Line Walk Document

The FMS Line Walk reports from April to August 2025 detail various observations and issues regarding equipment and connectivity, including weak coverage, overheating, and malfunctioning sensors. Corrective actions were taken for each issue, such as repositioning access points, replacing damaged components, and adjusting configurations. The reports indicate ongoing maintenance efforts to ensure operational efficiency and reliability.

Uploaded by

dvivekn
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
15 views3 pages

Line Walk Document

The FMS Line Walk reports from April to August 2025 detail various observations and issues regarding equipment and connectivity, including weak coverage, overheating, and malfunctioning sensors. Corrective actions were taken for each issue, such as repositioning access points, replacing damaged components, and adjusting configurations. The reports indicate ongoing maintenance efforts to ensure operational efficiency and reliability.

Uploaded by

dvivekn
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

FMS Line Walk – April 2025

Observations & Issues

1. Access Point AP-02 in mine pit showing weak coverage.


2. PMP Tower-1 experiencing packet loss during peak hours.
3. Loose wiring in Solar Trolley ST-03.
4. Overheating noted in Switch at Weighbridge control room.
5. Server response delayed in backup server.

Corrective Actions

 AP repositioned, signal improved.


 PMP antenna realigned and faulty connector replaced.
 Wiring tightened in trolley.
 Cooling fan installed in switch room.
 Additional storage configured in backup server.

FMS Line Walk – May 2025

Observations & Issues

1. P2P link between Dispatch and Workshop unstable during rain.


2. Solar panel cracked in Block-2 near South Hill.
3. DC Box DB-06 fan not functioning.
4. Fuel sensor in Dumper E612 miscalibrated.
5. Excavator EX-211 VDU screen flickering.

Corrective Actions

 Link parameters reconfigured; weatherproofing planned.


 Damaged panel replaced.
 DC box fan replaced.
 Sensor recalibrated.
 VDU screen replaced.

FMS Line Walk – June 2025

Observations & Issues

1. Frequent rebooting of Access Point AP-05 (Pit Office).


2. Solar Trolley ST-09 battery output fluctuating.
3. High temperature logged in Server Room (Main FMS).
4. Switch in Substation Room showing high error packets.
5. PMP Tower-3 alignment shifted due to strong wind.

Corrective Actions

 Firmware update applied to AP.


 Battery tested and replaced in trolley.
 Air conditioning adjusted in server room.
 Switch checked; faulty port disabled.
 PMP realigned.

FMS Line Walk – July 2025

Observations & Issues

1. Access Point AP-08 showing no connectivity intermittently.


2. Fuel sensor in Dumper E709 showing fluctuating readings.
3. Loose cable found in Solar Trolley ST-15.
4. Backup server nearing storage capacity.
5. Dust accumulation on Solar Panels Block-4.

Corrective Actions

 AP reset and replaced, monitoring ongoing.


 Sensor recalibrated.
 Cable re-tightened.
 Storage expanded with new disk.
 Panels cleaned.

FMS Line Walk – August 2025

Observations & Issues

1. P2P link to weighbridge office dropping packets.


2. Switch in Admin Building overheated.
3. Solar Trolley ST-11 controller not responding.
4. DC Box DB-10 fuse blown.
5. VDU in Shovel SH-09 screen blank intermittently.

Corrective Actions
 P2P antenna realigned, connection stable.
 Cooling unit installed in switch cabinet.
 Controller replaced in trolley.
 Fuse replaced in DC box.
 VDU unit replaced.