Professional Documents
Culture Documents
INTERCONNECTION
TO GRID PLN
BY DIDIK NOTOSUDJONO
RESERCHER BPP.TEKNOLOGI
LECTURER FT.UNIV.PAKUAN
TECHNICAL APPROPRIATENESS
BASIC DESIGN
An interconnection system to
PLN will include step up
transformers 0.4/20kV
The transformer would be
sized to cater for the black
start requirement of at least
650kVA
All the interconnection
equipment can be procured
locally
The interconnection capacity
designed specifically to
import power to displace the
diesel black start is higher
than the normal export
potential from the POM to the
PLN 20kV grid
The basic design
assumptions for the low
voltage interconnection
system
1000
Kwe
800
kWe
Export to electricity
200
kWe
Installed
1000
Units
Power Factor
kWe
Operation
Days
288
days
hours
20
hours
Annual
5760
30000
Diesel consumption
10000
360000
Diesel cost
Avoided cost
USD/l
USD
0.6
USD
72000
USD
kWh
l/mo
Annual
Diesel avoided Cost
hours
1800
0.04
792,000.00
hour
USD
kWh
1600
Kwe
800
kWe
For Housing
200
kWe
Export to electricity
600
kWe
6000
hours
Installed
1800
Units
Power Factor
kWe
Operation
Days
300
hours
20
Annual
Monthly electricity production
60000
Diesel consumption
20000
Diesel cost
USD/l
kWh
0.545
130800
kWh
720000
Avoided cost
l/mo
Annual
Diesel avoided Cost
days
USD
1200
0.04
2,880,000.00
kWh
115200
USD
Equipment
Unit
Total
(US $)
28300
28300
4800
4800
7500
7500
4700
4700
Price
(US $)
500
226
113000
50
253
12650
10
34
340
67500
67500
31000
31000
Total
269790
600
400
300
250
200
125
83
65
56
51
46
39
1.20
1.52
1.76
1.91 2.09
2.42
OUT GOINGCUBICLE
THANK YOU
EFB
Fiber
Shell