FMS Line Walk – April 2025
Observations & Issues
1. Access Point AP-02 in mine pit showing weak coverage.
2. PMP Tower-1 experiencing packet loss during peak hours.
3. Loose wiring in Solar Trolley ST-03.
4. Overheating noted in Switch at Weighbridge control room.
5. Server response delayed in backup server.
Corrective Actions
AP repositioned, signal improved.
PMP antenna realigned and faulty connector replaced.
Wiring tightened in trolley.
Cooling fan installed in switch room.
Additional storage configured in backup server.
FMS Line Walk – May 2025
Observations & Issues
1. P2P link between Dispatch and Workshop unstable during rain.
2. Solar panel cracked in Block-2 near South Hill.
3. DC Box DB-06 fan not functioning.
4. Fuel sensor in Dumper E612 miscalibrated.
5. Excavator EX-211 VDU screen flickering.
Corrective Actions
Link parameters reconfigured; weatherproofing planned.
Damaged panel replaced.
DC box fan replaced.
Sensor recalibrated.
VDU screen replaced.
FMS Line Walk – June 2025
Observations & Issues
1. Frequent rebooting of Access Point AP-05 (Pit Office).
2. Solar Trolley ST-09 battery output fluctuating.
3. High temperature logged in Server Room (Main FMS).
4. Switch in Substation Room showing high error packets.
5. PMP Tower-3 alignment shifted due to strong wind.
Corrective Actions
Firmware update applied to AP.
Battery tested and replaced in trolley.
Air conditioning adjusted in server room.
Switch checked; faulty port disabled.
PMP realigned.
FMS Line Walk – July 2025
Observations & Issues
1. Access Point AP-08 showing no connectivity intermittently.
2. Fuel sensor in Dumper E709 showing fluctuating readings.
3. Loose cable found in Solar Trolley ST-15.
4. Backup server nearing storage capacity.
5. Dust accumulation on Solar Panels Block-4.
Corrective Actions
AP reset and replaced, monitoring ongoing.
Sensor recalibrated.
Cable re-tightened.
Storage expanded with new disk.
Panels cleaned.
FMS Line Walk – August 2025
Observations & Issues
1. P2P link to weighbridge office dropping packets.
2. Switch in Admin Building overheated.
3. Solar Trolley ST-11 controller not responding.
4. DC Box DB-10 fuse blown.
5. VDU in Shovel SH-09 screen blank intermittently.
Corrective Actions
P2P antenna realigned, connection stable.
Cooling unit installed in switch cabinet.
Controller replaced in trolley.
Fuse replaced in DC box.
VDU unit replaced.