 for UPVC & CPVC
pipe
7. INSTRUMENTATION
 Each MMF inlet lines
 Backwash pump Discharge header
7.1. Flow transmitter 7.0
 Each RO Permeate lines
 Each RO Reject lines
 Across each MMF
7.2. Differential Pressure Transmitter 6.0
 Across each ACF
 MMF inlet header
7.3. Temperature Transmitter 2.0
 RO CIP tank
7.4. ORP Analyzer 1.0  RO feed header
 RO Feed Header
7.5. Conductivity Analyzer 3.0
 Each RO Permeate line
 RO feed header line
7.6. pH Analyzer 2.0
 RO Permeate header line
7.7. Free Chlorine Analyzer 1.0  RO Permeate header line
 Filter Feed Pump Suction header
 Each RO High Pressure pump
suction,
7.8. Pressure Switch 7.0
 Each RO High Pressure pump
discharge
 Each RO Reject

PACT REF: 231216 PLANT: WATER TREATMENT PLANT LOCATION: LIBYA DATE: 01/05/2024
Page 29 of 44
INDUSTRIAL AND MUNICIPAL WATER AND WASTEWATER
TREATMENT

QUANTIT
SN EQUIPMENT REMARKS
Y
 Raw Water tank (Loose Supply)
 Product Water Tank (Loose Supply)
 Filter Feed Tank
 Filtered Water Tank
 RO CIP Tank
 RO Flushing Tank
7.9. Level Switch 11.0
 Pre-Chlorine Dosing Tank
 Post-Chlorine Dosing Tank
 SMBS Dosing Tank
 Antiscalant Dosing Tank
 Acid Dosing Tank
 Post-pH correction Dosing Tank
 All pump & Blower discharge,
7.10.
Pressure Gauges Lot  Filters inlet/outlet
 RO feed, Reject & Permeate
8. ELECTRICAL & CONTROL SYSTEM (COMMON FOR BOTH THE TRAINS)
Main Control System:
MCC + PLC + HMI
Form II, IP54
8.1. 1.0 1 duty
PLC: non-redundant
MOC enclosure: Sheet Steel
Cable entry: bottom
Cable Works:
Power Cables: Cu/XLPE/PVC/SWA
Un-armored cable
8.2. Lot
Instruments cables: Cu/PVC/IS/OS
Un- armored cable
Cable Trays: PVC
9. SKID WORKS
Skid works for:
 Multimedia Filter Frontal piping
 Activated Carbon Filter Frontal
piping
9.1. Lot Carbon steel, Epoxy coated
 RO system
 RO CIP & Flushing system
 Dosing systems
 Control Panel

5.2. SCOPE OF SUPPLY FOR PACKAGE-B, OIL CENTER:


(2 X 50% OR 2 DUTY)

QUANTIT
SN EQUIPMENT REMARKS
Y
10. RAW WATER TANK
10.1.
Raw Water Tank -- (Existing By Client)

PACT REF: 231216 PLANT: WATER TREATMENT PLANT LOCATION: LIBYA DATE: 01/05/2024
Page 30 of 44
INDUSTRIAL AND MUNICIPAL WATER AND WASTEWATER
TREATMENT

QUANTIT
SN EQUIPMENT REMARKS
Y
11. PRE-TREATMENT SYSTEM
Filter Feed Tank (Common for both the
trains):
11.1. Capacity: 36.0 m3
1.0 1 duty
Retention: 10 mins
MOC: GRP
Type: Horizontal Cylindrical
Filter Feed Pump:
Capacity: 106.0 m3/h @ 5.0 bar
11.2. Type: Centrifugal pump
4.0 1 duty + 1 standby for each train
MOC: CI body / SS impeller
Design: ISO 5199
Motor: 22kW, IP55, Class 5
Pre-Chlorination (Hypo) Dosing System
(Common for both the trains):
Dosing pump:
Capacity: 0-4 lph @ 6 bar
MOC: PVC head PTFE diaphragm
11.3. Pump: 1 Duty + 1 standby
Operation (on/off): Automatic 1.0 set
Tank: 1 Duty
Stroke adjustment: Manual
Dosing tank:
Capacity: 100 lit
MOC: PE/GRP
Type: vertical Cylindrical
Multimedia Filters (MMF):
Flow rate: 106.0 m3/hr
Dimension: 3400mm Dia. x 1500mm HOS
MOC: Carbon steel
Internal coating: Epoxy paint
External coating: Epoxy paint
Operating pressure: 5 bar
Design Pressure: 7.5 bar
11.4. U-Stamp: not considered.
2.0 2 duty (1 for each train)
Design Standard: ASME Sec VIII Div-1
Inlet piping: UPVC
Face piping: CPVC
Backwash drain line: Transparent PVC tube
Valves:
 Operation: Automatic,
 Actuator: Double acting Pneumatic
Actuated
 MOC: CPVC
11.5. Activated Carbon Filters (ACF): 4.0 4 duty (2 nos. in series for each train)
Flow rate: 106.0 m3/hr
Dimension: 3000mm Dia. x 1500mm HOS
MOC: Carbon Steel
Internal coating: Epoxy paint
External coating: Epoxy paint
Operating pressure: 4 – 5 bar
Design Pressure: 7.5 bar

PACT REF: 231216 PLANT: WATER TREATMENT PLANT LOCATION: LIBYA DATE: 01/05/2024
Page 31 of 44
INDUSTRIAL AND MUNICIPAL WATER AND WASTEWATER
TREATMENT

QUANTIT
SN EQUIPMENT REMARKS
Y
U-Stamp: not considered.
Design Standard: ASME Sec VIII Div-1
Face piping: CPVC
Inlet/Outlet Piping: CPVC
Backwash drain line: Transparent PVC tube
Valves:
 Operation: Automatic,
 Actuator: Double acting Pneumatic
Actuated
 MOC: CPVC
Filtered Water Tank (Common for both the
trains):
Capacity: 75.0 m3
11.6.
Retention: backwash volume of one MMF or 1.0 1 duty
ACF + 10 mins RO Feed volume
MOC: GRP
Type: Horizontal Cylindrical
Backwash Pump for MMF & ACF (common
for both the trains):
Capacity: 227.0 m3/h @ 2.0 bar
11.7.
Type: Centrifugal pump 2.0 1 duty + 1 standby
MOC: CI body / SS impeller
Design: ISO 5199
Motor: 22kW, IP55, Class 5
Air Scouring Blower for MMF (common for
both the trains):
11.8. 365 Nm3/hr @ 0.35 bar
2.0 1 duty + 1 standby
Type: Side channel / Positive Displacement
MOC: Aluminum alloy/Cast Iron
Motor: 7.5kW, IP55, Class 5
12. BWRO SYSTEM
RO Feed Pumps:
Capacity: 100.0 m3/h @ 3.0 bar
12.1. Type: Centrifugal pump 2 Duty (1 for each train) + 1 common
3.0
MOC: SS316 body & Impeller standby
Design: ISO 5199
Motor: 18.5kW, IP55, Class 5
SMBS Dosing System (Common for both the
trains):
Dosing pump:
Capacity: 0-8 lph @ 6 bar
MOC: PVC head PTFE diaphragm
Pump: 1 Duty + 1 standby
12.2. Operation (on/off): Automatic
1.0 set Tank: 1 Duty
Stroke adjustment: Automatic
Mixer: 1 Duty
Dosing tank:
Capacity: 300 lit
MOC: PE/GRP,
Type: vertical Cylindrical
Mixer: SS316
12.3. Antiscalant Dosing System (Common for 1.0 set Pump: 1 Duty + 1 standby

PACT REF: 231216 PLANT: WATER TREATMENT PLANT LOCATION: LIBYA DATE: 01/05/2024
Page 32 of 44
INDUSTRIAL AND MUNICIPAL WATER AND WASTEWATER
TREATMENT

QUANTIT
SN EQUIPMENT REMARKS
Y
both the trains):
Dosing pump:
Capacity: 0-10 lph @ 6 bar
MOC: PVC head PTFE diaphragm
Operation (on/off): Automatic
Tank: 1 Duty
Stroke adjustment: Manual
Dosing tank:
Capacity: 300 lit
MOC: PE/GRP,
Type: vertical Cylindrical
Acid Dosing System (Common for both the
trains):
Dosing pump:
Capacity: 0-10 lph @ 6 bar
MOC: PVC head PTFE diaphragm
12.4. Pump: 1 Duty + 1 standby
Operation (on/off): Automatic 1.0 set
Tank: 1 Duty
Stroke adjustment: Automatic
Dosing tank:
Capacity: 300 lit
MOC: PE/GRP,
Type: vertical Cylindrical
12.5. Static Mixer:
1.0 1 duty (on common RO feed header)
Size: DN 200
Cartridge Filter:
Capacity: 100.0 m3/hr
12.6.
Operating pressure: 3 – 4 bar 2.0 2 duty (1 for each train)
MOC: PP cartridge, PVC/FRP housing
5-micron filtration
Isolation Valve:
12.7. MOC: CPVC
2.0 2 duty (1 for each train)
Type: Butterfly, PN 10
Actuation: Pneumatic
Dump Valve:
12.8. MOC: CPVC
1.0 1 duty (on common feed header)
Type: Butterfly, PN 10
Actuation: Pneumatic
High Pressure Pump with VFD:
Capacity: 100.0 m3/hr @ 21.0 bar
12.9. Type: Vertical Multistage
2.0 1 duty for each train
MOC: SS316 body & Impeller
Design: ISO 5199
Motor: 90kW, IP55, Class 5
RO Pressure Vessels:
Size: 8” dia. x 7 element long
1.1. Pressure rating: 450 psi
26.0 13 duty for each train
Arrey: 8:5
Type: Side port
MOC: FRP
1.2. RO Membranes: 182.0 91 duty for each train
Size: 8” dia. x 40” length
Type: Spiral wound, Brackish Water

PACT REF: 231216 PLANT: WATER TREATMENT PLANT LOCATION: LIBYA DATE: 01/05/2024
Page 33 of 44
INDUSTRIAL AND MUNICIPAL WATER AND WASTEWATER
TREATMENT

QUANTIT
SN EQUIPMENT REMARKS
Y
MOC: Polyamide
Area: 400 ft2 per element
Salt Rejection: 99.8%
1.3.
Product Water Tank -- (Existing By Client)
RO Product Transfer Pumps:
Capacity: 150.0 m3/h @ 3.0 bar
1.4. Type: Centrifugal pump
2.0 1 duty + 1 standby
MOC: SS316 body & Impeller
Design: ISO 5199
Motor: 22kW, IP55, Class 5
Waste Disposal Collection Tank (Common
for both the trains):
1.5. Capacity: 25.0 m3
1.0 1 duty
Retention: 20 mins
MOC: GRP
Type: Horizontal Cylindrical
Waste Water Transfer Pumps:
Capacity: 65.0 m3/h @ 4.0 bar
1.6. Type: Centrifugal pump
2.0 1 duty + 1 standby
MOC: Duplex SS
Design: ISO 5199
Motor: 15kW, IP55, Class 5
2. POST TREATMENT SYSTEM
Post pH (NaOH) Adjustment Dosing System:
Dosing pump:
Capacity: 0-15 lph @ 4 bar
MOC: PVC head PTFE diaphragm
(Common for both the trains)
Operation (on/off): Automatic
Pump: 1 Duty + 1 standby
2.1. Stroke adjustment: Automatic 1.0 set
Tank: 1 Duty
Dosing tank:
Mixer: 1 Duty
Capacity: 400 lit
MOC: PE/GRP,
Type: vertical Cylindrical
Mixer: SS316
Post-Chlorination (Hypo) Dosing System:
Dosing pump:
Capacity: 0-3 lph @ 4 bar
MOC: PVC head PTFE diaphragm
(Common for both the trains)
Operation (on/off): Automatic
2.2. 1.0 set Pump: 1 Duty + 1 standby
Stroke adjustment: Automatic
Tank: 1 Duty
Dosing tank:
Capacity: 100 lit
MOC: PE/GRP
Type: vertical Cylindrical
3. RO CIP SYSTEM (COMMON FOR BOTH THE TRAINS)
3.1. RO CIP Tank: 1.0 1 duty
Capacity: 3.5 m3
MOC: PE/GRP

PACT REF: 231216 PLANT: WATER TREATMENT PLANT LOCATION: LIBYA DATE: 01/05/2024
Page 34 of 44
INDUSTRIAL AND MUNICIPAL WATER AND WASTEWATER
TREATMENT

QUANTIT
SN EQUIPMENT REMARKS
Y
Type: Horizontal Cylindrical
Electrical Heater: Provided
RO CIP Pump:
Capacity: 72 m3/hr @ 4.0 bar
Type: Centrifugal, end suction,
3.2. 1.0 1 duty
MOC: SS 316
Design: ISO 5199
Motor: 15 kW, IP55, Class 5
Cartridge Filter for RO CIP:
Capacity: 72 m3/hr
3.3. Operating pressure: 4-5 bar 1.0 1 duty
MOC: PP cartridge, PVC/FRP housing
5-micron filtration
4. RO FLUSHING SYSTEM (COMMON FOR BOTH THE TRAINS)
RO Flushing Tank:
Capacity: 5.5 m3
4.1. 1.0 1 duty
MOC: PE/GRP
Type: Horizontal Cylindrical
RO Flushing Pump:
Capacity: 36 m3/hr @ 2.0 bar
Type: Centrifugal, end suction,
4.2. 1.0 1 duty
MOC: SS 316
Design: ISO 5199
Motor: 5.5kW, IP55, Class 5
5. VALVES
High Pressure Valves:
5.1. MOC: Duplex SS Lot
Pressure ratings: PN 25
Low Pressure Valves:
5.2. MOC: CPVC Lot
Pressure ratings: PN 10
6. PIPE & FITTINGS
High Pressure Pipe & Fittings:
MOC:
6.1. RO Feed: SS316L Lot
RO Reject: Duplex SS
Pressure ratings: SCH 40
Low Pressure Pipe & Fittings:
MOC:
Upstream of MMF: UPVC
Downstream of MMF: CPVC
RO Permeate: SS316L
6.2. Lot
Backwash drain line: Transparent PVC tubing
Air Scouring: CS
Chemical Dosing line: CPVC
Pressure ratings: SCH80 for UPVC & CPVC
pipe

PACT REF: 231216 PLANT: WATER TREATMENT PLANT LOCATION: LIBYA DATE: 01/05/2024
Page 35 of 44
INDUSTRIAL AND MUNICIPAL WATER AND WASTEWATER
TREATMENT

QUANTIT
SN EQUIPMENT REMARKS
Y
7. INSTRUMENTATION
 Each MMF inlet lines
 Backwash pump Discharge header
7.1. Flow transmitter 7.0
 Each RO Permeate lines
 Each RO Reject lines
 Across each MMF
7.2. Differential Pressure Transmitter 6.0
 Across each ACF
 MMF inlet header
7.3. Temperature Transmitter 2.0
 RO CIP tank
7.4. ORP Analyzer 1.0  RO feed header
 RO Feed Header
7.5. Conductivity Analyzer 3.0
 Each RO Permeate line
 RO feed header line
7.6. pH Analyzer 2.0
 RO Permeate header line
7.7. Free Chlorine Analyzer 1.0  RO Permeate header line
 Raw Water tank (Loose Supply)
 Product Water Tank (Loose Supply)
 Filter Feed Tank
 Filtered Water Tank
 RO CIP Tank
 RO Flushing Tank
7.8. Level Switch 11.0
 Pre-Chlorine Dosing Tank
 Post-Chlorine Dosing Tank
 SMBS Dosing Tank
 Antiscalant Dosing Tank
 Acid Dosing Tank
 Post-pH correction Dosing Tank
 Filter Feed Pump Suction header
 Each RO High Pressure pump
suction,
7.9. Pressure Switch 7.0
 Each RO High Pressure pump
discharge
 Each RO Reject
 All pump & Blower discharge,
7.10.
Pressure Gauges Lot  Filters inlet/outlet
 RO feed, Reject & Permeate
8. ELECTRICAL & CONTROL SYSTEM (COMMON FOR BOTH THE TRAINS)
Main Control System:
MCC + PLC + HMI
Form II, IP54
8.1. 1.0 1 duty
PLC: non-redundant
MOC enclosure: Sheet Steel
Cable entry: bottom
8.2. Cable Works: Lot
Power Cables: Cu/XLPE/PVC/SWA
Un-armored cable
Instruments cables: Cu/PVC/IS/OS

PACT REF: 231216 PLANT: WATER TREATMENT PLANT LOCATION: LIBYA DATE: 01/05/2024
Page 36 of 44
INDUSTRIAL AND MUNICIPAL WATER AND WASTEWATER
TREATMENT

QUANTIT
SN EQUIPMENT REMARKS
Y
Un- armored cable
Cable Trays: PVC
9. SKID WORKS
Skid works for:
 Multimedia Filter Frontal piping
 Activated Carbon Filter Frontal
piping
9.1. Lot Carbon steel, Epoxy coated
 RO system
 RO CIP & Flushing system
 Dosing systems
 Control Panel

SECTION 6 : EQUIPMENT MAKES AND ORIGIN

EQUIPMENT MAKE ORIGIN


EBARA / XYLEM / GRUNDFOS /
CENTRIFUGAL PUMPS INTERNATIONAL
ANDTRITZ / WILO / TORISHIMA
PRESSURE VESSELS PACT UAE

DOSING PUMPS SEKO / DOSEURO EUROPE

DOSING TANKS PACT / SEKO / AQUA EUROPE / UAE


EUROPE/
AGITATORS SEKO / AQUA / XYLEM
INTERNATIONAL
AIR BLOWER FZP / MAPRO EUROPE

RO MEMBRANES LG/EQUIVALENT INTERNATIONAL

RO PRESSURE VESSELS ROPV/EQUIVALENT INTERNATIONAL


AQUALINE/BROTHER
CARTRIDGE FILTERS INTERNATIONAL
FILTRATION/DARLY
VALVES (NON-METALLIC) HIDROTEN / CEPEX / HDYDROPLAST INTERNATIONAL

VALVES (METALLIC) FLOWTECH /EMIRATES / DEMBLA / ABO INTERNATIONAL

ANALYZERS JUMO / HACH INTERNATIONAL

TRANSMITTERS GF/ YOKOGAWA / JUMO INTERNATIONAL

SWITCHES (LEVEL/PRESSURE) ITEC / SEKO/PI CONTROLS INTERNATIONAL

PACT REF: 231216 PLANT: WATER TREATMENT PLANT LOCATION: LIBYA DATE: 01/05/2024
Page 37 of 44
INDUSTRIAL AND MUNICIPAL WATER AND WASTEWATER
TREATMENT

PRESSURE GAUGES ITEC / PI CONTROLS INTERNATIONAL

ELECTRICAL PANEL COMPONENTS SCHNEIDER / SIEMENS / ABB / TERASAKI


INTERNATIONAL
(ASSEMBLY BY PACT)
PLC COMPONENTS SCHNEIDER / SIEMENS / ABB

VFD DANFOSS / EMETRON /FUJI / SIEMENS EUROPE / USA


BRUFLEX / SEECAB / RR KABEL /
CABLES INTERNATIONAL
THERMOCABLE
ELBOR / POLYCAB / EMIRATES
PIPES & FITTINGS (NON-METALLIC) INTERNATIONAL
GERMANY / UNION GLOBAL
PIPES & FITTINGS (METALLIC) CRA / TECHNINOX / TUBACEX / BEBITZ INTERNATIONAL
Note: Final Selection of vendors shall be in line with delivery and compatibility of technical offers which may vary from above
proposed manufacturers however shall be finalized upon client’s confirmation.

SECTION 7 : LIST OF TERMINATION / TIE-IN POINTS

7.1. TIE-IN POINTS FOR NGL PLANT (PACKAGE-A):


FLANGE
QUANT
SERVICE SIZE
ITY RATI TYP FAC
NG E E
Raw water at Filter feed pump suction 1 8” 150# WN RF

BWRO permeate header 1 6” 150# WN RF

BWRO Reject water header 1 3” 150# WN RF

RO product transfer pump discharge header 1 6” 150# WN RF

Waste Water transfer pump discharge header 1 4” 150# WN RF

MMF & ACF Backwash waste outlet deader 1 8” 150# WN RF

Instrument Air at one point within plant battery limit 1 1” 150# WN RF

Service water at one point within plant battery limit 1 1” 150# WN RF


Chemicals at the inlet of respective chemical dosing
-- -- -- -- --
tanks
Incomer Power Cable at PACT Control Panel -- -- -- -- --

Earthing Main Network -- -- -- -- --


Note:
 Flanges size may change during detail engineering
 In general, all piping termination points shall terminate near the termination points at 1 meter distance.

PACT REF: 231216 PLANT: WATER TREATMENT PLANT LOCATION: LIBYA DATE: 01/05/2024
Page 38 of 44
INDUSTRIAL AND MUNICIPAL WATER AND WASTEWATER
TREATMENT

7.2. TIE-IN POINTS FOR OIL CENTER (PACKAGE-B):


FLANGE
QUANT
SERVICE SIZE
ITY RATI TYP FAC
NG E E
Raw water at Filter feed pump suction 1 10” 150# WN RF

BWRO permeate header 1 8” 150# WN RF

BWRO Reject water header 1 4” 150# WN RF

RO product transfer pump discharge header 1 8” 150# WN RF

Waste Water transfer pump discharge header 1 4” 150# WN RF

MMF & ACF Backwash waste outlet deader 1 8” 150# WN RF

Instrument Air at one point within plant battery limit 1 1” 150# WN RF

Service water at one point within plant battery limit 1 1” 150# WN RF


Chemicals at the inlet of respective chemical dosing
-- -- -- -- --
tanks
Incomer Power Cable at PACT Control Panel -- -- -- -- --

Earthing Main Network -- -- -- -- --


Note:
 Flanges size may change during detail engineering
 In general, all piping termination points shall terminate near the termination points at 1 meter distance.

PACT REF: 231216 PLANT: WATER TREATMENT PLANT LOCATION: LIBYA DATE: 01/05/2024
Page 39 of 44
INDUSTRIAL AND MUNICIPAL WATER AND WASTEWATER
TREATMENT

SECTION 8 : POWER CONSUMPTION

8.1. PRELIMINARY POWER CONSUMPTION FOR NGL


PLANT (PACKAGE-A):
Avg. Total
Total Runnin total running
Insta Mot Absorbe
S. Install g hours running absorbe
Equipment Description lled Duty or d Power
N ed (Hrs/da absorbe d power
Qty (kW) (kW/Hr)
(kW) y) d power (kw/m3)
(kW-hr) Product
1 Filter feed pumps 4 2 18.5 74.00 13.35 24.0 26.70 0.2670

2 Filter backwash pumps 2 1 15.0 30.00 12.10 1.0 0.50 0.0050


11.0
3 RO feed pumps 3 2 33.00 9.10 24.0 18.20 0.1820
0
55.0
4 RO High Pressure Pump 2 2 110.00 51.62 24.0 103.24 1.0324
0
RO product Water 18.5
5 2 1 37.00 15.90 24.0 15.90 0.1590
Transfer Pump 0
15.0
6 RO CIP pump 1 1 15.00 12.80 0.0 0.00 0.0000
0
7 RO Flushing pump 2 1 5.50 11.00 4.30 1.0 0.18 0.0018
Waste Water Transfer 11.0
8 2 1 22.00 9.10 24.0 9.10 0.0910
Pumps 0
9 Dosing pumps 12 6 0.15 1.80 0.14 24.0 0.86 0.0086

10 Blower 2 1 5.50 11.00 4.20 1.0 0.18 0.0018

11 Agitator 2 2 0.20 0.40 0.19 2.0 0.03 0.0003


Electrical Heater for RO
12 1 1 7.50 7.50 7.50 0.0 0.00 0.0000
CIP
TOTAL 352.70 140.30 174.89 1.75

PACT REF: 231216 PLANT: WATER TREATMENT PLANT LOCATION: LIBYA DATE: 01/05/2024
Page 40 of 44
INDUSTRIAL AND MUNICIPAL WATER AND WASTEWATER
TREATMENT

8.2. PRELIMINARY POWER CONSUMPTION FOR OIL


CENTER (PACKAGE-B):
Total
Avg.
running
Absorb total
Total Runnin absorb
Mot ed running
S. Install Dut Install g hours ed
Equipment Description or Power absorb
N ed Qty y ed (Hrs/da power
(kW) (kW/Hr ed
(kW) y) (kw/m3
) power
)
(kW-hr)
Product
1 Filter feed pumps 4 2 22.0 88.00 19.00 24.0 38.00 0.2533

2 Filter backwash pumps 2 1 22.0 44.00 19.00 1.0 0.79 0.0053


18.5
3 RO feed pumps 3 2 55.50 15.90 24.0 31.80 0.2120
0
90.0
4 RO High Pressure Pump 2 2 180.00 75.50 24.0 151.00 1.0067
0
RO product Water Transfer 22.0
5 2 1 44.00 19.00 24.0 19.00 0.1267
Pump 0
15.0
6 RO CIP pump 1 1 15.00 12.80 0.0 0.00 0.0000
0
7 RO Flushing pump 2 1 5.50 11.00 4.30 1.0 0.18 0.0012
Waste Water Transfer 15.0
8 2 1 30.00 12.80 24.0 12.80 0.0853
Pumps 0
9 Dosing pumps 12 6 0.15 1.80 0.14 24.0 0.86 0.0057

10 Blower 2 1 7.50 15.00 5.80 1.0 0.24 0.0016

11 Agitator 2 2 0.20 0.40 0.19 2.0 0.03 0.0002


10.0
12 Electrical Heater for RO CIP 1 1 10.00 10.00 0.0 0.00 0.0000
0
TOTAL 494.70 194.43 254.70 1.70

Note: Power consumption is preliminary and indicative only and might be changed during detailed engineering.

PACT REF: 231216 PLANT: WATER TREATMENT PLANT LOCATION: LIBYA DATE: 01/05/2024
Page 41 of 44
INDUSTRIAL AND MUNICIPAL WATER AND WASTEWATER
TREATMENT

SECTION 9 : CHEMICALS CONSUMPTION

9.1. PRELIMINARY ONE (1) YEAR CHEMICAL


CONSUMPTION FOR NGL PLANT (PACKAGE-A):
DOSE, CHEMICAL CONSUMPTION KG FOR
ITEM DESCRIPTION
PPM CONC % 1 YEAR
1. Disinfection: NaOCl (Pre-chlorination) 2.0 12.00% 20,735.00

2. Antiscalant 5.0 100.00% 5,870.00

3. SMBS 4.0 96.00% 4,895.00

4. Acid 5.0 30.00% 19,565.00

5. Disinfection: NaOCl (Post-chlorination) 1.5 12.00% 10,950.00

6. pH Correction: NaOH 8.0 48.00% 14,600.00

9.2. PRELIMINARY ONE (1) YEAR CHEMICAL


CONSUMPTION FOR OIL CENTER (PACKAGE-B):
DOSE, CHEMICAL CONSUMPTION KG FOR
ITEM DESCRIPTION
PPM CONC % 1 YEAR
1. Disinfection: NaOCl (Pre-chlorination) 2.0 12.00% 30,955.00

2. Antiscalant 5.0 100.00% 8,760.00

3. SMBS 4.0 96.00% 7,300.00

4. Acid 5.0 30.00% 29,200.00

5. Disinfection: NaOCl (Post-chlorination) 1.5 12.00% 16,425.00

6. pH Correction: NaOH 8 48.00% 21,900.00

PACT REF: 231216 PLANT: WATER TREATMENT PLANT LOCATION: LIBYA DATE: 01/05/2024
Page 42 of 44
INDUSTRIAL AND MUNICIPAL WATER AND WASTEWATER
TREATMENT
Note: Chemical consumption is preliminary and indicative only and might be changed during detailed engineering.

SECTION 10 : SPARE PARTS

10.1. SPARE PARTS FOR START – UP &


COMMISSIONING
SN DESCRIPTION QUANTITY
100%, including removable
1. Set of Gasket
assemblies, man ways, etc.
2. Bolt, Nuts & Washers for Steel Structures 20% of each size, length & type

10.2. RECOMMENDED SPARE LIST FOR 2 YEARS


OPERATION
This is A recommended list of spare parts for 2 years of operation and maintenance of the plant.
This is a preliminary list and shall be finalized after the award of the contract.
SN DESCRIPTION QUANTITY

1. Centrifugal Pumps (for each set) – as applicable

1.1.1. Mechanical seal 1 No.

1.1.2. ‘O’ Ring 1 No.

1.1.3. Gasket set 1 No.

1.1.4. Metering Pumps (for each set)

1.1.5. Diaphragm 1 set

1.1.6. ‘O’ Ring 1 set

1.1.7. Gasket set 1 set

2. Air Blowers (for each set)

PACT REF: 231216 PLANT: WATER TREATMENT PLANT LOCATION: LIBYA DATE: 01/05/2024
Page 43 of 44
INDUSTRIAL AND MUNICIPAL WATER AND WASTEWATER
TREATMENT

SN DESCRIPTION QUANTITY

2.1.1. Bearing set 1 No.

3. Instruments

3.1.1. Pressure Gauges (for each type) 1 No

3.1.2. Conductivity sensor 1 No

3.1.3. Chlorine sensor 1 No

3.1.4. pH sensor 1 No

3.1.5. ORP sensor 1 No

4. Control Panel

4.1.1. Push button 10 Nos

4.1.2. Control fuse 5 Nos

4.1.3. Indication lamps (each color) 5 Nos

4.1.4. Aux contact for client/contractor 5 Nos

4.1.5. Control relay 5 Nos

5. PLC

5.1.1. Power Supply 1 No

5.1.2. Processor 1 No