~ ';-:.....:...~--=-,.---- ._-.--------..---------------!...-->'4111.•.-'v'-------,,-r;-.--:--.C"-J--,
..
. ;i;;·ln~:!!tional J:~AL OMAR DEVELOPMENT PROJECT ~"6 '< ~
DOCUMENT TRANSMITTAL FORM (DTF)
Contract No: 883 j Work Package: CN12

TO: M/S. EHAF Consulting Engineers TRANS. NO :883-4-Z04-W04Z-C-CN12-RCC-ECE-TRN-NA-0515


FROM: Ruwad Civil Construction (RCC) DATE: 09-Sept-2014
ATTN: Mr. Ahmed Atta (CRE) C/REF:

WE ARE .SENDING: SUBMITTED FOR:. ACTION TAKEN:


D Documents [8] Approval D A -Approved

D Drawings/Sketch D Review & Comments D B -Approved as noted,


Incorporate Comments
D Report D As Requested .·D'
\
C- Approved with Comments,
Revise & Re-submit
D Change Order D Information I Records Only
D Letter D For Necessary Action D D- Rejected
D Invoice D Other: D N- Noted
D BOQ/Specification SENT VIA: D R- Reviewed as Compliant
[8] Other: Method Statement, [8] Attached D S- Reviewed as Noted,
Inspection & Test Plan Incorporate comments

D Separate Cover D T- Reviewed with comments,


Revise & Re-submit

Item- Submittal or Document No. Rev. Date :Description Qf Submittal or Copies


No~. No. Document Title
Method Stateme,nt & Inspection and Test
883-4-Z04-W04Z-C-CN12- Plan for GR. 25 Mass Concrete Filling Below

~ ~.~~
1 RCC-SBT-C0-031 0 3 Hard
~Raft Foundation and Tunnel Wall at Part 3-5
- ·'-C.:..··, '11;',~/
.9:;
, and 5-5 in Zone S10
f!j. ~ _,..... ~
~0::.~" ~ As per Attached list 2 Soft
/.:§/ RW.C ::.\\1 t:,.I.J ~
::.:1 ~~_\~ ~Q'\t! ~
,_'-.....'>,
~
(\ 1"1 (
... -.J
e~ n.rt? j::;::..J
\~~ \'..., ~j b!.~\~f.:i :::...~1

Response: ~~~~~~"
.
.
·.->(f,:· ~~7 .~Approval
.......<\: \ '/) y
"-...~ . '.
Status*:·[- g ..
"!!/.Qfi/ r;m ~ .' ~ \c,lj ;;;/
Item S!Jbmittal or Document -~ IJ_!__': ·-· '
Rev· Date-.. _· Descriptioll of Submittal or Document Title · Status
No. Ref. No.
-
d: \''' '.....!_
'/...
'J I!?-;-...
~ ~ \
?; 7>
<J
•.':, •. ,o-'
I

~~'/ J.~ -~;d\


a!)" t(t(;
·IVED \~
li. f !II "",..
r IJi ,'\r ,... :m11.
\-"'
_..
r;:;· y
t

~·g~~~~~:nd~a~n;;-
Received By Recipient Date Title

Copy Distribution
D Jabal Omar Development Co [81 Hill International D

*Legends: A- Approved 8- Approved As Noted, Incorporate Comments C- Approved With Comments, Revise & Resubmi - Rejected
R- Reviewed As Compliant S-Reviewed As Noted, Incorporate Comments T -Reviewed with comments, Revise & Resubmit N- Noted
Page 1 of 1 Doc./Fonn No: PSA-883-PP-02-05-FM Rev.O
Revision Date: 29-Sep-1 0
. ·'
._

Hill International JABAL OMAR DEVELOPMENT PROJECT

DOCUMENT SUBMITTAL FORM- CONSTRUCTION CONTRACTORS


Contract No: 883 I Work Package: CN12
TITLE: Method Statement, Inspection & Test Plan SUBMITTAL NO: 883-4-Z04-W04Z-C-CN12-RCC-SBT-C0-031 0
TO: EHAF Consulting Engineers REV. No.: 0
FROM: Ruwad Civil Construction (RCC) DATE: 09 Sept-2014
ATTN: Mr. Ahmed Atta (CRE) ORIG. REF: -

D PQD - Pre-Qualification
D SDS - Shop Drawing Schedule D SMP - Samples D OMM - Operating & Maintenance Manuals
D SCE - Program I Schedule D SHD - Shop Drawings D QPP - Quality Plans & Procedures -
~ ITP -Inspection & Test Plan D MUP- Mock Ups & QC Panels D INC - Insurance Certificates
~ MST - Method Statement D TST- Test reports D PBW - Bonds, Guarantees, Warranties
0

-=
ABO - As Built Drawings
D MPD - Product & Materials Data
D OTH -Others-

D C-Civil D S-Structural D A-Architectural D E-Eiectrical ~M-Mechanical D G-General D 0-Coordination


D !-Interior Design D T-Sections D U-Urban I Master Planning
Method Statement & Inspection and Test Plan for GR. 25 Mass Concrete Filling Below Raft Foundation and Tunnel
Wall at Part 3-5 and 5-5 in Zone S10

l:gj A-Approval D R-Review & Comments D Q-As Requested D !-Information I Records Only D N-Action D 0-0thers

Submitted By Contractor's Rep.: Engr. Nabil Abdul Samad Signature:


(Sr. Construction Manager)

Name: Signature: Date:


----------------- --·--·- ---
~-~---------------------~
....._____~TS_(optional)____________________________________ _j

Name: Date:

B -Approved As Noted, Work May D C- Approved With Comments, D D- Rejected D N-Noted


Proceed - Incorporate Comments Work May Not Proceed,
& Resubmit Within ..
0 Days
0 0 0 Revise & Resubmit

D R-Reviewed As Compliant D S- Reviewed As Noted, lncorpo Comments D T- Reviewed With Comments, Revise I Resubmit

Name: Signature:

Page 1 of 1 Doc./Form No: PSA-883-PP-02-06-FM Revo2


Revision Date: 15-Mar-2011
Ulll
Hill International
JABAL OMAR DEVELOPMENT PROJECT
~
I I
-'

I SUBMITTAL REVIEW .COMMENTS FORM I


REVIEW BY: 0 DESIGN CONSULTANT ~ SUPERVISION CONSULTANT 0 PMC (HILL) 0 OTHER (Specify)

TYPE OF SUBMITTAL: t--\4J.-s.~-1-m ~ SUBMITTAL NO.:


.Ii .~f..- ~~:b TRANSMITTAL NO.: 5~5 r
0\M.ol '\"€.'\ \:.~\e.( V\
SUBJECT: SUB. REVIEW REF. REVIEW I APPR. STATUS:

Item I.I Title I Reference No. of


I ' Review Basis
No. Document Reviewed II -
Review Comments
- I ·(Specify Contract l Specification
Clauses) -.
1
l. ~t<.\\6~ c.. D ~1:- •"i A~ D ex- rll. Wn r ~ n ..J S\Ab oM\\\~ L
2. MP~ft l c:::."tn.·h:~. ~
I
.......+ ,..vt. -" !+ r "" ~~ "" =..PP, .·..:e:-r
. . :r_
""'"""
3.
4.
5.

Main Reviewer's Name: Designation:

Reviewer's Name: .I.r la }11\...- da hwa.L.J Designation: L1~d·'~


p:.,_;pq ~
Signatu~~ Date ( ? - '},.. '2-u "'
~ Chief Resident Engineer Designation: Signature Date

.., r "Review Status Legends: A-Approved ~ved As Noted, Incorporate Comments C-Approved With Comments, Revise & Resubmit D-Rejected N-Noted
R-!Reviewed As Compliant S-Reviewed As Noted, lrn:orporate Comments T-Reviewed With Comments, Revise & Resubmit

·'
.
Submittal Review Ref.: Page 1 of1
Doc/ Fonn No: PSA-883-PP-02-10-FM Rev.2
Revision Date: 15-Mar-2011
Client: Jabal Omar Dev. Corp PMC: Hill Interna ti onal M ain Consu lta nt : Ehaf Consultin g Contractor : Sa udi RCC

METHOD STATEMENT FOR GR. 25 MASS CONCRETE FILLING AND WATERPROOFING BELOW RAFT FOUNDATION
AND TUNNEL WALL AT PART 3-5 AND 5-5 IN ZONE S10

Introduction:

The area beside the existing Tunnel Walls, which partially built by the previous contractor left some raft
foundation unconstructed including the waterproofing. The existing condition at site that rock was cast over by a
mass concrete with two stages of waterproofing. In this regard we will carry out the same sequence in to
complete till to the raft as follows :

1. Remove unsuitable materials and other debris in the area over the rock and beside the Tunnel Wall and
offer to the consultant for inspection of ground preparation/readiness.
2. Once approved, fill the area/void with Gr. 25 mass concrete in stages (as per .the attached t,ke'*hl \a_: th: ~
area is uneven and the existing concrete Tunnel Wall height~~~~J~~ ~"<)QG'T ~ ~ f~'-"'-J.d
3. Last stage of mass concrete fill ing sh ~he existing rebars (which protrude from the
existing Tunnel Wall) in order to allow for a working space during waterproofing works below those dowel
bars.
4. After casting and the area is cured, an inspection will be offered to the consultant for approval prior to the
f irst stage of waterproofing (as per the approved details) . Once HOPE is laid, consultant will inspect for it
readiness prior to casting of lOOmm blinding.

Page 1 of 4
11111
Client: Jabal Omar Dev. Corp PMC: Hill International Main Consu ltant : Ehaf Consulting

5. Blinding will be laid over by the 2"d stage of waterproofing as per details and sequence of the work.
~~ is laid below HOPE and will be inspected by the consultant prior to covering by another layer of
~ V(\"- geotextile and SOmm screed will then to proceed for protection of the waterproofing membrane.
~~ 6. All the termination or end of waterproofing shall be tuck in the existing Tunnel Wall and will be sealed
using approved joint sealant materials. An Aluminum flashing shall be installed for the whole length prior
to casting of raft foundation.
7. Prior to casting of raft foundation, the gap below the existing started bars of Tunnel Wall, which having a
large concrete cover, a single a layer of bars (both ways in X andY direction) will be provided for provision
of crack control at this portion.
8. Construction of raft shall be then carried out thereafter and will be submitted the Method Statement in a
separate submittal.

Page 2 of 4
Client: Jabal Omar Dev. Corp PMC: Hill Internat ional M ain Consultant: Ehaf Consulting

--

MASS CO CRETE FILLING USING GR. 25 BELOW RAFT FOUNDATION & TUN EL WALL
AND WATERPROOF! G DETAILS PROPOSAL

Page 3 of 4
Client: Jabal Omar Dev. Corp PMC: Hi ll Internationa l Main Consultant: Ehaf Consulting

.
..
@ _ ...

-
Page 4 of 4
1111 Civil C
• t 'It '
na trv t n
>U .. ,.J
JABAL OMAR DEVELOPMENT INSPECTION AND TEST PLAN
PROJECT- PHASE IV (MASS CONCRETE FILLING AND WATERPROOFING WORKS
ZONE S09, S10 AND Sll BELOW RAFT FOUNDATION NEAR TUNNEL WALL AT S10)

Casting of Gr. 25 in fill mass concrete over the rock/below raft foundation near Tunnel Wall at part 3-5 &
WORK SCOPE
5-5 in S10.
MAIN CONSULTANT EHAF

MAIN CONTRACTOR RUWAD CIVIL CONSTRUCTION

PART 1- APPROVALS REQUIRED PRIOR TO COMMENCEMENT OF THE WORKS

Item Frequency of Hold, or Witness Point


Description of Operation/Inspection, Test and Approval Records Generated
No. Inspection & Test Plan Subcont. RCC EHAF
1 Waterproofing Drawings and Details Once Approved Drawings Sub* R R&A
Mix Design, Data
Materials Submittals- Gr. 25 Concrete Mix,
2 Once Sheets, Product Sub R R&A
Waterproofing Materials (geotextile/HDPE/Accessories)
Certificates
Method Statement, Inspection & Test Plan {this
3 Once MS & ITP Sub R R&A
documents)
Approved Drawings,
5 Survey reference and Bench Marks {drawings) Once Sub** R R&A
Control Point
Permits, licenses, NOC's and Authority Approvals (if
6 Once Approval of work Sub** R R&A
required)

Page 1 of 2
.. .

11111 -
R.C.C

JABAL OMAR DEVELOPMENT INSPECTION AND TEST PLAN


PROJ ECT- PHASE IV (MASS CONCRETE FILLING AND WATERPROOF IN G WORKS
ZONE S09, S10 AND S11 BELOW RAFT FOUNDATION NEAR TUNNE L WA LL AT S10)

Note *· Al l deviation from the approved drawings/ documents to be recorded and discussed with the Main Consultant prior to
proceeding . • Other subcontracto r/sub consulta nt engaged by RCC. •• By RCC

PART 2- INSPECTION AND TEST DURING CONSTRUCTION WO RKS (MASS CONCRETE, WATERPROOFING, BLINDING & SCREED)

Item Freq uency of Hold, or Witness Point


Description of Operation/I nspection, Test and Approval Records Generated
No. Inspect ion & Test Plan
Subcon RCC EHAF
Cleaning and Preparation of ground - read iness of the
1 By Area/Stages/Layout IR H H RC
area
Consultant Inspection and Approval for cleanl iness of By Area/Stages/Layo ut
gro und prior to casting, concrete surface preparation,
2 IR H H I&A
laying of HD PE waterproofing (stages), blinding and
screed .
Waterproofing works- Laying of geotextile, HDPE, joint By Area/Stages/Layout IR H H I&A
3
sealant, welding j oint and insta ll at ion off
Concrete Order and Casting- Bli nd ing and Screed, By Area/Stages/Layout
Delivery notes, Pour
4 H H I
Sam pling on site : Sl ump/Flow , Temperature . Record
Abbreviations : Sub- SUBM IT, H- HOLD, R&A- REVI EW & APPROVE, RC- RANDO M CHECK, !&A-INSPECT & APPROVE, S- SURVEILANCE,
CL= CHECKLIST, IR- INSPECTION REQUEST, 1- INSPECT

Page 2 of 2
JABAL OMAR DEVELOPMENT INSPECTION AND TEST PLAN
PROJECT- PHASE IV (MASS CONCRETE FILLING AND WATERPROOFING WORKS
ZONE S09, S10 AND S11 BELOW RAFT FOUNDATION NEAR TUNNEL WALL AT S10)

Casting of Gr. 25 in fill mass concrete over the rock/below raft foundation near Tunnel Wall at part 3-5 &
WORK SCOPE
5-5 in S10.
MAIN CONSULTANT EHAF
MAIN CONTRACTOR RUWAD CIVIL CONSTRUCTION

PART 1- APPROVALS REQUIRED PRIOR TO COMMENCEMENT OF THE WORKS


Item Frequency of Hold, or Witness Point
Description of Operation/Inspection, Test and Approval Records Generated
No. Inspection & Test Plan Subcont. RCC EHAF
1 Waterproofing Drawings and Details Once Approved Drawings Sub* R R&A
Mix Design, Data
Materials Submittals- Gr. 25 Concrete Mix,
2 Once Sheets, Product Sub R R&A
Waterproofing Materials (geotextile/HDPE/Accessories)
Certificates
Method Statement, Inspection & Test Plan (this
3 Once MS & ITP Sub R R&A
documents)
Approved Drawings,
5 Survey reference and Bench Marks (drawings) Once Sub** R R&A
Control Point
Permits, Licenses, NOC’s and Authority Approvals (if
6 Once Approval of work Sub** R R&A
required)

Page 1 of 2
JABAL OMAR DEVELOPMENT INSPECTION AND TEST PLAN
PROJECT- PHASE IV (MASS CONCRETE FILLING AND WATERPROOFING WORKS
ZONE S09, S10 AND S11 BELOW RAFT FOUNDATION NEAR TUNNEL WALL AT S10)
Note*- All deviation from the approved drawings/documents to be recorded and discussed with the Main Consultant prior to
proceeding. * Other subcontractor/sub consultant engaged by RCC. ** By RCC

PART 2- INSPECTION AND TEST DURING CONSTRUCTION WORKS (MASS CONCRETE, WATERPROOFING, BLINDING & SCREED)

Item Frequency of Hold, or Witness Point


Description of Operation/Inspection, Test and Approval Records Generated
No. Inspection & Test Plan Subcon RCC EHAF
Cleaning and Preparation of ground –readiness of the
1 By Area/Stages/Layout IR H H RC
area
Consultant Inspection and Approval for cleanliness of By Area/Stages/Layout
ground prior to casting, concrete surface preparation,
2 IR H H I&A
laying of HDPE waterproofing (stages), blinding and
screed.
Waterproofing works- Laying of geotextile, HDPE, joint By Area/Stages/Layout IR H H I&A
3
sealant, welding joint and installation of f
Concrete Order and Casting- Blinding and Screed, By Area/Stages/Layout Delivery notes, Pour
4 H H I
Sampling on site: Slump/Flow, Temperature. Record
Abbreviations: Sub- SUBMIT, H- HOLD, R&A- REVIEW & APPROVE, RC- RANDOM CHECK, I&A- INSPECT & APPROVE, S- SURVEILANCE,
CL= CHECKLIST, IR- INSPECTION REQUEST, I- INSPECT

Page 2 of 2
Client: Jabal Omar Dev. Corp PMC: Hill International Main Consultant: Ehaf Consulting Contractor: Saudi RCC

METHOD STATEMENT FOR GR. 25 MASS CONCRETE FILLING AND WATERPROOFING BELOW RAFT FOUNDATION
AND TUNNEL WALL AT PART 3-5 AND 5-5 IN ZONE S10

Introduction:
The area beside the existing Tunnel Walls, which partially built by the previous contractor left some raft
foundation unconstructed including the waterproofing. The existing condition at site that rock was cast over by a
mass concrete with two stages of waterproofing. In this regard we will carry out the same sequence in to
complete till to the raft as follows:

1. Remove unsuitable materials and other debris in the area over the rock and beside the Tunnel Wall and
offer to the consultant for inspection of ground preparation/readiness.
2. Once approved, fill the area/void with Gr. 25 mass concrete in stages (as per the attached sketch) as the
area is uneven and the existing concrete Tunnel Wall height is varying.
3. Last stage of mass concrete filling shall stop at 0.75m below the existing rebars (which protrude from the
existing Tunnel Wall) in order to allow for a working space during waterproofing works below those dowel
bars.
4. After casting and the area is cured, an inspection will be offered to the consultant for approval prior to the
first stage of waterproofing (as per the approved details). Once HDPE is laid, consultant will inspect for it
readiness prior to casting of 100mm blinding.

Page 1 of 4
Client: Jabal Omar Dev. Corp PMC: Hill International Main Consultant: Ehaf Consulting Contractor: Saudi RCC

5. Blinding will be laid over by the 2nd stage of waterproofing as per details and sequence of the work.
Geotextile is laid below HDPE and will be inspected by the consultant prior to covering by another layer of
geotextile and 50mm screed will then to proceed for protection of the waterproofing membrane.
6. All the termination or end of waterproofing shall be tuck in the existing Tunnel Wall and will be sealed
using approved joint sealant materials. An Aluminum flashing shall be installed for the whole length prior
to casting of raft foundation.
7. Prior to casting of raft foundation, the gap below the existing started bars of Tunnel Wall, which having a
large concrete cover, a single a layer of bars (both ways in X and Y direction) will be provided for provision
of crack control at this portion.
8. Construction of raft shall be then carried out thereafter and will be submitted the Method Statement in a
separate submittal.

Page 2 of 4
Client: Jabal Omar Dev. Corp PMC: Hill International Main Consultant: Ehaf Consulting Contractor: Saudi RCC

Page 3 of 4
Client: Jabal Omar Dev. Corp PMC: Hill International Main Consultant: Ehaf Consulting Contractor: Saudi RCC

Page 4 of 4

You might also like