Event Name:
Start Date:
ANALYZE / THINK
Future
State Map
Hypothesis
Testing
Effort /
Impact
Graph
Problem
Statement
Project
Scope
Goal
Target Date
Goal OR Objective:
Actual Date
Target Date
IMPROVE / IMPLEMENT
After
Picture
Cycle
Time
Yield Rate
Actual Date
MEASURE / UNDERSTAND
VSM
Takt Time
Cycle
Time
Spaghetti
Chart
Baseline
Capability
Data
Collection
Plan
Before
Picture
Target Date
Actual Date
CONTROL / SUSTAIN
Control
Plan
Target Date
Target Date
Actual Date
Actual Date
Validation by Process Owner
End Date
Event Name: Click here and enter the name of the Kaizen or other
Event and the area in which it is being held.
Event Team Members: Enter the names of the people on the kaizen team and identify the Facilitator.
ANALYZE / THINK
FMEA
Graphics
Hypothesis
Tests
Problem
Statement
Project Scope
Goal
Target Date
Actual Date
Target Date
Scope: Optional. Use this to clarify what will and will not be addressed during the
kaizen if you believe there may be confusion.
Goal or Objective: State the desired result of the kaizen. A Goal always meets this
format: Increase/Decrease the {Primary Metric} from {Baseline/Current} to {Desired
Performance Level} by {Date}. If you lack the information to specify each of these
variables you may insert TBD. In this case you have an Objective which allows you to
being your kaizen but requires that you circle back and finalize during the event.
MEASURE / UNDERSTAND
Actual Date
IMPROVE / IMPLEMENT
DOE
Trial
Experiment
Creative
Solutions
Pilot
Process Map
Fishbone
C&E Matrix
Data
Collection
Plan
Utilizing existing data on most commonly sought topics, a Master Search Term
lexicon was developed and distributed to all Associates in the area.
Measurement
System
Analysis
Master Search Term lexicon to be updated and enhanced with the data gathered
through the tick sheet. (Team, 7 and 30 day follow-up sessions)
Process
Capability
Analysis
Target Date
Actual Date
CONTROL / SUSTAIN
Mistake
Proof
Control Plan
Target Date
Actual Date
End Date