BAR BENDING SCHEDULE

SST-3A-30M-FD
332GI35G - 3G_WATU-WATU
a
(m)

b
(m)

c
(m)

1.518

0.500

0.050

16

0.400

0.070

0.000

Top-Bottom Dir X

0.900

0.350

Top-Bottom Dir Y

2.100

Spacer

COLUMN
c

Longitudinal
Stirrups 1

Dia
L potong
( mm )
(m)

QTY

L tot
(m)

Berat Satuan
( kg / m )

BERAT
( kg )

2.068

48

99.26

1.58

156.84

10

1.740

33

57.42

0.62

35.60

0.000

16

1.600

90

144.00

1.58

227.52

0.350

0.000

16

1.600

42

67.20

1.58

106.18

0.250

0.336

0.000

16

1.422

4.27

1.58

6.74

4.346

0.150

0.000

16

4.646

24

111.50

1.58

176.18

4.346

0.000

0.000

10

4.346

26.08

0.62

16.17

0.150

0.400

0.070

10

1.240

33

40.92

0.62

25.37

PAD

TIE BEAM
Top - Bottom
Side Rebar

a
a

Stirrups

Berat Total Pembesian


Volume Total beton
Panjang Bore Pile

750.600 kg
4.937 M3
37.200 M