You are on page 1of 5

Construction of Gas Treatment Plant -Tataouine Gas Project

Contract No. Document No. Rev.


AOI NO 01/2018 TGP-JE-GTPT-240-RE-DAT-0004 A01
Date 30/09/2019 Page 1 of 5
Data Sheet

Data Sheet for Depropanizer Air Cooler

Document No. TGP-JE-GTPT-240-RE-DAT-0004

A01 12/06/2020 Issued for Internal Review HS Dong ZK Wang QX Wang


Rev Date Description Prepared by Reviewed by Approved by
Project Name:

Construction of Gas Treatment Plant -Tataouine Gas Project

Contract No.: AOI NO 01/2018


Title: Data Sheet for Depropanizer Air Cooler Document No.:TGP-JE-GTPT-240-RE-DAT-0004 Rev.: A01 Page : 2 of 5

REVISIONS REVISIONS
SHEETS A01 A02 SHEETS A01 A02
1* 35
2**
2 36
3 37
4 38
5 39
6 40
7 41
8 42
9 43
10 44
11 45
12 46
13 47
14 48
15 49
16 50
17 51
18 52
19 53
20 54
21 55
22 56
23 57
24 58
25 59
26 60
27 61
28 62
29 63
30 64
31 65
32 66
33 67
34 68
Note : * front page
** this page
Revisions History
Revision Description
A01 Issued for Internal Review
Project Name:

Construction of Gas Treatment Plant -Tataouine Gas Project

Contract No.: AOI NO 01/2018

Title: Data Sheet for Depropanizer Air Cooler Document No.:TGP-JE-GTPT-240-RE-DAT-0004 Rev.: A01 Page : 3 of 5
Manufacturer Heat exchanged (Watts) 547712
Model no. Surface/Item-Finned tube (m2) 3062
Customer Bare tube (m2) 127.582
Plant location Tunisia MTD, Eff. (Deg. C) 12.10
Service GTPT-AC-240-002 Transfer rate-Finned (W/m2-K) 25.389
Type draft FORCED Bare tube, service (W/m2-K) 609.370
Bay size (WxL) (m) 2 91 x 9
2.91 9.000
000 Bare tube
tube, clean (W/m2-K) 609.370
No. of bays/Items 1

Basic design data


Pressure design code Structural code
Tube bundle code stamped Flammable service
Heating coil code stamped Lethal/toxic service
Performance Data - Tube Side
Fluid name 24018 In Out
Total fluid entering
g (kg/s)
( g ) 2.06 Total flow rate (Liq/Vap)
( q p) (kg/s)
( g ) 0.00000 / 2.05797 2.05797 / 0.00
Dew/bubble point (Deg. C) / Water/Steam (kg/s) 0.00000 / 0.00000 0.00000 / 0.00000
(Deg. C) Noncondensables (kg/s) 0.00000 0.00000
Latent heat (kJ/kg) Molecular Wt. (Vap/Non-cond) / /
Inlet pressure (kPa) 235.03 Density (Liq/Vap) (kg/m3) 418.767 / 56.479 431.891 / 55.5064
Pressure drop (All/Calc) (kPa) 10 / 9.389 Specific heat (Liq/Vap) (kJ/kg-C) 3.9538 / 2.6379 3.6277 / 2.6107
Velocity (Allow/Calc) (m/s) / 1.43 Thermal conductivity (Liq/Va (W/m-C) 0.0717 / 0.0255 0.0754 / 0.0253
Inside fouling resistance (m2-K/W) 0.000000 Viscosity (Liq/Vap) (mN-s/m2) 0.0675 / 0.0110 0.0716 / 0.0110
In Out
Temperature (Deg. C) 64.21 57.49

Performance Data - Air Side


Air inlet temperature (Deg. C) -5~47.6 Face velocity (m/s) 2.70
Air flow rate/item (m3/s) 70.40 Minimum design ambient temp. (Deg. C) -5
Mass velocity (kg/s-m2) Altitude (m) 287.000
Air outlet temperature (Deg. C) 54.0 Static pressure (Pa) 95.13
Air flow rate/fan (m3/s) 26.5

Design, Material, and Construction


Design pressure (kPaG) 2480 Heating Coil
Test pressure (kPaG) No. of tubes
Design temperature (Deg. C) 95 Tube outside diameter (mm)
Min. design metal temp. (Deg. C) -10 Tube material
Tube bundle Fin material and type
Size (WxL) (m) 2.897 X 9.000 Fin thickness (mm)
No./Bay 1 ASME Code, Sec. VIII, Div. 1
Number of tube rows 4 Heating fluid
Bundles in parallel 1 Heating fluid flowrate (kg/s)
Bundles in series Temperature (In/Out) (Deg. C)
Structure mounting Inlet pressure (kPa)
Pipe rack beams Pressure drop (All/Calc) (kPa)
Ladders, walkways, platforms Design temperature (Deg. C)
Structure surface prep. Design pressure (kPa)
Header surface prep. Inlet/Outlet nozzle
Louver Header
Material Type Plug
Action control Material CS
Action type Corrosion Allowance (mm) 3
No. of p
passes 4
Project Name:

Construction of Gas Treatment Plant -Tataouine Gas Project

Contract No.: AOI NO 01/2018

Title: Data Sheet for Depropanizer Air Cooler Document No.:TGP-JE-GTPT-240-RE-DAT-0004 Rev.: A01 Page : 4 of 5
Design, Material, and Construction (continued)
Header (continued) No./Bundle 184.0
Slope Length (m) 9
Plug material Pitch (mm) 62.000
Gasket material Layout Triangular
Nozzle No. Size Rating/Facing Fin
Inlet 1 4“
4 300#-RF Type Plain round
Outlet 1 3" 300#-RF Material Aluminum 1060 - H14
Vent Thickness (mm) 0.500
Drain Selection temp. (C)
Chemical Cleaning Outside diameter (mm) 57.000
Min. Wall Thk. Fin density (fin/meter) 433.0
Tube ASME Code, Sec. VIII, Div. 1
Material CS Customer Specifications
Tube outside diameter (mm) 25.000
Average wall thickness (mm) 2.5

Mechanical Equipment
Fan RPM
Manufacturer Service factor
No./Bay 3 Enclosure
RPM (Revs/min.) Voltage
Diameter (m) 2.108 Phase
No. of blades Cycle
Angle (degrees) Fan noise level (dB)
Pitch adjustment Speed Reducer
Blade material Type
Hub material Manufacturer
@design temp No./Bay
@min. ambient temp Service factor
Tip speed Speed ratio
Driver Support
Type Vib. switch
Manufacturer Enclosure
No./Bay
Driver
Controls - Air Side
Air recirculation Louvers
Degree control of outlet process temp. Positioner
(Max. Cooling),+/- Signal air pressure (kPa)
Action on control signal failure From To
Fan pitch From To
Louvers Supply air pressure (kPa)
Actuator air supply From To
Fan From To

Shipping
Plot area (WxL) (m) Total (kg)
Bundle weight (kg) Shipping (kg)
Bay (kg)
Project Name:

Construction of Gas Treatment Plant -Tataouine Gas Project

Contract No.: AOI NO 01/2018

Title: Data Sheet for Depropanizer Air Cooler Document No.:TGP-JE-GTPT-240-RE-DAT-0004 Rev.: A01 Page : 5 of 5
Inlet Stream Property and Components

NOTES
1. - Materials and Corrosion allowance shalll be confirmed by VENDOR.
2.- VENDOR shall verify, design and provide mechanical and thermal guarantee.
3.- VENDOR shall provide Data Sheet with Complete information
4- Data submitted in this sheet should be confirmed by VENDOR
5 VENDOR should
5.- h ld consider
id extra
t margin
i off heat
h t exchange
h i case heat
area in h t exchange
h ffi i
efficiency l
low d
down ft a long
after l d ti running.
duration i
6. - The VENDOR should provide the max. allowable torque and disposition of nozzles.
7.- Only one is driven by VFD, others are fixed frequency.
8.- In any conditions, the outlet temperature of air cooler bundle shall be lower than 57.5 Deg.C
9.- VENDOR shall confirm that material of fan meet service requirements.
10.- The max. ambient temperature for the motor design and selection is 55 Deg.C
11.- Equipment shall be designed to meet a service life of 25 years, and the packaged equipment shall be suitable for operation at the rated loading for a
continuous period of 3 years.The continous running: 355 days/year.
12.- Over design margin:10% on flowrate& duty, 15% on surface area.