W2021E-DNGF-CV-272-SDY-0001 3
W2021E-DNGF-CV-272-SDY-0001 – Rev. 3 Page 1 of 38
PT PERTAMINA EP
Table of Contents
1. INTRODUCTION
1.1. General
This report is the result of the Soil Investigation Area CPP Donggi Matindok which is OCTG, GTG at CPP
Donggi area and ATU at CPP Matindok area.
The Soil Investigation work aims to obtain data and subsurface soil parameters that will be used to analyze
soil behavior when burdened, as well as to identify possible patterns of collapse that may occur and how
to overcome them. These data can be used for further analysis.
a. 1 (one) point of Sondir/DCPT Capacity of 2.5 ton to a depth of 25 meter or up to hard soil (the value
of cone resistance readings >200 kg/cm2);
b. 1 (one) point of Hand Bore up to 6 meter depth, include soil sampling (2 tube of undisturbed
sample/UDS);
c. 2 points of Test Pit (soil sampling for CBR test at soil mechanical Laboratory).
a. 1 (one) point of Sondir/DCPT Capacity of 2.5 ton to a depth of 25 meter or up to hard soil (the value
of cone resistance readings >200 kg/cm2);
b. 1 (one) point of Deep Boring (boreholes) and N-SPT Test to a depth of 20 meters, include soil
sampling (interval 2 meters or 6 tube).
a. 1 (one) point of Sondir/DCPT Capacity of 2.5 ton to a depth of 25 meter or up to hard soil (the value
of cone resistance readings >200 kg/cm2);
b. 1 (one) point of Deep Boring (boreholes) and N-SPT Test to a depth of 20 meters, include soil
sampling (interval 2 meters or 6 tube).
Laboratory Test:
a. Index Properties:
- Atterberg Limits,
- Grain Size,
- Unit Weight,
- Spesific Gravity,
- Soil Classification,
- Water Content,
- Organic Content.
b. Engineering Properties:
- Direct Shear/Triaxial UU,
W2021E-DNGF-CV-272-SDY-0001 – Rev. 3 Page 5 of 38
PT PERTAMINA EP
Location of soil investigation is at Pertamina EP Regional 4 Zona 13, CPP Donggi-Matindok Kec. Toili
Barat and Kec. Batui, Kab. Banggai, Prov. Sulawesi Tengah (Gambar 1-1).
1.4. Reference
The implementation of Soil Investigation refers to the provisions, regulations, and norms of technical
implementation of work, consist of:
- SNI 2827: 2008 : “Cara uji penetrasi lapangan dengan alat sondir”
- SNI 2436: 2008 : “Tata cara pencatatan dan identifikasi hasil pengeboran inti”
- SNI 4153: 2008 : “Cara uji penetrasi lapangan dengan SPT”
- ASTM D2573 : Standard Test Method for Field Vane Shear Test in Cohesive Soil
- ASTM D4700 : Standard Guide for Soil Sampling from the Vadose Zone
- ASTM D1586-67 : Standard Test Method for Standard Penetration Test (SPT) and Split Barrel
Sampling of Soil
- ASTM D1587-67 : Standard practice for Thin Walled Tube sampling soils for geotechnical purpose
- Technical rules of survey.
The list of equipment which used in Soil Investigation work can be seen in Tables 1.5-1.
2. METHOD OF WORK
Sondir or also called Dutch Cone Penetration Test (DCPT) is implemented in reference to ASTM D 3441-
98 (Standard Test Method for Mechanical Cone Penetration Test of Soil) and SNI 2827:2008 on how to
test penetration to obtain parameters layer of soil hardness in the field, with penetration (static conus
penetration) mechanical system. Cone testing tools with a diameter of 3.57 cm. area of a section 100 mm 2,
cone with rod in the pipe suppressor. Parameters that read on the manometer form a conus resistance
(Cw) and shear resistance (Tw). From these parameters can find out the number of friction ratio (R f), and
total soil friction (Tf) for the interpretation of the soil layer hardness that is part of the foundation design.
The mechanics of the penetration testing tool and the penetration test method can be seen in figure 2.1-1
and 2.1-2.
Figure 2.1-1 Scheme of Cone Penetration Test/Sondir (ASTM D 3341-98 and SNI 2827:2008)
The results of penetration are presented in graphical form with empirical equations as follows:
Qc x Ac = Cw x Apl
As = π Ds Ls ..................................................................................................................... (7)
With:
The results of penetration test in clay soil can be estimated the strength level of each layer of soil based
on qc value (conus resistance) where the estimate of strength or a fine grained soil properties is influenced
by the level of strength due to water content. The estimated soil strength of the penetration result based
on qc value can be seen in table 2.1-1.
(Conus Resistance)
Soil Strength Estimate
Cw ( kg/cm2)
<6 Very Soft
6 - 12 Soft
12 - 24 Medium
24 - 45 Stiff
45 - 75 Very Stiff
75-150 Hard
150< Very Hard
Drilling with an auger or hand boring is the simplest and most economical drilling method on soft ground
to a certain depth. The methods of implementation in detail are described in sub-section below.
a. Determine the drill point and clean the area around the drill point. Drill bits are installed on rod then
the top is installed T-key.
b. Build/Set up perpendicular drill tools at a predetermined point, then by using crank, turn round the
clockwise while pressed until the drill into the ground
c. After the drill bits is full, the drill tools is lifted out then immediately identified about the type, color,
properties the soil while the drill bits is cleaned.
d. Then continue drilling to reach 5 meter depth. If the hole has more than one rod, then the rod are
connected with another rods and so on.
Soil sampling refers to ASTM D4700 (Standard Guide for Soil Sampling from the Vadose Zone), i.e. This
guide includes procedures that can be used to obtain soil samples from the vadose zone. Take examples
of soil with thin steel cylinders with a diameter of 73 mm and a length of 50 cm. The taking of the original
soil example, undisturbed sample (UDS), is done vertically by being pressed or pounded by a hammer
and covered with wax liquid (paraffin) so that the moisture content and texture of the soil are not disturbed
and protected from heat and impact. The hand bore tool scheme can be seen in Figures 2.2-1 below.
Deep boring is carried out by core drilling methods. Deep boring is done by rotating and pressing a core
barrel with a diameter of 73 mm. The result of the piece of soil is removed and placed on a corebox
measuring 1 meter long consisting of 5 rows. On the layer of soil that is loose, drilling will use or install
casings (protective pipes). Drilling will be stopped until it reaches a depth of 30 meters or reaches the
value of N-SPT>50 with 3 consecutive SPT tests. The scheme of core drilling tools and working procedures
can be seen in Figures 2.3-1 below.
In this soil investigation, GXY-01 machine is used. GXY machine can be assembled such that it is easier
for mobilization. In addition, generators and water pumps are also needed. The first generator is used to
drive the YBM engine, meanwhile the second generator is used as a power source for water pumps.
After the bed is in the position of the planned drill point, raise the main controller on the bed then tighten
the bolt. Raise the gearbox and tightened the bolt. Then raise the crane/coupling and tighten the bolt.
Finally install the spindle. Always check machine straightness using water pass. After the machine is
arranged, the next step is to raise the tripod for the pulley stand. The height of the tripod should be higher
than the rod. In this drilling, the tripod height is 6 m. Ensure the end of sling is attached to pulley in parallel
to the engine spindle hole. The sling is used for Lifting or Lowering process the rod and casing. Figure 2.3-
2 show drilling machine arrangement.
Before conducting SPT, N value of the SPT should be defined. N value is the number of blows needed to
insert a standard Split Spoon tube into the ground as deep as 12" (or 1 foot, or 30 cm). The test is
performed as much as 3 x 15 cm, where the number of collisions is in the first 15 cm (N1). However it is
not used as the SPT value. The N value of the SPT is the sum of N2 and N3.
This Standard Penetration Test or SPT has been performed in according with ASTM Standard D1586
(ASTM = American Standard for Testing and Materials). Standard Penetration Test, SPT, must always be
done together with drilling.
Split Spoon Tube is a tube with an outer diameter of 2" (5.08 cm), and an inner diameter of 1.5" (3.81 cm),
a length of 18" to 30" (45.7 - 76.2 cm). It is split into 2 sections towards its length, in order to take soil
samples from it. The bottom end is screwed with a hard metal (shoe). The shoe straps the two halves of
the split pipe. Meanwhile the upper part is connected with a Split Spoon connecting pipe and rod.
Another standard equipment is the Hammer, which weighs 140 lbs (63.5 kg) and the height of fall during
mashing is 30" (76 cm). Likewise, during measuring SPT, the drill pipe used to connect the pounder (at
ground level) to the split spoon (inside the ground) is a pipe of size A, namely the outer diameter of 1-5 /
8" (4.12 cm) and the inner diameter of 1-1 / 8" (2.85 cm) or larger.
Figure 2.3.1-1 Schemes of Standard Penetration Test (ASTM D1586 and SNI 4153: 2008)
a. Drilling to a depth where the SPT test will be conducted. Then clean the drill hole from the loose
soil.
b. Attach the Split Spoon to the rod, and insert it into the ground to the depth of the drilling resulted
above.
c. At the top of the rod, attach the hammer along with its complementary parts, which consist of the
hammer fall guide, hammer lifter rope, etc.
d. Do the collision, so that the split spoon penetrated as deep as 3x6” (3x15 cm). Count the number
of collisions for the first, second and third for each 15 cm penetration. Note that during pounding,
the height of the hammer must always be 30", and the lifting strap of the hammer must be loose
during the hammer fall.
e. The number of collisions for the second and third 2x15 cm penetration is called the N value (SPT).
Collisions for the first 15 cm are considered penetration of a split spoon still in the ground damaged
by drilling, it is still ignored, unless a third 15 cm collision is not possible.
f. Lift the Split Spoon to the surface. The soil from the split spoon can easily be removed by
unscrewing the pipe shoes. Then open the two halves of the Split Spoon pipe. After the soil is
identified as necessary, store the soil in plastic.
g. To test the SPT in the next depth, the drill hole must be deepened first, to the next to be tested for
the SPT. From the results of SPT in various depths from one borehole, it can be described SPT
graphs of depth, which usually become one by visually identifying the soil type, color and properties
called bore log.
The soil layer profile at the soil investigation site is made based on the results of the soil investigation.
Determination and classification of soil types is determined from visual observations, Standard Penetration
Test (SPT) results, and laboratory test results. Verification against soil classification that has been
determined based on visual observations needs to be done to determine the soil type. Some references
for classifying soil types can be seen in the following table.
Table 2.3.1-1 Classification of Granular Soil by N-SPT Value (Meyerhof and Peck, 1948)
Tabel 2.3.1-2 Classification of Cohessive Soil by N-SPT Value (Terzaghi et al., 1996)
N-SPT Soil
Su (psf) Su (kPa)
Value Consistency
0-2 Very Soft <250 <12
2-4 Soft 250 – 500 12 – 25
4-8 Medium 500 – 1000 25 – 50
8 - 15 Stiff 1000 – 2000 50 – 100
15 – 30 Very Stiff 2000 – 4000 100 – 200
30 < N Hard >4000 >200
Examples of undisturbed soil are soil samples whose grain structure and water content are the same as
the structure and moisture content of the original place in the soil. The soil samples must represent well
the soil in the place of origin (representative sample). In order to maintain these conditions, their collection
and storage require certain techniques.
The original soil sample is taken using thin walled tube sampler, at depths as long as the soil condition is
possible to be taken using (Thin Walled Tube Sampler). This tube has an outer diameter of 3 "and an inner
diameter of 2,875" (some have an outer diameter of 2 "to 5"). The length is between 40 and 80 cm. It is
W2021E-DNGF-CV-272-SDY-0001 – Rev. 3 Page 15 of 38
PT PERTAMINA EP
used for cohesive soils, such as clay, silt, or clay or silt, which is not too hard. Sampling of undisturbed soil
shall follow standard ASTM D-1587-83 "Standard Practice for Thin-Walled Tube Sampling of Soils".
The original soil samples taken from the drilling above, remain in the sampler tube which is tightly closed
and free from disturbance or collision such that the physical, chemical structure and composition remain
as the soil in its original place, until the time for laboratory tests.
Original soil samples are taken from deep boreholes at planned depth, or it can be obtained from certain
depths where there are changes in type, color, odor, hardness, and grain. Normally, it is taken from every
change in depth from 2 to 3 meters. Ideally original soil samples are taken continuously along the depth
of the borehole. However it takes longer time and expensive, especially if everything must be tested by
the Laboratory.
On soils with Stiff, Very Stiff or Hard consistency, the original soil sampling taken by Thin Walled Tube
Sampler can no longer be done. Sampling at this layer can still be done, although with a greater degree
of disturbance than samples taken with the Thin Walled Tube Sampler, i.e. using Core-Barrel, and after
arriving at the surface, the sample is removed from the Core-Barrel. Then inserted into the Thin Walled
Tube Sampler to protect it from further disturbance. There are 2 types of soil samples that are known,
namely so-called original (undisturbed) and non-original (disturbed) soil samples. It is depend on how they
are taken, and each is required to be tested in a laboratory.
Samples of soil taken from drilling, and which remain in tightly closed sampler tubes, are tested in the
laboratory to obtain the value of the original geotechnical parameters.
Test
No. ASTM SNI Reference Title
Description
- 03-3422-1994 Plastic Limit (PL), and Plasticity
Index (PI).
Grain Size Method of testing the size of soil
5. D 1140-00 03-1968-1990
Analysis grains with a sieve and hydrometer
Organic
6. 03-6793-2002 Organic material testing methods
Content
7. Direct Shear D 3080-04 03-3420-1994 Soil Shear Strength Test Method
Triaxial Test (Unconsolidated Un-
drained, UU) is performed to look for
8. Triaxial UU D 2850-95 03-4813-2004
cohesion (c) and shear angle (f) in
an Unconsolidated Un-drained state
Triaxial Test (Consolidated Un-
drained, CU) is performed to look for
9. Triaxial CU 2455-2015
cohesion (c) and shear angle (f) in
an Consolidated Un-drained state
Consolidation
Method for One-Dimensional
10. One D 2435-96 03-2812-2011
Consolidation Properties of Soils
Dimensional
Unconfined
Standard Test Methode for
11. Compression D 2166-06
Unconfined Compression Test
Test
12. pH 19-6426-2000 PH measurement testing methods
13. SO4 D 516-11 Standard Test Methode for Sulfate
Here is a summary of sondir results at S-01 OCTG Area CPP Donggi, are shown in Figure and Table
below.
Figure 3.1.1-1 Cone Resistance Against Estimated of Soil Strength at S-01 OCTG Area CPP Donggi
Depth Cw Tw Rf
Soil Strength Estimate
(m) (kg/cm2) (kg/cm2) (%)
1.00 30 35 1.11 Stiff
2.00 5 8 4.01 Very Soft
3.00 5 9 5.35 Very Soft
4.00 15 25 4.46 Medium
5.00 15 20 2.23 Medium
6.00 10 15 3.34 Soft
7.00 25 40 4.01 Stiff
8.00 20 25 1.67 Medium
9.00 15 25 4.46 Medium
10.00 50 70 2.67 Very Stiff
11.00 100 130 2.01 Hard
11.60 200 250 1.67 Very Hard
11.80 The test was stopped at Cone Resistance ≥ 200 kg/cm2
Here is a summary of hand boring results at HB-01 OCTG Area CPP Donggi, are shown in Table below.
Table 3.1.2-1 Summary of Hand Boring Log at HB-01 OCTG Area CPP Donggi
Figure 3.1.2-1 Documentation of Hand Boring at HB-01 OCTG Area CPP Donggi
The Test Pit has been conducted two points in OCTG area CPP Donggi. Excavation was carried out with
dimensions of 1m x 1m and depth of 1.5m with soil sampling of at least 25 kg for CBR testing in soil
mechanics laboratories.
Figure 3.1.3-1 Documentation of Test Pit at TP-01 OCTG Area CPP Donggi
Figure 3.1.3-2 Documentation of Test Pit at TP-02 OCTG Area CPP Donggi
Figure 3.1.3-3 Documentation of Test Pit Samples at OCTG Area CPP Donggi
The point and coordinate of soil investigation at GTG Area CPP Donggi can be seen in the image below.
Here is a summary of sondir results at S-01 GTG Area CPP Donggi, are shown in Figure and Table below.
Figure 3.2.1-1 Cone Resistance Against Estimated of Soil Strength at S-01 GTG Area CPP Donggi
Depth Cw Tw Rf
2 2
Soil Strength Estimate
(m) (kg/cm ) (kg/cm ) (%)
1.00 20 35 5.01 Medium
2.00 30 50 4.46 Stiff
3.00 25 40 4.01 Stiff
4.00 35 50 2.87 Stiff
5.00 25 40 4.01 Stiff
6.00 20 35 5.01 Medium
7.00 25 40 4.01 Stiff
8.00 35 50 2.87 Stiff
9.00 40 60 3.34 Stiff
10.00 60 80 2.23 Very Stiff
11.00 85 100 1.18 Hard
11.40 200 250 1.67 Very Hard
11.60 The test was stopped at Cone Resistance ≥ 200 kg/cm2
3.2.2. Deep Boring/Bore Hole (BH) and SPT Result at GTG Area CPP Donggi
Here is a summary of deep boring results at BH-01 GTG Area CPP Donggi, are shown in Table below.
Table 3.2.2-1 Summary of Deep Boring Log at BH-01 GTG Area CPP Donggi
Samples N-SPT
BH Depth (m) Soil Description GWL
Value
0.00 – 0.50 Silty CLAY to Clay, Brown, Medium Plasticity, Stiff -1.4 m
01
0.50 – 1.00 CLAY, Brown, Medium Plasticity, Stiff
1.00 – 1.50 Silty SAND to Clay, Greyish Brown to Brown, Stiff
1.50 – 2.00 CLAY, Brown, Medium Plasticity, Stiff 14
2.00 – 2.50 CLAY, Brown, Low Plasticity, Soft
2.50 – 3.00 CLAY, Brownish Grey, Low Plasticity, Soft to Stiff
3.00 – 3.50 -ditto- DS 1
3.50 – 4.00 CLAY, Brown, Low Plasticity, Very Stiff 17
4.00 – 4.50 CLAY, Brown, Medium Plasticity, Medium Stiff
4.50 – 5.00 -ditto-
5.00 – 5.50 UDS Tube UDS 1
5.50 – 6.00 CLAY, Brownish Grey, Medium Plasticity, Stiff 9
6.00 – 6.50 Clayey SILT Mixed Wood Organic, Grey, Soft
6.50 – 7.00 Clayey SILT, Grey, Soft
7.00 – 7.50 UDS Tube UDS 2
7.50 – 8.00 Clayey SILT, Grey, Soft 3
8.00 – 8.50 Clayey SILT to Clay, Grey, Soft to Medium Stiff
8.50 – 9.00 CLAY, Greenish Grey, Medium Plasticity, Stiff to Very Stiff
9.00 – 9.50 -ditto- DS 2
9.50 – 10.00 -ditto- 17
10.00 – 10.50 Clayey SILT to SILT, Grey, Very Stiff
Samples N-SPT
BH Depth (m) Soil Description GWL
Value
10.50 – 11.00 SILT, Grey, Very Stiff
11.00 – 11.50 -ditto- DS 3
11.50 – 12.00 SILT Layer Siltstone, Grey, Very Stiff to Hard 25
12.00 – 12.50 -ditto-
12.50 – 13.00 SILT to Siltstone, Grey, Hard DS 4
13.00 – 13.50 SILTSTONE, Grey, Hard
13.50 – 14.00 -ditto- >50
14.00 – 14.50 -ditto-
14.50 – 15.00 -ditto-
15.00 – 15.50 -ditto-
15.50 – 16.00 -ditto- >50
16.00 – 16.50 -ditto-
16.50 – 17.00 -ditto-
17.00 – 17.50 -ditto-
17.50 – 18.00 SILTSTONE to Sandy Gravel, Grey, Hard >50
Figure 3.2.2-1 Documentation of Deep Boring at BH-01 GTG Area CPP Donggi
The point and coordinate of soil investigation at ATU Area CPP Matindok can be seen in the image below.
Figure 3.3.1-1 Cone Resistance Against Estimated of Soil Strength at S-01 ATU Area CPP Matindok
Depth Cw Tw Rf
2 2
Soil Strength Estimate
(m) (kg/cm ) (kg/cm ) (%)
0.20 65 90 2.57 Very Stiff
0.40 75 100 2.23 Very Stiff
0.60 200 250 1.67 Very Hard
0.80 The test was stopped at Cone Resistance ≥ 200 kg/cm2
3.3.2. Deep Boring/Bore Hole (BH) and SPT Result at ATU Area CPP Matindok
Here is a summary of deep boring results at BH-01 ATU Area CPP Matindok, are shown in Table below.
Table 3.3.2-1 Summary of Deep Boring Log at BH-01 ATU Area CPP Matindok
Samples N-SPT
BH Depth (m) Soil Description GWL
Value
0.00 – 0.50 SILT to Siltstone, Greenish Grey, Hard -5.7 m
01
0.50 – 1.00 SILTSTONE, Grey, Hard, Massive
1.00 – 1.50 -ditto- DS 1
1.50 – 2.00 -ditto- >50
2.00 – 2.50 -ditto-
2.50 – 3.00 -ditto-
3.00 – 3.50 -ditto- DS 2
3.50 – 4.00 -ditto- >50
4.00 – 4.50 -ditto-
4.50 – 5.00 -ditto-
5.00 – 5.50 -ditto- DS 3
5.50 – 6.00 SILTSTONE to Boulder Andesit, Grey, Hard >50
6.00 – 6.50 Sandy GRAVEL to Boulder Andesit, Grey, Very Dense
6.50 – 7.00 BOULDER ANDESIT, Grey, Very Dense
7.00 – 7.50 -ditto- DS 4
7.50 – 8.00 -ditto- >50
Figure 3.3.2-1 Documentation of Deep Boring at BH-01 ATU Area CPP Matindok
The result of laboratory test for soil investigation area CPP Donggi Matindok is presented in Table 3-11.
CPP Matindok
CPP Donggi
The formation on the CPP Donggi Matindok regional geological map is the Alluvium (Qa) formation.
Alluvium (from Latin alluvius) is loose clay, silt, sand, or gravel that has been deposited by water flowing
on a riverbed, in floodplains, on alluvial fans or beaches, or in similar settings. Alluvium is also sometimes
called alluvial deposits and generally has a young geological scale age (https://magma.esdm.go.id
/v1/edukasi/glossary).
The soil classification site for this area is determined based on the value of N-SPT, where the calculation
of the classification site up to the depth of drilling that has been done.
The calculation of soil site classification at BH-01 GTG Area CPP Donggi is <15 (soft soil site class/SE)
and at BH-01 ATU Area CPP Matindok is between 15 to 50 (medium soil site class/SD).
With the soil sites classification, the response spectral can be seen in the following graph.
Figure 5-1 Response Spectral of Soft Soil (SE) at BH-01 GTG Area CPP Donggi (source: Puskim-PusGeN-
ESRC, 2019-2020)
Figure 5-2 Response Spectral of Soft Soil (SD) at BH-01 ATU Area CPP Matindok (source: Puskim-PusGeN-
ESRC, 2019-2020)
6. BEARING CAPACITY
Equations 1 and 2 are formulas for calculating the bearing capacity of sandy or clayey soils from Meyerhof
(1976).
(B) Df
q ult = q̅c (1 + ) ..................................................................... (equation 1)
12.2 B
q ult
q all = ........................................................................................ (equation 2)
3
With:
c = average value of qc
B = width of foundation
Df = depth of foundation
Table bellow presents bearing capacity refer to CPT/Sondir data in accordance with Meyerhof equation.
Table 6.1-1 Bearing Capacity for Shallow Foundation refer to CPT/Sondir Data (Df = 1 m; B = 1 m)
Average qc Q ult (kg/cm2) Q all (kg/cm2)
Point ID
(kg/cm) meyerhof qult/sf
S-01 OCTG CPP Donggi 22.86 3.75 1.25
S-01 GTG CPP Donggi 16.43 2.69 0.90
S-01 ATU CPP Matindok 137.50 22.54 7.51
Table 6.1-2 Bearing Capacity for Shallow Foundation refer to CPT/Sondir Data (Df = 2 m; B = 1 m)
Average qc Q ult (kg/cm2) Q all (kg/cm2)
Point ID
(kg/cm) meyerhof qult/sf
S-01 OCTG CPP Donggi 12.86 3.16 1.05
S-01 GTG CPP Donggi 22.86 5.62 1.87
Table 6.1-3 Bearing Capacity for Shallow Foundation refer to CPT/Sondir Data (Df = 3 m; B = 1 m)
Average qc Q ult (kg/cm2) Q all (kg/cm2)
Point ID
(kg/cm) meyerhof qult/sf
S-01 OCTG CPP Donggi 7.86 2.58 0.86
S-01 GTG CPP Donggi 25.71 8.43 2.81
The calculation of bearing capacity is the ability of the pile in supporting the load, is generally calculated
by the equation:
Qu = Qp + Qs – W
W = Weight of pile
Qu = (40*Nb*Ap)
Nb = (N1+N2)/2
N1 = SPT value at depth of 3B from the tip of the pile to the bottom
N2 = SPT value at depth of 8B from the tip of the pile to the top
Qsi = qs*Asi
Pile Capacity
P = (Qu +Qsi)/FS
Using the above equation and survey data (CPT and N-SPT value), the value of pile capacity can be seen
at Appendix B.
Project : SOIL INVESTIGATION AREA DONGGI – MATINDOK DI PT. PERTAMINA EP REGIONAL 4 ZONA 13 – CTR-BTC-EPSF-04
Location : CPP DONGGI, KAB, BANGGAI, PROV. SULAWESI TENGAH
Area : OCTG - CPP DONGGI
CPT Type : Mechanic Date : 11 December 2021
Test Point S-01 Capacity : 2.5 ton Weather : Sunny
Coordinates : X = 418297 m E Cone Diameter (Dc) (cm) : 3.57 Work Leader : Musriyanto
: Y = 9832587 m S Sleeve Diameter (Ds) (cm) : 3.57 Team : Herditanto
Zone : 51 S Sleeve Length (Ls) (cm) : 13.35 : Ipan Sofyan
Tot. Depth (m) : 11.60 As = πDsLs (cm2) : 149.727 0.066854 : Bangun Suyono
GWL (m) : 1.40 Api = Ac = ¼πDc² (cm2) : 10.01 10.009821 : Alexander
CONE LOCAL TOTAL CUM. TOTAL FRICTION SOIL
MANOMETER DIAL DIFFERENCE
DEPTH RESISTANCE FRICTION FRICTION FRICTION RATIO CONSISTENCY
Project : SOIL INVESTIGATION AREA DONGGI – MATINDOK DI PT. PERTAMINA EP REGIONAL 4 ZONA 13 – CTR-BTC-EPSF-04
Coordinates : X = 418297 m E CPT Type : Mechanic
Test Point S-01 : Y = 9832587 m S Capacity : 2.5 ton
Area : OCTG - CPP DONGGI : 51 S Date : 11 December 2021
1.0 1.0
2.0 2.0
3.0 3.0
4.0 4.0
5.0 5.0
6.0 6.0
DEPTH (meter)
7.0 7.0
8.0 8.0
9.0 9.0
10.0 10.0
11.0 11.0
12.0 12.0
13.0 13.0
14.0 14.0
15.0 15.0
16.0 16.0
17.0 17.0
18.0 18.0
Cone Resistance (Cw)
Total Friction (Tw) Friction Ratio (R)
19.0 19.0
Cum. Total Friction (Tf) Local Friction (fs)
20.0 20.0
0 200 400 600 800 1000 0.0 1.0 2.0 3.0 4.0
G.W.L (m)
Profil Log
Elevation
Sample
Colour
(m) Weight, Spesific Gravity, Triaxial UU,
Description
Atterberg Limit, Grain Consolidation, Direct
Size, Hydrometer, Water Shear
Content
+0.00
RESUME OF LABORATORY
UDS 1
Silty CLAY, Brown, Medium USCS : Bulk gr/cm3 :
0.5
Plasticity, Soft Wn (%) : Dry gr/cm3 :
Gs : f (°) :
LL (%) : C (kN/m2) :
1.0
PL (%) : Cc :
CLAY, Brown, Low Plasticity,
PI (%) : Cr :
Soft
e :
1.5
Sr (%) :
UDS 1
4.5
5.5
6.0
REMARKS
CLAY GRAVEL
SILT SAND
• APPENDIX A.3 – SONDIR DATA GTG CPP DONGGI
SONDIR (CONE PENETRATION TEST )
SNI 2827 - 2008 / ASTM D-3441
Project : SOIL INVESTIGATION AREA DONGGI – MATINDOK DI PT. PERTAMINA EP REGIONAL 4 ZONA 13 – CTR-BTC-EPSF-04
Location : CPP DONGGI, KAB, BANGGAI, PROV. SULAWESI TENGAH
Area : GTG - CPP DONGGI
CPT Type : Mechanic Date : 14 December 2021
Test Point S-01 Capacity : 2.5 ton Weather : Sunny
Coordinates : X = 418370 m E Cone Diameter (Dc) (cm) : 3.57 Work Leader : Musriyanto
: Y = 9832335 m S Sleeve Diameter (Ds) (cm) : 3.57 Team : Herditanto
Zone : 51 S Sleeve Length (Ls) (cm) : 13.35 : Ipan Sofyan
Tot. Depth (m) : 11.40 As = πDsLs (cm2) : 149.727 0.066854 : Bangun Suyono
GWL (m) : 1.40 Api = Ac = ¼πDc² (cm2) : 10.01 10.009821 : Alexander
CONE LOCAL TOTAL CUM. TOTAL FRICTION SOIL
MANOMETER DIAL DIFFERENCE
DEPTH RESISTANCE FRICTION FRICTION FRICTION RATIO CONSISTENCY
Project : SOIL INVESTIGATION AREA DONGGI – MATINDOK DI PT. PERTAMINA EP REGIONAL 4 ZONA 13 – CTR-BTC-EPSF-04
Coordinates : X = 418370 m E CPT Type : Mechanic
Test Point S-01 : Y = 9832335 m S Capacity : 2.5 ton
Area : GTG - CPP DONGGI : 51 S Date : 14 December 2021
1.0 1.0
2.0 2.0
3.0 3.0
4.0 4.0
5.0 5.0
6.0 6.0
DEPTH (meter)
7.0 7.0
8.0 8.0
9.0 9.0
10.0 10.0
11.0 11.0
12.0 12.0
13.0 13.0
14.0 14.0
15.0 15.0
16.0 16.0
17.0 17.0
18.0 18.0
Cone Resistance (Cw)
Total Friction (Tw) Friction Ratio (R)
19.0 19.0
Cum. Total Friction (Tf) Local Friction (fs)
20.0 20.0
0 300 600 900 1200 1500 0.0 1.0 2.0 3.0 4.0
BORE PROFILE
SAMPLE CODE
COLOURS
G.W.L (m)
SAMPLE
CORRELATION REMARKS
DATE
3.0 Stiff
CLAY, Brownish Grey, Low Plasticity, Soft to Stiff 3
Well graded GRAVEL
DS 1
Thin Wall Tube f 89 mm
10.0
Clayey SILT to SILT, Grey, Very Stiff 15 15 15 30
10 17
11.0 Very Stiff
SILT, Grey, Very Stiff 11
Silty GRAVEL
DS 3
12.0 7 11 14 25 Sandy Silty GRAVEL
SILT Layer Siltstone, Grey, Very Stiff to Hard 15 15 15 30
12 25
13.0 DS 4 SILT to Siltstone, Grey, Hard Very Stiff
13
14.0 14 51 >50
15 12 30
14 >50
15.0 Hard
15
SILTSTONE, Grey, Hard Clayey GRAVEL
51 >50 Sandy Clayey GRAVEL
23-Dec-21
16.0
7 30
16 >50
17.0 Hard
17
18.0 SILTSTONE to Sandy Gravel, Grey, Hard 51 >50
11 30
18 >50
19.0 Hard
19
Well graded SAND
20.0 Gravelly SAND
20
21.0
21
22.0
22
23.0
23
Poorly graded SAND
24.0 Gravelly SAND
24
25.0
25
26.0
26
27.0
27
Silty SAND
28.0 Gravelly Silty SAND
28
29.0
29
30.0
30
31.0
31
Clayey SAND
32.0 Gravelly Clayey SAND
32
33.0
33
34.0
34
35.0
35
SILT
36.0 Gravelly, Sandy, Clayey SILT
36
37.0
37
38.0
38
39.0
39
CLAY
40.0 Gravelly, Sandy, Silty CLAY
40
REMARKS : Test Was Stopped Undisturbed Sample (UDS) G.W.L (Ground Water Level)
ROCK
DOCUMENTATION OF CORE BOX
SOIL INVESTIGATION AREA DONGGI – MATINDOK
PT. PERTAMINA EP REGIONAL 4 ZONA 13 – CTR-BTC-EPSF-04
0m
CORE BOX 1
5m
CORE BOX 2
10m
CORE BOX 3
15m
Description
Page 1 of 2
DOCUMENTATION OF CORE BOX
SOIL INVESTIGATION AREA DONGGI – MATINDOK
PT. PERTAMINA EP REGIONAL 4 ZONA 13 – CTR-BTC-EPSF-04
15m
CORE BOX 4
20m
CORE BOX 5
25m
CORE BOX 6
30m
Description
Page 2 of 2
• APPENDIX A.5 – SONDIR DATA ATU CPP MATINDOK
SONDIR (CONE PENETRATION TEST )
SNI 2827 - 2008 / ASTM D-3441
Project : SOIL INVESTIGATION AREA DONGGI – MATINDOK DI PT. PERTAMINA EP REGIONAL 4 ZONA 13 – CTR-BTC-EPSF-04
Location : CPP MATINDOK, KAB, BANGGAI, PROV. SULAWESI TENGAH
Area : ATU - CPP MATINDOK
CPT Type : Mechanic Date : 30 December 2021
Test Point S-01 Capacity : 2.5 ton Weather : Sunny
Coordinates : X = 443424 m E Cone Diameter (Dc) (cm) : 3.57 Work Leader : Musriyanto
: Y = 9853139 m S Sleeve Diameter (Ds) (cm) : 3.57 Team : Herditanto
Zone : 51 S Sleeve Length (Ls) (cm) : 13.35 : Ipan Sofyan
Tot. Depth (m) : 0.60 As = πDsLs (cm2) : 149.727 0.066854 : Bangun Suyono
GWL (m) :- Api = Ac = ¼πDc² (cm2) : 10.01 10.009821 : Alexander
CONE LOCAL TOTAL CUM. TOTAL FRICTION SOIL
MANOMETER DIAL DIFFERENCE
DEPTH RESISTANCE FRICTION FRICTION FRICTION RATIO CONSISTENCY
Project : SOIL INVESTIGATION AREA DONGGI – MATINDOK DI PT. PERTAMINA EP REGIONAL 4 ZONA 13 – CTR-BTC-EPSF-04
Coordinates : X = 443424 m E CPT Type : Mechanic
Test Point S-01 : Y = 9853139 m S Capacity : 2.5 ton
Area : ATU - CPP MATINDOK : 51 S Date : 30 December 2021
1.0 1.0
2.0 2.0
3.0 3.0
4.0 4.0
5.0 5.0
6.0 6.0
DEPTH (meter)
7.0 7.0
8.0 8.0
9.0 9.0
10.0 10.0
11.0 11.0
12.0 12.0
13.0 13.0
14.0 14.0
15.0 15.0
16.0 16.0
17.0 17.0
18.0 18.0
Cone Resistance (Cw)
Total Friction (Tw) Friction Ratio (R)
19.0 19.0
Cum. Total Friction (Tf) Local Friction (fs)
20.0 20.0
0 300 600 900 1200 1500 0.0 1.0 2.0 3.0 4.0
BORE PROFILE
SAMPLE CODE
COLOURS
G.W.L (m)
SAMPLE
CORRELATION REMARKS
DATE
1.0
1
DS 1
28-Dec-21
2.0 51 >50
11 30
2 >50
3.0 Hard
SILTSTONE, Grey, Hard, Massive 3
Well graded GRAVEL
DS 2
4.0 51 >50 Sandy GRAVEL
6 30
4 >50
5.0 Hard
5
DS 3
29-Dec-21
10.0
10
11.0
11
Silty GRAVEL
12.0 Sandy Silty GRAVEL
12
13.0
13
14.0
14
15.0
15
Clayey GRAVEL
16.0 Sandy Clayey GRAVEL
16
17.0
17
18.0
18
19.0
19
Well graded SAND
20.0 Gravelly SAND
20
21.0
21
22.0
22
23.0
23
Poorly graded SAND
24.0 Gravelly SAND
24
25.0
25
26.0
26
27.0
27
Silty SAND
28.0 Gravelly Silty SAND
28
29.0
29
30.0
30
31.0
31
Clayey SAND
32.0 Gravelly Clayey SAND
32
33.0
33
34.0
34
35.0
35
SILT
36.0 Gravelly, Sandy, Clayey SILT
36
37.0
37
38.0
38
39.0
39
CLAY
40.0 Gravelly, Sandy, Silty CLAY
40
REMARKS : Test Was Stopped Undisturbed Sample (UDS) G.W.L (Ground Water Level)
ROCK
DOCUMENTATION OF CORE BOX
SOIL INVESTIGATION AREA DONGGI – MATINDOK
PT. PERTAMINA EP REGIONAL 4 ZONA 13 – CTR-BTC-EPSF-04
0m
CORE BOX 1
5m
CORE BOX 2
10m
CORE BOX 3
15m
Description
Page 1 of 1
PT PERTAMINA EP
Pile Data:
Diameter (D) : 30.0 cm
Perimeter (K) : 94.25 cm
Section Area (Ab) : 706.86 cm2
Vertikal 36 Ton
SF1 = 3 (End bearing) Horizontal 54 Ton
SF2 = 5 (Skin bearing) Resultan 65 Ton
3.80 0.20 5.00 6.69 1.20 0.300 7.71 5.45 0.63 1.94 0.50
4.00 0.20 15.00 13.37 1.20 0.300 7.71 5.45 1.26 2.07 1.01
4.20 0.20 15.00 13.37 1.20 0.300 9.14 6.46 1.26 2.41 1.01
4.40 0.20 15.00 13.37 1.20 0.300 11.29 7.98 1.26 2.91 1.01
4.60 0.20 20.00 6.69 1.20 0.300 12.71 8.99 0.63 3.12 0.50
4.80 0.20 15.00 6.69 1.20 0.300 14.29 10.10 0.63 3.49 0.50
5.00 0.20 15.00 6.69 1.20 0.300 15.71 11.11 0.63 3.83 0.50
5.20 0.20 15.00 6.69 1.20 0.300 15.71 11.11 0.63 3.83 0.50
5.40 0.20 15.00 6.69 1.20 0.300 15.71 11.11 0.63 3.83 0.50
5.60 0.20 15.00 6.69 1.20 0.300 15.71 11.11 0.63 3.83 0.50
5.80 0.20 15.00 6.69 1.20 0.300 14.29 10.10 0.63 3.49 0.50
6.00 0.20 10.00 6.69 1.20 0.300 14.29 10.10 0.63 3.49 0.50
6.20 0.20 15.00 6.69 1.20 0.300 14.29 10.10 0.63 3.49 0.50
6.40 0.20 15.00 6.69 1.20 0.300 19.29 13.63 0.63 4.67 0.50
6.60 0.20 50.00 26.74 1.20 0.300 20.71 14.64 2.52 5.38 2.02
6.80 0.20 25.00 20.06 1.20 0.300 22.14 15.65 1.89 5.60 1.51
7.00 0.20 25.00 20.06 1.20 0.300 23.57 16.66 1.89 5.93 1.51
7.20 0.20 25.00 20.06 1.20 0.300 25.71 18.18 1.89 6.44 1.51
7.40 0.20 25.00 20.06 1.20 0.300 25.71 18.18 1.89 6.44 1.51
7.60 0.20 15.00 6.69 1.20 0.300 26.43 18.68 0.63 6.35 0.50
7.80 0.20 20.00 6.69 1.20 0.300 22.14 15.65 0.63 5.34 0.50
8.00 0.20 20.00 6.69 1.20 0.300 21.43 15.15 0.63 5.18 0.50
8.20 0.20 20.00 6.69 1.20 0.300 21.43 15.15 0.63 5.18 0.50
8.40 0.20 25.00 13.37 1.20 0.300 23.57 16.66 1.26 5.81 1.01
ALLOWABLE BEARING CAPACITY OF SINGLE PILE
(BASED ON CPT)
PROJECT : SOIL INVESTIGATION AREA DONGGI – MATINDOK DI PT. PERTAMINA EP REGIONAL 4 ZONA 13
LOCATION : CPP DONGGI, KAB, BANGGAI, PROV. SULAWESI TENGAH
SONDIR : S-01 OCTG CPP DONGGI
Pile Data:
Diameter (D) : 30.0 cm
Perimeter (K) : 94.25 cm
Section Area (Ab) : 706.86 cm2
Vertikal 36 Ton
SF1 = 3 (End bearing) Horizontal 54 Ton
SF2 = 5 (Skin bearing) Resultan 65 Ton
9.80 0.20 40.00 26.74 1.20 0.300 28.57 20.20 2.52 7.24 2.02
10.00 0.20 50.00 26.74 1.20 0.300 32.14 22.72 2.52 8.08 2.02
10.20 0.20 50.00 26.74 1.20 0.300 38.57 27.26 2.52 9.59 2.02
10.40 0.20 60.00 26.74 1.20 0.300 45.71 32.31 2.52 11.28 2.02
10.60 0.20 70.00 40.11 1.20 0.300 55.00 38.88 3.78 13.72 3.02
10.80 0.20 85.00 33.43 1.20 0.300 65.00 45.95 3.15 15.95 2.52
11.00 0.20 100.00 40.11 1.20 0.300 76.43 54.02 3.78 18.76 3.02
11.20 0.20 120.00 40.11 1.20 0.300 90.71 64.12 3.78 22.13 3.02
11.40 0.20 150.00 40.11 1.20 0.300 112.14 79.27 3.78 27.18 3.02
11.60 0.20 200.00 66.85 1.20 0.300 120.83 85.41 6.30 29.73 5.04
ALLOWABLE BEARING CAPACITY OF SINGLE PILE
(BASED ON CPT)
PROJECT : SOIL INVESTIGATION AREA DONGGI – MATINDOK DI PT. PERTAMINA EP REGIONAL 4 ZONA 13
LOCATION : CPP DONGGI, KAB, BANGGAI, PROV. SULAWESI TENGAH
SONDIR : S-01 OCTG CPP DONGGI
Pile Data:
Diameter (D) : 40.0 cm
Perimeter (K) : 125.66 cm Gaya Tarik Bollar Kapal 8000 DWT (3063 GT)
Section Area (Ab) : 1256.64 cm2 Gaya Tambatan Bollard
Vertikal 36 Ton
SF1 = 3 (End bearing) Horizontal 54 Ton
SF2 = 5 (Skin bearing) Resultan 65 Ton
3.80 0.20 5.00 6.69 1.60 0.400 7.71 9.69 0.84 3.40 0.67
4.00 0.20 15.00 13.37 1.60 0.400 7.71 9.69 1.68 3.57 1.34
4.20 0.20 15.00 13.37 1.60 0.400 9.14 11.49 1.68 4.17 1.34
4.40 0.20 15.00 13.37 1.60 0.400 11.29 14.18 1.68 5.06 1.34
4.60 0.20 20.00 6.69 1.60 0.400 12.71 15.98 0.84 5.49 0.67
4.80 0.20 15.00 6.69 1.60 0.400 14.29 17.95 0.84 6.15 0.67
5.00 0.20 15.00 6.69 1.60 0.400 15.71 19.75 0.84 6.75 0.67
5.20 0.20 15.00 6.69 1.60 0.400 15.71 19.75 0.84 6.75 0.67
5.40 0.20 15.00 6.69 1.60 0.400 15.71 19.75 0.84 6.75 0.67
5.60 0.20 15.00 6.69 1.60 0.400 15.71 19.75 0.84 6.75 0.67
5.80 0.20 15.00 6.69 1.60 0.400 14.29 17.95 0.84 6.15 0.67
6.00 0.20 10.00 6.69 1.60 0.400 14.29 17.95 0.84 6.15 0.67
6.20 0.20 15.00 6.69 1.60 0.400 14.29 17.95 0.84 6.15 0.67
6.40 0.20 15.00 6.69 1.60 0.400 19.29 24.24 0.84 8.25 0.67
6.60 0.20 50.00 26.74 1.60 0.400 20.71 26.03 3.36 9.35 2.69
6.80 0.20 25.00 20.06 1.60 0.400 22.14 27.83 2.52 9.78 2.02
7.00 0.20 25.00 20.06 1.60 0.400 23.57 29.62 2.52 10.38 2.02
7.20 0.20 25.00 20.06 1.60 0.400 25.71 32.31 2.52 11.28 2.02
7.40 0.20 25.00 20.06 1.60 0.400 25.71 32.31 2.52 11.28 2.02
7.60 0.20 15.00 6.69 1.60 0.400 26.43 33.21 0.84 11.24 0.67
7.80 0.20 20.00 6.69 1.60 0.400 22.14 27.83 0.84 9.44 0.67
8.00 0.20 20.00 6.69 1.60 0.400 21.43 26.93 0.84 9.14 0.67
8.20 0.20 20.00 6.69 1.60 0.400 21.43 26.93 0.84 9.14 0.67
8.40 0.20 25.00 13.37 1.60 0.400 23.57 29.62 1.68 10.21 1.34
ALLOWABLE BEARING CAPACITY OF SINGLE PILE
(BASED ON CPT)
PROJECT : SOIL INVESTIGATION AREA DONGGI – MATINDOK DI PT. PERTAMINA EP REGIONAL 4 ZONA 13
LOCATION : CPP DONGGI, KAB, BANGGAI, PROV. SULAWESI TENGAH
SONDIR : S-01 OCTG CPP DONGGI
Pile Data:
Diameter (D) : 40.0 cm
Perimeter (K) : 125.66 cm Gaya Tarik Bollar Kapal 8000 DWT (3063 GT)
Section Area (Ab) : 1256.64 cm2 Gaya Tambatan Bollard
Vertikal 36 Ton
SF1 = 3 (End bearing) Horizontal 54 Ton
SF2 = 5 (Skin bearing) Resultan 65 Ton
9.80 0.20 40.00 26.74 1.60 0.400 28.57 35.90 3.36 12.64 2.69
10.00 0.20 50.00 26.74 1.60 0.400 32.14 40.39 3.36 14.14 2.69
10.20 0.20 50.00 26.74 1.60 0.400 38.57 48.47 3.36 16.83 2.69
10.40 0.20 60.00 26.74 1.60 0.400 45.71 57.45 3.36 19.82 2.69
10.60 0.20 70.00 40.11 1.60 0.400 55.00 69.12 5.04 24.05 4.03
10.80 0.20 85.00 33.43 1.60 0.400 65.00 81.68 4.20 28.07 3.36
11.00 0.20 100.00 40.11 1.60 0.400 76.43 96.04 5.04 33.02 4.03
11.20 0.20 120.00 40.11 1.60 0.400 90.71 113.99 5.04 39.01 4.03
11.40 0.20 150.00 40.11 1.60 0.400 112.14 140.92 5.04 47.98 4.03
11.60 0.20 200.00 66.85 1.60 0.400 120.83 151.84 8.40 52.29 6.72
ALLOWABLE BEARING CAPACITY OF SINGLE PILE
(BASED ON CPT)
PROJECT : SOIL INVESTIGATION AREA DONGGI – MATINDOK DI PT. PERTAMINA EP REGIONAL 4 ZONA 13
LOCATION : CPP DONGGI, KAB, BANGGAI, PROV. SULAWESI TENGAH
SONDIR : S-01 OCTG CPP DONGGI
Pile Data:
Diameter (D) : 50.0 cm
Perimeter (K) : 157.08 cm Gaya Tarik Bollar Kapal 8000 DWT (3063 GT)
Section Area (Ab) : 1963.50 cm2 Gaya Tambatan Bollard
Vertikal 36 Ton
SF1 = 3 (End bearing) Horizontal 54 Ton
SF2 = 5 (Skin bearing) Resultan 65 Ton
3.80 0.20 5.00 6.69 2.00 0.500 7.71 15.15 1.05 5.26 0.84
4.00 0.20 15.00 13.37 2.00 0.500 7.71 15.15 2.10 5.47 1.68
4.20 0.20 15.00 13.37 2.00 0.500 9.14 17.95 2.10 6.40 1.68
4.40 0.20 15.00 13.37 2.00 0.500 11.29 22.16 2.10 7.81 1.68
4.60 0.20 20.00 6.69 2.00 0.500 12.71 24.96 1.05 8.53 0.84
4.80 0.20 15.00 6.69 2.00 0.500 14.29 28.05 1.05 9.56 0.84
5.00 0.20 15.00 6.69 2.00 0.500 15.71 30.85 1.05 10.50 0.84
5.20 0.20 15.00 6.69 2.00 0.500 15.71 30.85 1.05 10.50 0.84
5.40 0.20 15.00 6.69 2.00 0.500 15.71 30.85 1.05 10.50 0.84
5.60 0.20 15.00 6.69 2.00 0.500 15.71 30.85 1.05 10.50 0.84
5.80 0.20 15.00 6.69 2.00 0.500 14.29 28.05 1.05 9.56 0.84
6.00 0.20 10.00 6.69 2.00 0.500 14.29 28.05 1.05 9.56 0.84
6.20 0.20 15.00 6.69 2.00 0.500 14.29 28.05 1.05 9.56 0.84
6.40 0.20 15.00 6.69 2.00 0.500 19.29 37.87 1.05 12.83 0.84
6.60 0.20 50.00 26.74 2.00 0.500 20.71 40.67 4.20 14.40 3.36
6.80 0.20 25.00 20.06 2.00 0.500 22.14 43.48 3.15 15.12 2.52
7.00 0.20 25.00 20.06 2.00 0.500 23.57 46.28 3.15 16.06 2.52
7.20 0.20 25.00 20.06 2.00 0.500 25.71 50.49 3.15 17.46 2.52
7.40 0.20 25.00 20.06 2.00 0.500 25.71 50.49 3.15 17.46 2.52
7.60 0.20 15.00 6.69 2.00 0.500 26.43 51.89 1.05 17.51 0.84
7.80 0.20 20.00 6.69 2.00 0.500 22.14 43.48 1.05 14.70 0.84
8.00 0.20 20.00 6.69 2.00 0.500 21.43 42.07 1.05 14.23 0.84
8.20 0.20 20.00 6.69 2.00 0.500 21.43 42.07 1.05 14.23 0.84
8.40 0.20 25.00 13.37 2.00 0.500 23.57 46.28 2.10 15.85 1.68
ALLOWABLE BEARING CAPACITY OF SINGLE PILE
(BASED ON CPT)
PROJECT : SOIL INVESTIGATION AREA DONGGI – MATINDOK DI PT. PERTAMINA EP REGIONAL 4 ZONA 13
LOCATION : CPP DONGGI, KAB, BANGGAI, PROV. SULAWESI TENGAH
SONDIR : S-01 OCTG CPP DONGGI
Pile Data:
Diameter (D) : 50.0 cm
Perimeter (K) : 157.08 cm Gaya Tarik Bollar Kapal 8000 DWT (3063 GT)
Section Area (Ab) : 1963.50 cm2 Gaya Tambatan Bollard
Vertikal 36 Ton
SF1 = 3 (End bearing) Horizontal 54 Ton
SF2 = 5 (Skin bearing) Resultan 65 Ton
9.80 0.20 40.00 26.74 2.00 0.500 28.57 56.10 4.20 19.54 3.36
10.00 0.20 50.00 26.74 2.00 0.500 32.14 63.11 4.20 21.88 3.36
10.20 0.20 50.00 26.74 2.00 0.500 38.57 75.73 4.20 26.09 3.36
10.40 0.20 60.00 26.74 2.00 0.500 45.71 89.76 4.20 30.76 3.36
10.60 0.20 70.00 40.11 2.00 0.500 55.00 107.99 6.30 37.26 5.04
10.80 0.20 85.00 33.43 2.00 0.500 65.00 127.63 5.25 43.59 4.20
11.00 0.20 100.00 40.11 2.00 0.500 76.43 150.07 6.30 51.28 5.04
11.20 0.20 120.00 40.11 2.00 0.500 90.71 178.12 6.30 60.63 5.04
11.40 0.20 150.00 40.11 2.00 0.500 112.14 220.19 6.30 74.66 5.04
11.60 0.20 200.00 66.85 2.00 0.500 120.83 237.26 10.50 81.19 8.40
ALLOWABLE BEARING CAPACITY OF SINGLE PILE
(BASED ON CPT)
PROJECT : SOIL INVESTIGATION AREA DONGGI – MATINDOK DI PT. PERTAMINA EP REGIONAL 4 ZONA 13
LOCATION : CPP DONGGI, KAB, BANGGAI, PROV. SULAWESI TENGAH
SONDIR : S-01 OCTG CPP DONGGI
Pile Data:
Diameter (D) : 60.0 cm
Perimeter (K) : 188.50 cm Gaya Tarik Bollar Kapal 8000 DWT (3063 GT)
Section Area (Ab) : 2827.43 cm2 Gaya Tambatan Bollard
Vertikal 36 Ton
SF1 = 3 (End bearing) Horizontal 54 Ton
SF2 = 5 (Skin bearing) Resultan 65 Ton
3.80 0.20 5.00 6.69 2.40 0.600 7.71 21.81 1.26 7.52 1.01
4.00 0.20 15.00 13.37 2.40 0.600 7.71 21.81 2.52 7.77 2.02
4.20 0.20 15.00 13.37 2.40 0.600 9.14 25.85 2.52 9.12 2.02
4.40 0.20 15.00 13.37 2.40 0.600 11.29 31.91 2.52 11.14 2.02
4.60 0.20 20.00 6.69 2.40 0.600 12.71 35.95 1.26 12.23 1.01
4.80 0.20 15.00 6.69 2.40 0.600 14.29 40.39 1.26 13.72 1.01
5.00 0.20 15.00 6.69 2.40 0.600 15.71 44.43 1.26 15.06 1.01
5.20 0.20 15.00 6.69 2.40 0.600 15.71 44.43 1.26 15.06 1.01
5.40 0.20 15.00 6.69 2.40 0.600 15.71 44.43 1.26 15.06 1.01
5.60 0.20 15.00 6.69 2.40 0.600 15.71 44.43 1.26 15.06 1.01
5.80 0.20 15.00 6.69 2.40 0.600 14.29 40.39 1.26 13.72 1.01
6.00 0.20 10.00 6.69 2.40 0.600 14.29 40.39 1.26 13.72 1.01
6.20 0.20 15.00 6.69 2.40 0.600 14.29 40.39 1.26 13.72 1.01
6.40 0.20 15.00 6.69 2.40 0.600 19.29 54.53 1.26 18.43 1.01
6.60 0.20 50.00 26.74 2.40 0.600 20.71 58.57 5.04 20.53 4.03
6.80 0.20 25.00 20.06 2.40 0.600 22.14 62.61 3.78 21.63 3.02
7.00 0.20 25.00 20.06 2.40 0.600 23.57 66.65 3.78 22.97 3.02
7.20 0.20 25.00 20.06 2.40 0.600 25.71 72.71 3.78 24.99 3.02
7.40 0.20 25.00 20.06 2.40 0.600 25.71 72.71 3.78 24.99 3.02
7.60 0.20 15.00 6.69 2.40 0.600 26.43 74.73 1.26 25.16 1.01
7.80 0.20 20.00 6.69 2.40 0.600 22.14 62.61 1.26 21.12 1.01
8.00 0.20 20.00 6.69 2.40 0.600 21.43 60.59 1.26 20.45 1.01
8.20 0.20 20.00 6.69 2.40 0.600 21.43 60.59 1.26 20.45 1.01
8.40 0.20 25.00 13.37 2.40 0.600 23.57 66.65 2.52 22.72 2.02
ALLOWABLE BEARING CAPACITY OF SINGLE PILE
(BASED ON CPT)
PROJECT : SOIL INVESTIGATION AREA DONGGI – MATINDOK DI PT. PERTAMINA EP REGIONAL 4 ZONA 13
LOCATION : CPP DONGGI, KAB, BANGGAI, PROV. SULAWESI TENGAH
SONDIR : S-01 OCTG CPP DONGGI
Pile Data:
Diameter (D) : 60.0 cm
Perimeter (K) : 188.50 cm Gaya Tarik Bollar Kapal 8000 DWT (3063 GT)
Section Area (Ab) : 2827.43 cm2 Gaya Tambatan Bollard
Vertikal 36 Ton
SF1 = 3 (End bearing) Horizontal 54 Ton
SF2 = 5 (Skin bearing) Resultan 65 Ton
9.80 0.20 40.00 26.74 2.40 0.600 28.57 80.78 5.04 27.94 4.03
10.00 0.20 50.00 26.74 2.40 0.600 32.14 90.88 5.04 31.30 4.03
10.20 0.20 50.00 26.74 2.40 0.600 38.57 109.06 5.04 37.36 4.03
10.40 0.20 60.00 26.74 2.40 0.600 45.71 129.25 5.04 44.09 4.03
10.60 0.20 70.00 40.11 2.40 0.600 55.00 155.51 7.56 53.35 6.05
10.80 0.20 85.00 33.43 2.40 0.600 65.00 183.78 6.30 62.52 5.04
11.00 0.20 100.00 40.11 2.40 0.600 76.43 216.10 7.56 73.54 6.05
11.20 0.20 120.00 40.11 2.40 0.600 90.71 256.49 7.56 87.01 6.05
11.40 0.20 150.00 40.11 2.40 0.600 112.14 317.08 7.56 107.20 6.05
11.60 0.20 200.00 66.85 2.40 0.600 120.83 341.65 12.60 116.40 10.08
CPT Graphics (S) 01 OCTG End Bearing Capacity Friction Bearing Capacity
Qc (kg/cm2) Ultimate (Ton) Ultimate (Ton)
0 75 150 225 300 0 80 160 240 320 400 0.0 4.0 8.0 12.0 16.0
0 0 0
1 1 1
2 2 2
3 3 3
4 4 4
5 5 5
6 6 6
Depth (m)
7 7 7
8 8 8
9 9 9
10 10 10
11 11 11
12 12 12
Pile Dia. 30 cm Pile Dia. 30 cm
13 13 13
Cw (kg/cm2) Pile Dia. 40 cm Pile Dia. 40 cm
14 14 Pile Dia. 50 cm 14 Pile Dia. 50 cm
Tw (kg/cm2)
Pile Dia. 60 cm Pile Dia. 60 cm
15 15 15
1 1 1
2 2 2
3 3 3
4 4 4
5 5 5
6 6 6
Depth (m)
7 7 7
8 8 8
9 9 9
10 10 10
11 11 11
12 12 12
Pile Dia. 30 cm Pile Dia. 30 cm
13 13 13
Cw (kg/cm2) Pile Dia. 40 cm Pile Dia. 40 cm
14 14 Pile Dia. 50 cm 14 Pile Dia. 50 cm
Tw (kg/cm2)
Pile Dia. 60 cm Pile Dia. 60 cm
15 15 15
Pile Data:
Diameter (D) : 30.0 cm
Perimeter (K) : 94.25 cm
Section Area (Ab) : 706.86 cm2
Vertikal 36 Ton
SF1 = 3 (End bearing) Horizontal 54 Ton
SF2 = 5 (Skin bearing) Resultan 65 Ton
3.80 0.20 30.00 20.06 1.20 0.300 30.71 21.71 1.89 7.61 1.51
4.00 0.20 35.00 20.06 1.20 0.300 32.14 22.72 1.89 7.95 1.51
4.20 0.20 35.00 20.06 1.20 0.300 33.57 23.73 1.89 8.29 1.51
4.40 0.20 35.00 20.06 1.20 0.300 34.29 24.24 1.89 8.46 1.51
4.60 0.20 35.00 20.06 1.20 0.300 35.00 24.74 1.89 8.62 1.51
4.80 0.20 35.00 20.06 1.20 0.300 32.86 23.23 1.89 8.12 1.51
5.00 0.20 25.00 20.06 1.20 0.300 32.14 22.72 1.89 7.95 1.51
5.20 0.20 25.00 20.06 1.20 0.300 30.71 21.71 1.89 7.61 1.51
5.40 0.20 25.00 20.06 1.20 0.300 28.57 20.20 1.89 7.11 1.51
5.60 0.20 20.00 20.06 1.20 0.300 26.43 18.68 1.89 6.61 1.51
5.80 0.20 20.00 20.06 1.20 0.300 24.29 17.17 1.89 6.10 1.51
6.00 0.20 20.00 20.06 1.20 0.300 22.86 16.16 1.89 5.76 1.51
6.20 0.20 25.00 20.06 1.20 0.300 22.86 16.16 1.89 5.76 1.51
6.40 0.20 25.00 20.06 1.20 0.300 22.14 15.65 1.89 5.60 1.51
6.60 0.20 20.00 20.06 1.20 0.300 21.43 15.15 1.89 5.43 1.51
6.80 0.20 20.00 20.06 1.20 0.300 22.14 15.65 1.89 5.60 1.51
7.00 0.20 25.00 20.06 1.20 0.300 22.86 16.16 1.89 5.76 1.51
7.20 0.20 25.00 20.06 1.20 0.300 23.57 16.66 1.89 5.93 1.51
7.40 0.20 25.00 20.06 1.20 0.300 23.57 16.66 1.89 5.93 1.51
7.60 0.20 25.00 26.74 1.20 0.300 23.57 16.66 2.52 6.06 2.02
7.80 0.20 25.00 26.74 1.20 0.300 25.71 18.18 2.52 6.56 2.02
8.00 0.20 35.00 20.06 1.20 0.300 26.43 18.68 1.89 6.61 1.51
8.20 0.20 25.00 20.06 1.20 0.300 26.43 18.68 1.89 6.61 1.51
8.40 0.20 25.00 26.74 1.20 0.300 28.57 20.20 2.52 7.24 2.02
ALLOWABLE BEARING CAPACITY OF SINGLE PILE
(BASED ON CPT)
PROJECT : SOIL INVESTIGATION AREA DONGGI – MATINDOK DI PT. PERTAMINA EP REGIONAL 4 ZONA 13
LOCATION : CPP DONGGI, KAB, BANGGAI, PROV. SULAWESI TENGAH
SONDIR : S-01 GTG CPP DONGGI
Pile Data:
Diameter (D) : 30.0 cm
Perimeter (K) : 94.25 cm
Section Area (Ab) : 706.86 cm2
Vertikal 36 Ton
SF1 = 3 (End bearing) Horizontal 54 Ton
SF2 = 5 (Skin bearing) Resultan 65 Ton
9.80 0.20 50.00 33.43 1.20 0.300 45.71 32.31 3.15 11.40 2.52
10.00 0.20 60.00 26.74 1.20 0.300 48.57 34.33 2.52 11.95 2.02
10.20 0.20 60.00 26.74 1.20 0.300 51.43 36.35 2.52 12.62 2.02
10.40 0.20 60.00 26.74 1.20 0.300 54.29 38.37 2.52 13.29 2.02
10.60 0.20 60.00 26.74 1.20 0.300 57.14 40.39 2.52 13.97 2.02
10.80 0.20 65.00 33.43 1.20 0.300 62.86 44.43 3.15 15.44 2.52
11.00 0.20 85.00 20.06 1.20 0.300 72.86 51.50 1.89 17.54 1.51
11.20 0.20 120.00 40.11 1.20 0.300 92.86 65.64 3.78 22.64 3.02
11.40 0.20 200.00 66.85 1.20 0.300 98.33 69.51 6.30 24.43 5.04
ALLOWABLE BEARING CAPACITY OF SINGLE PILE
(BASED ON CPT)
PROJECT : SOIL INVESTIGATION AREA DONGGI – MATINDOK DI PT. PERTAMINA EP REGIONAL 4 ZONA 13
LOCATION : CPP DONGGI, KAB, BANGGAI, PROV. SULAWESI TENGAH
SONDIR : S-01 GTG CPP DONGGI
Pile Data:
Diameter (D) : 40.0 cm
Perimeter (K) : 125.66 cm Gaya Tarik Bollar Kapal 8000 DWT (3063 GT)
Section Area (Ab) : 1256.64 cm2 Gaya Tambatan Bollard
Vertikal 36 Ton
SF1 = 3 (End bearing) Horizontal 54 Ton
SF2 = 5 (Skin bearing) Resultan 65 Ton
3.80 0.20 30.00 20.06 1.60 0.400 30.71 38.60 2.52 13.37 2.02
4.00 0.20 35.00 20.06 1.60 0.400 32.14 40.39 2.52 13.97 2.02
4.20 0.20 35.00 20.06 1.60 0.400 33.57 42.19 2.52 14.57 2.02
4.40 0.20 35.00 20.06 1.60 0.400 34.29 43.08 2.52 14.87 2.02
4.60 0.20 35.00 20.06 1.60 0.400 35.00 43.98 2.52 15.16 2.02
4.80 0.20 35.00 20.06 1.60 0.400 32.86 41.29 2.52 14.27 2.02
5.00 0.20 25.00 20.06 1.60 0.400 32.14 40.39 2.52 13.97 2.02
5.20 0.20 25.00 20.06 1.60 0.400 30.71 38.60 2.52 13.37 2.02
5.40 0.20 25.00 20.06 1.60 0.400 28.57 35.90 2.52 12.47 2.02
5.60 0.20 20.00 20.06 1.60 0.400 26.43 33.21 2.52 11.57 2.02
5.80 0.20 20.00 20.06 1.60 0.400 24.29 30.52 2.52 10.68 2.02
6.00 0.20 20.00 20.06 1.60 0.400 22.86 28.72 2.52 10.08 2.02
6.20 0.20 25.00 20.06 1.60 0.400 22.86 28.72 2.52 10.08 2.02
6.40 0.20 25.00 20.06 1.60 0.400 22.14 27.83 2.52 9.78 2.02
6.60 0.20 20.00 20.06 1.60 0.400 21.43 26.93 2.52 9.48 2.02
6.80 0.20 20.00 20.06 1.60 0.400 22.14 27.83 2.52 9.78 2.02
7.00 0.20 25.00 20.06 1.60 0.400 22.86 28.72 2.52 10.08 2.02
7.20 0.20 25.00 20.06 1.60 0.400 23.57 29.62 2.52 10.38 2.02
7.40 0.20 25.00 20.06 1.60 0.400 23.57 29.62 2.52 10.38 2.02
7.60 0.20 25.00 26.74 1.60 0.400 23.57 29.62 3.36 10.55 2.69
7.80 0.20 25.00 26.74 1.60 0.400 25.71 32.31 3.36 11.44 2.69
8.00 0.20 35.00 20.06 1.60 0.400 26.43 33.21 2.52 11.57 2.02
8.20 0.20 25.00 20.06 1.60 0.400 26.43 33.21 2.52 11.57 2.02
8.40 0.20 25.00 26.74 1.60 0.400 28.57 35.90 3.36 12.64 2.69
ALLOWABLE BEARING CAPACITY OF SINGLE PILE
(BASED ON CPT)
PROJECT : SOIL INVESTIGATION AREA DONGGI – MATINDOK DI PT. PERTAMINA EP REGIONAL 4 ZONA 13
LOCATION : CPP DONGGI, KAB, BANGGAI, PROV. SULAWESI TENGAH
SONDIR : S-01 GTG CPP DONGGI
Pile Data:
Diameter (D) : 40.0 cm
Perimeter (K) : 125.66 cm Gaya Tarik Bollar Kapal 8000 DWT (3063 GT)
Section Area (Ab) : 1256.64 cm2 Gaya Tambatan Bollard
Vertikal 36 Ton
SF1 = 3 (End bearing) Horizontal 54 Ton
SF2 = 5 (Skin bearing) Resultan 65 Ton
9.80 0.20 50.00 33.43 1.60 0.400 45.71 57.45 4.20 19.99 3.36
10.00 0.20 60.00 26.74 1.60 0.400 48.57 61.04 3.36 21.02 2.69
10.20 0.20 60.00 26.74 1.60 0.400 51.43 64.63 3.36 22.21 2.69
10.40 0.20 60.00 26.74 1.60 0.400 54.29 68.22 3.36 23.41 2.69
10.60 0.20 60.00 26.74 1.60 0.400 57.14 71.81 3.36 24.61 2.69
10.80 0.20 65.00 33.43 1.60 0.400 62.86 78.99 4.20 27.17 3.36
11.00 0.20 85.00 20.06 1.60 0.400 72.86 91.55 2.52 31.02 2.02
11.20 0.20 120.00 40.11 1.60 0.400 92.86 116.69 5.04 39.90 4.03
11.40 0.20 200.00 66.85 1.60 0.400 98.33 123.57 8.40 42.87 6.72
ALLOWABLE BEARING CAPACITY OF SINGLE PILE
(BASED ON CPT)
PROJECT : SOIL INVESTIGATION AREA DONGGI – MATINDOK DI PT. PERTAMINA EP REGIONAL 4 ZONA 13
LOCATION : CPP DONGGI, KAB, BANGGAI, PROV. SULAWESI TENGAH
SONDIR : S-01 GTG CPP DONGGI
Pile Data:
Diameter (D) : 50.0 cm
Perimeter (K) : 157.08 cm Gaya Tarik Bollar Kapal 8000 DWT (3063 GT)
Section Area (Ab) : 1963.50 cm2 Gaya Tambatan Bollard
Vertikal 36 Ton
SF1 = 3 (End bearing) Horizontal 54 Ton
SF2 = 5 (Skin bearing) Resultan 65 Ton
3.80 0.20 30.00 20.06 2.00 0.500 30.71 60.31 3.15 20.73 2.52
4.00 0.20 35.00 20.06 2.00 0.500 32.14 63.11 3.15 21.67 2.52
4.20 0.20 35.00 20.06 2.00 0.500 33.57 65.92 3.15 22.60 2.52
4.40 0.20 35.00 20.06 2.00 0.500 34.29 67.32 3.15 23.07 2.52
4.60 0.20 35.00 20.06 2.00 0.500 35.00 68.72 3.15 23.54 2.52
4.80 0.20 35.00 20.06 2.00 0.500 32.86 64.51 3.15 22.14 2.52
5.00 0.20 25.00 20.06 2.00 0.500 32.14 63.11 3.15 21.67 2.52
5.20 0.20 25.00 20.06 2.00 0.500 30.71 60.31 3.15 20.73 2.52
5.40 0.20 25.00 20.06 2.00 0.500 28.57 56.10 3.15 19.33 2.52
5.60 0.20 20.00 20.06 2.00 0.500 26.43 51.89 3.15 17.93 2.52
5.80 0.20 20.00 20.06 2.00 0.500 24.29 47.68 3.15 16.53 2.52
6.00 0.20 20.00 20.06 2.00 0.500 22.86 44.88 3.15 15.59 2.52
6.20 0.20 25.00 20.06 2.00 0.500 22.86 44.88 3.15 15.59 2.52
6.40 0.20 25.00 20.06 2.00 0.500 22.14 43.48 3.15 15.12 2.52
6.60 0.20 20.00 20.06 2.00 0.500 21.43 42.07 3.15 14.66 2.52
6.80 0.20 20.00 20.06 2.00 0.500 22.14 43.48 3.15 15.12 2.52
7.00 0.20 25.00 20.06 2.00 0.500 22.86 44.88 3.15 15.59 2.52
7.20 0.20 25.00 20.06 2.00 0.500 23.57 46.28 3.15 16.06 2.52
7.40 0.20 25.00 20.06 2.00 0.500 23.57 46.28 3.15 16.06 2.52
7.60 0.20 25.00 26.74 2.00 0.500 23.57 46.28 4.20 16.27 3.36
7.80 0.20 25.00 26.74 2.00 0.500 25.71 50.49 4.20 17.67 3.36
8.00 0.20 35.00 20.06 2.00 0.500 26.43 51.89 3.15 17.93 2.52
8.20 0.20 25.00 20.06 2.00 0.500 26.43 51.89 3.15 17.93 2.52
8.40 0.20 25.00 26.74 2.00 0.500 28.57 56.10 4.20 19.54 3.36
ALLOWABLE BEARING CAPACITY OF SINGLE PILE
(BASED ON CPT)
PROJECT : SOIL INVESTIGATION AREA DONGGI – MATINDOK DI PT. PERTAMINA EP REGIONAL 4 ZONA 13
LOCATION : CPP DONGGI, KAB, BANGGAI, PROV. SULAWESI TENGAH
SONDIR : S-01 GTG CPP DONGGI
Pile Data:
Diameter (D) : 50.0 cm
Perimeter (K) : 157.08 cm Gaya Tarik Bollar Kapal 8000 DWT (3063 GT)
Section Area (Ab) : 1963.50 cm2 Gaya Tambatan Bollard
Vertikal 36 Ton
SF1 = 3 (End bearing) Horizontal 54 Ton
SF2 = 5 (Skin bearing) Resultan 65 Ton
9.80 0.20 50.00 33.43 2.00 0.500 45.71 89.76 5.25 30.97 4.20
10.00 0.20 60.00 26.74 2.00 0.500 48.57 95.37 4.20 32.63 3.36
10.20 0.20 60.00 26.74 2.00 0.500 51.43 100.98 4.20 34.50 3.36
10.40 0.20 60.00 26.74 2.00 0.500 54.29 106.59 4.20 36.37 3.36
10.60 0.20 60.00 26.74 2.00 0.500 57.14 112.20 4.20 38.24 3.36
10.80 0.20 65.00 33.43 2.00 0.500 62.86 123.42 5.25 42.19 4.20
11.00 0.20 85.00 20.06 2.00 0.500 72.86 143.05 3.15 48.31 2.52
11.20 0.20 120.00 40.11 2.00 0.500 92.86 182.32 6.30 62.04 5.04
11.40 0.20 200.00 66.85 2.00 0.500 98.33 193.08 10.50 66.46 8.40
ALLOWABLE BEARING CAPACITY OF SINGLE PILE
(BASED ON CPT)
PROJECT : SOIL INVESTIGATION AREA DONGGI – MATINDOK DI PT. PERTAMINA EP REGIONAL 4 ZONA 13
LOCATION : CPP DONGGI, KAB, BANGGAI, PROV. SULAWESI TENGAH
SONDIR : S-01 GTG CPP DONGGI
Pile Data:
Diameter (D) : 60.0 cm
Perimeter (K) : 188.50 cm Gaya Tarik Bollar Kapal 8000 DWT (3063 GT)
Section Area (Ab) : 2827.43 cm2 Gaya Tambatan Bollard
Vertikal 36 Ton
SF1 = 3 (End bearing) Horizontal 54 Ton
SF2 = 5 (Skin bearing) Resultan 65 Ton
3.80 0.20 30.00 20.06 2.40 0.600 30.71 86.84 3.78 29.70 3.02
4.00 0.20 35.00 20.06 2.40 0.600 32.14 90.88 3.78 31.05 3.02
4.20 0.20 35.00 20.06 2.40 0.600 33.57 94.92 3.78 32.40 3.02
4.40 0.20 35.00 20.06 2.40 0.600 34.29 96.94 3.78 33.07 3.02
4.60 0.20 35.00 20.06 2.40 0.600 35.00 98.96 3.78 33.74 3.02
4.80 0.20 35.00 20.06 2.40 0.600 32.86 92.90 3.78 31.72 3.02
5.00 0.20 25.00 20.06 2.40 0.600 32.14 90.88 3.78 31.05 3.02
5.20 0.20 25.00 20.06 2.40 0.600 30.71 86.84 3.78 29.70 3.02
5.40 0.20 25.00 20.06 2.40 0.600 28.57 80.78 3.78 27.68 3.02
5.60 0.20 20.00 20.06 2.40 0.600 26.43 74.73 3.78 25.66 3.02
5.80 0.20 20.00 20.06 2.40 0.600 24.29 68.67 3.78 23.64 3.02
6.00 0.20 20.00 20.06 2.40 0.600 22.86 64.63 3.78 22.30 3.02
6.20 0.20 25.00 20.06 2.40 0.600 22.86 64.63 3.78 22.30 3.02
6.40 0.20 25.00 20.06 2.40 0.600 22.14 62.61 3.78 21.63 3.02
6.60 0.20 20.00 20.06 2.40 0.600 21.43 60.59 3.78 20.95 3.02
6.80 0.20 20.00 20.06 2.40 0.600 22.14 62.61 3.78 21.63 3.02
7.00 0.20 25.00 20.06 2.40 0.600 22.86 64.63 3.78 22.30 3.02
7.20 0.20 25.00 20.06 2.40 0.600 23.57 66.65 3.78 22.97 3.02
7.40 0.20 25.00 20.06 2.40 0.600 23.57 66.65 3.78 22.97 3.02
7.60 0.20 25.00 26.74 2.40 0.600 23.57 66.65 5.04 23.22 4.03
7.80 0.20 25.00 26.74 2.40 0.600 25.71 72.71 5.04 25.24 4.03
8.00 0.20 35.00 20.06 2.40 0.600 26.43 74.73 3.78 25.66 3.02
8.20 0.20 25.00 20.06 2.40 0.600 26.43 74.73 3.78 25.66 3.02
8.40 0.20 25.00 26.74 2.40 0.600 28.57 80.78 5.04 27.94 4.03
ALLOWABLE BEARING CAPACITY OF SINGLE PILE
(BASED ON CPT)
PROJECT : SOIL INVESTIGATION AREA DONGGI – MATINDOK DI PT. PERTAMINA EP REGIONAL 4 ZONA 13
LOCATION : CPP DONGGI, KAB, BANGGAI, PROV. SULAWESI TENGAH
SONDIR : S-01 GTG CPP DONGGI
Pile Data:
Diameter (D) : 60.0 cm
Perimeter (K) : 188.50 cm Gaya Tarik Bollar Kapal 8000 DWT (3063 GT)
Section Area (Ab) : 2827.43 cm2 Gaya Tambatan Bollard
Vertikal 36 Ton
SF1 = 3 (End bearing) Horizontal 54 Ton
SF2 = 5 (Skin bearing) Resultan 65 Ton
9.80 0.20 50.00 33.43 2.40 0.600 45.71 129.25 6.30 44.34 5.04
10.00 0.20 60.00 26.74 2.40 0.600 48.57 137.33 5.04 46.79 4.03
10.20 0.20 60.00 26.74 2.40 0.600 51.43 145.41 5.04 49.48 4.03
10.40 0.20 60.00 26.74 2.40 0.600 54.29 153.49 5.04 52.17 4.03
10.60 0.20 60.00 26.74 2.40 0.600 57.14 161.57 5.04 54.86 4.03
10.80 0.20 65.00 33.43 2.40 0.600 62.86 177.72 6.30 60.50 5.04
11.00 0.20 85.00 20.06 2.40 0.600 72.86 206.00 3.78 69.42 3.02
11.20 0.20 120.00 40.11 2.40 0.600 92.86 262.55 7.56 89.03 6.05
11.40 0.20 200.00 66.85 2.40 0.600 98.33 278.03 12.60 95.20 10.08
CPT Graphics (S) 01 GTG End Bearing Capacity Friction Bearing Capacity
Qc (kg/cm2) Ultimate (Ton) Ultimate (Ton)
0 75 150 225 300 0 80 160 240 320 0.0 4.0 8.0 12.0 16.0
0 0 0
1 1 1
2 2 2
3 3 3
4 4 4
5 5 5
6 6 6
Depth (m)
7 7 7
8 8 8
9 9 9
10 10 10
11 11 11
12 12 12
Pile Dia. 30 cm Pile Dia. 30 cm
13 13 13
Cw (kg/cm2) Pile Dia. 40 cm Pile Dia. 40 cm
14 14 Pile Dia. 50 cm 14 Pile Dia. 50 cm
Tw (kg/cm2)
Pile Dia. 60 cm Pile Dia. 60 cm
15 15 15
1 1 1
2 2 2
3 3 3
4 4 4
5 5 5
6 6 6
Depth (m)
7 7 7
8 8 8
9 9 9
10 10 10
11 11 11
12 12 12
Pile Dia. 30 cm Pile Dia. 30 cm
13 13 13
Cw (kg/cm2) Pile Dia. 40 cm Pile Dia. 40 cm
14 14 Pile Dia. 50 cm 14 Pile Dia. 50 cm
Tw (kg/cm2)
Pile Dia. 60 cm Pile Dia. 60 cm
15 15 15
2 14 2 2 2
4 17 4 4 4
6 9 6 6 6
8 3 8 8 8
10 17 10 10 10
12 25 12 12 12
14 50 14 14 14
16 50 16 16 16
18 50 18 18 18
20 20 20 20
22 22 22 22
24 24 24 24
Friction Pile D30cm (T6) End Pile D30cm (T6) Pile Capacity D30cm (T6)
26 26 26 End Pile D40cm (T7.5) 26 Pile Capacity D40cm (T7.5)
Friction Pile D40cm (T7.5)
End Pile D50cm (T9) Pile Capacity D50cm (T9)
28 28 Friction Pile D50cm (T9) 28 28
Friction Pile D60cm (T10) End Pile D60 cm (T10) Pile Capacity D60 cm (T10)
30 30 30 30
PILE MATERIAL PROPERTIES Dimensions Inertia Virtual Fixity Point
4
Pile Material : Concrete Spun Pile D 30 T6 : 34607.78 cm 392.24 cm
2 4
Concrete K - 600 'c 508.16 kg/cm D 40 T7.5 : 106488.95 cm 486.47 cm
4
49.80 MPa D 50 T9 : 255324.30 cm 575.43 cm
4
Modulus of Elasticity Ec 33167.48 MPa D 60 T10 : 510508.81 cm 656.96 cm
• APPENDIX B.4 – PILE BEARING CAPACITY S-01 ATU CPP MATINDOK
ALLOWABLE BEARING CAPACITY OF SINGLE PILE
(BASED ON CPT)
PROJECT : SOIL INVESTIGATION AREA DONGGI – MATINDOK DI PT. PERTAMINA EP REGIONAL 4 ZONA 13
LOCATION : CPP MATINDOK, KAB, BANGGAI, PROV. SULAWESI TENGAH
SONDIR : S-01 ATU CPP MATINDOK
Pile Data:
Diameter (D) : 30.0 cm
Perimeter (K) : 94.25 cm
Section Area (Ab) : 706.86 cm2
Vertikal 36 Ton
SF1 = 3 (End bearing) Horizontal 54 Ton
SF2 = 5 (Skin bearing) Resultan 65 Ton
Pile Data:
Diameter (D) : 40.0 cm
Perimeter (K) : 125.66 cm Gaya Tarik Bollar Kapal 8000 DWT (3063 GT)
Section Area (Ab) : 1256.64 cm2 Gaya Tambatan Bollard
Vertikal 36 Ton
SF1 = 3 (End bearing) Horizontal 54 Ton
SF2 = 5 (Skin bearing) Resultan 65 Ton
Pile Data:
Diameter (D) : 50.0 cm
Perimeter (K) : 157.08 cm Gaya Tarik Bollar Kapal 8000 DWT (3063 GT)
Section Area (Ab) : 1963.50 cm2 Gaya Tambatan Bollard
Vertikal 36 Ton
SF1 = 3 (End bearing) Horizontal 54 Ton
SF2 = 5 (Skin bearing) Resultan 65 Ton
Pile Data:
Diameter (D) : 60.0 cm
Perimeter (K) : 188.50 cm Gaya Tarik Bollar Kapal 8000 DWT (3063 GT)
Section Area (Ab) : 2827.43 cm2 Gaya Tambatan Bollard
Vertikal 36 Ton
SF1 = 3 (End bearing) Horizontal 54 Ton
SF2 = 5 (Skin bearing) Resultan 65 Ton
1 1 1
2 2 2
Depth (m)
3 3 3
4 4 4
Pile Dia. 30 cm Pile Dia. 30 cm
Cw (kg/cm2) Pile Dia. 40 cm Pile Dia. 40 cm
Pile Dia. 50 cm Pile Dia. 50 cm
Tw (kg/cm2)
Pile Dia. 60 cm Pile Dia. 60 cm
5 5 5
1 1 1
2 2 2
Depth (m)
3 3 3
4 4 4
Pile Dia. 30 cm Pile Dia. 30 cm
Cw (kg/cm2) Pile Dia. 40 cm Pile Dia. 40 cm
Pile Dia. 50 cm Pile Dia. 50 cm
Tw (kg/cm2)
Pile Dia. 60 cm Pile Dia. 60 cm
5 5 5
2 50 2 2 2
4 50 4 4 4
6 50 6 6 6
8 50 8 8 8
10 10 10 10
12 12 12 12
14 14 14 14
16 16 16 16
18 18 18 18
20 20 20 20
22 22 22 22
24 24 24 24
Friction Pile D30cm (T6) End Pile D30cm (T6) Pile Capacity D30cm (T6)
26 26 26 End Pile D40cm (T7.5) 26 Pile Capacity D40cm (T7.5)
Friction Pile D40cm (T7.5)
End Pile D50cm (T9) Pile Capacity D50cm (T9)
28 28 Friction Pile D50cm (T9) 28 28
Friction Pile D60cm (T10) End Pile D60 cm (T10) Pile Capacity D60 cm (T10)
30 30 30 30
PILE MATERIAL PROPERTIES Dimensions Inertia Virtual Fixity Point
4
Pile Material : Concrete Spun Pile D 30 T6 : 34607.78 cm 209.28 cm
2 4
Concrete K - 600 'c 508.16 kg/cm D 40 T7.5 : 106488.95 cm 260.97 cm
4
49.80 MPa D 50 T9 : 255324.30 cm 310.05 cm
4
Modulus of Elasticity Ec 33167.48 MPa D 60 T10 : 510508.81 cm 355.45 cm
PT PERTAMINA EP
Page
Field Documentation
1
Page
Field Documentation
2
Page
Field Documentation
1
Page
Field Documentation
2
Page
Field Documentation
3
Page
Field Documentation
3
Page
Field Documentation
1
Page
Field Documentation
2
Page
Field Documentation
3
Page
Field Documentation
1
Page
Field Documentation
2
Page
Field Documentation
3
Page
Field Documentation
1
Page
Field Documentation
2
Page
Field Documentation
1
Page
Field Documentation
1
Page
Field Documentation
2
Page
Field Documentation
3
Page
Field Documentation
1
Page
Field Documentation
2
Page
Field Documentation
3
Page
Field Documentation
1
Page
Field Documentation
2
1st SPT Test, depth 1.55 m – 2.00 m at BH-01 GTG Area CPP DONGGI
Soil Investigation Area CPP Donggi – Matindok, PT. Pertamina EP Regional 4 Zone 13
Page
Field Documentation
3
2nd SPT, Test depth 3.55 m – 4.00 m at BH-01 GTG Area CPP DONGGI
3rd SPT Test, depth 5.55 m – 6.00 m at BH-01 GTG Area CPP DONGGI
Soil Investigation Area CPP Donggi – Matindok, PT. Pertamina EP Regional 4 Zone 13
Page
Field Documentation
4
4th SPT Test, depth 7.55 m – 8.00 m at BH-01 GTG Area CPP DONGGI
5th SPT Test, depth 9.55 m – 10.00 m at BH-01 GTG Area CPP DONGGI
Soil Investigation Area CPP Donggi – Matindok, PT. Pertamina EP Regional 4 Zone 13
Page
Field Documentation
5
6th SPT Test, depth 11.55 m – 12.00 m at BH-01 GTG Area CPP DONGGI
7th SPT Test, depth 13.55 m – 14.00 m at BH-01 GTG Area CPP DONGGI
Soil Investigation Area CPP Donggi – Matindok, PT. Pertamina EP Regional 4 Zone 13
Page
Field Documentation
6
8th SPT Test, depth 15.55 m – 16.00 m at BH-01 GTG Area CPP DONGGI
9th SPT Test, depth 17.55 m – 18.00 m at BH-01 GTG Area CPP DONGGI
• APPENDIX C.3 – FIELD DOCUMENTATION ATU CPP MATINDOK
Soil Investigation Area CPP Donggi – Matindok, PT. Pertamina EP Regional 4 Zone 13
Page
Field Documentation
1
Page
Field Documentation
2
Page
Field Documentation
1
Page
Field Documentation
2
Page
Field Documentation
3
Page
Field Documentation
1
Page
Field Documentation
2
Page
Field Documentation
1
Page
Field Documentation
2
1st SPT Test, depth 1.55 m – 2.00 m at BH-01 ATU Area CPP MATINDOK
Soil Investigation Area CPP Donggi – Matindok, PT. Pertamina EP Regional 4 Zone 13
Page
Field Documentation
3
2nd SPT, Test depth 3.55 m – 4.00 m at BH-01 ATU Area CPP MATINDOK
3rd SPT Test, depth 5.55 m – 6.00 m at BH-01 ATU Area CPP MATINDOK
Soil Investigation Area CPP Donggi – Matindok, PT. Pertamina EP Regional 4 Zone 13
Page
Field Documentation
4
4th SPT Test, depth 7.55 m – 8.00 m at BH-01 ATU Area CPP MATINDOK