You are on page 1of 140

PT PERTAMINA EP

OPERATION & SURFACE FACILITIES DEPT.

SOIL INVESTIGATION REPORT AREA CPP DONGGI


MATINDOK

3 31 Dec 21 Issued for Company Use ES AW/RA OC


2 13 Dec 21 Issued for Company Approval ES AW/RA OC
1 10 Dec 21 Issued for Company Review ES AW/RA OC
Issued for Contractor Internal
0 10 Dec 21 ES AW/RA OC
Review
PRE CHK APP CHK APP
REV DATE DESCRIPTION Consortium PT Bina Rekacipta
Utama & PT Tiga Inti Pilar
PERTAMINA EP

TOTAL OR PARTIAL REPRODUCTION AND/OR UTILIZATION OF THIS DOCUMENT ARE FORBIDDEN WITHOUT PRIOR WRITTEN
AUTHORIZATION OF PT PERTAMINA EP

SOIL INVESTIGATION AREA DONGGI – MATINDOK


PT PERTAMINA EP ZONA 13

Contract Number : 4650011247 Job No.: CTR-BTC-EPSF-048

Document No. : Revision

W2021E-DNGF-CV-272-SDY-0001 3
W2021E-DNGF-CV-272-SDY-0001 – Rev. 3 Page 1 of 38
PT PERTAMINA EP

SOIL INVESTIGATION REPORT AREA CPP DONGGI


MATINDOK

TABULATION OF REVISION SHEET


REVISION REVISION
SHEET REMARKS SHEET REMARKS
0 1 2 3 4 5 0 1 2 3 4 5
1 46
2 47
3 48
4 49
5 50
6 51
7 52
8 53
9 54
10 55
11 56
12 57
13 58
14 59
15 60
16 61
17 62
18 63
19 64
20 65
21 66
22 67
23 68
24 69
25 70
26 71
27 72
28 73
29 74
30 75
31 76
32 77
33 78
34 79
35 80
36 ATTACHMENT
37 1
38 2
39 3
40 4
41 5
42 6
43 7
44 8
45 9

W2021E-DNGF-CV-272-SDY-0001 – Rev. 3 Page 2 of 38


PT PERTAMINA EP

SOIL INVESTIGATION REPORT AREA CPP DONGGI


MATINDOK

REVISION SHEET DESCRIPTION


NO PAGE SUBJECT DESCRIPTION OF CHANGE REV.

W2021E-DNGF-CV-272-SDY-0001 – Rev. 3 Page 3 of 38


PT PERTAMINA EP

SOIL INVESTIGATION REPORT AREA CPP DONGGI


MATINDOK

Table of Contents

TABULATION OF REVISION SHEET ....................................................................................................................... 2


REVISION SHEET DESCRIPTION ............................................................................................................................ 3
1. INTRODUCTION ................................................................................................................................................... 5
1.1. General .......................................................................................................................................................... 5
1.2. Scope of Work ............................................................................................................................................... 5
1.3. Location of Soil Investigation ......................................................................................................................... 6
1.4. Reference ...................................................................................................................................................... 6
1.5. List of Equipments ......................................................................................................................................... 6
2. METHOD OF WORK ............................................................................................................................................. 8
2.1. Dutch Cone Penetration Test (DCPT)/Sondir Test ........................................................................................ 8
2.2. Hand Boring ................................................................................................................................................. 11
2.3. Deep Boring/Bore Holes (BH) ...................................................................................................................... 12
2.3.1. SPT (Standard Penetration Test)....................................................................................................... 13
2.3.2. Undisturbed Sample (UDS) ............................................................................................................... 15
2.4. Laboratory Test ............................................................................................................................................ 16
3. RESULT OF SOIL INVESTIGATION................................................................................................................... 18
3.1. OCTG Area CPP Donggi ............................................................................................................................. 18
3.1.1. DCPT/Sondir (S) Result at OCTG Area CPP Donggi ........................................................................ 19
3.1.2. Hand Boring (HB) Result at OCTG Area CPP Donggi ....................................................................... 20
3.1.3. Test Pit (TP) Result at OCTG Area CPP Donggi ............................................................................... 21
3.2. GTG Area CPP Donggi ................................................................................................................................ 22
3.2.1. DCPT/Sondir (S) Result at GTG Area CPP Donggi ........................................................................... 22
3.2.2. Deep Boring/Bore Hole (BH) and SPT Result at GTG Area CPP Donggi.......................................... 24
3.3. ATU Area CPP Matindok ............................................................................................................................. 26
3.3.1. DCPT/Sondir (S) Result at ATU Area CPP Matindok ........................................................................ 26
3.3.2. Deep Boring/Bore Hole (BH) and SPT Result at ATU Area CPP Matindok ....................................... 28
3.4. Laboratory Test ............................................................................................................................................ 29
4. GEOLOGICAL CONDITIONS ............................................................................................................................. 30
5. GEOTECHNICAL INFORMATION RELATED TO SEISMICITY ......................................................................... 30
6. BEARING CAPACITY ......................................................................................................................................... 33
6.1. Bearing Capacity for Shallow Foundation (DCPT Data) .............................................................................. 33
6.2. Bearing Capacity for Single Pile .................................................................................................................. 34

APPENDIX A – RESULT OF SOIL INVESTIGATION ............................................................................................. 36


APPENDIX B – PILE BEARING CAPACITY ............................................................................................................ 37
APPENDIX C – FIELD DOCUMENTATION ............................................................................................................. 38

W2021E-DNGF-CV-272-SDY-0001 – Rev. 3 Page 4 of 38


PT PERTAMINA EP

SOIL INVESTIGATION REPORT AREA CPP DONGGI


MATINDOK

1. INTRODUCTION

1.1. General
This report is the result of the Soil Investigation Area CPP Donggi Matindok which is OCTG, GTG at CPP
Donggi area and ATU at CPP Matindok area.

The Soil Investigation work aims to obtain data and subsurface soil parameters that will be used to analyze
soil behavior when burdened, as well as to identify possible patterns of collapse that may occur and how
to overcome them. These data can be used for further analysis.

1.2. Scope of Work

The scope of work on this Soil Investigation includes:

OCTG Area CPP Donggi:

a. 1 (one) point of Sondir/DCPT Capacity of 2.5 ton to a depth of 25 meter or up to hard soil (the value
of cone resistance readings >200 kg/cm2);
b. 1 (one) point of Hand Bore up to 6 meter depth, include soil sampling (2 tube of undisturbed
sample/UDS);
c. 2 points of Test Pit (soil sampling for CBR test at soil mechanical Laboratory).

GTG Area CPP Donggi:

a. 1 (one) point of Sondir/DCPT Capacity of 2.5 ton to a depth of 25 meter or up to hard soil (the value
of cone resistance readings >200 kg/cm2);
b. 1 (one) point of Deep Boring (boreholes) and N-SPT Test to a depth of 20 meters, include soil
sampling (interval 2 meters or 6 tube).

ATU Area CPP Matindok:

a. 1 (one) point of Sondir/DCPT Capacity of 2.5 ton to a depth of 25 meter or up to hard soil (the value
of cone resistance readings >200 kg/cm2);
b. 1 (one) point of Deep Boring (boreholes) and N-SPT Test to a depth of 20 meters, include soil
sampling (interval 2 meters or 6 tube).

Laboratory Test:

a. Index Properties:
- Atterberg Limits,
- Grain Size,
- Unit Weight,
- Spesific Gravity,
- Soil Classification,
- Water Content,
- Organic Content.
b. Engineering Properties:
- Direct Shear/Triaxial UU,
W2021E-DNGF-CV-272-SDY-0001 – Rev. 3 Page 5 of 38
PT PERTAMINA EP

SOIL INVESTIGATION REPORT AREA CPP DONGGI


MATINDOK

- Unconfined Compression Test,


- Consolidation One Dimensional.
Chemical Properties:
- pH,
- SO4.

1.3. Location of Soil Investigation

Location of soil investigation is at Pertamina EP Regional 4 Zona 13, CPP Donggi-Matindok Kec. Toili
Barat and Kec. Batui, Kab. Banggai, Prov. Sulawesi Tengah (Gambar 1-1).

Figure 1.3-1 Location of Soil Investigation

1.4. Reference
The implementation of Soil Investigation refers to the provisions, regulations, and norms of technical
implementation of work, consist of:

- SNI 2827: 2008 : “Cara uji penetrasi lapangan dengan alat sondir”
- SNI 2436: 2008 : “Tata cara pencatatan dan identifikasi hasil pengeboran inti”
- SNI 4153: 2008 : “Cara uji penetrasi lapangan dengan SPT”
- ASTM D2573 : Standard Test Method for Field Vane Shear Test in Cohesive Soil
- ASTM D4700 : Standard Guide for Soil Sampling from the Vadose Zone
- ASTM D1586-67 : Standard Test Method for Standard Penetration Test (SPT) and Split Barrel
Sampling of Soil
- ASTM D1587-67 : Standard practice for Thin Walled Tube sampling soils for geotechnical purpose
- Technical rules of survey.

1.5. List of Equipments

The list of equipment which used in Soil Investigation work can be seen in Tables 1.5-1.

W2021E-DNGF-CV-272-SDY-0001 – Rev. 3 Page 6 of 38


PT PERTAMINA EP

SOIL INVESTIGATION REPORT AREA CPP DONGGI


MATINDOK

Table 1.5-1 List of Equipments

No Type of Equipment Quantity


1 CPT Machine 1 Unit
2 Manometer Dial 1 Unit
3 CPT Rod 25 pcs
4 Biconus 1 Set
5 Anker 4 pcs
6 Hand Bore Tools 1 Set
7 Test Pit Tools 1 Set
8 Drilling Machine incl. diesel engine 1 Set
9 Tripod 1 Set
10 Hammer and SPT Test 1 Set
11 Sanchin Pump incl. diesel engine 1 Set
12 UDS Tube 20 pcs
13 Casing 3 inch 15 pcs
14 Rod AW 10 pcs
15 Camera 1 Unit
16 Other accessories 1 Set
17 Safety Equipment 1 Set

W2021E-DNGF-CV-272-SDY-0001 – Rev. 3 Page 7 of 38


PT PERTAMINA EP

SOIL INVESTIGATION REPORT AREA CPP DONGGI


MATINDOK

2. METHOD OF WORK

2.1. Dutch Cone Penetration Test (DCPT)/Sondir Test

Sondir or also called Dutch Cone Penetration Test (DCPT) is implemented in reference to ASTM D 3441-
98 (Standard Test Method for Mechanical Cone Penetration Test of Soil) and SNI 2827:2008 on how to
test penetration to obtain parameters layer of soil hardness in the field, with penetration (static conus
penetration) mechanical system. Cone testing tools with a diameter of 3.57 cm. area of a section 100 mm 2,
cone with rod in the pipe suppressor. Parameters that read on the manometer form a conus resistance
(Cw) and shear resistance (Tw). From these parameters can find out the number of friction ratio (R f), and
total soil friction (Tf) for the interpretation of the soil layer hardness that is part of the foundation design.
The mechanics of the penetration testing tool and the penetration test method can be seen in figure 2.1-1
and 2.1-2.

Figure 2.1-1 Scheme of Cone Penetration Test/Sondir (ASTM D 3341-98 and SNI 2827:2008)

W2021E-DNGF-CV-272-SDY-0001 – Rev. 3 Page 8 of 38


PT PERTAMINA EP

SOIL INVESTIGATION REPORT AREA CPP DONGGI


MATINDOK

Figure 2.1-2 Cone Penetration Test/Sondir Diagram (based on SNI 2827:2008)

The results of penetration are presented in graphical form with empirical equations as follows:

A. Cone Resistance (qc)


The value of Cone Resistance (qc) with a conus end is driven, calculated using the equation:

Pkonus = Ppiston ................................................................................................................... (1)

Qc x Ac = Cw x Apl

Qc = Cw x Apl / Ac ............................................................................................................. (2)

W2021E-DNGF-CV-272-SDY-0001 – Rev. 3 Page 9 of 38


PT PERTAMINA EP

SOIL INVESTIGATION REPORT AREA CPP DONGGI


MATINDOK

Apl = π (Dpl)2 / 4 ............................................................................................................... (3)

Ac = π (Dc)2 / 4 ................................................................................................................ (4)

B. Friction Resistance (fs)


Local friction resistance values are obtained when the conus ends and friction are pushed together,
and are calculated using the equation:

Pkonus + Pgeser = Ppiston....................................................................................................... (5)

(qc x Ac) + (fs x As) = Tw x Apl

(Cw x Apl) + (fs x As) = Tw x Apl

Fs = Kw x Apl / As .............................................................................................................. (6)

As = π Ds Ls ..................................................................................................................... (7)

Kw = (Tw – Cw) ................................................................................................................. (8)

C. Friction Ration (Rf)


Friction ratio is derived from the comparison of the local friction resistance (f s) value with the cone
resistance (qc), and is calculated using the equation:

Rf = (fs / qc) x 100 ............................................................................................................ (9)

D. Total Friction (Tf)


The total friction value (Tf) is obtained by summing the local friction resistance (fs) value multiplied by
the reading interval, and calculated using the equation:

Tf = (fs x interval reading).............................................................................................. (10)

With:

Cw : manometer readings for conus resistance values;


Tw : manometer readings for conus and friction resistance values;
Kw : different between Cw and Tw;
Pkonus : force at the conus;
Ppiston : force of the piston;
qc : conus resistance;
fs : local friction resistance;
Rf : friction ratio;
Tf : total friction;
Apl : area of piston;
Dpl : diameter of piston;
Ac : area of konus;
Dc = Ds : diameter of conus = diameter of friction cover;
As : area of friction cover;
Ds : diameter of friction cover;
Ls : length of friction cover.

The results of penetration test in clay soil can be estimated the strength level of each layer of soil based
on qc value (conus resistance) where the estimate of strength or a fine grained soil properties is influenced

W2021E-DNGF-CV-272-SDY-0001 – Rev. 3 Page 10 of 38


PT PERTAMINA EP

SOIL INVESTIGATION REPORT AREA CPP DONGGI


MATINDOK

by the level of strength due to water content. The estimated soil strength of the penetration result based
on qc value can be seen in table 2.1-1.

Table 2.1-1 Conus Resistance Value Against Soil Strength Estimate

(Conus Resistance)
Soil Strength Estimate
Cw ( kg/cm2)
<6 Very Soft
6 - 12 Soft
12 - 24 Medium
24 - 45 Stiff
45 - 75 Very Stiff
75-150 Hard
150< Very Hard

2.2. Hand Boring


Hand boring/shallow boring test with depth up to 5 meter or called rotary method (vane shear) refers to
ASTM D2573 regarding “Standard Test Method for Field Vane Shear Test in Cohesive Soil” with the aim
of among others:

• Investigate and know the types of layers in each depth of soil,


• Set the depth for the disturbed/undisturbed soil sampling for laboratory testing purposes,
• To inform the ground water level

Drilling with an auger or hand boring is the simplest and most economical drilling method on soft ground
to a certain depth. The methods of implementation in detail are described in sub-section below.

a. Determine the drill point and clean the area around the drill point. Drill bits are installed on rod then
the top is installed T-key.
b. Build/Set up perpendicular drill tools at a predetermined point, then by using crank, turn round the
clockwise while pressed until the drill into the ground
c. After the drill bits is full, the drill tools is lifted out then immediately identified about the type, color,
properties the soil while the drill bits is cleaned.
d. Then continue drilling to reach 5 meter depth. If the hole has more than one rod, then the rod are
connected with another rods and so on.

Soil sampling refers to ASTM D4700 (Standard Guide for Soil Sampling from the Vadose Zone), i.e. This
guide includes procedures that can be used to obtain soil samples from the vadose zone. Take examples
of soil with thin steel cylinders with a diameter of 73 mm and a length of 50 cm. The taking of the original
soil example, undisturbed sample (UDS), is done vertically by being pressed or pounded by a hammer
and covered with wax liquid (paraffin) so that the moisture content and texture of the soil are not disturbed
and protected from heat and impact. The hand bore tool scheme can be seen in Figures 2.2-1 below.

W2021E-DNGF-CV-272-SDY-0001 – Rev. 3 Page 11 of 38


PT PERTAMINA EP

SOIL INVESTIGATION REPORT AREA CPP DONGGI


MATINDOK

Figure 2.2-1 Tools and Schemes of Hand Boring

2.3. Deep Boring/Bore Holes (BH)

Deep boring is carried out by core drilling methods. Deep boring is done by rotating and pressing a core
barrel with a diameter of 73 mm. The result of the piece of soil is removed and placed on a corebox
measuring 1 meter long consisting of 5 rows. On the layer of soil that is loose, drilling will use or install
casings (protective pipes). Drilling will be stopped until it reaches a depth of 30 meters or reaches the
value of N-SPT>50 with 3 consecutive SPT tests. The scheme of core drilling tools and working procedures
can be seen in Figures 2.3-1 below.

Figure 2.3-1 Drilling Tools and Schemes of Deep Boring


W2021E-DNGF-CV-272-SDY-0001 – Rev. 3 Page 12 of 38
PT PERTAMINA EP

SOIL INVESTIGATION REPORT AREA CPP DONGGI


MATINDOK

In this soil investigation, GXY-01 machine is used. GXY machine can be assembled such that it is easier
for mobilization. In addition, generators and water pumps are also needed. The first generator is used to
drive the YBM engine, meanwhile the second generator is used as a power source for water pumps.

After the bed is in the position of the planned drill point, raise the main controller on the bed then tighten
the bolt. Raise the gearbox and tightened the bolt. Then raise the crane/coupling and tighten the bolt.
Finally install the spindle. Always check machine straightness using water pass. After the machine is
arranged, the next step is to raise the tripod for the pulley stand. The height of the tripod should be higher
than the rod. In this drilling, the tripod height is 6 m. Ensure the end of sling is attached to pulley in parallel
to the engine spindle hole. The sling is used for Lifting or Lowering process the rod and casing. Figure 2.3-
2 show drilling machine arrangement.

Figure 2.3-2 Drilling Machine: Side and Front View

2.3.1. SPT (Standard Penetration Test)

Before conducting SPT, N value of the SPT should be defined. N value is the number of blows needed to
insert a standard Split Spoon tube into the ground as deep as 12" (or 1 foot, or 30 cm). The test is
performed as much as 3 x 15 cm, where the number of collisions is in the first 15 cm (N1). However it is
not used as the SPT value. The N value of the SPT is the sum of N2 and N3.

This Standard Penetration Test or SPT has been performed in according with ASTM Standard D1586
(ASTM = American Standard for Testing and Materials). Standard Penetration Test, SPT, must always be
done together with drilling.

Split Spoon Tube is a tube with an outer diameter of 2" (5.08 cm), and an inner diameter of 1.5" (3.81 cm),
a length of 18" to 30" (45.7 - 76.2 cm). It is split into 2 sections towards its length, in order to take soil
samples from it. The bottom end is screwed with a hard metal (shoe). The shoe straps the two halves of
the split pipe. Meanwhile the upper part is connected with a Split Spoon connecting pipe and rod.

Another standard equipment is the Hammer, which weighs 140 lbs (63.5 kg) and the height of fall during
mashing is 30" (76 cm). Likewise, during measuring SPT, the drill pipe used to connect the pounder (at

W2021E-DNGF-CV-272-SDY-0001 – Rev. 3 Page 13 of 38


PT PERTAMINA EP

SOIL INVESTIGATION REPORT AREA CPP DONGGI


MATINDOK

ground level) to the split spoon (inside the ground) is a pipe of size A, namely the outer diameter of 1-5 /
8" (4.12 cm) and the inner diameter of 1-1 / 8" (2.85 cm) or larger.

Figure 2.3.1-1 Schemes of Standard Penetration Test (ASTM D1586 and SNI 4153: 2008)

The workings of the SPT can be described are as follows:

a. Drilling to a depth where the SPT test will be conducted. Then clean the drill hole from the loose
soil.
b. Attach the Split Spoon to the rod, and insert it into the ground to the depth of the drilling resulted
above.
c. At the top of the rod, attach the hammer along with its complementary parts, which consist of the
hammer fall guide, hammer lifter rope, etc.
d. Do the collision, so that the split spoon penetrated as deep as 3x6” (3x15 cm). Count the number
of collisions for the first, second and third for each 15 cm penetration. Note that during pounding,
the height of the hammer must always be 30", and the lifting strap of the hammer must be loose
during the hammer fall.
e. The number of collisions for the second and third 2x15 cm penetration is called the N value (SPT).
Collisions for the first 15 cm are considered penetration of a split spoon still in the ground damaged
by drilling, it is still ignored, unless a third 15 cm collision is not possible.
f. Lift the Split Spoon to the surface. The soil from the split spoon can easily be removed by
unscrewing the pipe shoes. Then open the two halves of the Split Spoon pipe. After the soil is
identified as necessary, store the soil in plastic.

W2021E-DNGF-CV-272-SDY-0001 – Rev. 3 Page 14 of 38


PT PERTAMINA EP

SOIL INVESTIGATION REPORT AREA CPP DONGGI


MATINDOK

g. To test the SPT in the next depth, the drill hole must be deepened first, to the next to be tested for
the SPT. From the results of SPT in various depths from one borehole, it can be described SPT
graphs of depth, which usually become one by visually identifying the soil type, color and properties
called bore log.

The soil layer profile at the soil investigation site is made based on the results of the soil investigation.
Determination and classification of soil types is determined from visual observations, Standard Penetration
Test (SPT) results, and laboratory test results. Verification against soil classification that has been
determined based on visual observations needs to be done to determine the soil type. Some references
for classifying soil types can be seen in the following table.

Table 2.3.1-1 Classification of Granular Soil by N-SPT Value (Meyerhof and Peck, 1948)

Angle of Internal Friction (’)


N-SPT Relative Density
State of Packing Peck Meyerhof
Value (%)
(degrees) (degrees)
N<4 Very loose <20 < 28.5 < 30
4 – 10 Loose 20 – 40 28.5 – 30 30 – 35
10 – 30 Medium/Compact 40 – 60 30 – 36 35 – 40
30 – 50 Dense 60 – 80 36 – 41 40 – 45
N > 50 Very Dense >80 … > 41 … > 45

Tabel 2.3.1-2 Classification of Cohessive Soil by N-SPT Value (Terzaghi et al., 1996)

N-SPT Soil
Su (psf) Su (kPa)
Value Consistency
0-2 Very Soft <250 <12
2-4 Soft 250 – 500 12 – 25
4-8 Medium 500 – 1000 25 – 50
8 - 15 Stiff 1000 – 2000 50 – 100
15 – 30 Very Stiff 2000 – 4000 100 – 200
30 < N Hard >4000 >200

2.3.2. Undisturbed Sample (UDS)

Examples of undisturbed soil are soil samples whose grain structure and water content are the same as
the structure and moisture content of the original place in the soil. The soil samples must represent well
the soil in the place of origin (representative sample). In order to maintain these conditions, their collection
and storage require certain techniques.

The original soil sample is taken using thin walled tube sampler, at depths as long as the soil condition is
possible to be taken using (Thin Walled Tube Sampler). This tube has an outer diameter of 3 "and an inner
diameter of 2,875" (some have an outer diameter of 2 "to 5"). The length is between 40 and 80 cm. It is
W2021E-DNGF-CV-272-SDY-0001 – Rev. 3 Page 15 of 38
PT PERTAMINA EP

SOIL INVESTIGATION REPORT AREA CPP DONGGI


MATINDOK

used for cohesive soils, such as clay, silt, or clay or silt, which is not too hard. Sampling of undisturbed soil
shall follow standard ASTM D-1587-83 "Standard Practice for Thin-Walled Tube Sampling of Soils".

The original soil samples taken from the drilling above, remain in the sampler tube which is tightly closed
and free from disturbance or collision such that the physical, chemical structure and composition remain
as the soil in its original place, until the time for laboratory tests.

Original soil samples are taken from deep boreholes at planned depth, or it can be obtained from certain
depths where there are changes in type, color, odor, hardness, and grain. Normally, it is taken from every
change in depth from 2 to 3 meters. Ideally original soil samples are taken continuously along the depth
of the borehole. However it takes longer time and expensive, especially if everything must be tested by
the Laboratory.

On soils with Stiff, Very Stiff or Hard consistency, the original soil sampling taken by Thin Walled Tube
Sampler can no longer be done. Sampling at this layer can still be done, although with a greater degree
of disturbance than samples taken with the Thin Walled Tube Sampler, i.e. using Core-Barrel, and after
arriving at the surface, the sample is removed from the Core-Barrel. Then inserted into the Thin Walled
Tube Sampler to protect it from further disturbance. There are 2 types of soil samples that are known,
namely so-called original (undisturbed) and non-original (disturbed) soil samples. It is depend on how they
are taken, and each is required to be tested in a laboratory.

2.4. Laboratory Test

Samples of soil taken from drilling, and which remain in tightly closed sampler tubes, are tested in the
laboratory to obtain the value of the original geotechnical parameters.

Table 2.4-1 Standard Testing in Soil Mechanics Laboratory


Test
No. ASTM SNI Reference Title
Description
How to test the weight of soil
1. Unit Weight D 2937-83 03-1964-2008
contents
This test is intended to determine
the groundwater content.
Groundwater content is the ratio
2. Water Content D 2216-98 03-1965-1990 between the weight of water
contained in the soil and the dry
weight of the soil expressed in
percent
This test is intended to determine
the specific gravity of the soil. Soil
specific gravity is the ratio between
3. Spesific Gravity D 854-02 03-1964-1990 the weight of soil grains and the
weight of distilled water with the
same contents at a certain
temperature

- 03-1967-1990 The purpose of this test is to


4. Atterberg Limits D 4318-00 determine the Atteberg boundaries
- 03-1966-1990
which include Liquid Limit (LL),
W2021E-DNGF-CV-272-SDY-0001 – Rev. 3 Page 16 of 38
PT PERTAMINA EP

SOIL INVESTIGATION REPORT AREA CPP DONGGI


MATINDOK

Test
No. ASTM SNI Reference Title
Description
- 03-3422-1994 Plastic Limit (PL), and Plasticity
Index (PI).
Grain Size Method of testing the size of soil
5. D 1140-00 03-1968-1990
Analysis grains with a sieve and hydrometer
Organic
6. 03-6793-2002 Organic material testing methods
Content
7. Direct Shear D 3080-04 03-3420-1994 Soil Shear Strength Test Method
Triaxial Test (Unconsolidated Un-
drained, UU) is performed to look for
8. Triaxial UU D 2850-95 03-4813-2004
cohesion (c) and shear angle (f) in
an Unconsolidated Un-drained state
Triaxial Test (Consolidated Un-
drained, CU) is performed to look for
9. Triaxial CU 2455-2015
cohesion (c) and shear angle (f) in
an Consolidated Un-drained state
Consolidation
Method for One-Dimensional
10. One D 2435-96 03-2812-2011
Consolidation Properties of Soils
Dimensional
Unconfined
Standard Test Methode for
11. Compression D 2166-06
Unconfined Compression Test
Test
12. pH 19-6426-2000 PH measurement testing methods
13. SO4 D 516-11 Standard Test Methode for Sulfate

W2021E-DNGF-CV-272-SDY-0001 – Rev. 3 Page 17 of 38


PT PERTAMINA EP

SOIL INVESTIGATION REPORT AREA CPP DONGGI


MATINDOK

3. RESULT OF SOIL INVESTIGATION


Soil Investigation area CPP Donggi Matindok was conducted from December 09, 2021 to December 30,
2021.

3.1. OCTG Area CPP Donggi


The point and coordinate of soil investigation at OCTG Area CPP Donggi can be seen in the image below.

Figure 3.1-1 Point of Soil Investigation at OCTG Area CPP Donggi

Table 3.1-1 Coordinate at OCTG Area CPP Donggi

Coordinate (zone: 51 S) Ground


Total
No Point Water Level Area Start End
X Y Depth (m)
(m)
1 S-01 418297 9832587 11.60 1.40 OCTG 11-12-2021 11-12-2021
2 HB-01 418306 9832569 6.00 1.40 OCTG 10-12-2021 10-12-2021
3 TP-01 418293 9832567 1.50 1.40 OCTG 09-12-2021 09-12-2021
4 TP-02 418331 9832590 1.50 1.40 OCTG 09-12-2021 09-12-2021

W2021E-DNGF-CV-272-SDY-0001 – Rev. 3 Page 18 of 38


PT PERTAMINA EP

SOIL INVESTIGATION REPORT AREA CPP DONGGI


MATINDOK

3.1.1. DCPT/Sondir (S) Result at OCTG Area CPP Donggi

Here is a summary of sondir results at S-01 OCTG Area CPP Donggi, are shown in Figure and Table
below.

Figure 3.1.1-1 Cone Resistance Against Estimated of Soil Strength at S-01 OCTG Area CPP Donggi

Table 3.1.1-1 DCPT/Sondir Data at S-01 OCTG Area CPP Donggi

Depth Cw Tw Rf
Soil Strength Estimate
(m) (kg/cm2) (kg/cm2) (%)
1.00 30 35 1.11 Stiff
2.00 5 8 4.01 Very Soft
3.00 5 9 5.35 Very Soft
4.00 15 25 4.46 Medium
5.00 15 20 2.23 Medium
6.00 10 15 3.34 Soft
7.00 25 40 4.01 Stiff
8.00 20 25 1.67 Medium
9.00 15 25 4.46 Medium
10.00 50 70 2.67 Very Stiff
11.00 100 130 2.01 Hard
11.60 200 250 1.67 Very Hard
11.80 The test was stopped at Cone Resistance ≥ 200 kg/cm2

W2021E-DNGF-CV-272-SDY-0001 – Rev. 3 Page 19 of 38


PT PERTAMINA EP

SOIL INVESTIGATION REPORT AREA CPP DONGGI


MATINDOK

Figure 3.1.1-2 Documentation of DCPT/Sondir at S-01 OCTG Area CPP Donggi

3.1.2. Hand Boring (HB) Result at OCTG Area CPP Donggi

Here is a summary of hand boring results at HB-01 OCTG Area CPP Donggi, are shown in Table below.

Table 3.1.2-1 Summary of Hand Boring Log at HB-01 OCTG Area CPP Donggi

HB Depth (m) Soil Description Colour GWL


0.00 – 1.00 Silty CLAY, Medium Plasticity, Soft Brown -1.4 m
01
1.00 – 1.50 CLAY, Low Plasticity, Soft Brown
1.50 – 2.00 UDS Tube
2.00 – 3.00 CLAY, Low Plasticity, Medium Stiff Greyish Brown
3.00 – 3.50 UDS Tube
3.50 – 4.00 CLAY, Low Plasticity, Medium Stiff Greyish Brown
4.00 – 6.00 CLAY, Low Plasticity, Medium Stiff Brown

Figure 3.1.2-1 Documentation of Hand Boring at HB-01 OCTG Area CPP Donggi

W2021E-DNGF-CV-272-SDY-0001 – Rev. 3 Page 20 of 38


PT PERTAMINA EP

SOIL INVESTIGATION REPORT AREA CPP DONGGI


MATINDOK

3.1.3. Test Pit (TP) Result at OCTG Area CPP Donggi

The Test Pit has been conducted two points in OCTG area CPP Donggi. Excavation was carried out with
dimensions of 1m x 1m and depth of 1.5m with soil sampling of at least 25 kg for CBR testing in soil
mechanics laboratories.

Figure 3.1.3-1 Documentation of Test Pit at TP-01 OCTG Area CPP Donggi

Figure 3.1.3-2 Documentation of Test Pit at TP-02 OCTG Area CPP Donggi

TP-01 Sample TP-02 Sample

Figure 3.1.3-3 Documentation of Test Pit Samples at OCTG Area CPP Donggi

W2021E-DNGF-CV-272-SDY-0001 – Rev. 3 Page 21 of 38


PT PERTAMINA EP

SOIL INVESTIGATION REPORT AREA CPP DONGGI


MATINDOK

3.2. GTG Area CPP Donggi

The point and coordinate of soil investigation at GTG Area CPP Donggi can be seen in the image below.

Figure 3.2-1 Point of Soil Investigation at GTG Area CPP Donggi

Table 3.2-1 Coordinate at GTG Area CPP Donggi

Coordinate (zone: 51 S) Ground


Total
No Point Water Level Area Start End
X Y Depth (m)
(m)
1 S-01 418370 9832335 11.40 1.40 GTG 14-12-2021 14-12-2021
2 BH-01 418350 9832331 18.00 1.40 GTG 21-12-2021 23-12-2021

3.2.1. DCPT/Sondir (S) Result at GTG Area CPP Donggi

Here is a summary of sondir results at S-01 GTG Area CPP Donggi, are shown in Figure and Table below.

W2021E-DNGF-CV-272-SDY-0001 – Rev. 3 Page 22 of 38


PT PERTAMINA EP

SOIL INVESTIGATION REPORT AREA CPP DONGGI


MATINDOK

Figure 3.2.1-1 Cone Resistance Against Estimated of Soil Strength at S-01 GTG Area CPP Donggi

Table 3.2.1-1 DCPT/Sondir Data at S-01 GTG Area CPP Donggi

Depth Cw Tw Rf
2 2
Soil Strength Estimate
(m) (kg/cm ) (kg/cm ) (%)
1.00 20 35 5.01 Medium
2.00 30 50 4.46 Stiff
3.00 25 40 4.01 Stiff
4.00 35 50 2.87 Stiff
5.00 25 40 4.01 Stiff
6.00 20 35 5.01 Medium
7.00 25 40 4.01 Stiff
8.00 35 50 2.87 Stiff
9.00 40 60 3.34 Stiff
10.00 60 80 2.23 Very Stiff
11.00 85 100 1.18 Hard
11.40 200 250 1.67 Very Hard
11.60 The test was stopped at Cone Resistance ≥ 200 kg/cm2

W2021E-DNGF-CV-272-SDY-0001 – Rev. 3 Page 23 of 38


PT PERTAMINA EP

SOIL INVESTIGATION REPORT AREA CPP DONGGI


MATINDOK

Figure 3.2.1-2 Documentation of DCPT/Sondir at S-01 GTG Area CPP Donggi

3.2.2. Deep Boring/Bore Hole (BH) and SPT Result at GTG Area CPP Donggi

Here is a summary of deep boring results at BH-01 GTG Area CPP Donggi, are shown in Table below.

Table 3.2.2-1 Summary of Deep Boring Log at BH-01 GTG Area CPP Donggi

Samples N-SPT
BH Depth (m) Soil Description GWL
Value
0.00 – 0.50 Silty CLAY to Clay, Brown, Medium Plasticity, Stiff -1.4 m
01
0.50 – 1.00 CLAY, Brown, Medium Plasticity, Stiff
1.00 – 1.50 Silty SAND to Clay, Greyish Brown to Brown, Stiff
1.50 – 2.00 CLAY, Brown, Medium Plasticity, Stiff 14
2.00 – 2.50 CLAY, Brown, Low Plasticity, Soft
2.50 – 3.00 CLAY, Brownish Grey, Low Plasticity, Soft to Stiff
3.00 – 3.50 -ditto- DS 1
3.50 – 4.00 CLAY, Brown, Low Plasticity, Very Stiff 17
4.00 – 4.50 CLAY, Brown, Medium Plasticity, Medium Stiff
4.50 – 5.00 -ditto-
5.00 – 5.50 UDS Tube UDS 1
5.50 – 6.00 CLAY, Brownish Grey, Medium Plasticity, Stiff 9
6.00 – 6.50 Clayey SILT Mixed Wood Organic, Grey, Soft
6.50 – 7.00 Clayey SILT, Grey, Soft
7.00 – 7.50 UDS Tube UDS 2
7.50 – 8.00 Clayey SILT, Grey, Soft 3
8.00 – 8.50 Clayey SILT to Clay, Grey, Soft to Medium Stiff
8.50 – 9.00 CLAY, Greenish Grey, Medium Plasticity, Stiff to Very Stiff
9.00 – 9.50 -ditto- DS 2
9.50 – 10.00 -ditto- 17
10.00 – 10.50 Clayey SILT to SILT, Grey, Very Stiff

W2021E-DNGF-CV-272-SDY-0001 – Rev. 3 Page 24 of 38


PT PERTAMINA EP

SOIL INVESTIGATION REPORT AREA CPP DONGGI


MATINDOK

Samples N-SPT
BH Depth (m) Soil Description GWL
Value
10.50 – 11.00 SILT, Grey, Very Stiff
11.00 – 11.50 -ditto- DS 3
11.50 – 12.00 SILT Layer Siltstone, Grey, Very Stiff to Hard 25
12.00 – 12.50 -ditto-
12.50 – 13.00 SILT to Siltstone, Grey, Hard DS 4
13.00 – 13.50 SILTSTONE, Grey, Hard
13.50 – 14.00 -ditto- >50
14.00 – 14.50 -ditto-
14.50 – 15.00 -ditto-
15.00 – 15.50 -ditto-
15.50 – 16.00 -ditto- >50
16.00 – 16.50 -ditto-
16.50 – 17.00 -ditto-
17.00 – 17.50 -ditto-
17.50 – 18.00 SILTSTONE to Sandy Gravel, Grey, Hard >50

Figure 3.2.2-1 Documentation of Deep Boring at BH-01 GTG Area CPP Donggi

W2021E-DNGF-CV-272-SDY-0001 – Rev. 3 Page 25 of 38


PT PERTAMINA EP

SOIL INVESTIGATION REPORT AREA CPP DONGGI


MATINDOK

3.3. ATU Area CPP Matindok

The point and coordinate of soil investigation at ATU Area CPP Matindok can be seen in the image below.

Figure 3.3-1 Point of Soil Investigation at ATU Area CPP Matindok

Table 3.3-1 Coordinate at ATU Area CPP Matindok

Coordinate (zone: 51 S) Ground


Total
No Point Water Level Area Start End
X Y Depth (m)
(m)
1 S-01 443424 9853139 0.60 - ATU 30-12-2021 30-12-2021
2 BH-01 443412 9853156 8.00 5.70 ATU 28-12-2021 29-12-2021

3.3.1. DCPT/Sondir (S) Result at ATU Area CPP Matindok


Here is a summary of sondir results at S-01 ATU Area CPP Matindok, are shown in Figure and Table
below.

W2021E-DNGF-CV-272-SDY-0001 – Rev. 3 Page 26 of 38


PT PERTAMINA EP

SOIL INVESTIGATION REPORT AREA CPP DONGGI


MATINDOK

Figure 3.3.1-1 Cone Resistance Against Estimated of Soil Strength at S-01 ATU Area CPP Matindok

Table 3.3.1-1 DCPT/Sondir Data at S-01 ATU Area CPP Matindok

Depth Cw Tw Rf
2 2
Soil Strength Estimate
(m) (kg/cm ) (kg/cm ) (%)
0.20 65 90 2.57 Very Stiff
0.40 75 100 2.23 Very Stiff
0.60 200 250 1.67 Very Hard
0.80 The test was stopped at Cone Resistance ≥ 200 kg/cm2

Figure 3.3.1-2 Documentation of DCPT/Sondir at S-01 ATU Area CPP Matindok

W2021E-DNGF-CV-272-SDY-0001 – Rev. 3 Page 27 of 38


PT PERTAMINA EP

SOIL INVESTIGATION REPORT AREA CPP DONGGI


MATINDOK

3.3.2. Deep Boring/Bore Hole (BH) and SPT Result at ATU Area CPP Matindok

Here is a summary of deep boring results at BH-01 ATU Area CPP Matindok, are shown in Table below.

Table 3.3.2-1 Summary of Deep Boring Log at BH-01 ATU Area CPP Matindok

Samples N-SPT
BH Depth (m) Soil Description GWL
Value
0.00 – 0.50 SILT to Siltstone, Greenish Grey, Hard -5.7 m
01
0.50 – 1.00 SILTSTONE, Grey, Hard, Massive
1.00 – 1.50 -ditto- DS 1
1.50 – 2.00 -ditto- >50
2.00 – 2.50 -ditto-
2.50 – 3.00 -ditto-
3.00 – 3.50 -ditto- DS 2
3.50 – 4.00 -ditto- >50
4.00 – 4.50 -ditto-
4.50 – 5.00 -ditto-
5.00 – 5.50 -ditto- DS 3
5.50 – 6.00 SILTSTONE to Boulder Andesit, Grey, Hard >50
6.00 – 6.50 Sandy GRAVEL to Boulder Andesit, Grey, Very Dense
6.50 – 7.00 BOULDER ANDESIT, Grey, Very Dense
7.00 – 7.50 -ditto- DS 4
7.50 – 8.00 -ditto- >50

Figure 3.3.2-1 Documentation of Deep Boring at BH-01 ATU Area CPP Matindok

W2021E-DNGF-CV-272-SDY-0001 – Rev. 3 Page 28 of 38


3.4. Laboratory Test

The result of laboratory test for soil investigation area CPP Donggi Matindok is presented in Table 3-11.

Table 3.4-1 Result of Laboratory Test

The samples is being tested in the soil mechanics laboratory

W2021E-DNGF-CV-272-SDY-0001 – Rev. 3 Page 29 of 38


4. GEOLOGICAL CONDITIONS
The following is shown a geological map at survey area based on Kementerian ESDM Republik Indonesia
(geoportal.esdm.go.id/geologi/) Geological maps are used to determine the distribution of rocks in one
region.

CPP Matindok

CPP Donggi

Figure 4-1 Geological Map at CPP Donggi Matindok

The formation on the CPP Donggi Matindok regional geological map is the Alluvium (Qa) formation.
Alluvium (from Latin alluvius) is loose clay, silt, sand, or gravel that has been deposited by water flowing
on a riverbed, in floodplains, on alluvial fans or beaches, or in similar settings. Alluvium is also sometimes
called alluvial deposits and generally has a young geological scale age (https://magma.esdm.go.id
/v1/edukasi/glossary).

5. GEOTECHNICAL INFORMATION RELATED TO SEISMICITY


Referring to SNI 1726-2019, that the seismic will depend on the location of the structure associated with
the acceleration of the seismic on bedrock and classification of its site.

The soil classification site for this area is determined based on the value of N-SPT, where the calculation
of the classification site up to the depth of drilling that has been done.

W2021E-DNGF-CV-272-SDY-0001 – Rev. 3 Page 30 of 38


PT PERTAMINA EP

SOIL INVESTIGATION REPORT AREA CPP DONGGI


MATINDOK

Table 5-1 Site Classification (SNI 03-1726-2019)

Table 5-2 Calculation of Soil Site Classification at CPP Donggi Matindok

W2021E-DNGF-CV-272-SDY-0001 – Rev. 3 Page 31 of 38


PT PERTAMINA EP

SOIL INVESTIGATION REPORT AREA CPP DONGGI


MATINDOK

The calculation of soil site classification at BH-01 GTG Area CPP Donggi is <15 (soft soil site class/SE)
and at BH-01 ATU Area CPP Matindok is between 15 to 50 (medium soil site class/SD).

With the soil sites classification, the response spectral can be seen in the following graph.

Figure 5-1 Response Spectral of Soft Soil (SE) at BH-01 GTG Area CPP Donggi (source: Puskim-PusGeN-
ESRC, 2019-2020)

Figure 5-2 Response Spectral of Soft Soil (SD) at BH-01 ATU Area CPP Matindok (source: Puskim-PusGeN-
ESRC, 2019-2020)

W2021E-DNGF-CV-272-SDY-0001 – Rev. 3 Page 32 of 38


PT PERTAMINA EP

SOIL INVESTIGATION REPORT AREA CPP DONGGI


MATINDOK

6. BEARING CAPACITY

6.1. Bearing Capacity for Shallow Foundation (DCPT Data)

Equations 1 and 2 are formulas for calculating the bearing capacity of sandy or clayey soils from Meyerhof
(1976).
(B) Df
q ult = q̅c (1 + ) ..................................................................... (equation 1)
12.2 B

q ult
q all = ........................................................................................ (equation 2)
3

With:

q ult = ultimate bearing capacity (t/m2)

q all = Allowable bearing capacity

q all = q ult/3 (Safety Factor = 3)

qc = cone penetration value

c = average value of qc

B = width of foundation

Df = depth of foundation

Table bellow presents bearing capacity refer to CPT/Sondir data in accordance with Meyerhof equation.

Table 6.1-1 Bearing Capacity for Shallow Foundation refer to CPT/Sondir Data (Df = 1 m; B = 1 m)
Average qc Q ult (kg/cm2) Q all (kg/cm2)
Point ID
(kg/cm) meyerhof qult/sf
S-01 OCTG CPP Donggi 22.86 3.75 1.25
S-01 GTG CPP Donggi 16.43 2.69 0.90
S-01 ATU CPP Matindok 137.50 22.54 7.51

Table 6.1-2 Bearing Capacity for Shallow Foundation refer to CPT/Sondir Data (Df = 2 m; B = 1 m)
Average qc Q ult (kg/cm2) Q all (kg/cm2)
Point ID
(kg/cm) meyerhof qult/sf
S-01 OCTG CPP Donggi 12.86 3.16 1.05
S-01 GTG CPP Donggi 22.86 5.62 1.87

W2021E-DNGF-CV-272-SDY-0001 – Rev. 3 Page 33 of 38


PT PERTAMINA EP

SOIL INVESTIGATION REPORT AREA CPP DONGGI


MATINDOK

Table 6.1-3 Bearing Capacity for Shallow Foundation refer to CPT/Sondir Data (Df = 3 m; B = 1 m)
Average qc Q ult (kg/cm2) Q all (kg/cm2)
Point ID
(kg/cm) meyerhof qult/sf
S-01 OCTG CPP Donggi 7.86 2.58 0.86
S-01 GTG CPP Donggi 25.71 8.43 2.81

6.2. Bearing Capacity for Single Pile

The calculation of bearing capacity is the ability of the pile in supporting the load, is generally calculated
by the equation:

Qu = Qp + Qs – W

where: Qu = Ultimate bearing capacity

Qp = End bearing capacity

Qs = Friction bearing capacity

W = Weight of pile

Figure 6.2-1 Scheme of Bearing Capacity Calculation

End Bearing Pile

Qu = (40*Nb*Ap)

Where: Qu = Ultimate end bearing

Nb = Average N-SPT value at the base elevation of pile

W2021E-DNGF-CV-272-SDY-0001 – Rev. 3 Page 34 of 38


PT PERTAMINA EP

SOIL INVESTIGATION REPORT AREA CPP DONGGI


MATINDOK

Nb = (N1+N2)/2

N1 = SPT value at depth of 3B from the tip of the pile to the bottom

N2 = SPT value at depth of 8B from the tip of the pile to the top

Ap = Section area of the pile

Friction Bearing Pile

Qsi = qs*Asi

Where: Qsi = Ultimate friction bearing

qs = 0.2N: for sand

0.5N: for clay

Asi = Circumference of the pile*layer thickness

Pile Capacity

P = (Qu +Qsi)/FS

Where: Qu = Ultimate end bearing

Qsi = Ultimate friction bearing

SF = Safety factor (2.5 - 3.0)

Using the above equation and survey data (CPT and N-SPT value), the value of pile capacity can be seen
at Appendix B.

W2021E-DNGF-CV-272-SDY-0001 – Rev. 3 Page 35 of 38


PT PERTAMINA EP

SOIL INVESTIGATION REPORT AREA CPP DONGGI


MATINDOK

APPENDIX A – RESULT OF SOIL INVESTIGATION


• APPENDIX A.1 – SONDIR DATA OCTG CPP DONGGI
• APPENDIX A.2 – BORE LOG DATA OCTG CPP DONGGI
• APPENDIX A.3 – SONDIR DATA GTG CPP DONGGI
• APPENDIX A.4 – BORE LOG DATA AND CORE BOX GTG CPP DONGGI
• APPENDIX A.5 – SONDIR DATA ATU CPP MATINDOK
• APPENDIX A.6 – BORE LOG DATA AND CORE BOX ATU CPP MATINDOK

W2021E-DNGF-CV-272-SDY-0001 – Rev. 3 Page 36 of 38


• APPENDIX A.1 – SONDIR DATA OCTG CPP DONGGI
SONDIR (CONE PENETRATION TEST )
SNI 2827 - 2008 / ASTM D-3441

Project : SOIL INVESTIGATION AREA DONGGI – MATINDOK DI PT. PERTAMINA EP REGIONAL 4 ZONA 13 – CTR-BTC-EPSF-04
Location : CPP DONGGI, KAB, BANGGAI, PROV. SULAWESI TENGAH
Area : OCTG - CPP DONGGI
CPT Type : Mechanic Date : 11 December 2021
Test Point S-01 Capacity : 2.5 ton Weather : Sunny
Coordinates : X = 418297 m E Cone Diameter (Dc) (cm) : 3.57 Work Leader : Musriyanto
: Y = 9832587 m S Sleeve Diameter (Ds) (cm) : 3.57 Team : Herditanto
Zone : 51 S Sleeve Length (Ls) (cm) : 13.35 : Ipan Sofyan
Tot. Depth (m) : 11.60 As = πDsLs (cm2) : 149.727 0.066854 : Bangun Suyono
GWL (m) : 1.40 Api = Ac = ¼πDc² (cm2) : 10.01 10.009821 : Alexander
CONE LOCAL TOTAL CUM. TOTAL FRICTION SOIL
MANOMETER DIAL DIFFERENCE
DEPTH RESISTANCE FRICTION FRICTION FRICTION RATIO CONSISTENCY

Cw Tw Kw = Tw-Cw qc = CwxApi/Ac fs = KwxApi/As fsx20cm Tf = ƩTf+(fsx20) Rf = (fs/qc)100


S-01
(m) kg/cm2 kg/cm2 kg/cm2 kg/cm2 kg/cm2 kg/cm kg/cm %
0.0 0.0 0.0 0.0 0.0 0.00 0.00 0.00 0.00 -
0.2 15.0 19.0 4.0 15.0 0.27 5.35 5.35 1.78 Medium
0.4 25.0 29.0 4.0 25.0 0.27 5.35 10.70 1.07 Stiff
0.6 35.0 50.0 15.0 35.0 1.00 20.06 30.75 2.87 Stiff
0.8 35.0 45.0 10.0 35.0 0.67 13.37 44.12 1.91 Stiff
1.0 30.0 35.0 5.0 30.0 0.33 6.69 50.81 1.11 Stiff
1.2 20.0 30.0 10.0 20.0 0.67 13.37 64.18 3.34 Medium
1.4 10.0 15.0 5.0 10.0 0.33 6.69 70.87 3.34 Soft
1.6 10.0 14.0 4.0 10.0 0.27 5.35 76.21 2.67 Soft
1.8 10.0 14.0 4.0 10.0 0.27 5.35 81.56 2.67 Soft
2.0 5.0 8.0 3.0 5.0 0.20 4.01 85.57 4.01 Very Soft
2.2 5.0 8.0 3.0 5.0 0.20 4.01 89.58 4.01 Very Soft
2.4 10.0 15.0 5.0 10.0 0.33 6.69 96.27 3.34 Soft
2.6 10.0 15.0 5.0 10.0 0.33 6.69 102.96 3.34 Soft
2.8 15.0 18.0 3.0 15.0 0.20 4.01 106.97 1.34 Medium
3.0 5.0 9.0 4.0 5.0 0.27 5.35 112.31 5.35 Very Soft
3.2 5.0 9.0 4.0 5.0 0.27 5.35 117.66 5.35 Very Soft
3.4 5.0 10.0 5.0 5.0 0.33 6.69 124.35 6.69 Very Soft
3.6 4.0 7.0 3.0 4.0 0.20 4.01 128.36 5.01 Very Soft
3.8 5.0 10.0 5.0 5.0 0.33 6.69 135.05 6.69 Very Soft
4.0 15.0 25.0 10.0 15.0 0.67 13.37 148.42 4.46 Medium
4.2 15.0 25.0 10.0 15.0 0.67 13.37 161.79 4.46 Medium
4.4 15.0 25.0 10.0 15.0 0.67 13.37 175.16 4.46 Medium
4.6 20.0 25.0 5.0 20.0 0.33 6.69 181.84 1.67 Medium
4.8 15.0 20.0 5.0 15.0 0.33 6.69 188.53 2.23 Medium
5.0 15.0 20.0 5.0 15.0 0.33 6.69 195.21 2.23 Medium
5.2 15.0 20.0 5.0 15.0 0.33 6.69 201.90 2.23 Medium
5.4 15.0 20.0 5.0 15.0 0.33 6.69 208.58 2.23 Medium
5.6 15.0 20.0 5.0 15.0 0.33 6.69 215.27 2.23 Medium
5.8 15.0 20.0 5.0 15.0 0.33 6.69 221.96 2.23 Medium
6.0 10.0 15.0 5.0 10.0 0.33 6.69 228.64 3.34 Soft
6.2 15.0 20.0 5.0 15.0 0.33 6.69 235.33 2.23 Medium
6.4 15.0 20.0 5.0 15.0 0.33 6.69 242.01 2.23 Medium
6.6 50.0 70.0 20.0 50.0 1.34 26.74 268.75 2.67 Very Stiff
6.8 25.0 40.0 15.0 25.0 1.00 20.06 288.81 4.01 Stiff
7.0 25.0 40.0 15.0 25.0 1.00 20.06 308.87 4.01 Stiff
7.2 25.0 40.0 15.0 25.0 1.00 20.06 328.92 4.01 Stiff
7.4 25.0 40.0 15.0 25.0 1.00 20.06 348.98 4.01 Stiff
7.6 15.0 20.0 5.0 15.0 0.33 6.69 355.66 2.23 Medium
7.8 20.0 25.0 5.0 20.0 0.33 6.69 362.35 1.67 Medium
8.0 20.0 25.0 5.0 20.0 0.33 6.69 369.03 1.67 Medium
8.2 20.0 25.0 5.0 20.0 0.33 6.69 375.72 1.67 Medium
CONE LOCAL TOTAL CUM. TOTAL FRICTION SOIL
MANOMETER DIAL DIFFERENCE
DEPTH RESISTANCE FRICTION FRICTION FRICTION RATIO CONSISTENCY

Cw Tw Kw = Tw-Cw qc = CwxApi/Ac fs = KwxApi/As fsx20cm Tf = ƩTf+(fsx20) Rf = (fs/qc)100


S-01
(m) kg/cm2 kg/cm2 kg/cm2 kg/cm2 kg/cm2 kg/cm kg/cm %
8.4 25.0 35.0 10.0 25.0 0.67 13.37 389.09 2.67 Stiff
8.6 40.0 55.0 15.0 40.0 1.00 20.06 409.15 2.51 Stiff
8.8 25.0 35.0 10.0 25.0 0.67 13.37 422.52 2.67 Stiff
9.0 15.0 25.0 10.0 15.0 0.67 13.37 435.89 4.46 Medium
9.2 20.0 35.0 15.0 20.0 1.00 20.06 455.94 5.01 Medium
9.4 20.0 35.0 15.0 20.0 1.00 20.06 476.00 5.01 Medium
9.6 30.0 45.0 15.0 30.0 1.00 20.06 496.06 3.34 Stiff
9.8 40.0 60.0 20.0 40.0 1.34 26.74 522.80 3.34 Stiff
10.0 50.0 70.0 20.0 50.0 1.34 26.74 549.54 2.67 Very Stiff
10.2 50.0 70.0 20.0 50.0 1.34 26.74 576.28 2.67 Very Stiff
10.4 60.0 80.0 20.0 60.0 1.34 26.74 603.02 2.23 Very Stiff
10.6 70.0 100.0 30.0 70.0 2.01 40.11 643.14 2.87 Very Stiff
10.8 85.0 110.0 25.0 85.0 1.67 33.43 676.56 1.97 Hard
11.0 100.0 130.0 30.0 100.0 2.01 40.11 716.67 2.01 Hard
11.2 120.0 150.0 30.0 120.0 2.01 40.11 756.79 1.67 Hard
11.4 150.0 180.0 30.0 150.0 2.01 40.11 796.90 1.34 Hard
11.6 200.0 250.0 50.0 200.0 3.34 66.85 863.75 1.67 Very Hard
11.8 -------------------------------------------------------------------------The test was stopped at Cone Resistance ≥ 200 kg/cm2
12.0
12.2
12.4
12.6
12.8
13.0
13.2
13.4
13.6
13.8
14.0
14.2
14.4
14.6
14.8
15.0
15.2
15.4
15.6
15.8
16.0
16.2
16.4
16.6
16.8
17.0
17.2
17.4
17.6
17.8
18.0
18.2
18.4
18.6
18.8
19.0
19.2
19.4
19.6
SONDIR (CONE PENETRATION TEST )
SNI 2827 - 2008 / ASTM D-3441

Project : SOIL INVESTIGATION AREA DONGGI – MATINDOK DI PT. PERTAMINA EP REGIONAL 4 ZONA 13 – CTR-BTC-EPSF-04
Coordinates : X = 418297 m E CPT Type : Mechanic
Test Point S-01 : Y = 9832587 m S Capacity : 2.5 ton
Area : OCTG - CPP DONGGI : 51 S Date : 11 December 2021

MANOMETER DIAL (kg/cm2) FRICTION RATIO (Rf) (%)


0 50 100 150 200 250 0 1 2 3 4 5 6 7 8 9 10 11 12
0.0 0.0

1.0 1.0

2.0 2.0

3.0 3.0

4.0 4.0

5.0 5.0

6.0 6.0
DEPTH (meter)

7.0 7.0

8.0 8.0

9.0 9.0

10.0 10.0

11.0 11.0

12.0 12.0

13.0 13.0

14.0 14.0

15.0 15.0

16.0 16.0

17.0 17.0

18.0 18.0
Cone Resistance (Cw)
Total Friction (Tw) Friction Ratio (R)
19.0 19.0
Cum. Total Friction (Tf) Local Friction (fs)

20.0 20.0
0 200 400 600 800 1000 0.0 1.0 2.0 3.0 4.0

CUMULATIVE TOTAL FRICTION (Tf) (kg/cm2) LOCAL FRICTION (fs) (kg/cm2)


• APPENDIX A.2 – BORE LOG DATA OCTG CPP DONGGI
SOIL INVESTIGATION AREA DONGGI – MATINDOK DI PT. PERTAMINA EP
REGIONAL 4 ZONA 13, KAB, BANGGAI, PROV. SULAWESI TENGAH

Bor Tangan (Hand Bore /HB)


ASTM D-4700 & ASTM D-2573

Location : OCTG - CPP Donggi Bore Type : Auger Boring


Test Point : HB-01 Elevation : 6.00 m
Coordinate : X = 418306 Zone = 51 S G.W.L (m) : 1.40 m
: Y = 9832569 Date : 10 December 2021
Weather : Sunny Work Leader : Musriyanto

Index Properties Engineering Prop.

Soil Classification, Unit

G.W.L (m)
Profil Log
Elevation

Sample
Colour
(m) Weight, Spesific Gravity, Triaxial UU,
Description
Atterberg Limit, Grain Consolidation, Direct
Size, Hydrometer, Water Shear
Content
+0.00
RESUME OF LABORATORY
UDS 1
Silty CLAY, Brown, Medium USCS : Bulk gr/cm3 :
0.5
Plasticity, Soft Wn (%) : Dry gr/cm3 :
Gs : f (°) :
LL (%) : C (kN/m2) :
1.0
PL (%) : Cc :
CLAY, Brown, Low Plasticity,
PI (%) : Cr :
Soft
e :
1.5
Sr (%) :
UDS 1

UDS Tube Finer #200 :


UDS 2
2.0
USCS : Bulk gr/cm3 :
Wn (%) : Dry gr/cm3 :
CLAY, Greyish Brown, Low Gs : f (°) :
2.5
Plasticity, Medium Stiff LL (%) : 2
C (kN/m ) :
PL (%) : Cc :
PI (%) : Cr :
3.0
e :
UDS 2

UDS Tube Sr (%) :


Finer #200 :
3.5
DOCUMENTATION OF COREBOX
CLAY, Greyish Brown, Low
Plasticity, Medium Stiff
4.0

4.5

CLAY, Brown, Low Plasticity,


5.0
Medium Stiff

5.5

6.0

REMARKS

CLAY GRAVEL

SILT SAND
• APPENDIX A.3 – SONDIR DATA GTG CPP DONGGI
SONDIR (CONE PENETRATION TEST )
SNI 2827 - 2008 / ASTM D-3441

Project : SOIL INVESTIGATION AREA DONGGI – MATINDOK DI PT. PERTAMINA EP REGIONAL 4 ZONA 13 – CTR-BTC-EPSF-04
Location : CPP DONGGI, KAB, BANGGAI, PROV. SULAWESI TENGAH
Area : GTG - CPP DONGGI
CPT Type : Mechanic Date : 14 December 2021
Test Point S-01 Capacity : 2.5 ton Weather : Sunny
Coordinates : X = 418370 m E Cone Diameter (Dc) (cm) : 3.57 Work Leader : Musriyanto
: Y = 9832335 m S Sleeve Diameter (Ds) (cm) : 3.57 Team : Herditanto
Zone : 51 S Sleeve Length (Ls) (cm) : 13.35 : Ipan Sofyan
Tot. Depth (m) : 11.40 As = πDsLs (cm2) : 149.727 0.066854 : Bangun Suyono
GWL (m) : 1.40 Api = Ac = ¼πDc² (cm2) : 10.01 10.009821 : Alexander
CONE LOCAL TOTAL CUM. TOTAL FRICTION SOIL
MANOMETER DIAL DIFFERENCE
DEPTH RESISTANCE FRICTION FRICTION FRICTION RATIO CONSISTENCY

Cw Tw Kw = Tw-Cw qc = CwxApi/Ac fs = KwxApi/As fsx20cm Tf = ƩTf+(fsx20) Rf = (fs/qc)100


S-01
(m) kg/cm2 kg/cm2 kg/cm2 kg/cm2 kg/cm2 kg/cm kg/cm %
0.0 0.0 0.0 0.0 0.0 0.00 0.00 0.00 0.00 -
0.2 20.0 30.0 10.0 20.0 0.67 13.37 13.37 3.34 Medium
0.4 20.0 30.0 10.0 20.0 0.67 13.37 26.74 3.34 Medium
0.6 20.0 35.0 15.0 20.0 1.00 20.06 46.80 5.01 Medium
0.8 20.0 40.0 20.0 20.0 1.34 26.74 73.54 6.69 Medium
1.0 20.0 35.0 15.0 20.0 1.00 20.06 93.60 5.01 Medium
1.2 15.0 30.0 15.0 15.0 1.00 20.06 113.65 6.69 Medium
1.4 15.0 30.0 15.0 15.0 1.00 20.06 133.71 6.69 Medium
1.6 30.0 45.0 15.0 30.0 1.00 20.06 153.76 3.34 Stiff
1.8 30.0 45.0 15.0 30.0 1.00 20.06 173.82 3.34 Stiff
2.0 30.0 50.0 20.0 30.0 1.34 26.74 200.56 4.46 Stiff
2.2 20.0 35.0 15.0 20.0 1.00 20.06 220.62 5.01 Medium
2.4 25.0 40.0 15.0 25.0 1.00 20.06 240.67 4.01 Stiff
2.6 25.0 40.0 15.0 25.0 1.00 20.06 260.73 4.01 Stiff
2.8 25.0 40.0 15.0 25.0 1.00 20.06 280.79 4.01 Stiff
3.0 25.0 40.0 15.0 25.0 1.00 20.06 300.84 4.01 Stiff
3.2 30.0 35.0 5.0 30.0 0.33 6.69 307.53 1.11 Stiff
3.4 30.0 40.0 10.0 30.0 0.67 13.37 320.90 2.23 Stiff
3.6 40.0 60.0 20.0 40.0 1.34 26.74 347.64 3.34 Stiff
3.8 30.0 45.0 15.0 30.0 1.00 20.06 367.70 3.34 Stiff
4.0 35.0 50.0 15.0 35.0 1.00 20.06 387.75 2.87 Stiff
4.2 35.0 50.0 15.0 35.0 1.00 20.06 407.81 2.87 Stiff
4.4 35.0 50.0 15.0 35.0 1.00 20.06 427.87 2.87 Stiff
4.6 35.0 50.0 15.0 35.0 1.00 20.06 447.92 2.87 Stiff
4.8 35.0 50.0 15.0 35.0 1.00 20.06 467.98 2.87 Stiff
5.0 25.0 40.0 15.0 25.0 1.00 20.06 488.03 4.01 Stiff
5.2 25.0 40.0 15.0 25.0 1.00 20.06 508.09 4.01 Stiff
5.4 25.0 40.0 15.0 25.0 1.00 20.06 528.15 4.01 Stiff
5.6 20.0 35.0 15.0 20.0 1.00 20.06 548.20 5.01 Medium
5.8 20.0 35.0 15.0 20.0 1.00 20.06 568.26 5.01 Medium
6.0 20.0 35.0 15.0 20.0 1.00 20.06 588.32 5.01 Medium
6.2 25.0 40.0 15.0 25.0 1.00 20.06 608.37 4.01 Stiff
6.4 25.0 40.0 15.0 25.0 1.00 20.06 628.43 4.01 Stiff
6.6 20.0 35.0 15.0 20.0 1.00 20.06 648.48 5.01 Medium
6.8 20.0 35.0 15.0 20.0 1.00 20.06 668.54 5.01 Medium
7.0 25.0 40.0 15.0 25.0 1.00 20.06 688.60 4.01 Stiff
7.2 25.0 40.0 15.0 25.0 1.00 20.06 708.65 4.01 Stiff
7.4 25.0 40.0 15.0 25.0 1.00 20.06 728.71 4.01 Stiff
7.6 25.0 45.0 20.0 25.0 1.34 26.74 755.45 5.35 Stiff
7.8 25.0 45.0 20.0 25.0 1.34 26.74 782.19 5.35 Stiff
8.0 35.0 50.0 15.0 35.0 1.00 20.06 802.25 2.87 Stiff
8.2 25.0 40.0 15.0 25.0 1.00 20.06 822.30 4.01 Stiff
CONE LOCAL TOTAL CUM. TOTAL FRICTION SOIL
MANOMETER DIAL DIFFERENCE
DEPTH RESISTANCE FRICTION FRICTION FRICTION RATIO CONSISTENCY

Cw Tw Kw = Tw-Cw qc = CwxApi/Ac fs = KwxApi/As fsx20cm Tf = ƩTf+(fsx20) Rf = (fs/qc)100


S-01
(m) kg/cm2 kg/cm2 kg/cm2 kg/cm2 kg/cm2 kg/cm kg/cm %
8.4 25.0 45.0 20.0 25.0 1.34 26.74 849.05 5.35 Stiff
8.6 40.0 60.0 20.0 40.0 1.34 26.74 875.79 3.34 Stiff
8.8 40.0 60.0 20.0 40.0 1.34 26.74 902.53 3.34 Stiff
9.0 40.0 60.0 20.0 40.0 1.34 26.74 929.27 3.34 Stiff
9.2 40.0 65.0 25.0 40.0 1.67 33.43 962.70 4.18 Stiff
9.4 45.0 70.0 25.0 45.0 1.67 33.43 996.12 3.71 Stiff
9.6 45.0 70.0 25.0 45.0 1.67 33.43 1029.55 3.71 Stiff
9.8 50.0 75.0 25.0 50.0 1.67 33.43 1062.98 3.34 Very Stiff
10.0 60.0 80.0 20.0 60.0 1.34 26.74 1089.72 2.23 Very Stiff
10.2 60.0 80.0 20.0 60.0 1.34 26.74 1116.46 2.23 Very Stiff
10.4 60.0 80.0 20.0 60.0 1.34 26.74 1143.20 2.23 Very Stiff
10.6 60.0 80.0 20.0 60.0 1.34 26.74 1169.95 2.23 Very Stiff
10.8 65.0 90.0 25.0 65.0 1.67 33.43 1203.37 2.57 Very Stiff
11.0 85.0 100.0 15.0 85.0 1.00 20.06 1223.43 1.18 Hard
11.2 120.0 150.0 30.0 120.0 2.01 40.11 1263.54 1.67 Hard
11.4 200.0 250.0 50.0 200.0 3.34 66.85 1330.39 1.67 Very Hard
11.6 -------------------------------------------------------------------------The test was stopped at Cone Resistance ≥ 200 kg/cm2
11.8
12.0
12.2
12.4
12.6
12.8
13.0
13.2
13.4
13.6
13.8
14.0
14.2
14.4
14.6
14.8
15.0
15.2
15.4
15.6
15.8
16.0
16.2
16.4
16.6
16.8
17.0
17.2
17.4
17.6
17.8
18.0
18.2
18.4
18.6
18.8
19.0
19.2
19.4
19.6
SONDIR (CONE PENETRATION TEST )
SNI 2827 - 2008 / ASTM D-3441

Project : SOIL INVESTIGATION AREA DONGGI – MATINDOK DI PT. PERTAMINA EP REGIONAL 4 ZONA 13 – CTR-BTC-EPSF-04
Coordinates : X = 418370 m E CPT Type : Mechanic
Test Point S-01 : Y = 9832335 m S Capacity : 2.5 ton
Area : GTG - CPP DONGGI : 51 S Date : 14 December 2021

MANOMETER DIAL (kg/cm2) FRICTION RATIO (Rf) (%)


0 50 100 150 200 250 0 1 2 3 4 5 6 7 8 9 10 11 12
0.0 0.0

1.0 1.0

2.0 2.0

3.0 3.0

4.0 4.0

5.0 5.0

6.0 6.0
DEPTH (meter)

7.0 7.0

8.0 8.0

9.0 9.0

10.0 10.0

11.0 11.0

12.0 12.0

13.0 13.0

14.0 14.0

15.0 15.0

16.0 16.0

17.0 17.0

18.0 18.0
Cone Resistance (Cw)
Total Friction (Tw) Friction Ratio (R)
19.0 19.0
Cum. Total Friction (Tf) Local Friction (fs)

20.0 20.0
0 300 600 900 1200 1500 0.0 1.0 2.0 3.0 4.0

CUMULATIVE TOTAL FRICTION (Tf) (kg/cm2) LOCAL FRICTION (fs) (kg/cm2)


• APPENDIX A.4 – BORE LOG DATA AND CORE BOX GTG CPP DONGGI
SUB SURFACE EXPLORATION LOG (SNI 2436 - 2008)
PROJECT NAME : SOIL INVESTIGATION AREA DONGGI – MATINDOK DI PT. PERTAMINA EP REGIONAL 4 ZONA 13 – CTR-BTC-EPSF-04
LOCATION : CPP DONGGI, KAB, BANGGAI, PROV. SULAWESI TENGAH
DEEP BORING NUMBER : BH-01 GTG DRILLING TYPE MACHINE : GXY-01 AREA : GTG - CPP DONGGI
METHOD OF SAMPLING : Rotary Drilling CORE TYPE : Single Core Barrel DATE COMMENCED : 21 December 2021
COORDINATES X : 418350 m ZONE: 51 S CORE DIAMETER (mm) : Ø 73 DATE COMPLETED : 23 December 2021
Y : 9832331 m WEIGHT OF HAMMER (Kg) : 63.5 LOGGING BY : Herditanto
TOTAL DEPTH (m) : 18.00 meter DIST.FALLING HAMMER (cm) : 75 DRILLING MASTER : Herditanto
GWL (m) : 1.40 meter CASSING DIAMETER (mm) : Ø 89 WEATHER : Sunny, Cloudy, Rainy
BORE LOG

BORE PROFILE
SAMPLE CODE

SPT, N VALUE &


CASSING (m)
DEPTH (m)

COLOURS
G.W.L (m)

SAMPLE
CORRELATION REMARKS
DATE

STANDARD PENETRATION TEST


CORE DESCRIPTIONS SYMBOL OF UNIFIED
NUMBER OF BLOWS
N CLASIFICATION
N1 N2 N3
total
0 10 20 30 40 50 60 70
0.0
Silty CLAY to Clay, Brown, Medium Plasticity, Stiff
0 0
1.0 CLAY, Brown, Medium Plasticity, Stiff
1
Silty SAND to Clay, Greyish Brown to Brown, Stiff
2.0 CLAY, Brown, Medium Plasticity, Stiff 4 6 8 14
CLAY, Brown, Low Plasticity, Soft 15 15 15 30
2 14
21-Dec-21

3.0 Stiff
CLAY, Brownish Grey, Low Plasticity, Soft to Stiff 3
Well graded GRAVEL
DS 1
Thin Wall Tube f 89 mm

4.0 CLAY, Brown, Low Plasticity, Very Stiff 5 7 10 17 Sandy GRAVEL


15 15 15 30
4 17
5.0
CLAY, Brown, Medium Plasticity, Medium Stiff Very Stiff
5
UDS 1 UDS Tube
6.0 CLAY, Brownish Grey, Medium Plasticity, Stiff 2 3 6 9
Clayey SILT Mixed Wood Organic, Grey, Soft 15 15 15 30
6 9
7.0 Clayey SILT, Grey, Soft Stiff
7
UDS 2 UDS Tube Poorly graded GRAVEL
8.0 Clayey SILT, Grey, Soft 1 1 2 3 Sandy GRAVEL
Clayey SILT to Clay, Grey, Soft to Medium Stiff 15 15 15 30
8 3
9.0 Soft
9
DS 2 CLAY, Greenish Grey, Medium Plasticity, Stiff to Very Stiff
4 7 10 17
22-Dec-21

10.0
Clayey SILT to SILT, Grey, Very Stiff 15 15 15 30
10 17
11.0 Very Stiff
SILT, Grey, Very Stiff 11
Silty GRAVEL
DS 3
12.0 7 11 14 25 Sandy Silty GRAVEL
SILT Layer Siltstone, Grey, Very Stiff to Hard 15 15 15 30
12 25
13.0 DS 4 SILT to Siltstone, Grey, Hard Very Stiff
13

14.0 14 51 >50
15 12 30
14 >50
15.0 Hard
15
SILTSTONE, Grey, Hard Clayey GRAVEL
51 >50 Sandy Clayey GRAVEL
23-Dec-21

16.0
7 30
16 >50
17.0 Hard
17
18.0 SILTSTONE to Sandy Gravel, Grey, Hard 51 >50
11 30
18 >50
19.0 Hard
19
Well graded SAND
20.0 Gravelly SAND
20

21.0
21

22.0
22

23.0
23
Poorly graded SAND
24.0 Gravelly SAND
24

25.0
25

26.0
26

27.0
27
Silty SAND
28.0 Gravelly Silty SAND
28

29.0
29

30.0
30

31.0
31
Clayey SAND
32.0 Gravelly Clayey SAND
32

33.0
33

34.0
34

35.0
35
SILT
36.0 Gravelly, Sandy, Clayey SILT
36

37.0
37

38.0
38

39.0
39
CLAY
40.0 Gravelly, Sandy, Silty CLAY
40

REMARKS : Test Was Stopped Undisturbed Sample (UDS) G.W.L (Ground Water Level)

Depth Of Cassing Disturbed Sample (DS)

ROCK
DOCUMENTATION OF CORE BOX
SOIL INVESTIGATION AREA DONGGI – MATINDOK
PT. PERTAMINA EP REGIONAL 4 ZONA 13 – CTR-BTC-EPSF-04

0m

CORE BOX 1
5m

CORE BOX 2

10m
CORE BOX 3

15m

Description

CORE BOX BH-01 GTG CPP DONGGI


DEPTH: 00.00 - 15.00 M

Page 1 of 2
DOCUMENTATION OF CORE BOX
SOIL INVESTIGATION AREA DONGGI – MATINDOK
PT. PERTAMINA EP REGIONAL 4 ZONA 13 – CTR-BTC-EPSF-04

15m

CORE BOX 4
20m

CORE BOX 5

25m
CORE BOX 6

30m

Description

CORE BOX BH-01 GTG CPP DONGGI


DEPTH: 15.00 - 18.00 M

Page 2 of 2
• APPENDIX A.5 – SONDIR DATA ATU CPP MATINDOK
SONDIR (CONE PENETRATION TEST )
SNI 2827 - 2008 / ASTM D-3441

Project : SOIL INVESTIGATION AREA DONGGI – MATINDOK DI PT. PERTAMINA EP REGIONAL 4 ZONA 13 – CTR-BTC-EPSF-04
Location : CPP MATINDOK, KAB, BANGGAI, PROV. SULAWESI TENGAH
Area : ATU - CPP MATINDOK
CPT Type : Mechanic Date : 30 December 2021
Test Point S-01 Capacity : 2.5 ton Weather : Sunny
Coordinates : X = 443424 m E Cone Diameter (Dc) (cm) : 3.57 Work Leader : Musriyanto
: Y = 9853139 m S Sleeve Diameter (Ds) (cm) : 3.57 Team : Herditanto
Zone : 51 S Sleeve Length (Ls) (cm) : 13.35 : Ipan Sofyan
Tot. Depth (m) : 0.60 As = πDsLs (cm2) : 149.727 0.066854 : Bangun Suyono
GWL (m) :- Api = Ac = ¼πDc² (cm2) : 10.01 10.009821 : Alexander
CONE LOCAL TOTAL CUM. TOTAL FRICTION SOIL
MANOMETER DIAL DIFFERENCE
DEPTH RESISTANCE FRICTION FRICTION FRICTION RATIO CONSISTENCY

Cw Tw Kw = Tw-Cw qc = CwxApi/Ac fs = KwxApi/As fsx20cm Tf = ƩTf+(fsx20) Rf = (fs/qc)100


S-01
(m) kg/cm2 kg/cm2 kg/cm2 kg/cm2 kg/cm2 kg/cm kg/cm %
0.0 0.0 0.0 0.0 0.0 0.00 0.00 0.00 0.00 -
0.2 65.0 90.0 25.0 65.0 1.67 33.43 33.43 2.57 Very Stiff
0.4 75.0 100.0 25.0 75.0 1.67 33.43 66.85 2.23 Very Stiff
0.6 200.0 250.0 50.0 200.0 3.34 66.85 133.71 1.67 Very Hard
0.8 -------------------------------------------------------------------------The test was stopped at Cone Resistance ≥ 200 kg/cm2
1.0
1.2
1.4
1.6
1.8
2.0
2.2
2.4
2.6
2.8
3.0
3.2
3.4
3.6
3.8
4.0
4.2
4.4
4.6
4.8
5.0
5.2
5.4
5.6
5.8
6.0
6.2
6.4
6.6
6.8
7.0
7.2
7.4
7.6
7.8
8.0
8.2
SONDIR (CONE PENETRATION TEST )
SNI 2827 - 2008 / ASTM D-3441

Project : SOIL INVESTIGATION AREA DONGGI – MATINDOK DI PT. PERTAMINA EP REGIONAL 4 ZONA 13 – CTR-BTC-EPSF-04
Coordinates : X = 443424 m E CPT Type : Mechanic
Test Point S-01 : Y = 9853139 m S Capacity : 2.5 ton
Area : ATU - CPP MATINDOK : 51 S Date : 30 December 2021

MANOMETER DIAL (kg/cm2) FRICTION RATIO (Rf) (%)


0 50 100 150 200 250 0 1 2 3 4 5 6 7 8 9 10 11 12
0.0 0.0

1.0 1.0

2.0 2.0

3.0 3.0

4.0 4.0

5.0 5.0

6.0 6.0
DEPTH (meter)

7.0 7.0

8.0 8.0

9.0 9.0

10.0 10.0

11.0 11.0

12.0 12.0

13.0 13.0

14.0 14.0

15.0 15.0

16.0 16.0

17.0 17.0

18.0 18.0
Cone Resistance (Cw)
Total Friction (Tw) Friction Ratio (R)
19.0 19.0
Cum. Total Friction (Tf) Local Friction (fs)

20.0 20.0
0 300 600 900 1200 1500 0.0 1.0 2.0 3.0 4.0

CUMULATIVE TOTAL FRICTION (Tf) (kg/cm2) LOCAL FRICTION (fs) (kg/cm2)


• APPENDIX A.6 – BORE LOG DATA AND CORE BOX ATU CPP MATINDOK
SUB SURFACE EXPLORATION LOG (SNI 2436 - 2008)
PROJECT NAME : SOIL INVESTIGATION AREA DONGGI – MATINDOK DI PT. PERTAMINA EP REGIONAL 4 ZONA 13 – CTR-BTC-EPSF-04
LOCATION : CPP MATINDOK, KAB, BANGGAI, PROV. SULAWESI TENGAH
DEEP BORING NUMBER : BH-01 ATU DRILLING TYPE MACHINE : GXY-01 AREA : ATU - CPP MATINDOK
METHOD OF SAMPLING : Rotary Drilling CORE TYPE : Single Core Barrel DATE COMMENCED : 28 December 2021
COORDINATES X : 443412 m ZONE: 51 S CORE DIAMETER (mm) : Ø 73 DATE COMPLETED : 29 December 2021
Y : 9853156 m WEIGHT OF HAMMER (Kg) : 63.5 LOGGING BY : Herditanto
TOTAL DEPTH (m) : 8.00 meter DIST.FALLING HAMMER (cm) : 75 DRILLING MASTER : Herditanto
GWL (m) : 5.70 meter CASSING DIAMETER (mm) : Ø 89 WEATHER : Sunny, Cloudy
BORE LOG

BORE PROFILE
SAMPLE CODE

SPT, N VALUE &


CASSING (m)
DEPTH (m)

COLOURS
G.W.L (m)

SAMPLE
CORRELATION REMARKS
DATE

STANDARD PENETRATION TEST


CORE DESCRIPTIONS SYMBOL OF UNIFIED
NUMBER OF BLOWS
N CLASIFICATION
N1 N2 N3
total
0 10 20 30 40 50 60 70
0.0
SILT to Siltstone, Greenish Grey, Hard
0 0
Thin Wall Tube f 89 mm

1.0
1
DS 1
28-Dec-21

2.0 51 >50
11 30
2 >50
3.0 Hard
SILTSTONE, Grey, Hard, Massive 3
Well graded GRAVEL
DS 2
4.0 51 >50 Sandy GRAVEL
6 30
4 >50
5.0 Hard
5
DS 3
29-Dec-21

6.0 SILTSTONE to Boulder Andesit, Grey, Hard 51 >50


Sandy GRAVEL to Boulder Andesit, Grey, Very Dense 4 30
6 >50
7.0 Hard
7
DS 4 BOULDER ANDESIT, Grey, Very Dense Poorly graded GRAVEL
8.0 51 >50 Sandy GRAVEL
1 30
8 >50
9.0 Very Dense
9

10.0
10

11.0
11
Silty GRAVEL
12.0 Sandy Silty GRAVEL
12

13.0
13

14.0
14

15.0
15
Clayey GRAVEL
16.0 Sandy Clayey GRAVEL
16
17.0
17
18.0
18
19.0
19
Well graded SAND
20.0 Gravelly SAND
20

21.0
21

22.0
22

23.0
23
Poorly graded SAND
24.0 Gravelly SAND
24

25.0
25

26.0
26

27.0
27
Silty SAND
28.0 Gravelly Silty SAND
28

29.0
29

30.0
30

31.0
31
Clayey SAND
32.0 Gravelly Clayey SAND
32

33.0
33

34.0
34

35.0
35
SILT
36.0 Gravelly, Sandy, Clayey SILT
36

37.0
37

38.0
38

39.0
39
CLAY
40.0 Gravelly, Sandy, Silty CLAY
40

REMARKS : Test Was Stopped Undisturbed Sample (UDS) G.W.L (Ground Water Level)

Depth Of Cassing Disturbed Sample (DS)

ROCK
DOCUMENTATION OF CORE BOX
SOIL INVESTIGATION AREA DONGGI – MATINDOK
PT. PERTAMINA EP REGIONAL 4 ZONA 13 – CTR-BTC-EPSF-04

0m

CORE BOX 1
5m

CORE BOX 2

10m
CORE BOX 3

15m

Description

CORE BOX BH-01 ATU CPP MATINDOK


DEPTH: 00.00 - 08.00 M

Page 1 of 1
PT PERTAMINA EP

SOIL INVESTIGATION REPORT AREA CPP DONGGI


MATINDOK

APPENDIX B – PILE BEARING CAPACITY


• APPENDIX B.1 – PILE BEARING CAPACITY S-01 OCTG CPP DONGGI
• APPENDIX B.2 – PILE BEARING CAPACITY S-01 GTG CPP DONGGI
• APPENDIX B.3 – PILE BEARING CAPACITY BH-01 GTG CPP DONGGI
• APPENDIX B.4 – PILE BEARING CAPACITY S-01 ATU CPP MATINDOK
• APPENDIX B.5 – PILE BEARING CAPACITY BH-01 ATU CPP MATINDOK

W2021E-DNGF-CV-272-SDY-0001 – Rev. 3 Page 37 of 38


• APPENDIX B.1 – PILE BEARING CAPACITY S-01 OCTG CPP DONGGI
ALLOWABLE BEARING CAPACITY OF SINGLE PILE
(BASED ON CPT)
PROJECT : SOIL INVESTIGATION AREA DONGGI – MATINDOK DI PT. PERTAMINA EP REGIONAL 4 ZONA 13
LOCATION : CPP DONGGI, KAB, BANGGAI, PROV. SULAWESI TENGAH
SONDIR : S-01 OCTG CPP DONGGI

Pile Data:
Diameter (D) : 30.0 cm
Perimeter (K) : 94.25 cm
Section Area (Ab) : 706.86 cm2
Vertikal 36 Ton
SF1 = 3 (End bearing) Horizontal 54 Ton
SF2 = 5 (Skin bearing) Resultan 65 Ton

qc Range of qc qc correction Qp Qs Q allowable Q Uplift


DEPTH Li S fs
(kg/cm2) 4D (above) D (under) (kg/cm2) (ton) (ton) (ton) Ton
0.00 0.00 0.00 0.00 1.20 0.300 0.00
0.00 0.20 0.00 0.00 1.20 0.300 0.00 0.00 0.00 0.00 0.00
0.20 0.20 15.00 5.35 1.20 0.300 13.33 9.42 0.50 3.24 0.40
0.40 0.20 25.00 5.35 1.20 0.300 18.75 13.25 0.50 4.52 0.40
0.60 0.20 35.00 20.06 1.20 0.300 18.33 12.96 1.89 4.70 1.51
0.80 0.20 35.00 13.37 1.20 0.300 23.33 16.49 1.26 5.75 1.01
1.00 0.20 30.00 6.69 1.20 0.300 22.86 16.16 0.63 5.51 0.50
1.20 0.20 20.00 13.37 1.20 0.300 24.29 17.17 1.26 5.97 1.01
1.40 0.20 10.00 6.69 1.20 0.300 23.57 16.66 0.63 5.68 0.50
1.60 0.20 10.00 5.35 1.20 0.300 21.43 15.15 0.50 5.15 0.40
1.80 0.20 10.00 5.35 1.20 0.300 17.14 12.12 0.50 4.14 0.40
2.00 0.20 5.00 4.01 1.20 0.300 12.86 9.09 0.38 3.11 0.30
2.20 0.20 5.00 4.01 1.20 0.300 10.00 7.07 0.38 2.43 0.30
2.40 0.20 10.00 6.69 1.20 0.300 8.57 6.06 0.63 2.15 0.50
2.60 0.20 10.00 6.69 1.20 0.300 9.29 6.56 0.63 2.31 0.50
2.80 0.20 15.00 4.01 1.20 0.300 8.57 6.06 0.38 2.10 0.30
3.00 0.20 5.00 5.35 1.20 0.300 7.86 5.55 0.50 1.95 0.40
3.20 0.20 5.00 5.35 1.20 0.300 7.86 5.55 0.50 1.95 0.40
3.40 0.20 5.00 6.69 1.20 0.300 7.71 5.45 0.63 1.94 0.50
3.60 0.20 4.00 4.01 1.20 0.300 7.00 4.95 0.38 1.72 0.30
Survey Data

3.80 0.20 5.00 6.69 1.20 0.300 7.71 5.45 0.63 1.94 0.50
4.00 0.20 15.00 13.37 1.20 0.300 7.71 5.45 1.26 2.07 1.01
4.20 0.20 15.00 13.37 1.20 0.300 9.14 6.46 1.26 2.41 1.01
4.40 0.20 15.00 13.37 1.20 0.300 11.29 7.98 1.26 2.91 1.01
4.60 0.20 20.00 6.69 1.20 0.300 12.71 8.99 0.63 3.12 0.50
4.80 0.20 15.00 6.69 1.20 0.300 14.29 10.10 0.63 3.49 0.50
5.00 0.20 15.00 6.69 1.20 0.300 15.71 11.11 0.63 3.83 0.50
5.20 0.20 15.00 6.69 1.20 0.300 15.71 11.11 0.63 3.83 0.50
5.40 0.20 15.00 6.69 1.20 0.300 15.71 11.11 0.63 3.83 0.50
5.60 0.20 15.00 6.69 1.20 0.300 15.71 11.11 0.63 3.83 0.50
5.80 0.20 15.00 6.69 1.20 0.300 14.29 10.10 0.63 3.49 0.50
6.00 0.20 10.00 6.69 1.20 0.300 14.29 10.10 0.63 3.49 0.50
6.20 0.20 15.00 6.69 1.20 0.300 14.29 10.10 0.63 3.49 0.50
6.40 0.20 15.00 6.69 1.20 0.300 19.29 13.63 0.63 4.67 0.50
6.60 0.20 50.00 26.74 1.20 0.300 20.71 14.64 2.52 5.38 2.02
6.80 0.20 25.00 20.06 1.20 0.300 22.14 15.65 1.89 5.60 1.51
7.00 0.20 25.00 20.06 1.20 0.300 23.57 16.66 1.89 5.93 1.51
7.20 0.20 25.00 20.06 1.20 0.300 25.71 18.18 1.89 6.44 1.51
7.40 0.20 25.00 20.06 1.20 0.300 25.71 18.18 1.89 6.44 1.51
7.60 0.20 15.00 6.69 1.20 0.300 26.43 18.68 0.63 6.35 0.50
7.80 0.20 20.00 6.69 1.20 0.300 22.14 15.65 0.63 5.34 0.50
8.00 0.20 20.00 6.69 1.20 0.300 21.43 15.15 0.63 5.18 0.50
8.20 0.20 20.00 6.69 1.20 0.300 21.43 15.15 0.63 5.18 0.50
8.40 0.20 25.00 13.37 1.20 0.300 23.57 16.66 1.26 5.81 1.01
ALLOWABLE BEARING CAPACITY OF SINGLE PILE
(BASED ON CPT)
PROJECT : SOIL INVESTIGATION AREA DONGGI – MATINDOK DI PT. PERTAMINA EP REGIONAL 4 ZONA 13
LOCATION : CPP DONGGI, KAB, BANGGAI, PROV. SULAWESI TENGAH
SONDIR : S-01 OCTG CPP DONGGI

Pile Data:
Diameter (D) : 30.0 cm
Perimeter (K) : 94.25 cm
Section Area (Ab) : 706.86 cm2
Vertikal 36 Ton
SF1 = 3 (End bearing) Horizontal 54 Ton
SF2 = 5 (Skin bearing) Resultan 65 Ton

qc Range of qc qc correction Qp Qs Q allowable Q Uplift


DEPTH Li S fs
(kg/cm2) 4D (above) D (under) (kg/cm2) (ton) (ton) (ton) Ton
8.60 0.20 40.00 20.06 1.20 0.300 23.57 16.66 1.89 5.93 1.51
8.80 0.20 25.00 13.37 1.20 0.300 23.57 16.66 1.26 5.81 1.01
9.00 0.20 15.00 13.37 1.20 0.300 23.57 16.66 1.26 5.81 1.01
9.20 0.20 20.00 20.06 1.20 0.300 23.57 16.66 1.89 5.93 1.51
9.40 0.20 20.00 20.06 1.20 0.300 25.00 17.67 1.89 6.27 1.51
9.60 0.20 30.00 20.06 1.20 0.300 27.14 19.19 1.89 6.77 1.51
Survey Data

9.80 0.20 40.00 26.74 1.20 0.300 28.57 20.20 2.52 7.24 2.02
10.00 0.20 50.00 26.74 1.20 0.300 32.14 22.72 2.52 8.08 2.02
10.20 0.20 50.00 26.74 1.20 0.300 38.57 27.26 2.52 9.59 2.02
10.40 0.20 60.00 26.74 1.20 0.300 45.71 32.31 2.52 11.28 2.02
10.60 0.20 70.00 40.11 1.20 0.300 55.00 38.88 3.78 13.72 3.02
10.80 0.20 85.00 33.43 1.20 0.300 65.00 45.95 3.15 15.95 2.52
11.00 0.20 100.00 40.11 1.20 0.300 76.43 54.02 3.78 18.76 3.02
11.20 0.20 120.00 40.11 1.20 0.300 90.71 64.12 3.78 22.13 3.02
11.40 0.20 150.00 40.11 1.20 0.300 112.14 79.27 3.78 27.18 3.02
11.60 0.20 200.00 66.85 1.20 0.300 120.83 85.41 6.30 29.73 5.04
ALLOWABLE BEARING CAPACITY OF SINGLE PILE
(BASED ON CPT)
PROJECT : SOIL INVESTIGATION AREA DONGGI – MATINDOK DI PT. PERTAMINA EP REGIONAL 4 ZONA 13
LOCATION : CPP DONGGI, KAB, BANGGAI, PROV. SULAWESI TENGAH
SONDIR : S-01 OCTG CPP DONGGI

Pile Data:
Diameter (D) : 40.0 cm
Perimeter (K) : 125.66 cm Gaya Tarik Bollar Kapal 8000 DWT (3063 GT)
Section Area (Ab) : 1256.64 cm2 Gaya Tambatan Bollard
Vertikal 36 Ton
SF1 = 3 (End bearing) Horizontal 54 Ton
SF2 = 5 (Skin bearing) Resultan 65 Ton

qc Range of qc qc correction Qp Qs Q allowable Q Uplift


DEPTH Li S fs
(kg/cm2) 4D (above) D (under) (kg/cm2) (ton) (ton) (ton) Ton
0.00 0.00 0.00 0.00 1.60 0.400 0.00
0.00 0.20 0.00 0.00 1.60 0.400 0.00 0.00 0.00 0.00 0.00
0.20 0.20 15.00 5.35 1.60 0.400 13.33 16.76 0.67 5.72 0.54
0.40 0.20 25.00 5.35 1.60 0.400 18.75 23.56 0.67 7.99 0.54
0.60 0.20 35.00 20.06 1.60 0.400 18.33 23.04 2.52 8.18 2.02
0.80 0.20 35.00 13.37 1.60 0.400 23.33 29.32 1.68 10.11 1.34
1.00 0.20 30.00 6.69 1.60 0.400 22.86 28.72 0.84 9.74 0.67
1.20 0.20 20.00 13.37 1.60 0.400 24.29 30.52 1.68 10.51 1.34
1.40 0.20 10.00 6.69 1.60 0.400 23.57 29.62 0.84 10.04 0.67
1.60 0.20 10.00 5.35 1.60 0.400 21.43 26.93 0.67 9.11 0.54
1.80 0.20 10.00 5.35 1.60 0.400 17.14 21.54 0.67 7.32 0.54
2.00 0.20 5.00 4.01 1.60 0.400 12.86 16.16 0.50 5.49 0.40
2.20 0.20 5.00 4.01 1.60 0.400 10.00 12.57 0.50 4.29 0.40
2.40 0.20 10.00 6.69 1.60 0.400 8.57 10.77 0.84 3.76 0.67
2.60 0.20 10.00 6.69 1.60 0.400 9.29 11.67 0.84 4.06 0.67
2.80 0.20 15.00 4.01 1.60 0.400 8.57 10.77 0.50 3.69 0.40
3.00 0.20 5.00 5.35 1.60 0.400 7.86 9.87 0.67 3.43 0.54
3.20 0.20 5.00 5.35 1.60 0.400 7.86 9.87 0.67 3.43 0.54
3.40 0.20 5.00 6.69 1.60 0.400 7.71 9.69 0.84 3.40 0.67
3.60 0.20 4.00 4.01 1.60 0.400 7.00 8.80 0.50 3.03 0.40
Survey Data

3.80 0.20 5.00 6.69 1.60 0.400 7.71 9.69 0.84 3.40 0.67
4.00 0.20 15.00 13.37 1.60 0.400 7.71 9.69 1.68 3.57 1.34
4.20 0.20 15.00 13.37 1.60 0.400 9.14 11.49 1.68 4.17 1.34
4.40 0.20 15.00 13.37 1.60 0.400 11.29 14.18 1.68 5.06 1.34
4.60 0.20 20.00 6.69 1.60 0.400 12.71 15.98 0.84 5.49 0.67
4.80 0.20 15.00 6.69 1.60 0.400 14.29 17.95 0.84 6.15 0.67
5.00 0.20 15.00 6.69 1.60 0.400 15.71 19.75 0.84 6.75 0.67
5.20 0.20 15.00 6.69 1.60 0.400 15.71 19.75 0.84 6.75 0.67
5.40 0.20 15.00 6.69 1.60 0.400 15.71 19.75 0.84 6.75 0.67
5.60 0.20 15.00 6.69 1.60 0.400 15.71 19.75 0.84 6.75 0.67
5.80 0.20 15.00 6.69 1.60 0.400 14.29 17.95 0.84 6.15 0.67
6.00 0.20 10.00 6.69 1.60 0.400 14.29 17.95 0.84 6.15 0.67
6.20 0.20 15.00 6.69 1.60 0.400 14.29 17.95 0.84 6.15 0.67
6.40 0.20 15.00 6.69 1.60 0.400 19.29 24.24 0.84 8.25 0.67
6.60 0.20 50.00 26.74 1.60 0.400 20.71 26.03 3.36 9.35 2.69
6.80 0.20 25.00 20.06 1.60 0.400 22.14 27.83 2.52 9.78 2.02
7.00 0.20 25.00 20.06 1.60 0.400 23.57 29.62 2.52 10.38 2.02
7.20 0.20 25.00 20.06 1.60 0.400 25.71 32.31 2.52 11.28 2.02
7.40 0.20 25.00 20.06 1.60 0.400 25.71 32.31 2.52 11.28 2.02
7.60 0.20 15.00 6.69 1.60 0.400 26.43 33.21 0.84 11.24 0.67
7.80 0.20 20.00 6.69 1.60 0.400 22.14 27.83 0.84 9.44 0.67
8.00 0.20 20.00 6.69 1.60 0.400 21.43 26.93 0.84 9.14 0.67
8.20 0.20 20.00 6.69 1.60 0.400 21.43 26.93 0.84 9.14 0.67
8.40 0.20 25.00 13.37 1.60 0.400 23.57 29.62 1.68 10.21 1.34
ALLOWABLE BEARING CAPACITY OF SINGLE PILE
(BASED ON CPT)
PROJECT : SOIL INVESTIGATION AREA DONGGI – MATINDOK DI PT. PERTAMINA EP REGIONAL 4 ZONA 13
LOCATION : CPP DONGGI, KAB, BANGGAI, PROV. SULAWESI TENGAH
SONDIR : S-01 OCTG CPP DONGGI

Pile Data:
Diameter (D) : 40.0 cm
Perimeter (K) : 125.66 cm Gaya Tarik Bollar Kapal 8000 DWT (3063 GT)
Section Area (Ab) : 1256.64 cm2 Gaya Tambatan Bollard
Vertikal 36 Ton
SF1 = 3 (End bearing) Horizontal 54 Ton
SF2 = 5 (Skin bearing) Resultan 65 Ton

qc Range of qc qc correction Qp Qs Q allowable Q Uplift


DEPTH Li S fs
(kg/cm2) 4D (above) D (under) (kg/cm2) (ton) (ton) (ton) Ton
8.60 0.20 40.00 20.06 1.60 0.400 23.57 29.62 2.52 10.38 2.02
8.80 0.20 25.00 13.37 1.60 0.400 23.57 29.62 1.68 10.21 1.34
9.00 0.20 15.00 13.37 1.60 0.400 23.57 29.62 1.68 10.21 1.34
9.20 0.20 20.00 20.06 1.60 0.400 23.57 29.62 2.52 10.38 2.02
9.40 0.20 20.00 20.06 1.60 0.400 25.00 31.42 2.52 10.98 2.02
9.60 0.20 30.00 20.06 1.60 0.400 27.14 34.11 2.52 11.87 2.02
Survey Data

9.80 0.20 40.00 26.74 1.60 0.400 28.57 35.90 3.36 12.64 2.69
10.00 0.20 50.00 26.74 1.60 0.400 32.14 40.39 3.36 14.14 2.69
10.20 0.20 50.00 26.74 1.60 0.400 38.57 48.47 3.36 16.83 2.69
10.40 0.20 60.00 26.74 1.60 0.400 45.71 57.45 3.36 19.82 2.69
10.60 0.20 70.00 40.11 1.60 0.400 55.00 69.12 5.04 24.05 4.03
10.80 0.20 85.00 33.43 1.60 0.400 65.00 81.68 4.20 28.07 3.36
11.00 0.20 100.00 40.11 1.60 0.400 76.43 96.04 5.04 33.02 4.03
11.20 0.20 120.00 40.11 1.60 0.400 90.71 113.99 5.04 39.01 4.03
11.40 0.20 150.00 40.11 1.60 0.400 112.14 140.92 5.04 47.98 4.03
11.60 0.20 200.00 66.85 1.60 0.400 120.83 151.84 8.40 52.29 6.72
ALLOWABLE BEARING CAPACITY OF SINGLE PILE
(BASED ON CPT)
PROJECT : SOIL INVESTIGATION AREA DONGGI – MATINDOK DI PT. PERTAMINA EP REGIONAL 4 ZONA 13
LOCATION : CPP DONGGI, KAB, BANGGAI, PROV. SULAWESI TENGAH
SONDIR : S-01 OCTG CPP DONGGI

Pile Data:
Diameter (D) : 50.0 cm
Perimeter (K) : 157.08 cm Gaya Tarik Bollar Kapal 8000 DWT (3063 GT)
Section Area (Ab) : 1963.50 cm2 Gaya Tambatan Bollard
Vertikal 36 Ton
SF1 = 3 (End bearing) Horizontal 54 Ton
SF2 = 5 (Skin bearing) Resultan 65 Ton

qc Range of qc qc correction Qp Qs Q allowable Q Uplift


DEPTH Li S fs
(kg/cm2) 4D (above) D (under) (kg/cm2) (ton) (ton) (ton) Ton
0.00 0.00 0.00 0.00 2.00 0.500 0.00
0.00 0.20 0.00 0.00 2.00 0.500 0.00 0.00 0.00 0.00 0.00
0.20 0.20 15.00 5.35 2.00 0.500 13.33 26.18 0.84 8.89 0.67
0.40 0.20 25.00 5.35 2.00 0.500 18.75 36.82 0.84 12.44 0.67
0.60 0.20 35.00 20.06 2.00 0.500 18.33 36.00 3.15 12.63 2.52
0.80 0.20 35.00 13.37 2.00 0.500 23.33 45.81 2.10 15.69 1.68
1.00 0.20 30.00 6.69 2.00 0.500 22.86 44.88 1.05 15.17 0.84
1.20 0.20 20.00 13.37 2.00 0.500 24.29 47.68 2.10 16.32 1.68
1.40 0.20 10.00 6.69 2.00 0.500 23.57 46.28 1.05 15.64 0.84
1.60 0.20 10.00 5.35 2.00 0.500 21.43 42.07 0.84 14.19 0.67
1.80 0.20 10.00 5.35 2.00 0.500 17.14 33.66 0.84 11.39 0.67
2.00 0.20 5.00 4.01 2.00 0.500 12.86 25.24 0.63 8.54 0.50
2.20 0.20 5.00 4.01 2.00 0.500 10.00 19.63 0.63 6.67 0.50
2.40 0.20 10.00 6.69 2.00 0.500 8.57 16.83 1.05 5.82 0.84
2.60 0.20 10.00 6.69 2.00 0.500 9.29 18.23 1.05 6.29 0.84
2.80 0.20 15.00 4.01 2.00 0.500 8.57 16.83 0.63 5.74 0.50
3.00 0.20 5.00 5.35 2.00 0.500 7.86 15.43 0.84 5.31 0.67
3.20 0.20 5.00 5.35 2.00 0.500 7.86 15.43 0.84 5.31 0.67
3.40 0.20 5.00 6.69 2.00 0.500 7.71 15.15 1.05 5.26 0.84
3.60 0.20 4.00 4.01 2.00 0.500 7.00 13.74 0.63 4.71 0.50
Survey Data

3.80 0.20 5.00 6.69 2.00 0.500 7.71 15.15 1.05 5.26 0.84
4.00 0.20 15.00 13.37 2.00 0.500 7.71 15.15 2.10 5.47 1.68
4.20 0.20 15.00 13.37 2.00 0.500 9.14 17.95 2.10 6.40 1.68
4.40 0.20 15.00 13.37 2.00 0.500 11.29 22.16 2.10 7.81 1.68
4.60 0.20 20.00 6.69 2.00 0.500 12.71 24.96 1.05 8.53 0.84
4.80 0.20 15.00 6.69 2.00 0.500 14.29 28.05 1.05 9.56 0.84
5.00 0.20 15.00 6.69 2.00 0.500 15.71 30.85 1.05 10.50 0.84
5.20 0.20 15.00 6.69 2.00 0.500 15.71 30.85 1.05 10.50 0.84
5.40 0.20 15.00 6.69 2.00 0.500 15.71 30.85 1.05 10.50 0.84
5.60 0.20 15.00 6.69 2.00 0.500 15.71 30.85 1.05 10.50 0.84
5.80 0.20 15.00 6.69 2.00 0.500 14.29 28.05 1.05 9.56 0.84
6.00 0.20 10.00 6.69 2.00 0.500 14.29 28.05 1.05 9.56 0.84
6.20 0.20 15.00 6.69 2.00 0.500 14.29 28.05 1.05 9.56 0.84
6.40 0.20 15.00 6.69 2.00 0.500 19.29 37.87 1.05 12.83 0.84
6.60 0.20 50.00 26.74 2.00 0.500 20.71 40.67 4.20 14.40 3.36
6.80 0.20 25.00 20.06 2.00 0.500 22.14 43.48 3.15 15.12 2.52
7.00 0.20 25.00 20.06 2.00 0.500 23.57 46.28 3.15 16.06 2.52
7.20 0.20 25.00 20.06 2.00 0.500 25.71 50.49 3.15 17.46 2.52
7.40 0.20 25.00 20.06 2.00 0.500 25.71 50.49 3.15 17.46 2.52
7.60 0.20 15.00 6.69 2.00 0.500 26.43 51.89 1.05 17.51 0.84
7.80 0.20 20.00 6.69 2.00 0.500 22.14 43.48 1.05 14.70 0.84
8.00 0.20 20.00 6.69 2.00 0.500 21.43 42.07 1.05 14.23 0.84
8.20 0.20 20.00 6.69 2.00 0.500 21.43 42.07 1.05 14.23 0.84
8.40 0.20 25.00 13.37 2.00 0.500 23.57 46.28 2.10 15.85 1.68
ALLOWABLE BEARING CAPACITY OF SINGLE PILE
(BASED ON CPT)
PROJECT : SOIL INVESTIGATION AREA DONGGI – MATINDOK DI PT. PERTAMINA EP REGIONAL 4 ZONA 13
LOCATION : CPP DONGGI, KAB, BANGGAI, PROV. SULAWESI TENGAH
SONDIR : S-01 OCTG CPP DONGGI

Pile Data:
Diameter (D) : 50.0 cm
Perimeter (K) : 157.08 cm Gaya Tarik Bollar Kapal 8000 DWT (3063 GT)
Section Area (Ab) : 1963.50 cm2 Gaya Tambatan Bollard
Vertikal 36 Ton
SF1 = 3 (End bearing) Horizontal 54 Ton
SF2 = 5 (Skin bearing) Resultan 65 Ton

qc Range of qc qc correction Qp Qs Q allowable Q Uplift


DEPTH Li S fs
(kg/cm2) 4D (above) D (under) (kg/cm2) (ton) (ton) (ton) Ton
8.60 0.20 40.00 20.06 2.00 0.500 23.57 46.28 3.15 16.06 2.52
8.80 0.20 25.00 13.37 2.00 0.500 23.57 46.28 2.10 15.85 1.68
9.00 0.20 15.00 13.37 2.00 0.500 23.57 46.28 2.10 15.85 1.68
9.20 0.20 20.00 20.06 2.00 0.500 23.57 46.28 3.15 16.06 2.52
9.40 0.20 20.00 20.06 2.00 0.500 25.00 49.09 3.15 16.99 2.52
9.60 0.20 30.00 20.06 2.00 0.500 27.14 53.29 3.15 18.40 2.52
Survey Data

9.80 0.20 40.00 26.74 2.00 0.500 28.57 56.10 4.20 19.54 3.36
10.00 0.20 50.00 26.74 2.00 0.500 32.14 63.11 4.20 21.88 3.36
10.20 0.20 50.00 26.74 2.00 0.500 38.57 75.73 4.20 26.09 3.36
10.40 0.20 60.00 26.74 2.00 0.500 45.71 89.76 4.20 30.76 3.36
10.60 0.20 70.00 40.11 2.00 0.500 55.00 107.99 6.30 37.26 5.04
10.80 0.20 85.00 33.43 2.00 0.500 65.00 127.63 5.25 43.59 4.20
11.00 0.20 100.00 40.11 2.00 0.500 76.43 150.07 6.30 51.28 5.04
11.20 0.20 120.00 40.11 2.00 0.500 90.71 178.12 6.30 60.63 5.04
11.40 0.20 150.00 40.11 2.00 0.500 112.14 220.19 6.30 74.66 5.04
11.60 0.20 200.00 66.85 2.00 0.500 120.83 237.26 10.50 81.19 8.40
ALLOWABLE BEARING CAPACITY OF SINGLE PILE
(BASED ON CPT)
PROJECT : SOIL INVESTIGATION AREA DONGGI – MATINDOK DI PT. PERTAMINA EP REGIONAL 4 ZONA 13
LOCATION : CPP DONGGI, KAB, BANGGAI, PROV. SULAWESI TENGAH
SONDIR : S-01 OCTG CPP DONGGI

Pile Data:
Diameter (D) : 60.0 cm
Perimeter (K) : 188.50 cm Gaya Tarik Bollar Kapal 8000 DWT (3063 GT)
Section Area (Ab) : 2827.43 cm2 Gaya Tambatan Bollard
Vertikal 36 Ton
SF1 = 3 (End bearing) Horizontal 54 Ton
SF2 = 5 (Skin bearing) Resultan 65 Ton

qc Range of qc qc correction Qp Qs Q allowable Q Uplift


DEPTH Li S fs
(kg/cm2) 4D (above) D (under) (kg/cm2) (ton) (ton) (ton) Ton
0.00 0.00 0.00 0.00 2.40 0.600 0.00
0.00 0.20 0.00 0.00 2.40 0.600 0.00 0.00 0.00 0.00 0.00
0.20 0.20 15.00 5.35 2.40 0.600 13.33 37.70 1.01 12.77 0.81
0.40 0.20 25.00 5.35 2.40 0.600 18.75 53.01 1.01 17.87 0.81
0.60 0.20 35.00 20.06 2.40 0.600 18.33 51.84 3.78 18.03 3.02
0.80 0.20 35.00 13.37 2.40 0.600 23.33 65.97 2.52 22.50 2.02
1.00 0.20 30.00 6.69 2.40 0.600 22.86 64.63 1.26 21.79 1.01
1.20 0.20 20.00 13.37 2.40 0.600 24.29 68.67 2.52 23.39 2.02
1.40 0.20 10.00 6.69 2.40 0.600 23.57 66.65 1.26 22.47 1.01
1.60 0.20 10.00 5.35 2.40 0.600 21.43 60.59 1.01 20.40 0.81
1.80 0.20 10.00 5.35 2.40 0.600 17.14 48.47 1.01 16.36 0.81
2.00 0.20 5.00 4.01 2.40 0.600 12.86 36.35 0.76 12.27 0.60
2.20 0.20 5.00 4.01 2.40 0.600 10.00 28.27 0.76 9.58 0.60
2.40 0.20 10.00 6.69 2.40 0.600 8.57 24.24 1.26 8.33 1.01
2.60 0.20 10.00 6.69 2.40 0.600 9.29 26.25 1.26 9.00 1.01
2.80 0.20 15.00 4.01 2.40 0.600 8.57 24.24 0.76 8.23 0.60
3.00 0.20 5.00 5.35 2.40 0.600 7.86 22.22 1.01 7.61 0.81
3.20 0.20 5.00 5.35 2.40 0.600 7.86 22.22 1.01 7.61 0.81
3.40 0.20 5.00 6.69 2.40 0.600 7.71 21.81 1.26 7.52 1.01
3.60 0.20 4.00 4.01 2.40 0.600 7.00 19.79 0.76 6.75 0.60
Survey Data

3.80 0.20 5.00 6.69 2.40 0.600 7.71 21.81 1.26 7.52 1.01
4.00 0.20 15.00 13.37 2.40 0.600 7.71 21.81 2.52 7.77 2.02
4.20 0.20 15.00 13.37 2.40 0.600 9.14 25.85 2.52 9.12 2.02
4.40 0.20 15.00 13.37 2.40 0.600 11.29 31.91 2.52 11.14 2.02
4.60 0.20 20.00 6.69 2.40 0.600 12.71 35.95 1.26 12.23 1.01
4.80 0.20 15.00 6.69 2.40 0.600 14.29 40.39 1.26 13.72 1.01
5.00 0.20 15.00 6.69 2.40 0.600 15.71 44.43 1.26 15.06 1.01
5.20 0.20 15.00 6.69 2.40 0.600 15.71 44.43 1.26 15.06 1.01
5.40 0.20 15.00 6.69 2.40 0.600 15.71 44.43 1.26 15.06 1.01
5.60 0.20 15.00 6.69 2.40 0.600 15.71 44.43 1.26 15.06 1.01
5.80 0.20 15.00 6.69 2.40 0.600 14.29 40.39 1.26 13.72 1.01
6.00 0.20 10.00 6.69 2.40 0.600 14.29 40.39 1.26 13.72 1.01
6.20 0.20 15.00 6.69 2.40 0.600 14.29 40.39 1.26 13.72 1.01
6.40 0.20 15.00 6.69 2.40 0.600 19.29 54.53 1.26 18.43 1.01
6.60 0.20 50.00 26.74 2.40 0.600 20.71 58.57 5.04 20.53 4.03
6.80 0.20 25.00 20.06 2.40 0.600 22.14 62.61 3.78 21.63 3.02
7.00 0.20 25.00 20.06 2.40 0.600 23.57 66.65 3.78 22.97 3.02
7.20 0.20 25.00 20.06 2.40 0.600 25.71 72.71 3.78 24.99 3.02
7.40 0.20 25.00 20.06 2.40 0.600 25.71 72.71 3.78 24.99 3.02
7.60 0.20 15.00 6.69 2.40 0.600 26.43 74.73 1.26 25.16 1.01
7.80 0.20 20.00 6.69 2.40 0.600 22.14 62.61 1.26 21.12 1.01
8.00 0.20 20.00 6.69 2.40 0.600 21.43 60.59 1.26 20.45 1.01
8.20 0.20 20.00 6.69 2.40 0.600 21.43 60.59 1.26 20.45 1.01
8.40 0.20 25.00 13.37 2.40 0.600 23.57 66.65 2.52 22.72 2.02
ALLOWABLE BEARING CAPACITY OF SINGLE PILE
(BASED ON CPT)
PROJECT : SOIL INVESTIGATION AREA DONGGI – MATINDOK DI PT. PERTAMINA EP REGIONAL 4 ZONA 13
LOCATION : CPP DONGGI, KAB, BANGGAI, PROV. SULAWESI TENGAH
SONDIR : S-01 OCTG CPP DONGGI

Pile Data:
Diameter (D) : 60.0 cm
Perimeter (K) : 188.50 cm Gaya Tarik Bollar Kapal 8000 DWT (3063 GT)
Section Area (Ab) : 2827.43 cm2 Gaya Tambatan Bollard
Vertikal 36 Ton
SF1 = 3 (End bearing) Horizontal 54 Ton
SF2 = 5 (Skin bearing) Resultan 65 Ton

qc Range of qc qc correction Qp Qs Q allowable Q Uplift


DEPTH Li S fs
(kg/cm2) 4D (above) D (under) (kg/cm2) (ton) (ton) (ton) Ton
8.60 0.20 40.00 20.06 2.40 0.600 23.57 66.65 3.78 22.97 3.02
8.80 0.20 25.00 13.37 2.40 0.600 23.57 66.65 2.52 22.72 2.02
9.00 0.20 15.00 13.37 2.40 0.600 23.57 66.65 2.52 22.72 2.02
9.20 0.20 20.00 20.06 2.40 0.600 23.57 66.65 3.78 22.97 3.02
9.40 0.20 20.00 20.06 2.40 0.600 25.00 70.69 3.78 24.32 3.02
9.60 0.20 30.00 20.06 2.40 0.600 27.14 76.74 3.78 26.34 3.02
Survey Data

9.80 0.20 40.00 26.74 2.40 0.600 28.57 80.78 5.04 27.94 4.03
10.00 0.20 50.00 26.74 2.40 0.600 32.14 90.88 5.04 31.30 4.03
10.20 0.20 50.00 26.74 2.40 0.600 38.57 109.06 5.04 37.36 4.03
10.40 0.20 60.00 26.74 2.40 0.600 45.71 129.25 5.04 44.09 4.03
10.60 0.20 70.00 40.11 2.40 0.600 55.00 155.51 7.56 53.35 6.05
10.80 0.20 85.00 33.43 2.40 0.600 65.00 183.78 6.30 62.52 5.04
11.00 0.20 100.00 40.11 2.40 0.600 76.43 216.10 7.56 73.54 6.05
11.20 0.20 120.00 40.11 2.40 0.600 90.71 256.49 7.56 87.01 6.05
11.40 0.20 150.00 40.11 2.40 0.600 112.14 317.08 7.56 107.20 6.05
11.60 0.20 200.00 66.85 2.40 0.600 120.83 341.65 12.60 116.40 10.08
CPT Graphics (S) 01 OCTG End Bearing Capacity Friction Bearing Capacity
Qc (kg/cm2) Ultimate (Ton) Ultimate (Ton)
0 75 150 225 300 0 80 160 240 320 400 0.0 4.0 8.0 12.0 16.0
0 0 0

1 1 1

2 2 2

3 3 3

4 4 4

5 5 5

6 6 6
Depth (m)

7 7 7

8 8 8

9 9 9

10 10 10

11 11 11

12 12 12
Pile Dia. 30 cm Pile Dia. 30 cm
13 13 13
Cw (kg/cm2) Pile Dia. 40 cm Pile Dia. 40 cm
14 14 Pile Dia. 50 cm 14 Pile Dia. 50 cm
Tw (kg/cm2)
Pile Dia. 60 cm Pile Dia. 60 cm
15 15 15

PILE MATERIAL PROPERTIES Dimensions Inersia Virtual Vixity Point


4
Pile Material : Concrete Spunpile D 30 T6 : 34607.78 cm 506.73 cm
2 4
Concrete K-600 'c 508.16 kg/cm D 40 T7.5 : 106488.95 cm 627.59 cm
4
49.80 MPa D 50 T9 : 255324.30 cm 741.50 cm
4
Modulus of Elasticity Ec 33167.48 MPa D 60 T10 : 510508.81 cm 845.64 cm
CPT Graphics (S) 01 OCTG Uplift Bearing Capacity Total Bearing Capacity
Qc (kg/cm2) Allowable (Ton) Allowable (Ton)
0 75 150 225 300 0.0 3.0 6.0 9.0 12.0 0 20 40 60 80 100 120 140
0 0 0

1 1 1

2 2 2

3 3 3

4 4 4

5 5 5

6 6 6
Depth (m)

7 7 7

8 8 8

9 9 9

10 10 10

11 11 11

12 12 12
Pile Dia. 30 cm Pile Dia. 30 cm
13 13 13
Cw (kg/cm2) Pile Dia. 40 cm Pile Dia. 40 cm
14 14 Pile Dia. 50 cm 14 Pile Dia. 50 cm
Tw (kg/cm2)
Pile Dia. 60 cm Pile Dia. 60 cm
15 15 15

PILE MATERIAL PROPERTIES Dimensions Inersia Virtual Vixity Point


4
Pile Material : Concrete Spunpile D 30 T6 : 34607.785 cm 506.73 cm
2 4
Concrete K-600 'c 508.16 kg/cm D 40 T7.5 : 106488.95 cm 627.59 cm
4
49.80 MPa D 50 T9 : 255324.30 cm 741.50 cm
4
Modulus of Elasticity Ec 33167.48 MPa D 60 T10 : 510508.81 cm 845.64 cm
• APPENDIX B.2 – PILE BEARING CAPACITY S-01 GTG CPP DONGGI
ALLOWABLE BEARING CAPACITY OF SINGLE PILE
(BASED ON CPT)
PROJECT : SOIL INVESTIGATION AREA DONGGI – MATINDOK DI PT. PERTAMINA EP REGIONAL 4 ZONA 13
LOCATION : CPP DONGGI, KAB, BANGGAI, PROV. SULAWESI TENGAH
SONDIR : S-01 GTG CPP DONGGI

Pile Data:
Diameter (D) : 30.0 cm
Perimeter (K) : 94.25 cm
Section Area (Ab) : 706.86 cm2
Vertikal 36 Ton
SF1 = 3 (End bearing) Horizontal 54 Ton
SF2 = 5 (Skin bearing) Resultan 65 Ton

qc Range of qc qc correction Qp Qs Q allowable Q Uplift


DEPTH Li S fs
(kg/cm2) 4D (above) D (under) (kg/cm2) (ton) (ton) (ton) Ton
0.00 0.00 0.00 0.00 1.20 0.300 0.00
0.00 0.20 0.00 0.00 1.20 0.300 0.00 0.00 0.00 0.00 0.00
0.20 0.20 20.00 13.37 1.20 0.300 13.33 9.42 1.26 3.39 1.01
0.40 0.20 20.00 13.37 1.20 0.300 15.00 10.60 1.26 3.79 1.01
0.60 0.20 20.00 20.06 1.20 0.300 13.33 9.42 1.89 3.52 1.51
0.80 0.20 20.00 26.74 1.20 0.300 16.67 11.78 2.52 4.43 2.02
1.00 0.20 20.00 20.06 1.20 0.300 16.43 11.61 1.89 4.25 1.51
1.20 0.20 15.00 20.06 1.20 0.300 18.57 13.13 1.89 4.75 1.51
1.40 0.20 15.00 20.06 1.20 0.300 20.00 14.14 1.89 5.09 1.51
1.60 0.20 30.00 20.06 1.20 0.300 21.43 15.15 1.89 5.43 1.51
1.80 0.20 30.00 20.06 1.20 0.300 22.86 16.16 1.89 5.76 1.51
2.00 0.20 30.00 26.74 1.20 0.300 22.86 16.16 2.52 5.89 2.02
2.20 0.20 20.00 20.06 1.20 0.300 23.57 16.66 1.89 5.93 1.51
2.40 0.20 25.00 20.06 1.20 0.300 25.00 17.67 1.89 6.27 1.51
2.60 0.20 25.00 20.06 1.20 0.300 26.43 18.68 1.89 6.61 1.51
2.80 0.20 25.00 20.06 1.20 0.300 25.71 18.18 1.89 6.44 1.51
3.00 0.20 25.00 20.06 1.20 0.300 25.71 18.18 1.89 6.44 1.51
3.20 0.20 30.00 6.69 1.20 0.300 25.71 18.18 0.63 6.18 0.50
3.40 0.20 30.00 13.37 1.20 0.300 28.57 20.20 1.26 6.98 1.01
3.60 0.20 40.00 26.74 1.20 0.300 29.29 20.70 2.52 7.40 2.02
Survey Data

3.80 0.20 30.00 20.06 1.20 0.300 30.71 21.71 1.89 7.61 1.51
4.00 0.20 35.00 20.06 1.20 0.300 32.14 22.72 1.89 7.95 1.51
4.20 0.20 35.00 20.06 1.20 0.300 33.57 23.73 1.89 8.29 1.51
4.40 0.20 35.00 20.06 1.20 0.300 34.29 24.24 1.89 8.46 1.51
4.60 0.20 35.00 20.06 1.20 0.300 35.00 24.74 1.89 8.62 1.51
4.80 0.20 35.00 20.06 1.20 0.300 32.86 23.23 1.89 8.12 1.51
5.00 0.20 25.00 20.06 1.20 0.300 32.14 22.72 1.89 7.95 1.51
5.20 0.20 25.00 20.06 1.20 0.300 30.71 21.71 1.89 7.61 1.51
5.40 0.20 25.00 20.06 1.20 0.300 28.57 20.20 1.89 7.11 1.51
5.60 0.20 20.00 20.06 1.20 0.300 26.43 18.68 1.89 6.61 1.51
5.80 0.20 20.00 20.06 1.20 0.300 24.29 17.17 1.89 6.10 1.51
6.00 0.20 20.00 20.06 1.20 0.300 22.86 16.16 1.89 5.76 1.51
6.20 0.20 25.00 20.06 1.20 0.300 22.86 16.16 1.89 5.76 1.51
6.40 0.20 25.00 20.06 1.20 0.300 22.14 15.65 1.89 5.60 1.51
6.60 0.20 20.00 20.06 1.20 0.300 21.43 15.15 1.89 5.43 1.51
6.80 0.20 20.00 20.06 1.20 0.300 22.14 15.65 1.89 5.60 1.51
7.00 0.20 25.00 20.06 1.20 0.300 22.86 16.16 1.89 5.76 1.51
7.20 0.20 25.00 20.06 1.20 0.300 23.57 16.66 1.89 5.93 1.51
7.40 0.20 25.00 20.06 1.20 0.300 23.57 16.66 1.89 5.93 1.51
7.60 0.20 25.00 26.74 1.20 0.300 23.57 16.66 2.52 6.06 2.02
7.80 0.20 25.00 26.74 1.20 0.300 25.71 18.18 2.52 6.56 2.02
8.00 0.20 35.00 20.06 1.20 0.300 26.43 18.68 1.89 6.61 1.51
8.20 0.20 25.00 20.06 1.20 0.300 26.43 18.68 1.89 6.61 1.51
8.40 0.20 25.00 26.74 1.20 0.300 28.57 20.20 2.52 7.24 2.02
ALLOWABLE BEARING CAPACITY OF SINGLE PILE
(BASED ON CPT)
PROJECT : SOIL INVESTIGATION AREA DONGGI – MATINDOK DI PT. PERTAMINA EP REGIONAL 4 ZONA 13
LOCATION : CPP DONGGI, KAB, BANGGAI, PROV. SULAWESI TENGAH
SONDIR : S-01 GTG CPP DONGGI

Pile Data:
Diameter (D) : 30.0 cm
Perimeter (K) : 94.25 cm
Section Area (Ab) : 706.86 cm2
Vertikal 36 Ton
SF1 = 3 (End bearing) Horizontal 54 Ton
SF2 = 5 (Skin bearing) Resultan 65 Ton

qc Range of qc qc correction Qp Qs Q allowable Q Uplift


DEPTH Li S fs
(kg/cm2) 4D (above) D (under) (kg/cm2) (ton) (ton) (ton) Ton
8.60 0.20 40.00 26.74 1.20 0.300 30.71 21.71 2.52 7.74 2.02
8.80 0.20 40.00 26.74 1.20 0.300 32.86 23.23 2.52 8.25 2.02
9.00 0.20 40.00 26.74 1.20 0.300 35.00 24.74 2.52 8.75 2.02
9.20 0.20 40.00 33.43 1.20 0.300 36.43 25.75 3.15 9.21 2.52
9.40 0.20 45.00 33.43 1.20 0.300 39.29 27.77 3.15 9.89 2.52
9.60 0.20 45.00 33.43 1.20 0.300 42.86 30.29 3.15 10.73 2.52
Survey Data

9.80 0.20 50.00 33.43 1.20 0.300 45.71 32.31 3.15 11.40 2.52
10.00 0.20 60.00 26.74 1.20 0.300 48.57 34.33 2.52 11.95 2.02
10.20 0.20 60.00 26.74 1.20 0.300 51.43 36.35 2.52 12.62 2.02
10.40 0.20 60.00 26.74 1.20 0.300 54.29 38.37 2.52 13.29 2.02
10.60 0.20 60.00 26.74 1.20 0.300 57.14 40.39 2.52 13.97 2.02
10.80 0.20 65.00 33.43 1.20 0.300 62.86 44.43 3.15 15.44 2.52
11.00 0.20 85.00 20.06 1.20 0.300 72.86 51.50 1.89 17.54 1.51
11.20 0.20 120.00 40.11 1.20 0.300 92.86 65.64 3.78 22.64 3.02
11.40 0.20 200.00 66.85 1.20 0.300 98.33 69.51 6.30 24.43 5.04
ALLOWABLE BEARING CAPACITY OF SINGLE PILE
(BASED ON CPT)
PROJECT : SOIL INVESTIGATION AREA DONGGI – MATINDOK DI PT. PERTAMINA EP REGIONAL 4 ZONA 13
LOCATION : CPP DONGGI, KAB, BANGGAI, PROV. SULAWESI TENGAH
SONDIR : S-01 GTG CPP DONGGI

Pile Data:
Diameter (D) : 40.0 cm
Perimeter (K) : 125.66 cm Gaya Tarik Bollar Kapal 8000 DWT (3063 GT)
Section Area (Ab) : 1256.64 cm2 Gaya Tambatan Bollard
Vertikal 36 Ton
SF1 = 3 (End bearing) Horizontal 54 Ton
SF2 = 5 (Skin bearing) Resultan 65 Ton

qc Range of qc qc correction Qp Qs Q allowable Q Uplift


DEPTH Li S fs
(kg/cm2) 4D (above) D (under) (kg/cm2) (ton) (ton) (ton) Ton
0.00 0.00 0.00 0.00 1.60 0.400 0.00
0.00 0.20 0.00 0.00 1.60 0.400 0.00 0.00 0.00 0.00 0.00
0.20 0.20 20.00 13.37 1.60 0.400 13.33 16.76 1.68 5.92 1.34
0.40 0.20 20.00 13.37 1.60 0.400 15.00 18.85 1.68 6.62 1.34
0.60 0.20 20.00 20.06 1.60 0.400 13.33 16.76 2.52 6.09 2.02
0.80 0.20 20.00 26.74 1.60 0.400 16.67 20.94 3.36 7.65 2.69
1.00 0.20 20.00 20.06 1.60 0.400 16.43 20.64 2.52 7.39 2.02
1.20 0.20 15.00 20.06 1.60 0.400 18.57 23.34 2.52 8.28 2.02
1.40 0.20 15.00 20.06 1.60 0.400 20.00 25.13 2.52 8.88 2.02
1.60 0.20 30.00 20.06 1.60 0.400 21.43 26.93 2.52 9.48 2.02
1.80 0.20 30.00 20.06 1.60 0.400 22.86 28.72 2.52 10.08 2.02
2.00 0.20 30.00 26.74 1.60 0.400 22.86 28.72 3.36 10.25 2.69
2.20 0.20 20.00 20.06 1.60 0.400 23.57 29.62 2.52 10.38 2.02
2.40 0.20 25.00 20.06 1.60 0.400 25.00 31.42 2.52 10.98 2.02
2.60 0.20 25.00 20.06 1.60 0.400 26.43 33.21 2.52 11.57 2.02
2.80 0.20 25.00 20.06 1.60 0.400 25.71 32.31 2.52 11.28 2.02
3.00 0.20 25.00 20.06 1.60 0.400 25.71 32.31 2.52 11.28 2.02
3.20 0.20 30.00 6.69 1.60 0.400 25.71 32.31 0.84 10.94 0.67
3.40 0.20 30.00 13.37 1.60 0.400 28.57 35.90 1.68 12.30 1.34
3.60 0.20 40.00 26.74 1.60 0.400 29.29 36.80 3.36 12.94 2.69
Survey Data

3.80 0.20 30.00 20.06 1.60 0.400 30.71 38.60 2.52 13.37 2.02
4.00 0.20 35.00 20.06 1.60 0.400 32.14 40.39 2.52 13.97 2.02
4.20 0.20 35.00 20.06 1.60 0.400 33.57 42.19 2.52 14.57 2.02
4.40 0.20 35.00 20.06 1.60 0.400 34.29 43.08 2.52 14.87 2.02
4.60 0.20 35.00 20.06 1.60 0.400 35.00 43.98 2.52 15.16 2.02
4.80 0.20 35.00 20.06 1.60 0.400 32.86 41.29 2.52 14.27 2.02
5.00 0.20 25.00 20.06 1.60 0.400 32.14 40.39 2.52 13.97 2.02
5.20 0.20 25.00 20.06 1.60 0.400 30.71 38.60 2.52 13.37 2.02
5.40 0.20 25.00 20.06 1.60 0.400 28.57 35.90 2.52 12.47 2.02
5.60 0.20 20.00 20.06 1.60 0.400 26.43 33.21 2.52 11.57 2.02
5.80 0.20 20.00 20.06 1.60 0.400 24.29 30.52 2.52 10.68 2.02
6.00 0.20 20.00 20.06 1.60 0.400 22.86 28.72 2.52 10.08 2.02
6.20 0.20 25.00 20.06 1.60 0.400 22.86 28.72 2.52 10.08 2.02
6.40 0.20 25.00 20.06 1.60 0.400 22.14 27.83 2.52 9.78 2.02
6.60 0.20 20.00 20.06 1.60 0.400 21.43 26.93 2.52 9.48 2.02
6.80 0.20 20.00 20.06 1.60 0.400 22.14 27.83 2.52 9.78 2.02
7.00 0.20 25.00 20.06 1.60 0.400 22.86 28.72 2.52 10.08 2.02
7.20 0.20 25.00 20.06 1.60 0.400 23.57 29.62 2.52 10.38 2.02
7.40 0.20 25.00 20.06 1.60 0.400 23.57 29.62 2.52 10.38 2.02
7.60 0.20 25.00 26.74 1.60 0.400 23.57 29.62 3.36 10.55 2.69
7.80 0.20 25.00 26.74 1.60 0.400 25.71 32.31 3.36 11.44 2.69
8.00 0.20 35.00 20.06 1.60 0.400 26.43 33.21 2.52 11.57 2.02
8.20 0.20 25.00 20.06 1.60 0.400 26.43 33.21 2.52 11.57 2.02
8.40 0.20 25.00 26.74 1.60 0.400 28.57 35.90 3.36 12.64 2.69
ALLOWABLE BEARING CAPACITY OF SINGLE PILE
(BASED ON CPT)
PROJECT : SOIL INVESTIGATION AREA DONGGI – MATINDOK DI PT. PERTAMINA EP REGIONAL 4 ZONA 13
LOCATION : CPP DONGGI, KAB, BANGGAI, PROV. SULAWESI TENGAH
SONDIR : S-01 GTG CPP DONGGI

Pile Data:
Diameter (D) : 40.0 cm
Perimeter (K) : 125.66 cm Gaya Tarik Bollar Kapal 8000 DWT (3063 GT)
Section Area (Ab) : 1256.64 cm2 Gaya Tambatan Bollard
Vertikal 36 Ton
SF1 = 3 (End bearing) Horizontal 54 Ton
SF2 = 5 (Skin bearing) Resultan 65 Ton

qc Range of qc qc correction Qp Qs Q allowable Q Uplift


DEPTH Li S fs
(kg/cm2) 4D (above) D (under) (kg/cm2) (ton) (ton) (ton) Ton
8.60 0.20 40.00 26.74 1.60 0.400 30.71 38.60 3.36 13.54 2.69
8.80 0.20 40.00 26.74 1.60 0.400 32.86 41.29 3.36 14.44 2.69
9.00 0.20 40.00 26.74 1.60 0.400 35.00 43.98 3.36 15.33 2.69
9.20 0.20 40.00 33.43 1.60 0.400 36.43 45.78 4.20 16.10 3.36
9.40 0.20 45.00 33.43 1.60 0.400 39.29 49.37 4.20 17.30 3.36
9.60 0.20 45.00 33.43 1.60 0.400 42.86 53.86 4.20 18.79 3.36
Survey Data

9.80 0.20 50.00 33.43 1.60 0.400 45.71 57.45 4.20 19.99 3.36
10.00 0.20 60.00 26.74 1.60 0.400 48.57 61.04 3.36 21.02 2.69
10.20 0.20 60.00 26.74 1.60 0.400 51.43 64.63 3.36 22.21 2.69
10.40 0.20 60.00 26.74 1.60 0.400 54.29 68.22 3.36 23.41 2.69
10.60 0.20 60.00 26.74 1.60 0.400 57.14 71.81 3.36 24.61 2.69
10.80 0.20 65.00 33.43 1.60 0.400 62.86 78.99 4.20 27.17 3.36
11.00 0.20 85.00 20.06 1.60 0.400 72.86 91.55 2.52 31.02 2.02
11.20 0.20 120.00 40.11 1.60 0.400 92.86 116.69 5.04 39.90 4.03
11.40 0.20 200.00 66.85 1.60 0.400 98.33 123.57 8.40 42.87 6.72
ALLOWABLE BEARING CAPACITY OF SINGLE PILE
(BASED ON CPT)
PROJECT : SOIL INVESTIGATION AREA DONGGI – MATINDOK DI PT. PERTAMINA EP REGIONAL 4 ZONA 13
LOCATION : CPP DONGGI, KAB, BANGGAI, PROV. SULAWESI TENGAH
SONDIR : S-01 GTG CPP DONGGI

Pile Data:
Diameter (D) : 50.0 cm
Perimeter (K) : 157.08 cm Gaya Tarik Bollar Kapal 8000 DWT (3063 GT)
Section Area (Ab) : 1963.50 cm2 Gaya Tambatan Bollard
Vertikal 36 Ton
SF1 = 3 (End bearing) Horizontal 54 Ton
SF2 = 5 (Skin bearing) Resultan 65 Ton

qc Range of qc qc correction Qp Qs Q allowable Q Uplift


DEPTH Li S fs
(kg/cm2) 4D (above) D (under) (kg/cm2) (ton) (ton) (ton) Ton
0.00 0.00 0.00 0.00 2.00 0.500 0.00
0.00 0.20 0.00 0.00 2.00 0.500 0.00 0.00 0.00 0.00 0.00
0.20 0.20 20.00 13.37 2.00 0.500 13.33 26.18 2.10 9.15 1.68
0.40 0.20 20.00 13.37 2.00 0.500 15.00 29.45 2.10 10.24 1.68
0.60 0.20 20.00 20.06 2.00 0.500 13.33 26.18 3.15 9.36 2.52
0.80 0.20 20.00 26.74 2.00 0.500 16.67 32.72 4.20 11.75 3.36
1.00 0.20 20.00 20.06 2.00 0.500 16.43 32.26 3.15 11.38 2.52
1.20 0.20 15.00 20.06 2.00 0.500 18.57 36.46 3.15 12.79 2.52
1.40 0.20 15.00 20.06 2.00 0.500 20.00 39.27 3.15 13.72 2.52
1.60 0.20 30.00 20.06 2.00 0.500 21.43 42.07 3.15 14.66 2.52
1.80 0.20 30.00 20.06 2.00 0.500 22.86 44.88 3.15 15.59 2.52
2.00 0.20 30.00 26.74 2.00 0.500 22.86 44.88 4.20 15.80 3.36
2.20 0.20 20.00 20.06 2.00 0.500 23.57 46.28 3.15 16.06 2.52
2.40 0.20 25.00 20.06 2.00 0.500 25.00 49.09 3.15 16.99 2.52
2.60 0.20 25.00 20.06 2.00 0.500 26.43 51.89 3.15 17.93 2.52
2.80 0.20 25.00 20.06 2.00 0.500 25.71 50.49 3.15 17.46 2.52
3.00 0.20 25.00 20.06 2.00 0.500 25.71 50.49 3.15 17.46 2.52
3.20 0.20 30.00 6.69 2.00 0.500 25.71 50.49 1.05 17.04 0.84
3.40 0.20 30.00 13.37 2.00 0.500 28.57 56.10 2.10 19.12 1.68
3.60 0.20 40.00 26.74 2.00 0.500 29.29 57.50 4.20 20.01 3.36
Survey Data

3.80 0.20 30.00 20.06 2.00 0.500 30.71 60.31 3.15 20.73 2.52
4.00 0.20 35.00 20.06 2.00 0.500 32.14 63.11 3.15 21.67 2.52
4.20 0.20 35.00 20.06 2.00 0.500 33.57 65.92 3.15 22.60 2.52
4.40 0.20 35.00 20.06 2.00 0.500 34.29 67.32 3.15 23.07 2.52
4.60 0.20 35.00 20.06 2.00 0.500 35.00 68.72 3.15 23.54 2.52
4.80 0.20 35.00 20.06 2.00 0.500 32.86 64.51 3.15 22.14 2.52
5.00 0.20 25.00 20.06 2.00 0.500 32.14 63.11 3.15 21.67 2.52
5.20 0.20 25.00 20.06 2.00 0.500 30.71 60.31 3.15 20.73 2.52
5.40 0.20 25.00 20.06 2.00 0.500 28.57 56.10 3.15 19.33 2.52
5.60 0.20 20.00 20.06 2.00 0.500 26.43 51.89 3.15 17.93 2.52
5.80 0.20 20.00 20.06 2.00 0.500 24.29 47.68 3.15 16.53 2.52
6.00 0.20 20.00 20.06 2.00 0.500 22.86 44.88 3.15 15.59 2.52
6.20 0.20 25.00 20.06 2.00 0.500 22.86 44.88 3.15 15.59 2.52
6.40 0.20 25.00 20.06 2.00 0.500 22.14 43.48 3.15 15.12 2.52
6.60 0.20 20.00 20.06 2.00 0.500 21.43 42.07 3.15 14.66 2.52
6.80 0.20 20.00 20.06 2.00 0.500 22.14 43.48 3.15 15.12 2.52
7.00 0.20 25.00 20.06 2.00 0.500 22.86 44.88 3.15 15.59 2.52
7.20 0.20 25.00 20.06 2.00 0.500 23.57 46.28 3.15 16.06 2.52
7.40 0.20 25.00 20.06 2.00 0.500 23.57 46.28 3.15 16.06 2.52
7.60 0.20 25.00 26.74 2.00 0.500 23.57 46.28 4.20 16.27 3.36
7.80 0.20 25.00 26.74 2.00 0.500 25.71 50.49 4.20 17.67 3.36
8.00 0.20 35.00 20.06 2.00 0.500 26.43 51.89 3.15 17.93 2.52
8.20 0.20 25.00 20.06 2.00 0.500 26.43 51.89 3.15 17.93 2.52
8.40 0.20 25.00 26.74 2.00 0.500 28.57 56.10 4.20 19.54 3.36
ALLOWABLE BEARING CAPACITY OF SINGLE PILE
(BASED ON CPT)
PROJECT : SOIL INVESTIGATION AREA DONGGI – MATINDOK DI PT. PERTAMINA EP REGIONAL 4 ZONA 13
LOCATION : CPP DONGGI, KAB, BANGGAI, PROV. SULAWESI TENGAH
SONDIR : S-01 GTG CPP DONGGI

Pile Data:
Diameter (D) : 50.0 cm
Perimeter (K) : 157.08 cm Gaya Tarik Bollar Kapal 8000 DWT (3063 GT)
Section Area (Ab) : 1963.50 cm2 Gaya Tambatan Bollard
Vertikal 36 Ton
SF1 = 3 (End bearing) Horizontal 54 Ton
SF2 = 5 (Skin bearing) Resultan 65 Ton

qc Range of qc qc correction Qp Qs Q allowable Q Uplift


DEPTH Li S fs
(kg/cm2) 4D (above) D (under) (kg/cm2) (ton) (ton) (ton) Ton
8.60 0.20 40.00 26.74 2.00 0.500 30.71 60.31 4.20 20.94 3.36
8.80 0.20 40.00 26.74 2.00 0.500 32.86 64.51 4.20 22.35 3.36
9.00 0.20 40.00 26.74 2.00 0.500 35.00 68.72 4.20 23.75 3.36
9.20 0.20 40.00 33.43 2.00 0.500 36.43 71.53 5.25 24.89 4.20
9.40 0.20 45.00 33.43 2.00 0.500 39.29 77.14 5.25 26.76 4.20
9.60 0.20 45.00 33.43 2.00 0.500 42.86 84.15 5.25 29.10 4.20
Survey Data

9.80 0.20 50.00 33.43 2.00 0.500 45.71 89.76 5.25 30.97 4.20
10.00 0.20 60.00 26.74 2.00 0.500 48.57 95.37 4.20 32.63 3.36
10.20 0.20 60.00 26.74 2.00 0.500 51.43 100.98 4.20 34.50 3.36
10.40 0.20 60.00 26.74 2.00 0.500 54.29 106.59 4.20 36.37 3.36
10.60 0.20 60.00 26.74 2.00 0.500 57.14 112.20 4.20 38.24 3.36
10.80 0.20 65.00 33.43 2.00 0.500 62.86 123.42 5.25 42.19 4.20
11.00 0.20 85.00 20.06 2.00 0.500 72.86 143.05 3.15 48.31 2.52
11.20 0.20 120.00 40.11 2.00 0.500 92.86 182.32 6.30 62.04 5.04
11.40 0.20 200.00 66.85 2.00 0.500 98.33 193.08 10.50 66.46 8.40
ALLOWABLE BEARING CAPACITY OF SINGLE PILE
(BASED ON CPT)
PROJECT : SOIL INVESTIGATION AREA DONGGI – MATINDOK DI PT. PERTAMINA EP REGIONAL 4 ZONA 13
LOCATION : CPP DONGGI, KAB, BANGGAI, PROV. SULAWESI TENGAH
SONDIR : S-01 GTG CPP DONGGI

Pile Data:
Diameter (D) : 60.0 cm
Perimeter (K) : 188.50 cm Gaya Tarik Bollar Kapal 8000 DWT (3063 GT)
Section Area (Ab) : 2827.43 cm2 Gaya Tambatan Bollard
Vertikal 36 Ton
SF1 = 3 (End bearing) Horizontal 54 Ton
SF2 = 5 (Skin bearing) Resultan 65 Ton

qc Range of qc qc correction Qp Qs Q allowable Q Uplift


DEPTH Li S fs
(kg/cm2) 4D (above) D (under) (kg/cm2) (ton) (ton) (ton) Ton
0.00 0.00 0.00 0.00 2.40 0.600 0.00
0.00 0.20 0.00 0.00 2.40 0.600 0.00 0.00 0.00 0.00 0.00
0.20 0.20 20.00 13.37 2.40 0.600 13.33 37.70 2.52 13.07 2.02
0.40 0.20 20.00 13.37 2.40 0.600 15.00 42.41 2.52 14.64 2.02
0.60 0.20 20.00 20.06 2.40 0.600 13.33 37.70 3.78 13.32 3.02
0.80 0.20 20.00 26.74 2.40 0.600 16.67 47.12 5.04 16.72 4.03
1.00 0.20 20.00 20.06 2.40 0.600 16.43 46.45 3.78 16.24 3.02
1.20 0.20 15.00 20.06 2.40 0.600 18.57 52.51 3.78 18.26 3.02
1.40 0.20 15.00 20.06 2.40 0.600 20.00 56.55 3.78 19.61 3.02
1.60 0.20 30.00 20.06 2.40 0.600 21.43 60.59 3.78 20.95 3.02
1.80 0.20 30.00 20.06 2.40 0.600 22.86 64.63 3.78 22.30 3.02
2.00 0.20 30.00 26.74 2.40 0.600 22.86 64.63 5.04 22.55 4.03
2.20 0.20 20.00 20.06 2.40 0.600 23.57 66.65 3.78 22.97 3.02
2.40 0.20 25.00 20.06 2.40 0.600 25.00 70.69 3.78 24.32 3.02
2.60 0.20 25.00 20.06 2.40 0.600 26.43 74.73 3.78 25.66 3.02
2.80 0.20 25.00 20.06 2.40 0.600 25.71 72.71 3.78 24.99 3.02
3.00 0.20 25.00 20.06 2.40 0.600 25.71 72.71 3.78 24.99 3.02
3.20 0.20 30.00 6.69 2.40 0.600 25.71 72.71 1.26 24.49 1.01
3.40 0.20 30.00 13.37 2.40 0.600 28.57 80.78 2.52 27.43 2.02
3.60 0.20 40.00 26.74 2.40 0.600 29.29 82.80 5.04 28.61 4.03
Survey Data

3.80 0.20 30.00 20.06 2.40 0.600 30.71 86.84 3.78 29.70 3.02
4.00 0.20 35.00 20.06 2.40 0.600 32.14 90.88 3.78 31.05 3.02
4.20 0.20 35.00 20.06 2.40 0.600 33.57 94.92 3.78 32.40 3.02
4.40 0.20 35.00 20.06 2.40 0.600 34.29 96.94 3.78 33.07 3.02
4.60 0.20 35.00 20.06 2.40 0.600 35.00 98.96 3.78 33.74 3.02
4.80 0.20 35.00 20.06 2.40 0.600 32.86 92.90 3.78 31.72 3.02
5.00 0.20 25.00 20.06 2.40 0.600 32.14 90.88 3.78 31.05 3.02
5.20 0.20 25.00 20.06 2.40 0.600 30.71 86.84 3.78 29.70 3.02
5.40 0.20 25.00 20.06 2.40 0.600 28.57 80.78 3.78 27.68 3.02
5.60 0.20 20.00 20.06 2.40 0.600 26.43 74.73 3.78 25.66 3.02
5.80 0.20 20.00 20.06 2.40 0.600 24.29 68.67 3.78 23.64 3.02
6.00 0.20 20.00 20.06 2.40 0.600 22.86 64.63 3.78 22.30 3.02
6.20 0.20 25.00 20.06 2.40 0.600 22.86 64.63 3.78 22.30 3.02
6.40 0.20 25.00 20.06 2.40 0.600 22.14 62.61 3.78 21.63 3.02
6.60 0.20 20.00 20.06 2.40 0.600 21.43 60.59 3.78 20.95 3.02
6.80 0.20 20.00 20.06 2.40 0.600 22.14 62.61 3.78 21.63 3.02
7.00 0.20 25.00 20.06 2.40 0.600 22.86 64.63 3.78 22.30 3.02
7.20 0.20 25.00 20.06 2.40 0.600 23.57 66.65 3.78 22.97 3.02
7.40 0.20 25.00 20.06 2.40 0.600 23.57 66.65 3.78 22.97 3.02
7.60 0.20 25.00 26.74 2.40 0.600 23.57 66.65 5.04 23.22 4.03
7.80 0.20 25.00 26.74 2.40 0.600 25.71 72.71 5.04 25.24 4.03
8.00 0.20 35.00 20.06 2.40 0.600 26.43 74.73 3.78 25.66 3.02
8.20 0.20 25.00 20.06 2.40 0.600 26.43 74.73 3.78 25.66 3.02
8.40 0.20 25.00 26.74 2.40 0.600 28.57 80.78 5.04 27.94 4.03
ALLOWABLE BEARING CAPACITY OF SINGLE PILE
(BASED ON CPT)
PROJECT : SOIL INVESTIGATION AREA DONGGI – MATINDOK DI PT. PERTAMINA EP REGIONAL 4 ZONA 13
LOCATION : CPP DONGGI, KAB, BANGGAI, PROV. SULAWESI TENGAH
SONDIR : S-01 GTG CPP DONGGI

Pile Data:
Diameter (D) : 60.0 cm
Perimeter (K) : 188.50 cm Gaya Tarik Bollar Kapal 8000 DWT (3063 GT)
Section Area (Ab) : 2827.43 cm2 Gaya Tambatan Bollard
Vertikal 36 Ton
SF1 = 3 (End bearing) Horizontal 54 Ton
SF2 = 5 (Skin bearing) Resultan 65 Ton

qc Range of qc qc correction Qp Qs Q allowable Q Uplift


DEPTH Li S fs
(kg/cm2) 4D (above) D (under) (kg/cm2) (ton) (ton) (ton) Ton
8.60 0.20 40.00 26.74 2.40 0.600 30.71 86.84 5.04 29.96 4.03
8.80 0.20 40.00 26.74 2.40 0.600 32.86 92.90 5.04 31.98 4.03
9.00 0.20 40.00 26.74 2.40 0.600 35.00 98.96 5.04 33.99 4.03
9.20 0.20 40.00 33.43 2.40 0.600 36.43 103.00 6.30 35.59 5.04
9.40 0.20 45.00 33.43 2.40 0.600 39.29 111.08 6.30 38.29 5.04
9.60 0.20 45.00 33.43 2.40 0.600 42.86 121.18 6.30 41.65 5.04
Survey Data

9.80 0.20 50.00 33.43 2.40 0.600 45.71 129.25 6.30 44.34 5.04
10.00 0.20 60.00 26.74 2.40 0.600 48.57 137.33 5.04 46.79 4.03
10.20 0.20 60.00 26.74 2.40 0.600 51.43 145.41 5.04 49.48 4.03
10.40 0.20 60.00 26.74 2.40 0.600 54.29 153.49 5.04 52.17 4.03
10.60 0.20 60.00 26.74 2.40 0.600 57.14 161.57 5.04 54.86 4.03
10.80 0.20 65.00 33.43 2.40 0.600 62.86 177.72 6.30 60.50 5.04
11.00 0.20 85.00 20.06 2.40 0.600 72.86 206.00 3.78 69.42 3.02
11.20 0.20 120.00 40.11 2.40 0.600 92.86 262.55 7.56 89.03 6.05
11.40 0.20 200.00 66.85 2.40 0.600 98.33 278.03 12.60 95.20 10.08
CPT Graphics (S) 01 GTG End Bearing Capacity Friction Bearing Capacity
Qc (kg/cm2) Ultimate (Ton) Ultimate (Ton)
0 75 150 225 300 0 80 160 240 320 0.0 4.0 8.0 12.0 16.0
0 0 0

1 1 1

2 2 2

3 3 3

4 4 4

5 5 5

6 6 6
Depth (m)

7 7 7

8 8 8

9 9 9

10 10 10

11 11 11

12 12 12
Pile Dia. 30 cm Pile Dia. 30 cm
13 13 13
Cw (kg/cm2) Pile Dia. 40 cm Pile Dia. 40 cm
14 14 Pile Dia. 50 cm 14 Pile Dia. 50 cm
Tw (kg/cm2)
Pile Dia. 60 cm Pile Dia. 60 cm
15 15 15

PILE MATERIAL PROPERTIES Dimensions Inersia Virtual Vixity Point


4
Pile Material : Concrete Spunpile D 30 T6 : 34607.78 cm 372.58 cm
2 4
Concrete K-600 'c 508.16 kg/cm D 40 T7.5 : 106488.95 cm 462.25 cm
4
49.80 MPa D 50 T9 : 255324.30 cm 546.92 cm
4
Modulus of Elasticity Ec 33167.48 MPa D 60 T10 : 510508.81 cm 624.57 cm
CPT Graphics (S) 01 GTG Uplift Bearing Capacity Total Bearing Capacity
Qc (kg/cm2) Allowable (Ton) Allowable (Ton)
0 75 150 225 300 0.0 3.0 6.0 9.0 12.0 0 20 40 60 80 100
0 0 0

1 1 1

2 2 2

3 3 3

4 4 4

5 5 5

6 6 6
Depth (m)

7 7 7

8 8 8

9 9 9

10 10 10

11 11 11

12 12 12
Pile Dia. 30 cm Pile Dia. 30 cm
13 13 13
Cw (kg/cm2) Pile Dia. 40 cm Pile Dia. 40 cm
14 14 Pile Dia. 50 cm 14 Pile Dia. 50 cm
Tw (kg/cm2)
Pile Dia. 60 cm Pile Dia. 60 cm
15 15 15

PILE MATERIAL PROPERTIES Dimensions Inersia Virtual Vixity Point


4
Pile Material : Concrete Spunpile D 30 T6 : 34607.785 cm 372.58 cm
2 4
Concrete K-600 'c 508.16 kg/cm D 40 T7.5 : 106488.95 cm 462.25 cm
4
49.80 MPa D 50 T9 : 255324.30 cm 546.92 cm
4
Modulus of Elasticity Ec 33167.48 MPa D 60 T10 : 510508.81 cm 624.57 cm
• APPENDIX B.3 – PILE BEARING CAPACITY BH-01 GTG CPP DONGGI
Pile Bearing Capacity - Soil Investigation Area Donggi - Matindok Pertamina EP Regional 4 Zona 13
BH-01 GTG Area CPP Donggi 2021
Pile Bearing Capacity based on N-SPT, Meyerhof (1956)
Input:
Pile section: Square or Triangle or Circular? C Circular Concrete Spun Pile
Displacement: Large or Small ? S (0.1)
Pile diameter B 0.3 m
Perimeter P 0.942 m
Section Area A 0.071 m2
Depth of zero skin friction z 0 m
Safety factor SF 3
N-SPT value Ultimate Allowable
Depth
Average 8D Average 3D Average Friction Bearing Total Friction Bearing Total
(m) BH 01 GTG N-60 (2.4 m) (0.9 m) ton ton ton ton ton ton
0 0 0 0 0 0 0.0 0 0 0 0 0
2 14 11 5.6 12.4 9.0 2.1 25.4 27.6 0.7 8.5 9.2
4 17 14 8.3 10.4 9.3 4.7 26.4 31.1 1.6 8.8 10.4
6 9 7 8.0 4.8 6.4 6.0 18.1 24.1 2.0 6.0 8.0
8 3 2 8.6 8.0 8.3 6.5 23.5 30.0 2.2 7.8 10.0
10 17 14 9.2 16.8 13.0 9.0 36.8 45.8 3.0 12.3 15.3
12 25 20 10.8 30.0 20.4 12.8 57.7 70.5 4.3 19.2 23.5
14 50 40 19.0 40.0 29.5 20.4 83.4 103.8 6.8 27.8 34.6
16 50 40 28.4 40.0 34.2 27.9 96.7 124.6 9.3 32.2 41.5
18 50 40 35.0 40.0 37.5 35.4 106.0 141.5 11.8 35.3 47.2
20
22
24
26
28
30
32
34
36
38
40
Pile Bearing Capacity - Soil Investigation Area Donggi - Matindok Pertamina EP Regional 4 Zona 13
BH-01 GTG Area CPP Donggi 2021
Pile Bearing Capacity based on N-SPT, Meyerhof (1956)
Input:
Pile section: Square or Triangle or Circular? C Circular Concrete Spun Pile
Displacement: Large or Small ? S (0.1)
Pile diameter B 0.4 m
Perimeter P 1.257 m
Section Area A 0.126 m2
Depth of zero skin friction z 0 m
Safety factor SF 3
N-SPT value Ultimate Allowable
Depth
Average 8D Average 3D Average Friction Bearing Total Friction Bearing Total
(m) BH 01 GTG N-60 (3.2 m) (1.2 m) ton ton ton ton ton ton
0 0 0 0 0 0 0.0 0 0 0 0 0
2 14 11 5.6 12.4 9.0 2.8 45.2 48.1 0.9 15.1 16.0
4 17 14 8.3 10.4 9.3 6.2 46.9 53.1 2.1 15.6 17.7
6 9 7 8.0 4.8 6.4 8.0 32.2 40.2 2.7 10.7 13.4
8 3 2 8.6 8.0 8.3 8.6 41.7 50.4 2.9 13.9 16.8
10 17 14 9.2 16.8 13.0 12.1 65.3 77.4 4.0 21.8 25.8
12 25 20 10.8 30.0 20.4 17.1 102.5 119.6 5.7 34.2 39.9
14 50 40 19.0 40.0 29.5 27.1 148.3 175.4 9.0 49.4 58.5
16 50 40 28.4 40.0 34.2 37.2 171.9 209.1 12.4 57.3 69.7
18 50 40 35.0 40.0 37.5 47.2 188.5 235.7 15.7 62.8 78.6
20
22
24
26
28
30
32
34
36
38
40
Pile Bearing Capacity - Soil Investigation Area Donggi - Matindok Pertamina EP Regional 4 Zona 13
BH-01 GTG Area CPP Donggi 2021
Pile Bearing Capacity based on N-SPT, Meyerhof (1956)
Input:
Pile section: Square or Triangle or Circular? C Circular Concrete Spun Pile
Displacement: Large or Small ? S (0.1)
Pile diameter B 0.5 m
Perimeter P 1.571 m
Section Area A 0.196 m2
Depth of zero skin friction z 0 m
Safety factor SF 3
N-SPT value Ultimate Allowable
Depth
Average 8D Average 3D Average Friction Bearing Total Friction Bearing Total
(m) BH 01 GTG N-60 (4.0 m) (1.5 m) ton ton ton ton ton ton
0 0 0 0 0 0 0.0 0 0 0 0 0
2 14 11 5.6 12.4 9.0 3.5 70.7 74.2 1.2 23.6 24.7
4 17 14 8.3 10.4 9.3 7.8 73.3 81.1 2.6 24.4 27.0
6 9 7 8.0 4.8 6.4 10.1 50.3 60.3 3.4 16.8 20.1
8 3 2 8.6 8.0 8.3 10.8 65.2 76.0 3.6 21.7 25.3
10 17 14 9.2 16.8 13.0 15.1 102.1 117.2 5.0 34.0 39.1
12 25 20 10.8 30.0 20.4 21.4 160.2 181.6 7.1 53.4 60.5
14 50 40 19.0 40.0 29.5 33.9 231.7 265.6 11.3 77.2 88.5
16 50 40 28.4 40.0 34.2 46.5 268.6 315.1 15.5 89.5 105.0
18 50 40 35.0 40.0 37.5 59.1 294.5 353.6 19.7 98.2 117.9
20
22
24
26
28
30
32
34
36
38
40
Pile Bearing Capacity - Soil Investigation Area Donggi - Matindok Pertamina EP Regional 4 Zona 13
BH-01 GTG Area CPP Donggi 2021
Pile Bearing Capacity based on N-SPT, Meyerhof (1956)
Input:
Pile section: Square or Triangle or Circular? C Circular Concrete Spun Pile
Displacement: Large or Small ? S (0.1)
Pile diameter B 0.6 m
Perimeter P 1.885 m
Section Area A 0.283 m2
Depth of zero skin friction z 0 m
Safety factor SF 3
N-SPT value Ultimate Allowable
Depth
Average 8D Average 3D Average Friction Bearing Total Friction Bearing Total
(m) BH 01 GTG N-60 (4.8 m) (1.8 m) ton ton ton ton ton ton
0 0 0 0 0 0 0.0 0 0 0 0 0
2 14 11 5.6 12.4 9.0 4.2 101.8 106.0 1.4 33.9 35.3
4 17 14 8.3 10.4 9.3 9.3 105.6 114.9 3.1 35.2 38.3
6 9 7 8.0 4.8 6.4 12.1 72.4 84.4 4.0 24.1 28.1
8 3 2 8.6 8.0 8.3 13.0 93.9 106.8 4.3 31.3 35.6
10 17 14 9.2 16.8 13.0 18.1 147.0 165.1 6.0 49.0 55.0
12 25 20 10.8 30.0 20.4 25.6 230.7 256.4 8.5 76.9 85.5
14 50 40 19.0 40.0 29.5 40.7 333.6 374.4 13.6 111.2 124.8
16 50 40 28.4 40.0 34.2 55.8 386.8 442.6 18.6 128.9 147.5
18 50 40 35.0 40.0 37.5 70.9 424.1 495.0 23.6 141.4 165.0
20
22
24
26
28
30
32
34
36
38
40
PILE BEARING CAPACITY BASED ON N-SPT VALUE BH 01 GTG
N-SPT VALUE BH 01 GTG FRICTION BEARING CAPACITY (T) END BEARING CAPACITY (T) TOTAL BEARING CAPACITY (T)
0 20 40 60 0 20 40 60 80 100 0 40 80 120 160 200 0 50 100 150 200 250
0 0 0 0 0

2 14 2 2 2

4 17 4 4 4

6 9 6 6 6

8 3 8 8 8

10 17 10 10 10

12 25 12 12 12

14 50 14 14 14

16 50 16 16 16

18 50 18 18 18

20 20 20 20

22 22 22 22

24 24 24 24
Friction Pile D30cm (T6) End Pile D30cm (T6) Pile Capacity D30cm (T6)
26 26 26 End Pile D40cm (T7.5) 26 Pile Capacity D40cm (T7.5)
Friction Pile D40cm (T7.5)
End Pile D50cm (T9) Pile Capacity D50cm (T9)
28 28 Friction Pile D50cm (T9) 28 28
Friction Pile D60cm (T10) End Pile D60 cm (T10) Pile Capacity D60 cm (T10)
30 30 30 30
PILE MATERIAL PROPERTIES Dimensions Inertia Virtual Fixity Point
4
Pile Material : Concrete Spun Pile D 30 T6 : 34607.78 cm 392.24 cm
2 4
Concrete K - 600 'c 508.16 kg/cm D 40 T7.5 : 106488.95 cm 486.47 cm
4
49.80 MPa D 50 T9 : 255324.30 cm 575.43 cm
4
Modulus of Elasticity Ec 33167.48 MPa D 60 T10 : 510508.81 cm 656.96 cm
• APPENDIX B.4 – PILE BEARING CAPACITY S-01 ATU CPP MATINDOK
ALLOWABLE BEARING CAPACITY OF SINGLE PILE
(BASED ON CPT)
PROJECT : SOIL INVESTIGATION AREA DONGGI – MATINDOK DI PT. PERTAMINA EP REGIONAL 4 ZONA 13
LOCATION : CPP MATINDOK, KAB, BANGGAI, PROV. SULAWESI TENGAH
SONDIR : S-01 ATU CPP MATINDOK

Pile Data:
Diameter (D) : 30.0 cm
Perimeter (K) : 94.25 cm
Section Area (Ab) : 706.86 cm2
Vertikal 36 Ton
SF1 = 3 (End bearing) Horizontal 54 Ton
SF2 = 5 (Skin bearing) Resultan 65 Ton

qc Range of qc qc correction Qp Qs Q allowable Q Uplift


DEPTH Li S fs
(kg/cm2) 4D (above) D (under) (kg/cm2) (ton) (ton) (ton) Ton
0.00 0.00 0.00 0.00 1.20 0.300 0.00
0.00 0.20 0.00 0.00 1.20 0.300 0.00 0.00 0.00 0.00 0.00
0.20 0.20 65.00 33.43 1.20 0.300 46.67 32.99 3.15 11.63 2.52
0.40 0.20 75.00 33.43 1.20 0.300 85.00 60.08 3.15 20.66 2.52
0.60 0.20 200.00 66.85 1.20 0.300 113.33 80.11 6.30 27.96 5.04
Survey Data
ALLOWABLE BEARING CAPACITY OF SINGLE PILE
(BASED ON CPT)
PROJECT : SOIL INVESTIGATION AREA DONGGI – MATINDOK DI PT. PERTAMINA EP REGIONAL 4 ZONA 13
LOCATION : CPP MATINDOK, KAB, BANGGAI, PROV. SULAWESI TENGAH
SONDIR : S-01 ATU CPP MATINDOK

Pile Data:
Diameter (D) : 40.0 cm
Perimeter (K) : 125.66 cm Gaya Tarik Bollar Kapal 8000 DWT (3063 GT)
Section Area (Ab) : 1256.64 cm2 Gaya Tambatan Bollard
Vertikal 36 Ton
SF1 = 3 (End bearing) Horizontal 54 Ton
SF2 = 5 (Skin bearing) Resultan 65 Ton

qc Range of qc qc correction Qp Qs Q allowable Q Uplift


DEPTH Li S fs
(kg/cm2) 4D (above) D (under) (kg/cm2) (ton) (ton) (ton) Ton
0.00 0.00 0.00 0.00 1.60 0.400 0.00
0.00 0.20 0.00 0.00 1.60 0.400 0.00 0.00 0.00 0.00 0.00
0.20 0.20 65.00 33.43 1.60 0.400 46.67 58.64 4.20 20.39 3.36
0.40 0.20 75.00 33.43 1.60 0.400 85.00 106.81 4.20 36.44 3.36
0.60 0.20 200.00 66.85 1.60 0.400 113.33 142.42 8.40 49.15 6.72
Survey Data
ALLOWABLE BEARING CAPACITY OF SINGLE PILE
(BASED ON CPT)
PROJECT : SOIL INVESTIGATION AREA DONGGI – MATINDOK DI PT. PERTAMINA EP REGIONAL 4 ZONA 13
LOCATION : CPP MATINDOK, KAB, BANGGAI, PROV. SULAWESI TENGAH
SONDIR : S-01 ATU CPP MATINDOK

Pile Data:
Diameter (D) : 50.0 cm
Perimeter (K) : 157.08 cm Gaya Tarik Bollar Kapal 8000 DWT (3063 GT)
Section Area (Ab) : 1963.50 cm2 Gaya Tambatan Bollard
Vertikal 36 Ton
SF1 = 3 (End bearing) Horizontal 54 Ton
SF2 = 5 (Skin bearing) Resultan 65 Ton

qc Range of qc qc correction Qp Qs Q allowable Q Uplift


DEPTH Li S fs
(kg/cm2) 4D (above) D (under) (kg/cm2) (ton) (ton) (ton) Ton
0.00 0.00 0.00 0.00 2.00 0.500 0.00
0.00 0.20 0.00 0.00 2.00 0.500 0.00 0.00 0.00 0.00 0.00
0.20 0.20 65.00 33.43 2.00 0.500 46.67 91.63 5.25 31.59 4.20
0.40 0.20 75.00 33.43 2.00 0.500 85.00 166.90 5.25 56.68 4.20
0.60 0.20 200.00 66.85 2.00 0.500 113.33 222.53 10.50 76.28 8.40
Survey Data
ALLOWABLE BEARING CAPACITY OF SINGLE PILE
(BASED ON CPT)
PROJECT : SOIL INVESTIGATION AREA DONGGI – MATINDOK DI PT. PERTAMINA EP REGIONAL 4 ZONA 13
LOCATION : CPP MATINDOK, KAB, BANGGAI, PROV. SULAWESI TENGAH
SONDIR : S-01 ATU CPP MATINDOK

Pile Data:
Diameter (D) : 60.0 cm
Perimeter (K) : 188.50 cm Gaya Tarik Bollar Kapal 8000 DWT (3063 GT)
Section Area (Ab) : 2827.43 cm2 Gaya Tambatan Bollard
Vertikal 36 Ton
SF1 = 3 (End bearing) Horizontal 54 Ton
SF2 = 5 (Skin bearing) Resultan 65 Ton

qc Range of qc qc correction Qp Qs Q allowable Q Uplift


DEPTH Li S fs
(kg/cm2) 4D (above) D (under) (kg/cm2) (ton) (ton) (ton) Ton
0.00 0.00 0.00 0.00 2.40 0.600 0.00
0.00 0.20 0.00 0.00 2.40 0.600 0.00 0.00 0.00 0.00 0.00
0.20 0.20 65.00 33.43 2.40 0.600 46.67 131.95 6.30 45.24 5.04
0.40 0.20 75.00 33.43 2.40 0.600 85.00 240.33 6.30 81.37 5.04
0.60 0.20 200.00 66.85 2.40 0.600 113.33 320.44 12.60 109.33 10.08
Survey Data
CPT Graphics (S) 01 ATU End Bearing Capacity Friction Bearing Capacity
Qc (kg/cm2) Ultimate (Ton) Ultimate (Ton)
0 75 150 225 300 0 80 160 240 320 400 0.0 4.0 8.0 12.0 16.0
0 0 0

1 1 1

2 2 2
Depth (m)

3 3 3

4 4 4
Pile Dia. 30 cm Pile Dia. 30 cm
Cw (kg/cm2) Pile Dia. 40 cm Pile Dia. 40 cm
Pile Dia. 50 cm Pile Dia. 50 cm
Tw (kg/cm2)
Pile Dia. 60 cm Pile Dia. 60 cm
5 5 5

PILE MATERIAL PROPERTIES Dimensions Inersia Virtual Vixity Point


4
Pile Material : Concrete Spunpile D 30 T6 : 34607.78 cm 267.44 cm
2 4
Concrete K-600 'c 508.16 kg/cm D 40 T7.5 : 106488.95 cm 332.66 cm
4
49.80 MPa D 50 T9 : 255324.30 cm 394.41 cm
4
Modulus of Elasticity Ec 33167.48 MPa D 60 T10 : 510508.81 cm 451.30 cm
CPT Graphics (S) 01 ATU Uplift Bearing Capacity Total Bearing Capacity
Qc (kg/cm2) Allowable (Ton) Allowable (Ton)
0 75 150 225 300 0.0 3.0 6.0 9.0 12.0 0 20 40 60 80 100 120
0 0 0

1 1 1

2 2 2
Depth (m)

3 3 3

4 4 4
Pile Dia. 30 cm Pile Dia. 30 cm
Cw (kg/cm2) Pile Dia. 40 cm Pile Dia. 40 cm
Pile Dia. 50 cm Pile Dia. 50 cm
Tw (kg/cm2)
Pile Dia. 60 cm Pile Dia. 60 cm
5 5 5

PILE MATERIAL PROPERTIES Dimensions Inersia Virtual Vixity Point


4
Pile Material : Concrete Spunpile D 30 T6 : 34607.785 cm 267.44 cm
2 4
Concrete K-600 'c 508.16 kg/cm D 40 T7.5 : 106488.95 cm 332.66 cm
4
49.80 MPa D 50 T9 : 255324.30 cm 394.41 cm
4
Modulus of Elasticity Ec 33167.48 MPa D 60 T10 : 510508.81 cm 451.30 cm
• APPENDIX B.5 – PILE BEARING CAPACITY BH-01 ATU CPP MATINDOK
Pile Bearing Capacity - Soil Investigation Area Donggi - Matindok Pertamina EP Regional 4 Zona 13
BH-01 ATU Area CPP Matindok 2021
Pile Bearing Capacity based on N-SPT, Meyerhof (1956)
Input:
Pile section: Square or Triangle or Circular? C Circular Concrete Spun Pile
Displacement: Large or Small ? S (0.1)
Pile diameter B 0.3 m
Perimeter P 0.942 m
Section Area A 0.071 m2
Depth of zero skin friction z 0 m
Safety factor SF 3
N-SPT value Ultimate Allowable
Depth
Average 8D Average 3D Average Friction Bearing Total Friction Bearing Total
(m) BH 01 ATU N-60 (2.4 m) (0.9 m) ton ton ton ton ton ton
0 0 0 0 0 0 0.0 0 0 0 0 0
2 50 40 20.0 40.0 30.0 7.5 84.8 92.4 2.5 28.3 30.8
4 50 40 26.7 40.0 33.3 15.1 94.2 109.3 5.0 31.4 36.4
6 50 40 30.0 40.0 35.0 22.6 99.0 121.6 7.5 33.0 40.5
8 50 40 40.0 40.0 40.0 30.2 113.1 143.3 10.1 37.7 47.8
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
Pile Bearing Capacity - Soil Investigation Area Donggi - Matindok Pertamina EP Regional 4 Zona 13
BH-01 ATU Area CPP Matindok 2021
Pile Bearing Capacity based on N-SPT, Meyerhof (1956)
Input:
Pile section: Square or Triangle or Circular? C Circular Concrete Spun Pile
Displacement: Large or Small ? S (0.1)
Pile diameter B 0.4 m
Perimeter P 1.257 m
Section Area A 0.126 m2
Depth of zero skin friction z 0 m
Safety factor SF 3
N-SPT value Ultimate Allowable
Depth
Average 8D Average 3D Average Friction Bearing Total Friction Bearing Total
(m) BH 01 ATU N-60 (3.2 m) (1.2 m) ton ton ton ton ton ton
0 0 0 0 0 0 0.0 0 0 0 0 0
2 50 40 20.0 40.0 30.0 10.1 150.8 160.8 3.4 50.3 53.6
4 50 40 26.7 40.0 33.3 20.1 167.6 187.7 6.7 55.9 62.6
6 50 40 30.0 40.0 35.0 30.2 175.9 206.1 10.1 58.6 68.7
8 50 40 40.0 40.0 40.0 40.2 201.1 241.3 13.4 67.0 80.4
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
Pile Bearing Capacity - Soil Investigation Area Donggi - Matindok Pertamina EP Regional 4 Zona 13
BH-01 ATU Area CPP Matindok 2021
Pile Bearing Capacity based on N-SPT, Meyerhof (1956)
Input:
Pile section: Square or Triangle or Circular? C Circular Concrete Spun Pile
Displacement: Large or Small ? S (0.1)
Pile diameter B 0.5 m
Perimeter P 1.571 m
Section Area A 0.196 m2
Depth of zero skin friction z 0 m
Safety factor SF 3
N-SPT value Ultimate Allowable
Depth
Average 8D Average 3D Average Friction Bearing Total Friction Bearing Total
(m) BH 01 ATU N-60 (4.0 m) (1.5 m) ton ton ton ton ton ton
0 0 0 0 0 0 0.0 0 0 0 0 0
2 50 40 20.0 40.0 30.0 12.6 235.6 248.2 4.2 78.5 82.7
4 50 40 26.7 40.0 33.3 25.1 261.8 286.9 8.4 87.3 95.6
6 50 40 30.0 40.0 35.0 37.7 274.9 312.6 12.6 91.6 104.2
8 50 40 40.0 40.0 40.0 50.3 314.2 364.4 16.8 104.7 121.5
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
Pile Bearing Capacity - Soil Investigation Area Donggi - Matindok Pertamina EP Regional 4 Zona 13
BH-01 ATU Area CPP Matindok 2021
Pile Bearing Capacity based on N-SPT, Meyerhof (1956)
Input:
Pile section: Square or Triangle or Circular? C Circular Concrete Spun Pile
Displacement: Large or Small ? S (0.1)
Pile diameter B 0.6 m
Perimeter P 1.885 m
Section Area A 0.283 m2
Depth of zero skin friction z 0 m
Safety factor SF 3
N-SPT value Ultimate Allowable
Depth
Average 8D Average 3D Average Friction Bearing Total Friction Bearing Total
(m) BH 01 ATU N-60 (4.8 m) (1.8 m) ton ton ton ton ton ton
0 0 0 0 0 0 0.0 0 0 0 0 0
2 50 40 20.0 40.0 30.0 15.1 339.3 354.4 5.0 113.1 118.1
4 50 40 26.7 40.0 33.3 30.2 377.0 407.2 10.1 125.7 135.7
6 50 40 30.0 40.0 35.0 45.2 395.8 441.1 15.1 131.9 147.0
8 50 40 40.0 40.0 40.0 60.3 452.4 512.7 20.1 150.8 170.9
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
PILE BEARING CAPACITY BASED ON N-SPT VALUE BH 01 ATU
N-SPT VALUE BH 01 ATU FRICTION BEARING CAPACITY (T) END BEARING CAPACITY (T) TOTAL BEARING CAPACITY (T)
0 20 40 60 0 20 40 60 80 100 0 40 80 120 160 200 0 50 100 150 200 250
0 0 0 0 0

2 50 2 2 2

4 50 4 4 4

6 50 6 6 6

8 50 8 8 8

10 10 10 10

12 12 12 12

14 14 14 14

16 16 16 16

18 18 18 18

20 20 20 20

22 22 22 22

24 24 24 24
Friction Pile D30cm (T6) End Pile D30cm (T6) Pile Capacity D30cm (T6)
26 26 26 End Pile D40cm (T7.5) 26 Pile Capacity D40cm (T7.5)
Friction Pile D40cm (T7.5)
End Pile D50cm (T9) Pile Capacity D50cm (T9)
28 28 Friction Pile D50cm (T9) 28 28
Friction Pile D60cm (T10) End Pile D60 cm (T10) Pile Capacity D60 cm (T10)
30 30 30 30
PILE MATERIAL PROPERTIES Dimensions Inertia Virtual Fixity Point
4
Pile Material : Concrete Spun Pile D 30 T6 : 34607.78 cm 209.28 cm
2 4
Concrete K - 600 'c 508.16 kg/cm D 40 T7.5 : 106488.95 cm 260.97 cm
4
49.80 MPa D 50 T9 : 255324.30 cm 310.05 cm
4
Modulus of Elasticity Ec 33167.48 MPa D 60 T10 : 510508.81 cm 355.45 cm
PT PERTAMINA EP

SOIL INVESTIGATION REPORT AREA CPP DONGGI


MATINDOK

APPENDIX C – FIELD DOCUMENTATION


• APPENDIX C.1 – FIELD DOCUMENTATION OCTG CPP DONGGI
• APPENDIX C.2 - FIELD DOCUMENTATION GTG CPP DONGGI
• APPENDIX C.3 - FIELD DOCUMENTATION ATU CPP MATINDOK

W2021E-DNGF-CV-272-SDY-0001 – Rev. 3 Page 38 of 38


• APPENDIX C.1 – FIELD DOCUMENTATION OCTG CPP DONGGI
Soil Investigation Area CPP Donggi – Matindok, PT. Pertamina EP Regional 4 Zone 13

Page
Field Documentation
1

Test Pit (Underground Check) at S-01 OCTG Area CPP DONGGI

Test Pit (Underground Check) at S-01 OCTG Area CPP DONGGI


Soil Investigation Area CPP Donggi – Matindok, PT. Pertamina EP Regional 4 Zone 13

Page
Field Documentation
2

Test Pit (Underground Check) at S-01 OCTG Area CPP DONGGI

Test Pit (Underground Check) at S-01 OCTG Area CPP DONGGI


Soil Investigation Area CPP Donggi – Matindok, PT. Pertamina EP Regional 4 Zone 13

Page
Field Documentation
1

Dutch Cone Penetration Test/Sondir at S-01 OCTG Area CPP DONGGI

Dutch Cone Penetration Test/Sondir at S-01 OCTG Area CPP DONGGI


Soil Investigation Area CPP Donggi – Matindok, PT. Pertamina EP Regional 4 Zone 13

Page
Field Documentation
2

Dutch Cone Penetration Test/Sondir at S-01 OCTG Area CPP DONGGI

Dutch Cone Penetration Test/Sondir at S-01 OCTG Area CPP DONGGI


Soil Investigation Area CPP Donggi – Matindok, PT. Pertamina EP Regional 4 Zone 13

Page
Field Documentation
3

Dutch Cone Penetration Test/Sondir at S-01 OCTG Area CPP DONGGI

Dutch Cone Penetration Test/Sondir at S-01 OCTG Area CPP DONGGI


Soil Investigation Area CPP Donggi – Matindok, PT. Pertamina EP Regional 4 Zone 13

Page
Field Documentation
3

Dutch Cone Penetration Test/Sondir at S-01 OCTG Area CPP DONGGI

Dutch Cone Penetration Test/Sondir at S-01 OCTG Area CPP DONGGI


Soil Investigation Area CPP Donggi – Matindok, PT. Pertamina EP Regional 4 Zone 13

Page
Field Documentation
1

Hand Boring at HB-01 OCTG Area CPP DONGGI

Hand Boring at HB-01 OCTG Area CPP DONGGI


Soil Investigation Area CPP Donggi – Matindok, PT. Pertamina EP Regional 4 Zone 13

Page
Field Documentation
2

Hand Boring at HB-01 OCTG Area CPP DONGGI

Hand Boring at HB-01 OCTG Area CPP DONGGI


Soil Investigation Area CPP Donggi – Matindok, PT. Pertamina EP Regional 4 Zone 13

Page
Field Documentation
3

Hand Boring at HB-01 OCTG Area CPP DONGGI


Soil Investigation Area CPP Donggi – Matindok, PT. Pertamina EP Regional 4 Zone 13

Page
Field Documentation
1

Test Pit at TP-01 OCTG Area CPP DONGGI

Test Pit at TP-01 OCTG Area CPP DONGGI


Soil Investigation Area CPP Donggi – Matindok, PT. Pertamina EP Regional 4 Zone 13

Page
Field Documentation
2

Test Pit at TP-01 OCTG Area CPP DONGGI

Test Pit at TP-01 OCTG Area CPP DONGGI


Soil Investigation Area CPP Donggi – Matindok, PT. Pertamina EP Regional 4 Zone 13

Page
Field Documentation
3

Test Pit at TP-01 OCTG Area CPP DONGGI

Test Pit at TP-01 OCTG Area CPP DONGGI


Soil Investigation Area CPP Donggi – Matindok, PT. Pertamina EP Regional 4 Zone 13

Page
Field Documentation
1

Test Pit at TP-02 OCTG Area CPP DONGGI

Test Pit at TP-02 OCTG Area CPP DONGGI


Soil Investigation Area CPP Donggi – Matindok, PT. Pertamina EP Regional 4 Zone 13

Page
Field Documentation
2

Test Pit at TP-02 OCTG Area CPP DONGGI


• APPENDIX C.2 – FIELD DOCUMENTATION GTG CPP DONGGI
Soil Investigation Area CPP Donggi – Matindok, PT. Pertamina EP Regional 4 Zone 13

Page
Field Documentation
1

Test Pit (Underground Check) at S-01 GTG Area CPP DONGGI

Test Pit (Underground Check) at S-01 GTG Area CPP DONGGI


Soil Investigation Area CPP Donggi – Matindok, PT. Pertamina EP Regional 4 Zone 13

Page
Field Documentation
1

Dutch Cone Penetration Test/Sondir at S-01 GTG Area CPP DONGGI

Dutch Cone Penetration Test/Sondir at S-01 GTG Area CPP DONGGI


Soil Investigation Area CPP Donggi – Matindok, PT. Pertamina EP Regional 4 Zone 13

Page
Field Documentation
2

Dutch Cone Penetration Test/Sondir at S-01 GTG Area CPP DONGGI

Dutch Cone Penetration Test/Sondir at S-01 GTG Area CPP DONGGI


Soil Investigation Area CPP Donggi – Matindok, PT. Pertamina EP Regional 4 Zone 13

Page
Field Documentation
3

Dutch Cone Penetration Test/Sondir at S-01 GTG Area CPP DONGGI

Dutch Cone Penetration Test/Sondir at S-01 GTG Area CPP DONGGI


Soil Investigation Area CPP Donggi – Matindok, PT. Pertamina EP Regional 4 Zone 13

Page
Field Documentation
1

Test Pit (Underground Check) at BH-01 GTG Area CPP DONGGI

Test Pit (Underground Check) at BH-01 GTG Area CPP DONGGI


Soil Investigation Area CPP Donggi – Matindok, PT. Pertamina EP Regional 4 Zone 13

Page
Field Documentation
2

Test Pit (Underground Check) at BH-01 GTG Area CPP DONGGI

Test Pit (Underground Check) at BH-01 GTG Area CPP DONGGI


Soil Investigation Area CPP Donggi – Matindok, PT. Pertamina EP Regional 4 Zone 13

Page
Field Documentation
3

Test Pit (Underground Check) at BH-01 GTG Area CPP DONGGI

Test Pit (Underground Check) at BH-01 GTG Area CPP DONGGI


Soil Investigation Area CPP Donggi – Matindok, PT. Pertamina EP Regional 4 Zone 13

Page
Field Documentation
1

Deep Boring at BH-01 GTG Area CPP DONGGI

Deep Boring at BH-01 GTG Area CPP DONGGI


Soil Investigation Area CPP Donggi – Matindok, PT. Pertamina EP Regional 4 Zone 13

Page
Field Documentation
2

Deep Boring at BH-01 GTG Area CPP DONGGI

1st SPT Test, depth 1.55 m – 2.00 m at BH-01 GTG Area CPP DONGGI
Soil Investigation Area CPP Donggi – Matindok, PT. Pertamina EP Regional 4 Zone 13

Page
Field Documentation
3

2nd SPT, Test depth 3.55 m – 4.00 m at BH-01 GTG Area CPP DONGGI

3rd SPT Test, depth 5.55 m – 6.00 m at BH-01 GTG Area CPP DONGGI
Soil Investigation Area CPP Donggi – Matindok, PT. Pertamina EP Regional 4 Zone 13

Page
Field Documentation
4

4th SPT Test, depth 7.55 m – 8.00 m at BH-01 GTG Area CPP DONGGI

5th SPT Test, depth 9.55 m – 10.00 m at BH-01 GTG Area CPP DONGGI
Soil Investigation Area CPP Donggi – Matindok, PT. Pertamina EP Regional 4 Zone 13

Page
Field Documentation
5

6th SPT Test, depth 11.55 m – 12.00 m at BH-01 GTG Area CPP DONGGI

7th SPT Test, depth 13.55 m – 14.00 m at BH-01 GTG Area CPP DONGGI
Soil Investigation Area CPP Donggi – Matindok, PT. Pertamina EP Regional 4 Zone 13

Page
Field Documentation
6

8th SPT Test, depth 15.55 m – 16.00 m at BH-01 GTG Area CPP DONGGI

9th SPT Test, depth 17.55 m – 18.00 m at BH-01 GTG Area CPP DONGGI
• APPENDIX C.3 – FIELD DOCUMENTATION ATU CPP MATINDOK
Soil Investigation Area CPP Donggi – Matindok, PT. Pertamina EP Regional 4 Zone 13

Page
Field Documentation
1

Test Pit (Underground Check) at S-01 ATU Area CPP MATINDOK

Test Pit (Underground Check) at S-01 ATU Area CPP MATINDOK


Soil Investigation Area CPP Donggi – Matindok, PT. Pertamina EP Regional 4 Zone 13

Page
Field Documentation
2

Test Pit (Underground Check) at S-01 ATU Area CPP MATINDOK

Test Pit (Underground Check) at S-01 ATU Area CPP MATINDOK


Soil Investigation Area CPP Donggi – Matindok, PT. Pertamina EP Regional 4 Zone 13

Page
Field Documentation
1

Dutch Cone Penetration Test/Sondir at S-01 ATU Area CPP MATINDOK

Dutch Cone Penetration Test/Sondir at S-01 ATU Area CPP MATINDOK


Soil Investigation Area CPP Donggi – Matindok, PT. Pertamina EP Regional 4 Zone 13

Page
Field Documentation
2

Dutch Cone Penetration Test/Sondir at S-01 ATU Area CPP MATINDOK

Dutch Cone Penetration Test/Sondir at S-01 ATU Area CPP MATINDOK


Soil Investigation Area CPP Donggi – Matindok, PT. Pertamina EP Regional 4 Zone 13

Page
Field Documentation
3

Dutch Cone Penetration Test/Sondir at S-01 ATU Area CPP MATINDOK

Dutch Cone Penetration Test/Sondir at S-01 ATU Area CPP MATINDOK


Soil Investigation Area CPP Donggi – Matindok, PT. Pertamina EP Regional 4 Zone 13

Page
Field Documentation
1

Test Pit (Underground Check) at BH-01 ATU Area CPP MATINDOK

Test Pit (Underground Check) at BH-01 ATU Area CPP MATINDOK


Soil Investigation Area CPP Donggi – Matindok, PT. Pertamina EP Regional 4 Zone 13

Page
Field Documentation
2

Test Pit (Underground Check) at BH-01 ATU Area CPP MATINDOK

Test Pit (Underground Check) at BH-01 ATU Area CPP MATINDOK


Soil Investigation Area CPP Donggi – Matindok, PT. Pertamina EP Regional 4 Zone 13

Page
Field Documentation
1

Deep Boring at BH-01 ATU Area CPP MATINDOK

Deep Boring at BH-01 ATU Area CPP MATINDOK


Soil Investigation Area CPP Donggi – Matindok, PT. Pertamina EP Regional 4 Zone 13

Page
Field Documentation
2

Deep Boring at BH-01 ATU Area CPP MATINDOK

1st SPT Test, depth 1.55 m – 2.00 m at BH-01 ATU Area CPP MATINDOK
Soil Investigation Area CPP Donggi – Matindok, PT. Pertamina EP Regional 4 Zone 13

Page
Field Documentation
3

2nd SPT, Test depth 3.55 m – 4.00 m at BH-01 ATU Area CPP MATINDOK

3rd SPT Test, depth 5.55 m – 6.00 m at BH-01 ATU Area CPP MATINDOK
Soil Investigation Area CPP Donggi – Matindok, PT. Pertamina EP Regional 4 Zone 13

Page
Field Documentation
4

4th SPT Test, depth 7.55 m – 8.00 m at BH-01 ATU Area CPP MATINDOK

You might also like