Hours Medical Restricted Duty Cases Lost Work Day Cases Fatalities First Aid Cases
Canyon
1,001,969 2 0 2 0 38
ERT
641,972 0 0 2 0 8
HSC
1,390,771 1 0 5 0 10
RDS
94,500 0 0 0 0 1
Corporate
322,080 0 0 0 0 2
Well Ops
1,302,195 1 4 5 0 42
PROFAC
22,979 0 0 0 0 0
TOTAL
5,033,763 6 4 14 0 112
Near Miss
Equipment Damage Fire Pollution OSHA 300 Total Recordable Cases OSHA 300 TRIR
59
43 0 18 4 0.80
2
0 0 1 2 0.62
36
17 2 3 6 0.86
1
0 0 0 0 0.00
0
0 0 0 0 0.00
7
0 0 2 2 1.55
58
18 2 4 10 1.54
0
0 0 0 0 0.00
163
778 4 28 24 0.95 3
Intrepid has the flexibility to be deployed as a pipelay, installation or saturation diving vessel.
LENGTH TRANSIT SPEED TENSION A&R WINCH PIPE DIAMETERS MAIN CRANE 116 m (381 ft) 6 knts 138 mT (304 kips) 250 mT (551 kips) 3.5 to 10
FRICTION CLAMP
REEL CAPACITY ACCOMODATIONS
Express has established an extensive track record of field installation projects around the world.
LENGTH TRANSIT SPEED TENSION A&R WINCH PIPE DIAMETERS 160 m (520 ft) 12.5 knts 160 mT (353 kips) 250 mT (551 kips) 2 to 14
MAIN CRANE
AUX CRANE REEL CAPACITY FRICTION CLAMP DEP. ANGLE ACCOMODATIONS
Caesars onboard pipe welding and testing capability allows the vessel to Slay virtually unlimited lengths of pipe up to 36 in diameter.
LENGTH TRANSIT SPEED 146 m (479 ft) 10 knts
TENSION
A&R WINCH PIPE DIAMETERS STINGER LENGTH MAIN CRANE A-FRAME ACCOMODATIONS
10
Pipe elevator
11
12
13
One of the largest offshore subsea gas field developments ever executed on a fast track basis in a remote area
Changing the way you succeed. 14
15
16
17
ENI Manifold (210 Te.) on deck of MSV Q4000 to be installed in 2,440 fsw Pre-commissioning of complete system Project Management and installation engineering.
18
EOG Trinidad 2007 ATP Wenlock North Sea 2006 Shell Pastel Pink - 2006 Dominion Rigel / 17 Hand 2004/5 Kerr McGee Gunnison - 2003
19
The Q4000 removed a hydrate plug in a Mariner deepwater flowline in the Gulf of Mexico using five miles of drill pipe.
Canyon Offshore achieved the world record depth for flow line burial on the Coulomb project for Shell Oil. The 28 mile long Coulomb flow line was buried in water depths up to 7,576 ft. The burial performed for flow assurance improvement was a complete success with minimal downtime and high profitability. Helix Well Ops successfully abandoned 5 subsea wellheads wells for Total in Vietnam resulting in a worlds first with single pass severance of conductor and casing strings in under 24 hours each.
Helix Well Ops set world depth record for subsea wireline intervention from a monohull vessel offshore Australia for Woodside by retrieving tubing hanger plugs from two subsea wells located in 392 m (1,286 ft) of water.