Fuel Pipe Micro Schedule

The document outlines a project timeline for pipe installation, detailing start and end dates, along with specific tasks and responsibilities for welders and supervisors. It includes a legend for pipe systems, specifications for materials, and notes on compliance and accuracy. Additionally, it emphasizes the contractor's responsibility for coordination and adherence to specifications throughout the project duration from June 20 to July 2, 2025.

Uploaded by

whisperrefined
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
61 views1 page

Fuel Pipe Micro Schedule

The document outlines a project timeline for pipe installation, detailing start and end dates, along with specific tasks and responsibilities for welders and supervisors. It includes a legend for pipe systems, specifications for materials, and notes on compliance and accuracy. Additionally, it emphasizes the contractor's responsibility for coordination and adherence to specifications throughout the project duration from June 20 to July 2, 2025.

Uploaded by

whisperrefined
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Start date : 20 / 06 / 2025

APPROVED ENDORSEMENT:
End Date : 02 / 07 / 2025 Pipe System Legend BESCON CONSULTING ENGINEERS PTE
TO COMPLY WITH SPEC
NO OBJECTION
&/OR DRAWINGS
Part 4 : Part 2 : Part 3 : LEGEND DESCRIPTION PIPE SIZE MATERIAL REJECTED REVISE & RESUBMIT
24/06/2025 23/06/2025 23/06/2025 NO RESUBMISSION
COMMENTS TO BE NOTED
-Positioning bracket and Pipe (Unskill worker & Supervisor) -To complete internal Joint -Positioning bracket and Pipe (Unskill worker & Supervisor) REQUIRED

25/06/2025 -To coordinating and position for outer bracket -Welding inner Layer (2 6G Welder, 2 4G Welder) FFP Fuel Filling Pipe 80/125 mm API PIPE Sch-40 REVIEW OF SHOP DRAWINGS IS ONLY FOR CONFORMITY WITH THE DESIGN
CONCEPT & INTENT OF THE INSTALLATION, SPECIFICATION & DRAWINGS.
-Positioning bracket and Pipe (Unskill worker & Supervisor) -Welding inner & outer Layer (2 6G Welder, 2 4G 24/06/2025 FRP-A Fuel Return Pipe A 100/150 mm
THE CONTRACTOR/SUB-CONTRACTOR SHALL NOT BE RELIEVED OF THEIR
API PIPE Sch-40 RESPONSIBILITY FOR ACCURACY OF DETAILS & DIMENSIONS OF
-Welding inner Layer (1 6G Welder, 2 4G Welder) Welder) -Welding inner & Outer Layer (2 6G Welder, 2 4G Welder) EQUIPMENT AND SPACE PROVISIONS/CONSTRAINTS, COORDINATION WITH
OTHER TRADES & SERVICES, FULL COMPLIANCE WITH THE
26/06/2025 24/06/2025 25/06/2025 FRP-B Fuel Return Pipe B 100/150 mm API PIPE Sch-40 REQUIREMENTS OF THE SPECIFICATION, ETC.

-Welding inner & outer layer (2 6G Welder, 2 4G Welder) -Welding outer layer (2 6G Welder, 2 4G Welder) -Welding Outer Layer (2 6G Welder, 2 4G Welder)
FSP-A Fuel Supply Pipe A 80/125 mm API PIPE Sch-40
27/06/2025 25/06/2025 26/06/2025 SIGN: DATE:

-Welding outer layer (2 6G Welder, 2 4G Welder) -Welding Outer layer (1 6G Welder) -Welding Outer Layer (2 6G Welder, 2 4G Welder) FSP-B Fuel Supply Pipe B 80/125 mm API PIPE Sch-40 M.A.N ARCHITECTS LLP
28/06/2025 -RT Test 27/06/2025 NO EXCEPTIONS TAKEN, MAY PROCEED

-Welding outer layer (2 6G Welder) FVP Fuel Vent Pipe 80/125 mm API PIPE Sch-40
788 788
-Welding Outer Layer (1 6G Welder) MAKE CORRECTIONS
NOTED, DO NOT RE-SUBMIT
REJECTED AND
RE-SUBMIT
26/06/2025 -RT Test LDCP Leak Detection Cable Pipe 50 mm API PIPE Sch-40 REVISE AND RE-SUBMIT OTHERS
29/06/2025 Haunching 813
Haunching 28/06/2025 813 813 813
788 788
SIGN: DATE:
E
1 2 A
TANK - 1 3
Haunching
TANK - 2 4 TANK - 3 5
TANK - 4 6 7
REFILLING POINT JOSEPH & ANG ENGINEERS
VENT PIPES

625

625

625

625
C
D TANK - 1 TANK - 2
UNDERGROUND FUEL TANK TANK - 3 TANK - 4 NO EXCEPTIONS TAKEN, MAY PROCEED
FVP
FVP 69000 MAKE CORRECTIONS REJECTED AND
Part 5 :

4000
2750

2750

2750
FVP FVP FVP FVP FVP RE-SUBMIT
1 RAMP UP NOTED, DO NOT RE-SUBMIT
FVP 3600 8400 FFP 10800 FFP 10800 FFP 10800 FFP 10800 10200 3600
26/06/2025 REVISE AND RE-SUBMIT OTHERS

IL-1:50
-Positioning bracket and Pipe (Unskill worker
FFP& Supervisor)

625

625

625

625
B

27/06/2025 FFP
FFP
5 SIGN: DATE:
FFP FSP-A
-Positioning bracket and Pipe (Unskill worker & Supervisor) FSP-A FRP-A
A 2 4G Welder) 4 FRP-B
3 FRP-B FRP-A 4 1 2 3 4 6
-Welding inner Layer (1 6G Welder, LDCP FSP-B 3 FSP-B NO. OF SUBMISSION 5
POWER & GENSET BLOCK 1 POWER & GENSET BLOCK 2
28/06/2025 POWER & GENSET BLOCK 2
UP

FVP
6
MP

FVP IL-1:50
-Welding inner & outer layer (2 6G Welder, 2 4G Welder) Part 1 : Done
150

IL-1:50 IL-1:50 IL-1:50


150
RA

8700 FVP FL 4.20 LDCP FL 4.20


FVP
2 7
30/06/2025 LDCP

IL-1:50
LDCP
-Welding outer layer (4 6G Welder)
FUTURE CHILLED
WATER PIPE SHAFT
IL-1:50
FUTURE CHILLED
WATER PIPE SHAFT
2 SL 4.20

FRP
SL 4.20
8700

600 600 1200


A1 ABV ABV
1 FRP-B
01/07/2025 FRP-B
FSP-B
1 Updated As Per Comments 19.05.25
IL-1:50 4 welder HR

150
FSP-B
-Welding outer layer (4 6G Welder) 2996 FUEL
4 welder inner joint FUEL
PIPE
1B
inner joint PIPE 0 Updated Refilling Vent pipe installation detail 30.04.25
20 joint 3days HR 1A

02/07/2025 10 joint 2days CORRIDOR ST04


20 20 20 20 20 REV
Haunching outer REVISION DATE
PUMP ROOM - A
NO.
75

HR
outer 50 joint 4days
B
HR

HR
METER KIOSK
FUEL PUMP
ROOM B 30 joint 3days OWNER:
ST03 FUEL PUMPA/C PRODUCTION ROOM 5 ST Engineering Cloud And

HR
4200 N/V ROOM B 1 LV ROOM B A/C

IL-1:50
A/C PUMP ROOM -B M/V BATTERY ROOM 1 BATTERY ROOM 2 FUEL PUMP Data Centre Solutions Pte Ltd
1
A/C A/C FUEL PUMP
HDC3 PUMP ROOM -A

DRIVEWAY / FIRE ENGINE ACCESSWAY


ENGINEERING ROOM PRODUCTION ROOM ROOM AROOM A STORE ST Engineering Hub
20 PAX A/C M/V M/V 1 Ang Mo Kio Electronics Park Road
M/V P UP
PUMP ROOM - B RAM #04-01, Singapore 567710
22kV PG 22kV PG 1:15
SUBSTATION B SUBSTATION A
N/V N/V
10200
10200

FL 4.20
BATTERY ROOM 3 BATTERY ROOM 4 PROJECT MANAGER :
STORE

(2M HT CABLE
A/C A/C
N/V

CHAMBER CONSUMER HT SWITCH ROOM B (above)


SL 4.20
ROOM BELOW) HT CABLE CHAMBER ROOM
A/C PRODUCTION ROOM IL-1:50 TTH Services Pte Ltd
A/C (2M HT CABLE 111 North Bridge Road
2600 TOILET 4 welder LV ROOM A
A/C
CHAMBER
ROOM BELOW) 150 #08-06 Peninsula Plaza
M/V Singapore 179098
1 inner joint
SCHMETAIC BATTERY ROOM 13 BATTERY ROOM 5 BATTERY ROOM 6 Tel: 6261 0408
A/C A/C30 joint 3days A/C
ramp @ 1:9.25 SECURITY ROOM 3 /
DRIVEWAY / FIRE ENGINE ACCESSWAY

ISOLATION
ROOM
A/C outer 4 welder SECURITY
MECHANICAL & ELECTRICAL ENGINEER:
38400

SINK
ROOM 1

MOP
C 70 joint 6days inner joint N/V Bescon Consulting Engineers Pte
30 joint 3days Block 2 Joo Chiat Road
DOMESTIC BATTERY ROOM 7 BATTERY ROOM 8 Joo Chiat Complex
NeWATER WATER A/C A/C Singapore 420002
PUMP PUMP CONSUMER HT SWITCH ROOM A
ROOM ROOM
outer A/C
Tel: 6293 2611
LOADING BAY 2 LOADING STAGING/ BATTERY ROOM 12 50 joint 5days (2M HT CABLE
CHAMBER
150

DECK B UNPACKING/
RECEIVING AREA
A/C ROOM BELOW) ARCHITECT:
M/V
10200

M.A.N ARCHITECTS LLP


10200

BATTERY ROOM 9 BATTERY ROOM 10


BATTERY A/C A/C (UEN No: T17LL1511C)
LOADING DOCK ROOM 11 SECURITY
A/C CHECKPOINT
151 Chin Swee Road Manhattan House
IDF B
A/C #10-14 Singapore 169876
Tel: 6904 4820
MDF LL IDF A
LOADING
A/C A/C
DECK A
NeWATER
6000

LOADING BAY 1
TRANSFER
TANK STORE
STORAGE ROOM
STRUCTURAL ENGINEER:
1
A/C CORRIDOR 1
A/C DN
AE Joseph & Ang Engineers
SC2 BIN POINT 16 Arumugam Road
HR

D N/V

HR
HR BMS MAN TRAP BMS2 LTC Building D #07-02/03
SPRINKLER
1 Singapore 409961
HR
MEETING ROOM
A/C 5500 Tel: 6846 9371
ST02 FCC
100 100

N/V A/V
FL 4.20 FIRE FIGHTING
DOMESTIC
WATER GOODS LIFT LOBBY
LOBBY 1
A/C
NEW BUFFER TANK
MAIN CONTRACTOR:
TRANSFER M/V SL 4.20
TANK NAKANO SINGAPORE (PTE) LTD
TOILET 2 MV
N/V MAIN LOBBY NO. 1 COLEMAN STREET #10-03/04/05
9300

cut off drain FIRE A/C


THE ADELPHI SINGAPORE 179803
5000 FIGHTING
LOBBY 2
TEL ELV SC1 SECURITY
ROOM 2
ST01
N/V TEL : 6333 4933 FAX : 6338 8568
N/V A/C
TLX : RS 33197 NASIN

PANTRY

P
U
A/C
SUB-CONTRACTOR:

P
AM
GL2 GL1 NOC ROOM CONFERENCE ROOM

R
(EMERGENCY OPS ROOM) A/C
A/C 50
PEAK TOP ENGINEERING PTE LTD
FL2 FL1 (ELECTRICAL INSTALLATION SERVICES)
MAIN FOYER/DRIVEWAY
DROP OFF BLK 1 ANG MO KIO INDUSTRIAL PARK 2A
E R
AM #03-08 ANG MO KIO TECH 1

150
U

P SINGAPORE 568049
P

TEL : 6483 4669


R

RAMP UP 1:15
AM
P

ACCESSIBLE
PROJECT:
U
P

TOILET
N/V
PROPOSED ADDITION AND & ALTERATION TO
EXISTING INDUSTRIAL DEVELOPMENT INVOLVING
THE ERECTION OF NEW 7-STOREY SINGLE USER
DATA CENTER WITH ANCILLARY FACILITIES ON LOT
02622C MK 06 AT 249 JALAN BOON LAY SINGAPORE
619523
(JURONG WEST PLANNING AREA)

DRIVEWAY / FIRE ENGINE ACCESSWAY


DRAWING:

UNDERGROUND FUEL TANK & PIPING LAYOUT

GRASSCELLS
ER
ET T
SPRINKLER TANK A
RM MH
TE ER 1
W MB
DRAWN BY: CHECKED BY:
A
CH
AUNG ZAW

DR
T&
AN ER SCALE: DATE:
HY RINKL OOM
OW SP MP R AS SHOWN 24 MAR 2025
EL
KB PU
AN
NT
TIO
T EN
DE

SERVICE: REV:

H YD
R AN
TT
AN
K
FO 1

DRAWING NO.:
NKN/STEDC/MEP/FO/101