The Project
Construction
Phase
Hariette Trillanes
INTRODUCTION
PROJECT Project Delivery
comprehensive and rigorous
is a
Construction Management
Project Management
Design-Build
Owner-Builder
DESIGN-BID-
BUILD (DBB)
Advantages
to a wide range of projects.
Encourages
competitiveness
As the method includes a bidding phase,
it encourages competitive bidders to
undertake the project at the lowest
possible cost.
Separates duties
Design and construction roles are
separate and well-understood, making
both responsibility and liability relatively
clear
Long schedule
Since the method follows a linear process, it is normally
lengthy and time-consuming which might be
unacceptable to some owners. Any delay in one of the
phases usually sets back the entire schedule.
DRAWBACKS
PRE-CONSTRUCTION PHASE:
advise on practical consequences of
construction design options of either
the Architect and the Design
Engineers
review architectural and engineering
drawings and specifications
CONSTRUCTION PHASE
coordinate the implementation of
the Project
revise and refine estimates as
construction proceeds and, as
required
monitors each Contractor’s labor
and equipment
monitors the safety programs
developed and implemented by
each Contractor
Collaboration
Allows for innovation and constructability
during design through collaboration of
construction manager and the
Advantages
contractor.
Manageable risks
This method identifies and manages
risks. Further, it reduces error, change
orders, and materials overruns
Control of Designs
The construction manager retains control
over the design.
Potential unfairness
Since the method includes having the owner to hire
construction manager and contractor based on
qualifications, potential appearances of unfairness in sole
source selection process may ensue.
DRAWBACKS
PARTIES INVOLVED
Owner: provides the idea and funds
Design-Build Firm: responsible for both
design solution and construction until project
completion
Faster delivery
Collaborative project management
means work is completed faster with
fewer problems. This method
Advantages
accelerates delivery by also fast-tracking
design and construction
Cost savings
An integrated team is geared toward
efficiency and innovation., hence saving
costs. Also, the method increases the
potential to reduce error, change orders,
and materials overruns.
Better quality
Design-builders meet performance needs,
not minimum design requirements, often
developing innovations to deliver a better
project than initially imagined.
Lack of competitive pricing
The lack of competitive bidding by the design build
process points to its greatest flaw in serving the interest
of the client.
DRAWBACKS
Management issues
Contract management is more challenging as contract
administration requires more collaboration. The absence
of effective collaboration may be where the growing
pains of design-build are revealed.
PARTIES INVOLVED
Owner: provides the idea and funds
Builder/General Contractor: responsible for
the construction of owner's requirements
until project completion
ROLE OF THE GENERAL
CONTRACTOR
Budget Schedule
Owner
Design
involvement
INTRODUCTION
A schedule is composed of
the various activities
PROJECT included
implementation
in the
and
SCHEDULING execution of a project within
the pre-determined time
TOOLS frame. Time management
and adjustments with the
scope of a project is only
possible if there is a proper
schedule prepared for the
project being worked upon.
3 COMMON TOOLS
CONSTRUCTION
PERT-CPM GANTT CHART
SCHEDULING CHART
ABOUT
PERT-CPM
PERT -> Program Evaluation
and Review Technique
CPM -> Critical Path Method
The key concept used by
PERT-CPM is that a small set
of activities, which make up
the longest path through the
activity network control the
entire project.
PROCESS
PROCESS
Create a project table. List each task is a separate row and structure your project plan by
including the Start date, End date and Duration, i.e. the number of days required to
complete the tasks. A typical Gantt chart has the name of individual tasks or group of
tasks in the project on the Y-axis. The X-axis has a timeline divided into days or weeks.
Begin making the Gantt chart by setting up a usual Stacked Bar chart based on start date.
Add duration data to the chart.
ABOUT
SCHEDULING CHART
CONSTRUCTION
A construction schedule is a
timeline for every task and
event in a construction
project. It is a fundamental
part of the project planning
phase, as it also defines the
resources needed and the
teams responsible for each
task.
PROCESS
BENEFITS
HOW DOES EACH SCHEDULING TOOL HELP
THE CONSTRUCTION PHASE?
THANK YOU!
REFERENCES
Introduction:
https://dbia.org/wp-content/uploads/2018/05/Primers-Choosing-Delivery-Method.pdf
https://www.educba.com/project-scheduling-techniques/
Project Delivery Methods:
https://itd.idaho.gov/wp-content/uploads/project-delivery-methods.pdf
https://www.dbiarockymountain.org/what_is_design_build.php
https://www.marwoodconstruction.com/wp-content/uploads/2017/01/Design-Build-
Advantages-Disadvantages.pdf
https://the-opendoor.net/a-homeowner-guide-to-project-delivery-methods/
Project Scheduling Tools:
https://www.interventions.org/pertcpm/
https://www.projectmanager.com/blog/make-a-construction-schedule
https://silvermancpm.com/construction-term-of-the-week-critical-path-method-cpm-
scheduling/