You are on page 1of 14

NATIONAL BASICS COMPANY

HSE MANAGEMENT SYSTEM

HSETRAINING HEALTH & SAFETY SITE


ORIENTATION
EVIDENCE OF
CORRECTIVE ACTION
01/15/2022

Prepared By : Arjun Satheesan


Approved By : Eng. Nasar Abdelqader
Approved By : Shemim Abdul Azeez

NBC HSE ACADEMY


NATIONAL BASICS COMPANY

HSE MANAGEMENT SYSTEM OBSERVATIONS

1. Fire Extinguisher should be third party inspection certificate & UL listed


2. AED Must Be Provided

2 NBC HSE ACADEMY


NATIONAL BASICS COMPANY 1. Fire Extinguisher should be third party
HSE MANAGEMENT SYSTEM
inspection certificate & UL listed

1. Fire extinguishers available for the building meet the Saudi Fire code requirements (sbc -
801) and civil defence (approved). And the provision of FM/UL fire extinguishers is an
Aramco project requirement and doesn't match up with commercial buildings.
2. Third party inspection stickers are available on the FE, maintained FE inspection tags and
monthly inspection Checklists

3 NBC HSE ACADEMY


NATIONAL BASICS COMPANY

HSE MANAGEMENT SYSTEM


2. AED Must Be Provided

AED has been available in the Saudi Aramco and L & T floor

4 NBC HSE ACADEMY


NATIONAL BASICS COMPANY

HSE MANAGEMENT SYSTEM OBSERVATIONS

Internal Walk-Through Close Out


Report

5 NBC HSE ACADEMY


NATIONAL BASICS COMPANY
Emergency Evacuation route need to be
HSE MANAGEMENT SYSTEM
clear.

Emergency evacuation route clear from obstructions

6 NBC HSE ACADEMY


NATIONAL BASICS COMPANY Exposed live cables need to be removed
HSE MANAGEMENT SYSTEM or isolated

Removed and isolated all exposed live cables

7 NBC HSE ACADEMY


NATIONAL BASICS COMPANY

HSE MANAGEMENT SYSTEM


Need to be removed all unwanted materials

The entire floor area is neat and tidy

8 NBC HSE ACADEMY


NATIONAL BASICS COMPANY Each & Every panel boards need to be
HSE MANAGEMENT SYSTEM provided warning sign.

Warning signages are provided for the electrical panel

9 NBC HSE ACADEMY


NATIONAL BASICS COMPANY Combustible materials need be removed
HSE MANAGEMENT SYSTEM from inside of building & kept maintain
good housekeeping.

Area cleared from combustible materials and maintained proper house keeping

10 NBC HSE ACADEMY


NATIONAL BASICS COMPANY Emergency evacuation Plan need to be
HSE MANAGEMENT SYSTEM provided at two and three places.

ERP provide for the required locations

11 NBC HSE ACADEMY


NATIONAL BASICS COMPANY

HSE MANAGEMENT SYSTEM


Relevant signages has been provided

12 NBC HSE ACADEMY


NATIONAL BASICS COMPANY Project performance relies on
HSE MANAGEMENT SYSTEM

everyone involved;
As an organization we are committed to demonstrating visible safety
leadership, preventing injuries and to continuously improve our health
and safety performance.
Our goal is to ensure that every single person returns home safe at
the end of each day's work and incorporates these principles of safety
into his or her personal life

Our expectations are high and everyone has a role to play. We


expect everyone to get involved and to show HSE leadership.

13 NBC HSE ACADEMY


NATIONAL BASICS COMPANY

HSE MANAGEMENT SYSTEM

THANKS YOU FOR YOUR


ATTENTION !

Please fill out the questionnaire and hand it in to the instructor.

NBC HSE ACADEMY

You might also like