Construction
Phase
Ar. MAP, UAP
INTRODUCTION
M ETHODS
of project.
5 COMMON METHODS Design-Bid-Build
Construction Management
Project Management
Design-Build
O w ner-B uild er
DES IGN -BID-
BUILD
(DBB)
IM PORTANT FACETS PARTIES INVOLVED
Traditional method of Owner- provides the idea and funds
project delivery Architect- design solution based
Owner contracts separately on owner’s requirements
for design and Contractor- responsible for executing
construction services and managing the construction and who
·Bid based on complete can also hire several subcontractors
plans and specifications.
·Owner retains high level of F O L L O W S A LINEAR PROCESS:
control and risk IDEA -> DESIGN PHASE -> BUILD
Most widely used
D B B method is common in various
industries, hence easily understood by
all. It is well-established and applicable
Advantages
to a wide range of projects.
Encourages
c o m p etitivenes s
As the method includes a bidding phase,
it encourages competitive bidders to
undertake the project at the lowest
possible cost.
Separates duties
Design and construction roles are
separate and well-understood, making
both responsibility and liability relatively
clear
L o n g schedule
Since the method follows a linear process, it is normally
lengthy and time-consuming which might be
unacceptable to some owners. Any delay in one of the
phases usually sets back the entire schedule.
DRAWBACKS
PRE-CONSTRUCTION PHASE:
advise on practical consequences of
construction design options of either
the Architect and the Design
Engineers
review architectural and engineering
drawings and specifications
CONSTRUCTION PHASE
coordinate the implementation of the
Project
revise and refine estimates
constructio as proceeds
n required and, as
monitors each Contractor’s labor
and equipment
monitors the safety
developed and prog rams
each Contractor implemented by
C o llab o ratio n
Allows for innovation and constructability
during design through collaboration of
construction manager and the
Advantages
contractor.
Manageable risks
This method identifies and manages
risks. Further, it reduces error, change
orders, and materials overruns
Control of D esigns
The construction manager retains control
over the design.
Potential unfairness
Since the method includes having the owner to hire
construction manager and contractor based on
qualifications, potential appearances of unfairness in sole
source selection process may ensue.
DRAWBACKS
PARTIES INVOLVED
Owner: provides the idea and funds Design-
Build Firm: responsible fo r b o th
design solution and construction until project
completion
Faster delivery
Collaborative project management
means work is completed faster with
fewer problems. This method
Advantages
accelerates delivery by also fast-tracking
design and construction
Cost savings
An integrated team is geared toward
efficiency and innovation., hence saving
costs. Also, the method increases the
potential to reduce error, change orders,
and materials overruns.
Better quality
Design-builders meet performance needs,
not minimum design requirements, often
developing innovations to deliver a better
project than initially imagined.
Lack of competitive pricing
The lack of competitive bidding by the design build
process points to its greatest flaw in serving the interest
of the client.
DRAWBACKS
Management issues
Contract management is more challenging as contract
administration requires more collaboration. The absence
of effective collaboration may be where the growing
pains of design-build are revealed.
L o s s of Owner control
The firm designs the project based on their unique
capabilities and resources, creating room for the owner
to lose some control of the design.
IMPORTANT FACETS
The Project Manager operates
as a member of an Owner-
Architect-Eng ineer-
Contractor Team.
Each member of the team will
have precedence and
exercise leadership in his own
sphere of operations or
expertise.
PROJECT PA RT IE S I N V O L V E D
Owner
M AN AGEM EN T Project Manager
Construction Manager
ROLES OF PARTIES INVOLVED
PROJECT MANAGE R
to prepare an overall plan, program
and schedule of construction
activities as well as to monitor these
various construction activities
act as an adviser on materials costs
and construction methods
CONSTRUCTION MANAGER
provides the additional link and
coordinated efforts between the
members of the team
eliminate many of the conflicts and
resultant expensive change orders
OWNER
provide full information as to his
requirements
examine documents submitted for
his approval and/or comment and
render decisions pertaining thereto
promptly
AD VAN TAGES D RAW B AC KS
PARTIES INVOLVED
Owner: provides the idea and funds
Builder/General Contractor: responsible for
the c o ns truc tio n o f o w ner's
req uirem ents until project completion
ROLE OF THE
GENERAL
CONTRACTOR
the cognizance
take other documents
of the provisions of
contract especially
responsibilitiestheand liabilities
Contractor'
on
materials, workmanship, slabor, and
property
AD VAN TAGES D RAW B AC KS
B udg et S chedule
Owner
D esig n
involvemen
t
INTRODUCTION
A schedule is composed
of the various activities
PROJECT included
implementation
in the
S CHEDULIN G and
execution of a project within
the pre-determ ined
CONSTRUCTION
P E R T-C P M G A N TT C H A R T
SCHEDULING CHART
ABOUT
PERT-CPM
PERT -> Program Evaluation
and Review Technique
C P M -> Critical Path Method
The key concept used by
PERT-CPM is that a small set
of activities, which make up
the longest path through the
activity network control the
entire project.
PROCESS
PROCESS
Create a project table. List each task is a separate row and structure your project plan
by including the Start date, End date and Duration, i.e. the number of days required to
complete the tasks. A typical Gantt chart has the name of individual tasks or group of
tasks in the project on the Y-axis. The X-axis has a timeline divided into days or weeks.
Begin making the Gantt chart by setting up a usual Stacked Bar chart based on start
date. Add duration data to the chart.
ABOUT
SCHEDULING CHART
CONSTRUCTION
A construction schedule is a
timeline for every task and
event in a construction
project. It is a fundamental
part of the project planning
phase, as it also defines the
resources needed and the
teams responsible for each
task.
PROCESS
Get information. Construction scheduling involves different types of resources,
stakeholders and participants. Begin by listing all subcontractors involved in the job.
Collect and prioritize tasks. Step up to the project and break it down into the steps
that will lead it from a construction plan to a completed project.
Take each of the tasks and give them a start and finish date.
Allocate tasks and teams by color-coding for easy
identification.
P E R T- C P M Gantt Chart Construction
The method combines Scheduling Chart
This tool is used by
all relevant information
project managers Construction
into
singlea plan. The plan
most of the time to scheduling
allows you and the project
defines the sequence and
get an idea about the team to control
duration of operations, and
average time needed quality measures, as
depicts the interrelationship
to finish a project. well
manage asresource allocation
of the work
in each phase of
require elements to
construction.
d complete the
project.
BENEFITS
H O W DO ES EACH SCHEDULING TOOL HELP
THE C O N S T R U C T I O N P H A S E ?
THANK YOU!
REFERENCES
Introduction:
https://dbia.org/wp-content/uploads/2018/05/Primers-Choosing-Delivery-Method.pdf
https://www.educba.com/project-scheduling-techniques/
Project Delivery Methods:
https://itd.idaho.gov/wp-content/uploads/project-delivery-methods.pdf https://
www.dbiarockymountain.org/what_is_design_build.php
https://www.marwoodconstruction.com/wp-content/uploads/2017/01/Design-Build-
Advantages-Disadvantages.pdf
https://the-opendoor.net/a-homeowner-guide-to-project-delivery-methods/
Project Scheduling Tools:
https://www.interventions.org/pertcpm/
https://www.projectmanager.com/blog/make-a-construction-schedule
https://silvermancpm.com/construction-term-of-the-week-critical-path-method-cpm-