PM-3 Notes

A project delivery system is a framework for project completion involving various parties like owners, designers, and contractors, each with defined roles and responsibilities. Different types of systems, such as Design-Bid-Build and Integrated Project Delivery, dictate the process and risk allocation among participants. Effective risk management is crucial to control project costs, as delegating risks to parties with less control can lead to increased uncertainty and expenses.

Uploaded by

scarletlira08
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
22 views8 pages

PM-3 Notes

A project delivery system is a framework for project completion involving various parties like owners, designers, and contractors, each with defined roles and responsibilities. Different types of systems, such as Design-Bid-Build and Integrated Project Delivery, dictate the process and risk allocation among participants. Effective risk management is crucial to control project costs, as delegating risks to parties with less control can lead to increased uncertainty and expenses.

Uploaded by

scarletlira08
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Project Delivery Systems

- A project delivery system (a contracting method) is a


framework that an owner uses to communicate with other
partakers to have a project completed.

The Project Management Institute (PMI)


- As per the PMI a project delivery system is “the structure of
the relationships of the parties, the roles and responsibilities
of the parties, and the general sequence of activities
required to deliver the project.”

- Project delivery systems exist in different types. Each


follows a particular process (planning, design, and
construction) to execute and complete the project.

- Each project delivery method is defined by a unique


combination of contract type and selection method.

- Parties involved in each system expose different amounts of


risk and uncertainty.

- To lower the project cost, the party who has the most ability
to control risks should take more responsibilities and risks.

- If an owner with no or low ability to control risks delegates


risks, the cost of project will skyrocket since overall project
uncertainty increases.

Parties involved in a project:


- Owner
- Designer
- General Contractor/Construction Manager
- Subcontractors

Types of project delivery systems


Owner select one of the following project delivery systems:

1. Design-Bid-Build - traditional project delivery system


2. (a) Design Build - a turnkey project delivery system
(b) Design Manage - a turnkey project delivery system
3. Owner Builder (Multi-Prime - MP)
4. (a) Professional Construction Management: Construction
Manager
(b) Professional Construction Management: Construction
Manager at Risk
5. Integrated Project Delivery (IPD) systems

Design-Bid-Build (DBB)

- Traditional project delivery/most common project delivery


method
- Involves a designer and a general contractor

Who is the designer in this case?


A single professional engineer or an engineering company

- Both parties work for the owner under separate contracts

- This system has three phases:


1) Design phase
2) Bid phase
3) Build phase
- Designer develops all contract documents ( drawing,
specifications, etc) for biding

- Documents are then sent out to one or more general


contractor for biding on the project

- After receiving all proposals, the owner and designer select


on general contractor to enter into contract with.

- Selected contractor is responsible for constructing or


fabricating product

- General contractor uses his own workforce and may enter


into contracts with subcontractors

- Designer oversees the work of the general contractor and


subcontractors

- Although there is no contract between the designer and the


general contractor, the general contractor must
communicate with the designer during the construction

- Contract between the owner and the designer is usually a


negotiated professional fee contract.

- Contract between the owner and general contractor may be


lump sum (fixed price), unit price, or cost-plus fixed fee
contract
Types of Payment and Definition (no need to know by heart)
Construction Manager at Risk (CRM)
·

represents
construction
the owner during both design a

phase
·
system is suitable where the constructibility
issues arise
design process.
during the

to this is the case for very large projects such


as
olympic Games stadium facilities. a

system is delivery method.


similar to DBB But
Instead of the designer theConstruction ,

Manager (cm) oversees the entire project


(Design process + construction quality)
·
Both contracts for designer a construction
manager
are
usually negociated professional fee contracts.

Contract
· between the owner + subcontractors are

lost -

plus .
Design-Build (DB)
a
Design-Build (Turnkey) Delivery System
into
is a

method in which the owner enters contract


with a single entity for both
design -

construction

- firm that is liable for


entire
project is
usually a

large speciality
construction
contractor
capabilities
with both design

>
-
This system is more efficient and less
costly
suitable for nuclear
power plant projects , petrochemical
etc ..

Contract
>
-
between C
owner the firm may be lump
Sum .
owner - Builder (Multi-prime mp) ,

·
Owner handles both design + construction
·

system sustainable for large organizations such


is

as oil and
gas companies, ....
Contract between < subcontractors be
owner
may
·

lump Sum
(fixed price) or unit
price.

Integrated project Delivery CIPD) system


·
relatively new
·

Only 1contract make all projecttrom members


Involved and connected

·
Each member plays a role fromthe
beginning of
design to the end of construction

members share risk


equally
·

·
If members are
experienced Method - is Very
efficient and Shorten
significantly project timeline
.