High-Rise Constr

Description of
hazard
and hazardous
event

loc
ati
on

1. Tripping
2. Falling

ac
tiv
iti
es

Worker is
crossing
from
scaffolding
to building
on the
second
highest
floor

Eq
ui
p
m
en
t
an
d
su
bs
ta
nc
es

1.
Improper
installation
of scaffold
platform
might
cause the
guy to fell
down

Who
might be
harmed?

1. The
one that
is
crossing.
2.
Passerby
below

What risk controls


are currently in
place?

PPE

Current risk
rating*
L

25

Are further
controls
needed?

Yes.
1. Proper
installat
ion of
scaffold
ing
2. Proper
landing
platfor
m
3. Safety
Harness
4. Safety
net

Date to be
completed
by

Residual risk
rating*
L

20

16

Description of
hazard
and hazardous
event

loc
ati
on

1. Falling

ac
tiv
iti
es

Worker is
installing
reinforcem
ent bars
for shear
wall
constructio
n on
highest
wall of
project

Eq
ui
p
m
en
t
an
d
su
bs
ta

No
PPE,Safety
Harness,
the guy is
hanging
on the
steel rebar
and he
might fell
down

Who
might be
harmed?

1. The
one that
is doing
the work
2.
Passerby
below

What risk controls


are currently in
place?

PPE

Current risk
rating*
L

25

Are further
controls
needed?

Yes.
1. Proper
installatio
n of
scaffoldin
g
2. Proper
landing
platform
3. Safety
Harness
4. Safety
net

Date to
be
complete
d by

Residual risk
rating*
L

20

16

Description of
hazard
and hazardous
event

loc
ati
on

ac
tiv
iti
es

Eq
ui
p
m
en
t
an
d
su

Who
might be
harmed?

What risk controls


are currently in
place?

Current risk
rating*
L

Are further
controls
needed?

1. Falling
2. Trippin
g
3. Wood
plank
fall on
top of
worker
Workers
are
preparing
form works
for
concrete
slab and
beam
casting
Improper
housekeep
ingMaterial is
located on
top of a
column
rebar

1. Worke
rs

PPE

16

Yes
1. Proper
housek
eeping
for site
materia
l
2. Safety
Net

Date to be
completed
by

Residual risk
rating*
L

12

Description of
hazard
and hazardous
event

loc
ati
on

1. Falling

ac
tiv
iti
es

Worker is
tying
reinforcem
ent bar for
column on
the
highest
peak of
building

Eq
ui
p
m
en
t
an
d
su
bs
ta
nc
es

No Safety
Harness,
no working
platform
and
possibility
of falling

Who
might be
harmed?

What risk controls


are currently in
place?

Current risk
rating*
L

Are further
controls
needed?

Yes.
1.
Workers
2.
Passerby
below

PPE

25

Date to
be
complete
d by

Residual risk
rating*
L

16

12

1. Proper
erection
of
scaffoldin
g
2. Safety
harness
3. Safety net

Description of
hazard
and hazardous
event

loc
ati
on

1. Tripping
2. Falling

ac
tiv
iti
es

Worker is
standing
on a ledge
of form
work at
the
highest
floor of
building
near a
void
between
scaffolding

Eq
ui
p
m
en
t
an
d
su
bs
ta

No Safety
Harness,
no working
platform
and
possibility
of falling

Who
might be
harmed?

1. Worker
2.
Passerby
below

What risk controls


are currently in
place?

PPE

Current risk
rating*
L

16

Are further
controls
needed?

Yes.
1. Safety
harness
2. Safety
net

Date to be
completed
by

Residual risk
rating*
L

12

IMAGE 2

Sheet Piling Constru

Description of
hazard
and hazardous
event

loc
ati
on

Who
might be
harmed?

What risk controls


are currently in
place?

Current risk
rating*
L

Wind
blowing
might cause
the sheet
pile to hit
worker 1

ac
tiv
iti
es

Worker 1 is
monitoring
closely a
sheet piling
activity

Eq
ui
p
m
en
t
an
d
su
bs
ta
nc
es

1. Sheet
pile
might
fell and
hit the
worker

1. The
one
standing
near the
sheet
pile

1. PPE
2. Inspection of
Equipment
and
machineries

16

Are further
controls
needed?

Yes.
1. Improv
e the
safe
system
of work
that is
used
2. Worker
should
not
stand
nearby
/ below
while
crane is
operati
ng

Date to be
completed
by

Residual risk
rating*
L

12

Description of
hazard
and hazardous
event

loc
ati
on

Wind
blowing
might cause
respiratory
problems to
worker 2

ac
tiv
iti
es

Worker 2 is
observing
the sheet
piling
activity from
afar but too
close to
Gen-Set

Eq
ui
p
m
en
t
an
d
su
bs
ta
nc
es

1. Gen Set
might
produce
fumes
that will
cause
respirato
ry
problem

Who
might be
harmed?

1. The
one that
standing
nearby

What risk controls


are currently in
place?

PPE - Safety
helmet, vest

Current risk
rating*
L

Are further
controls
needed?

Yes,
1. Mainten
ance of
Gen Set
2. Stand
further
away
from
the
Gen-Set

Date to be
completed
by

Residual risk
rating*
L